Base station switching control method, device, equipment and storage medium

By acquiring the target base station in the cellular mobile communication network and generating tunnel cache downlink data, the problem of excessive delay in base station handover is solved, and the communication experience and system performance of user equipment are improved.

CN115396961BActive Publication Date: 2024-11-22CHINA MOBILE GROUP DESIGN INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110568374.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-24
Publication Date
2024-11-22
Estimated Expiration
2041-05-24

AI Technical Summary

Technical Problem

In cellular mobile communication networks, excessive delay during base station switching may lead to wireless link failure and increase call drop rate, affecting the performance and user experience of the communication system, especially in the 5G URLLC scenario, for delay and data jitter requirements. harsh.

Method used

By detecting that the user equipment meets the pre-switching conditions of the base station, the target base station is obtained, and a pre-switching request is sent to the core network access and mobility management network element AMF, generating a tunnel from the user-plane management network element UPF to the target base station, cache and forward the downlink Data ensures the continuity of data transmission when user equipment switches.

Benefits of technology

The time for user equipment to switch from the source base station to the target base station is shortened, signal interruption caused by handover delay is prevented, and user communication experience and system performance are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115396961B_ABST
    Figure CN115396961B_ABST
Patent Text Reader

Abstract

The present invention discloses a base station switching control method, device, equipment and storage medium, the method comprising: when detecting that a user equipment meets a base station pre-switching condition, obtaining a target base station corresponding to the user equipment; sending a first pre-switching request to a core network access and mobility management network element AMF, so that the AMF generates a tunnel from a user plane management network element UPF to a target base station for a pre-switched protocol data network element PDU session according to the first pre-switching request, the target base station receives and caches downlink data sent by the UPF through the tunnel, wherein after the user equipment is switched from a source base station to a connection with the target base station, the target base station sends the downlink data to the user equipment through the tunnel. The present invention shortens the switching time and improves the user's communication experience.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of enhanced switching technology, and in particular to a base station switching control method, device, equipment and storage medium. Background Art

[0002] In a cellular mobile communication network, when a user equipment (UE) that is using network services moves from one base station to another base station coverage area, in order to ensure communication continuity and service quality, the system must switch the UE from the source base station to the target base station, and the target base station will provide services. This process is called switching.

[0003] In some application scenarios, such as the 5G application scenario URLLC (Ultra-High Reliability Ultra-Low Latency Communication), the requirements for latency are extremely stringent, with air interface latency as low as 1ms, and end-to-end service latency requirements as low as a few milliseconds, which also places extremely high requirements on data jitter. However, during the handover preparation process, although the signaling transmission between base stations can reserve sufficient resources for the handover of user equipment, it will inevitably bring about handover latency. Excessive handover latency may cause radio link failure (RLF), and even cause handover failure or increase in call drop rate, affecting the performance of the entire communication system and the user's call experience. Summary of the invention

[0004] The main purpose of the present invention is to provide a base station switching control method, device, equipment and storage medium, aiming to solve the problem of how to shorten the switching delay.

[0005] To achieve the above object, the present invention provides a base station switching control method, the base station switching control method comprising the following steps:

[0006] When it is detected that the user equipment meets the base station pre-switching condition, obtaining a target base station corresponding to the user equipment;

[0007] A first pre-switching request is sent to the core network access and mobility management network element AMF, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein after the user equipment is switched from the source base station to be connected to the target base station, the target base station sends the downlink data to the user equipment through the tunnel.

[0008] In one embodiment, the step of acquiring the target base station corresponding to the user equipment includes:

[0009] Obtaining a source base station corresponding to the user equipment;

[0010] Determining a movement trajectory of the user equipment;

[0011] The target base station is determined according to the motion trajectory and the source base station.

[0012] In one embodiment, the step of determining the movement trajectory of the user equipment includes:

[0013] Acquire at least two pieces of location information of the user equipment;

[0014] When the location information of the user equipment meets a preset location condition, or when the signal strength of the user equipment meets a preset signal strength condition, determining a movement trajectory of the user equipment according to the location information;

[0015] Among them, the location condition includes detecting that a preset number of location information of the user equipment is the edge of the source base station, and the movement direction of the user equipment is away from the center of the source base station, and the signal strength condition is that the signal strength of the source base station of the user equipment is less than a first threshold value and / or the signal strength of the adjacent base station to the source base station is greater than a second threshold value.

[0016] In one embodiment, the step of obtaining at least two pieces of location information of the user equipment includes:

[0017] generating a positioning request for the user equipment, wherein the positioning request includes an international mobile subscriber identity code of the user equipment and a message type to be measured;

[0018] Sending the positioning request to the AMF, so that the AMF obtains the location information of the user equipment sent by the source base station or the user equipment;

[0019] Receive the location information of the user equipment sent by the AMF.

[0020] To achieve the above object, the present invention also provides a base station switching control method, the base station switching control method is applied to the core network access and mobility management network element AMF, the base station switching control method includes:

[0021] Receiving a first pre-switching request sent by the ESF;

[0022] According to the first pre-switching request, a tunnel from the user plane management network element UPF to the target base station is generated for the pre-switching protocol data network element PDU session, so that the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets the switching conditions, the target base station sends the downlink data to the user equipment according to the tunnel.

[0023] In one embodiment, the step of generating a tunnel from a user plane management network element UPF to a target base station for a pre-switched protocol data network element PDU session according to the first pre-switching request includes:

[0024] Generate a session update request according to the first pre-switching request, where the session update request at least includes an international mobile subscriber identity code of the user equipment, a PDU session, and a pre-switching trigger condition;

[0025] Sending the session update request to the session management network element SMF;

[0026] Obtain the core network CN tunnel allocated by the SMF;

[0027] Generate a second pre-switching request according to the CN tunnel, wherein the second pre-switching request information at least includes an international mobile subscriber identity code of a user equipment, a PDU session, and a CN tunnel;

[0028] sending the second pre-switching request to the target base station;

[0029] Acquire a radio access network RAN ​​tunnel sent by the target base station;

[0030] A pre-switching completion message is sent to the SMF, where the pre-switching completion message includes the RAN tunnel allocated by the target base station, so that the SMF controls the UPF to generate a tunnel from the UPF to the target base station for the pre-switching PDU session.

[0031] To achieve the above object, the present invention further provides a base station switching control method, which is applied to a target base station, and the base station switching control method includes:

[0032] Receive and cache downlink data sent by the UPF through a tunnel from the user plane management network element UPF to the target base station, wherein the tunnel is generated by the core network access and mobility management network element AMF according to the first pre-switching request sent by the Ethernet storage matrix network element ESF;

[0033] receiving a handover request from a source base station;

[0034] Sending a handover request confirmation message to the source base station or to the source base station through the AMF according to the handover request to confirm that the source base station is switched to the target base station;

[0035] After confirming that the user equipment is switched from the source base station to the target base station, the buffered downlink data is sent to the user equipment.

[0036] To achieve the above object, the present invention further provides a base station switching control device, the base station switching control device comprising:

[0037] An acquisition module, configured to acquire a target base station corresponding to the user equipment when it is detected that the user equipment meets the base station pre-switching condition;

[0038] A processing module is used to send a first pre-switching request to the core network access and mobility management network element AMF, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein, after the user equipment is switched from the source base station to be connected to the target base station, the target base station sends the downlink data to the user equipment through the tunnel.

[0039] To achieve the above-mentioned purpose, the present invention also provides a base station switching control device, which includes a memory, a processor, and a base station switching control program stored in the memory and executable on the processor. When the base station switching control program is executed by the processor, it implements the various steps of the base station switching control method as described above.

[0040] To achieve the above object, the present invention further provides a storage medium, wherein the storage medium stores a base station switching control program, and when the base station switching control program is executed by a processor, the base station switching control program implements the various steps of the base station switching control method described above.

[0041] The present invention provides a base station switching control method, device, equipment and storage medium. When it is detected that the user equipment meets the base station pre-switching condition, the target base station corresponding to the user equipment is obtained; a first pre-switching request is sent to the AMF, so that the AMF generates a tunnel from the UPF to the target base station for the pre-switching PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel. After the user equipment is switched from the source base station to the target base station, the target base station sends the downlink data to the user equipment through the tunnel. When the user equipment does not meet the switching condition but meets the pre-switching condition of the base station, the target base station of the user equipment is obtained, the downlink data of the user equipment is cached, and a tunnel from the UPF to the target base station is generated for the PDU session of the user equipment. After the user equipment meets the switching condition, the cached downlink data is sent to the user equipment through the tunnel, which saves the switching time of the user equipment from the source base station to the target base station, prevents signal interruption caused by long switching delay, and improves the user's communication experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Figure 1 A schematic diagram of the hardware structure of a base station switching control device involved in an embodiment of the present invention;

[0043] Figure 2A schematic diagram of a flow chart of a first embodiment of a base station switching control method of the present invention;

[0044] Figure 3 It is a detailed flowchart of step S10 of the second embodiment of the base station handover control method of the present invention;

[0045] Figure 4 A schematic flow chart of a third embodiment of a base station switching control method according to the present invention;

[0046] Figure 5 Schematic diagram of a flow chart of a fourth embodiment of a base station switching control method of the present invention;

[0047] Figure 6 A schematic diagram of the logical structure of a base station switching control device of the present invention;

[0048] Figure 7 A schematic diagram of the logical structure of a base station switching control device of the present invention;

[0049] Figure 8 It is a schematic diagram of the logical structure of the base station switching control device of the present invention.

[0050] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0051] It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not used to limit the present invention.

[0052] The main solution of the embodiment of the present invention is: when it is detected that the user equipment meets the base station pre-switching condition, obtain the target base station corresponding to the user equipment; send a first pre-switching request to the AMF, so that the AMF generates a tunnel from the UPF to the target base station for the pre-switching PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel. After the user equipment switches from the source base station to the connection with the target base station, the target base station sends the downlink data to the user equipment through the tunnel.

[0053] When the user equipment does not meet the switching conditions but meets the pre-switching conditions of the base station, the target base station of the user equipment is obtained, the downlink data of the user equipment is cached, and a tunnel from the UPF to the target base station is generated for the PDU session of the user equipment. After the user equipment meets the switching conditions, the cached downlink data is sent to the user equipment through the tunnel, which saves the switching time of the user equipment from the source base station to the target base station, prevents signal interruption caused by long switching delays, and improves the user's communication experience.

[0054] As an implementation solution, the base station switching control device can be as follows Figure 1 shown.

[0055] The embodiment of the present invention relates to a base station switching control device, which includes: a processor 101, such as a CPU, a memory 102, and a communication bus 103. The communication bus 103 is used to realize connection and communication between these components.

[0056] The memory 102 may be a high-speed RAM memory or a stable memory (non-volatile memory), such as a disk memory. Figure 1 As shown, the memory 102 as a computer-readable storage medium may include a base station switching control program; and the processor 101 may be used to call the base station switching control program stored in the memory 102 and perform the following operations:

[0057] When it is detected that the user equipment meets the base station pre-switching condition, obtaining a target base station corresponding to the user equipment;

[0058] A first pre-switching request is sent to the core network access and mobility management network element AMF, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein after the user equipment is switched from the source base station to be connected to the target base station, the target base station sends the downlink data to the user equipment through the tunnel.

[0059] In one embodiment, the processor 101 may be used to call a base station switching control program stored in the memory 102, and perform the following operations:

[0060] Obtaining a source base station corresponding to the user equipment;

[0061] Determining a movement trajectory of the user equipment;

[0062] The target base station is determined according to the motion trajectory and the source base station.

[0063] In one embodiment, the processor 101 may be used to call a base station switching control program stored in the memory 102, and perform the following operations:

[0064] Acquire at least two pieces of location information of the user equipment;

[0065] When the location information of the user equipment meets a preset location condition, or when the signal strength of the user equipment meets a preset signal strength condition, determining a movement trajectory of the user equipment according to the location information;

[0066] Among them, the location condition includes detecting that a preset number of location information of the user equipment is the edge of the source base station, and the movement direction of the user equipment is away from the center of the source base station, and the signal strength condition is that the signal strength of the source base station of the user equipment is less than a first threshold value and / or the signal strength of the adjacent base station to the source base station is greater than a second threshold value.

[0067] In one embodiment, the processor 101 may be used to call a base station switching control program stored in the memory 102, and perform the following operations:

[0068] generating a positioning request for the user equipment, wherein the positioning request includes an international mobile subscriber identity code of the user equipment and a message type to be measured;

[0069] Sending the positioning request to the AMF, so that the AMF obtains the location information of the user equipment sent by the source base station or the user equipment;

[0070] Receive the location information of the user equipment sent by the AMF.

[0071] In one embodiment, the processor 101 may be used to call a base station switching control program stored in the memory 102, and perform the following operations:

[0072] Receiving a first pre-switching request sent by the ESF;

[0073] According to the first pre-switching request, a tunnel from the user plane management network element UPF to the target base station is generated for the pre-switching protocol data network element PDU session, so that the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets the switching conditions, the target base station sends the downlink data to the user equipment according to the tunnel.

[0074] In one embodiment, the processor 101 may be used to call a base station switching control program stored in the memory 102, and perform the following operations:

[0075] Generate a session update request according to the first pre-switching request, where the session update request at least includes an international mobile subscriber identity code of the user equipment, a PDU session, and a pre-switching trigger condition;

[0076] Sending the session update request to the session management network element SMF;

[0077] Obtain the core network CN tunnel allocated by the SMF;

[0078] Generate a second pre-switching request according to the CN tunnel, wherein the second pre-switching request information at least includes an international mobile subscriber identity code of a user equipment, a PDU session, and a CN tunnel;

[0079] sending the second pre-switching request to the target base station;

[0080] Acquire a radio access network RAN ​​tunnel sent by the target base station;

[0081] A pre-switching completion message is sent to the SMF, where the pre-switching completion message includes the RAN tunnel allocated by the target base station, so that the SMF controls the UPF to generate a tunnel from the UPF to the target base station for the pre-switching PDU session.

[0082] In one embodiment, the processor 101 may be used to call a base station switching control program stored in the memory 102, and perform the following operations:

[0083] Receive and cache downlink data sent by the UPF through a tunnel from the user plane management network element UPF to the target base station, wherein the tunnel is generated by the core network access and mobility management network element AMF according to the first pre-switching request sent by the Ethernet storage matrix network element ESF;

[0084] receiving a handover request from a source base station;

[0085] Sending a handover request confirmation message to the source base station or to the source base station through the AMF according to the handover request to confirm that the source base station is switched to the target base station;

[0086] After confirming that the user equipment is switched from the source base station to the target base station, the buffered downlink data is sent to the user equipment.

[0087] Based on the hardware architecture of the above-mentioned base station switching control device, an embodiment of the base station switching control method of the present invention is proposed.

[0088] Reference Figure 2 , Figure 2 The first embodiment of the base station switching control method of the present invention comprises the following steps:

[0089] Step S10: when it is detected that the user equipment meets the base station pre-switching condition, a target base station corresponding to the user equipment is obtained.

[0090] Specifically, the present invention is applicable to URLLC scenarios of 5G application scenarios. URLLC scenarios mainly include industrial Internet, unmanned driving, etc., which have extremely stringent requirements on switching delay. The air interface delay is as low as 1ms, and the end-to-end service delay is required to be as low as a few ms. It also puts forward extremely high requirements on data jitter.

[0091] When the user equipment needs to transmit uplink and downlink data in the service area of ​​the source base station, the standard signaling process between the source base station, AMF (Core Access and Mobility Management Function), SMF (Session Management Function), UPF (User plane function), UDM (Unified Data Management), PCF (packet control function) and other network elements is used to establish a PDU (Ptotocol data unit) session bearer between the user equipment, the source base station and the UPF for the user. The PDU session is used to transmit uplink and downlink user data. Among them, the source base station is the service base station to which the user equipment is currently connected.

[0092] During the establishment of the PDU session of the user equipment, SMF will interact with PCF to establish the PCC (Policy and Charging Control) policy, and PCF will pass the contracted policy of the user equipment, including the enhanced switching function, to SMF to establish the PDU session. SMF binds the PDU session of the user equipment with the enhanced switching function of the user equipment, that is, SMF stores the association between the PDU session of the user equipment and the enhanced switching function to identify that this PDU session supports the enhanced switching function.

[0093] The user equipment satisfies the base station pre-switching condition if the PDU session of the user equipment supports a preset enhanced switching function, where the enhanced switching function is used to identify a PDU session of the user equipment that needs to shorten the switching delay.

[0094] When it is detected that the user equipment meets the base station pre-switching condition, the ESF (Ethernet Storage Fabric) network element obtains the target base station corresponding to the user equipment, wherein the target base station is the base station to which the user equipment is pre-switched, and the target base station is located in the neighboring area of ​​the source base station of the user equipment.

[0095] Step S20, sending a first pre-switching request to the core network access and mobility management network element AMF, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein, after the user equipment switches from the source base station to the connection with the target base station, the target base station sends the downlink data to the user equipment through the tunnel.

[0096] Specifically, the ESF network element sends a first pre-switching request to the AMF. The first pre-switching request may include information such as the IMSI (International Mobile Subscriber Identification Number) of the user equipment, PDU session information, target base station information, or switching type.

[0097] After receiving the first pre-switching request, AMF generates a tunnel from UPF to the target base station for the pre-switching PDU session according to the first pre-switching request, and the target base station caches the downlink data of the PDU session of the user equipment corresponding to the first pre-switching request. After the user equipment is switched from the source base station to the target base station, the target base station sends downlink data to the user equipment through the generated tunnel.

[0098] When the user equipment meets the preset switching event, the user equipment switches from the source base station to the target base station, and the target base station sends downlink data to the user equipment through the generated tunnel. The preset switching event may be that the signal strength of the base station adjacent to the user equipment is greater than the signal strength of the source base station.

[0099] In the technical solution of this embodiment, when it is detected that the user equipment meets the pre-switching conditions of the base station, the target base station corresponding to the user equipment is obtained; a first pre-switching request is sent to the AMF, so that the AMF generates a tunnel from the UPF to the target base station for the pre-switching PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel. After the user equipment switches from the source base station to the target base station, the target base station sends the downlink data to the user equipment through the tunnel. When the user equipment does not meet the switching conditions, but meets the pre-switching conditions of the base station, the target base station of the user equipment is obtained, the downlink data of the user equipment is cached, and a tunnel from the UPF to the target base station is generated for the PDU session of the user equipment. After the user equipment meets the switching conditions, the cached downlink data is sent to the user equipment through the tunnel, which saves the switching time of the user equipment from the source base station to the target base station, prevents signal interruption caused by long switching delays, and improves the user's communication experience.

[0100] Reference Figure 3 , Figure 3 This is a second embodiment of the base station switching control method of the present invention, based on the first embodiment, step S10 includes:

[0101] The step S11 is to obtain a source base station corresponding to the user equipment;

[0102] The step S12 is to determine the movement trajectory of the user equipment;

[0103] The step S13 is to determine the target base station according to the movement trajectory and the source base station.

[0104] Specifically, before obtaining the source base station corresponding to the user equipment, the ESF obtains the device information of the user equipment, wherein the device information at least includes the source base station information connected to the user equipment, the international mobile user identity code, and the AMF registered by the user equipment. The source base station corresponding to the user equipment is obtained, wherein the source base station is the base station currently connected to the user equipment.

[0105] ESF determines the movement trajectory of the user equipment by first acquiring at least two pieces of location information of the user equipment, and when the location information of the user equipment meets a preset location condition, the movement trajectory of the user equipment is determined according to the location information, wherein the location condition includes detecting a preset number of location information of the user equipment as the edge of the source base station, and the movement direction of the user equipment is away from the center of the source base station. ESF determines the movement trajectory of the user equipment by first acquiring at least two pieces of location information of the user equipment, and when the signal strength of the user equipment meets a preset signal strength condition, the movement trajectory of the user equipment is determined according to the location information. The signal strength condition is that the signal strength of the source base station of the user equipment is less than a first threshold value and / or the signal strength of a base station adjacent to the source base station is greater than a second threshold value.

[0106] When the ESF determines the movement trajectory of the user equipment, obtaining at least two locations of the user equipment can be by generating a positioning request corresponding to the user equipment through the ESF, wherein the positioning request includes the international mobile user identity code of the user equipment and the type of message to be measured; the ESF sends the positioning request to the AMF, so that the AMF obtains the location information of the user equipment sent by the source base station or the user equipment; the ESF receives the location information of the user equipment sent by the AMF.

[0107] ESF obtains the location information of the user equipment, which can be that ESF sends a positioning request to AMF, and then the user equipment and the source base station send a response message to AMF, and then send it to ESF through AMF; it can also be event-based, that is, after receiving the positioning request, the user equipment and the source base station do not necessarily respond to the positioning request immediately, but send a response message after a specific event occurs. The specific event can be when the signal strength of the serving base station is lower than a set threshold value and the actual switching condition has not yet been met. ESF obtains the initial position P1 of the user equipment at time t1 according to the response message. After ESF obtains the initial position of the user equipment at time t1, it resends the user equipment positioning request to AMF after a preset interval time, and obtains the position P2 of the user equipment at time t2 according to the response message of the user equipment and the source base station. Among them, the interval time can be fixed or variable. ESF repeats the above steps to obtain the positions P3, P4, ..., Pn of the user equipment at times t3, t4, ..., tn, etc.

[0108] Since ESF pre-configures all base station IDs and longitude and latitude and other base station information within the service range, and pre-configures the GIS (Geographic Information System) electronic map within its service range. ESF uses GIS maps and base station longitude and latitude and other information to generate base station GIS maps and generate neighbor list relationships for each base station. Information such as base station ID, longitude and latitude, and neighbor list can be synchronized to ESF. Therefore, ESF saves all base station IDs, geographical locations, and neighbor relationships within the service range. Therefore, ESF can determine the target base station for pre-switching based on the movement trajectory and the source base station.

[0109] In the technical solution of this embodiment, the source base station corresponding to the user equipment is obtained; the movement trajectory of the user equipment is determined; and the target base station is determined according to the movement trajectory and the source base station. The target base station for pre-switching is determined according to the movement trajectory of the user equipment and the source base station, avoiding determining the target base station when the user equipment meets the actual switching conditions, shortening the switching time and improving the user's communication experience.

[0110] Reference Figure 4 , Figure 4 This is a third embodiment of the base station switching control method of the present invention, which is applied to the core network access and mobility management network element AMF, and the base station switching control method includes:

[0111] Step S30, receiving a first pre-switching request sent by the ESF;

[0112] Step S40, generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, so that the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets the switching conditions, the target base station sends the downlink data to the user equipment according to the tunnel.

[0113] Specifically, AMF receives the first pre-switching request sent by ESF, generates a tunnel from UPF to the target base station for the pre-switched PUD session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by UPF through the tunnel. The tunnel here can be an N3 tunnel. When the user equipment meets the switching conditions, the target base station sends the downlink data to the user equipment according to the tunnel.

[0114] After receiving the first pre-switching request sent by ESF, AMF generates a session update request based on the first pre-switching request, wherein the session update request at least includes the international mobile user identity code of the user equipment, the PDU session, and the pre-switching trigger condition. AMF sends the session update request to SMF; obtains the core network CN tunnel allocated by SMF; generates a second pre-switching request based on the CN tunnel, wherein the second pre-switching request information at least includes the international mobile user identity code of the user equipment, the PDU session, and the CN tunnel. AMF sends the second pre-switching request to the target base station; after obtaining the RAN tunnel sent by the target base station, it sends a pre-switching completion message to SMF, and SMF controls UPF to generate a tunnel from UPF to the target base station for the pre-switched PDU session. The pre-switching completion message includes the RAN tunnel allocated by the target base station.

[0115] In the technical solution of this embodiment, AMF receives the first pre-switching request sent by ESF, and generates a tunnel from UPF to the target base station for the pre-switched PDU session according to the first pre-switching request, so that when the user equipment meets the switching conditions, the target base station sends downlink data to the user equipment according to the tunnel. Before the user equipment meets the actual switching conditions, a tunnel from UPF to the target base station is pre-established, which shortens the switching time during the actual switching process of the user equipment and improves the user's communication experience.

[0116] Reference Figure 5 , Figure 5 This is a fourth embodiment of a base station switching control method of the present invention, the method is applied to a target base station, and the base station switching control method includes:

[0117] Step S50, receiving and buffering downlink data sent by the UPF through a tunnel from the user plane management network element UPF to the target base station, wherein the tunnel is generated by the core network access and mobility management network element AMF according to the first pre-switching request sent by the Ethernet storage matrix network element ESF;

[0118] Step S60, receiving a handover request from a source base station;

[0119] Step S70: sending a handover request confirmation message to the source base station or to the source base station through the AMF according to the handover request to confirm that the source base station is switched to the target base station;

[0120] Step S80: after confirming that the user equipment is switched from the source base station to the target base station, the buffered downlink data is sent to the user equipment.

[0121] Specifically, after the tunnel from UPF to the target base station is established and before the user equipment meets the switching conditions, UPF starts to copy the downlink data of the pre-switched PDU session, and numbers the copied data with the source data, one by one in sequence. Then, the source data is sent to the source base station, and the copied downlink data is sent to the target base station, and the target base station caches the copied downlink data. At this time, the uplink and downlink data transmission of the user equipment is still carried out through the source base station.

[0122] If the target base station does not receive a handover request, it can set a timer for the pre-handover PDU session on the target base station. When the timer expires, if the target base station still has not received a handover request from the source base station, the target base station will delete the PDU session and N3 tunnel of the user equipment, discard the cached downlink data, and notify AMF and SMF to delete the above PDU session information.

[0123] When the user equipment meets the switching conditions, the source base station sends a switching request to the target base station. The switching condition here can be that the signal quality of the neighboring base station of the user equipment is better than the signal quality of the source base station. The target base station obtains the switching request from the source base station. If a tunnel has been established between the target base station and the user equipment, a switching request confirmation message is sent to the source base station. After the user equipment switches from the source base station to the target base station, the mark of the downlink data of the source base station is obtained, and the target base station sends the marked downlink data to the user equipment according to the tunnel. After the user equipment switches from the source base station to the target base station, the UPF releases the tunnel with the source base station and only retains the tunnel between the UPF and the target base station.

[0124] In the technical solution of this embodiment, a switching request of the source base station is obtained; if a tunnel has been established between the target base station and the user equipment, a switching request confirmation message is sent to the source base station or to the source base station through the AMF to confirm that the source base station is switched to the target base station; after the user equipment is switched from the source base station to the target base station, the mark of the downlink data sent by the source base station is obtained; the downlink data after the mark is determined, and the downlink data after the mark is sent to the user equipment according to the tunnel. When the user equipment meets the switching conditions, the source base station sends a switching request to the target base station, and the target base station sends the downlink data after the mark to the user equipment through the pre-generated tunnel, which shortens the switching time and improves the user's communication experience.

[0125] Reference Figure 6 The present invention also provides a base station switching control device, which is applied to ESF, and the base station switching control device includes:

[0126] The first acquisition module 100 is used to acquire a target base station corresponding to the user equipment when it is detected that the user equipment meets the base station pre-switching condition;

[0127] Processing module 200 is used to send a first pre-switching request to the core network access and mobility management network element AMF, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein, after the user equipment is switched from the source base station to be connected to the target base station, the target base station sends the downlink data to the user equipment through the tunnel.

[0128] In one embodiment, in terms of acquiring the target base station corresponding to the user equipment, the acquisition module 100 is specifically used to:

[0129] Obtaining a source base station corresponding to the user equipment;

[0130] Determining a movement trajectory of the user equipment;

[0131] The target base station is determined according to the motion trajectory and the source base station.

[0132] In one embodiment, in determining the movement trajectory of the user equipment, the acquisition module 100 is specifically used to:

[0133] Acquire at least two pieces of location information of the user equipment;

[0134] When the location information of the user equipment meets a preset location condition, or when the signal strength of the user equipment meets a preset signal strength condition, determining a movement trajectory of the user equipment according to the location information;

[0135] Among them, the location condition includes detecting that a preset number of location information of the user equipment is the edge of the source base station, and the movement direction of the user equipment is away from the center of the source base station, and the signal strength condition is that the signal strength of the source base station of the user equipment is less than a first threshold value and / or the signal strength of the adjacent base station to the source base station is greater than a second threshold value.

[0136] In one embodiment, in terms of acquiring at least two pieces of location information of the user equipment, the acquiring module 100 is specifically configured to:

[0137] generating a positioning request for the user equipment, wherein the positioning request includes an international mobile subscriber identity code of the user equipment and a message type to be measured;

[0138] Sending the positioning request to the AMF, so that the AMF obtains the location information of the user equipment sent by the source base station or the user equipment;

[0139] Receive the location information of the user equipment sent by the AMF.

[0140] Reference Figure 7 The present invention also provides a base station switching control device, which is applied to a core network access and mobility management network element AMF, and the base station switching control device includes:

[0141] The receiving module 300 is used to receive a first pre-switching request sent by the ESF;

[0142] The generation module 400 is used to generate a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, so that the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets the switching conditions, the target base station sends the downlink data to the user equipment according to the tunnel.

[0143] In one embodiment, in terms of generating a tunnel from a user plane management network element UPF to a target base station for a pre-switched protocol data network element PDU session according to a first pre-switching request, the generating module 400 is specifically used to:

[0144] Generate a session update request according to the first pre-switching request, where the session update request at least includes an international mobile subscriber identity code of the user equipment, a PDU session, and a pre-switching trigger condition;

[0145] Sending the session update request to the session management network element SMF;

[0146] Obtain the core network CN tunnel allocated by the SMF;

[0147] Generate a second pre-switching request according to the CN tunnel, wherein the second pre-switching request information at least includes an international mobile subscriber identity code of a user equipment, a PDU session, and a CN tunnel;

[0148] sending the second pre-switching request to the target base station;

[0149] Acquire a radio access network RAN ​​tunnel sent by the target base station;

[0150] A pre-switching completion message is sent to the SMF, where the pre-switching completion message includes the RAN tunnel allocated by the target base station, so that the SMF controls the UPF to generate a tunnel from the UPF to the target base station for the pre-switching PDU session.

[0151] Reference Figure 8 The present invention further provides a base station switching control device, which is applied to a target base station, and the base station switching control device comprises:

[0152] The cache module 500 is used to receive and cache the downlink data sent by the user plane management network element UPF to the target base station through a tunnel from the UPF, wherein the tunnel is generated by the core network access and mobility management network element AMF according to the first pre-switching request sent by the Ethernet storage matrix network element ESF;

[0153] A second acquisition module 600 is used to receive a handover request from a source base station;

[0154] A sending module 700 is configured to send a handover request confirmation message to the source base station according to the handover request or to the source base station through the AMF to confirm that the source base station is switched to the target base station;

[0155] The transmission module 800 is used to send the cached downlink data to the user equipment after confirming that the user equipment is switched from the source base station to the target base station.

[0156] The present invention also provides a base station switching control device, which includes a memory, a processor, and a base station switching control program stored in the memory and executable on the processor. When the base station switching control program is executed by the processor, the various steps of the base station switching control method described in the above embodiment are implemented.

[0157] The present invention also provides a storage medium, wherein the storage medium stores a base station switching control program, and when the base station switching control program is executed by a processor, each step of the base station switching control method described in the above embodiment is implemented.

[0158] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0159] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, system, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, system, article or device. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, system, article or device including the element.

[0160] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment system can be implemented by means of software plus a necessary general hardware platform, and of course it can also be implemented by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a computer-readable storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a parking management device, an air conditioner, or a network device, etc.) to execute the system described in each embodiment of the present invention.

[0161] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A base station switching control method, characterized in that: The base station switching control method is applied to an Ethernet storage matrix network element ESF, and the base station switching control method includes: When it is detected that the user equipment meets the base station pre-switching condition, a source base station corresponding to the user equipment is obtained; a movement trajectory of the user equipment is determined; and a target base station is determined according to the movement trajectory and the source base station, wherein the base station pre-switching condition is that the PDU session of the user equipment supports a preset enhanced switching function; A first pre-switching request is sent to the core network access and mobility management network element AMF, where the first pre-switching request includes the international mobile user identification code of the user equipment, PDU session information, target base station information or switching type, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets the preset switching event, the user equipment is switched from the source base station to the target base station for connection, and after the user equipment is switched from the source base station to the target base station for connection, the target base station sends the downlink data to the user equipment through the tunnel, and the preset switching event is that the signal strength of the base station adjacent to the user equipment is greater than the signal strength of the source base station.

2. The base station switching control method according to claim 1, characterized in that: The step of determining the movement trajectory of the user equipment comprises: Acquire at least two pieces of location information of the user equipment; When the location information of the user equipment meets a preset location condition, or when the signal strength of the user equipment meets a preset signal strength condition, determining a movement trajectory of the user equipment according to the location information; Among them, the location condition includes detecting that a preset number of location information of the user equipment is the edge of the source base station, and the movement direction of the user equipment is away from the center of the source base station, and the signal strength condition is that the signal strength of the source base station of the user equipment is less than a first threshold value and / or the signal strength of the adjacent base station to the source base station is greater than a second threshold value.

3. The base station switching control method according to claim 1, characterized in that: The step of acquiring at least two pieces of location information of the user equipment comprises: generating a positioning request for the user equipment, wherein the positioning request includes an international mobile subscriber identity code of the user equipment and a message type to be measured; Sending the positioning request to the AMF, so that the AMF obtains the location information of the user equipment sent by the source base station or the user equipment; Receive the location information of the user equipment sent by the AMF.

4. A base station switching control method, characterized in that: The base station switching control method is applied to the core network access and mobility management network element AMF, and the base station switching control method includes: Receive a first pre-switching request sent by the ESF, wherein the ESF, when detecting that the user equipment meets the base station pre-switching condition, obtains the source base station corresponding to the user equipment; determines the movement trajectory of the user equipment; determines the target base station according to the movement trajectory and the source base station, and sends the first pre-switching request to the core network access and mobility management network element AMF; the base station pre-switching condition is that the PDU session of the user equipment supports a preset enhanced switching function; the first pre-switching request includes the international mobile user identity code of the user equipment, PDU session information, target base station information or switching type; A tunnel from the user plane management network element UPF to the target base station is generated for the pre-switched protocol data network element PDU session according to the first pre-switching request, so that the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets the preset switching event, the user equipment is switched from the source base station to the target base station for connection, and after the user equipment is switched from the source base station to the target base station for connection, the target base station sends the downlink data to the user equipment according to the tunnel, and the preset switching event is that the signal strength of the base station adjacent to the user equipment is greater than the signal strength of the source base station.

5. The base station switching control method according to claim 4, characterized in that: The step of generating a tunnel from a user plane management network element UPF to a target base station for a pre-switched protocol data network element PDU session according to the first pre-switching request comprises: Generate a session update request according to the first pre-switching request, where the session update request at least includes an international mobile subscriber identity code of the user equipment, a PDU session, and a pre-switching trigger condition; Sending the session update request to the session management network element SMF; Obtain the core network CN tunnel allocated by the SMF; Generate a second pre-switching request according to the CN tunnel, wherein the second pre-switching request information at least includes an international mobile subscriber identity code of a user equipment, a PDU session, and a CN tunnel; sending the second pre-switching request to the target base station; Acquire a radio access network RAN ​​tunnel sent by the target base station; A pre-switching completion message is sent to the SMF, where the pre-switching completion message includes the RAN tunnel allocated by the target base station, so that the SMF controls the UPF to generate a tunnel from the UPF to the target base station for the pre-switching PDU session.

6. A base station switching control method, characterized in that: The base station switching control method is applied to a target base station, and the base station switching control method includes: Receive and cache the downlink data sent by the UPF through a tunnel from the user plane management network element UPF to the target base station, wherein the tunnel is generated by the core network access and mobility management network element AMF according to the first pre-switching request sent by the Ethernet storage matrix network element ESF; the first pre-switching request includes the international mobile user identity code of the user equipment, PDU session information, target base station information or switching type, and the first pre-switching request is sent by the ESF to the AMF when it is detected that the user equipment meets the base station pre-switching condition, and the base station pre-switching condition is that the PDU session of the user equipment supports a preset enhanced switching function; When the user equipment meets a preset switching event, receiving a switching request from the source base station, wherein the preset switching event is that the signal strength of the base station adjacent to the user equipment is greater than the signal strength of the source base station; Sending a handover request confirmation message to the source base station or to the source base station through the AMF according to the handover request to confirm that the source base station is switched to the target base station; After confirming that the user equipment is switched from the source base station to the target base station, the buffered downlink data is sent to the user equipment.

7. A base station switching control device, characterized in that: Applied to an Ethernet storage matrix network element ESF, the base station switching control device comprises: An acquisition module is used to acquire a source base station corresponding to the user equipment when it is detected that the user equipment meets the base station pre-switching condition; determine a movement trajectory of the user equipment; and determine a target base station according to the movement trajectory and the source base station, wherein the base station pre-switching condition is that the PDU session of the user equipment supports a preset enhanced switching function; A processing module is used to send a first pre-switching request to the core network access and mobility management network element AMF, wherein the first pre-switching request includes the international mobile user identification code of the user equipment, PDU session information, target base station information or switching type, so that the AMF generates a tunnel from the user plane management network element UPF to the target base station for the pre-switched protocol data network element PDU session according to the first pre-switching request, and the target base station receives and caches the downlink data sent by the UPF through the tunnel, wherein when the user equipment meets a preset switching event, the user equipment switches from the source base station to the target base station for connection, and after the user equipment switches from the source base station to the target base station for connection, the target base station sends the downlink data to the user equipment through the tunnel, and the preset switching event is that the signal strength of the base station adjacent to the user equipment is greater than the signal strength of the source base station.

8. A base station switching control device, characterized in that: The base station switching control device includes a memory, a processor, and a base station switching control program stored in the memory and executable on the processor. When the base station switching control program is executed by the processor, the various steps of the base station switching control method as described in any one of claims 1-6 are implemented.

9. A storage medium, characterized in that: The storage medium stores a base station switching control program, and when the base station switching control program is executed by the processor, each step of the base station switching control method according to any one of claims 1 to 6 is implemented.