A method, device and storage medium for analyzing and processing engineering component usage data
By constructing and correcting the amount analysis model of the components used in the construction project, combining the construction progress and actual amount, the amount of use is accurate and visual monitoring is achieved, and the problems of inaccurate amount analysis and insufficient monitoring in the existing methods are solved, and the reliability of engineering management is improved Sex and efficiency.
Patent Information
- Application Number
- CN202410926323.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2044-07-11
AI Technical Summary
The existing methods of building engineering component usage analysis lack accurate and data analysis, resulting in inaccurate estimated usage results, easy to be misjudged, and the inability to monitor and visualize the abnormal usage in real time, affecting the cost, quality and progress of the project.
By obtaining the usage information of historical construction projects, building and correcting the usage analysis model, combining the construction progress and actual usage, the usage rationality assessment and abnormal warning are carried out, and visual display is carried out.
It improves the reliability and accuracy of dosage judgment, promptly detects dosage abnormalities, ensures the cost, quality and progress of the project, and ensures sustainable development.
Smart Images

Figure CN118469768B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of engineering component usage data analysis and processing, and relates to an engineering component usage data analysis and processing method, equipment and storage medium. Background Art
[0002] Engineering components refer to basic units that can exist independently or withstand forces in engineering construction. Among them, construction engineering components are an important part of engineering components. Construction engineering components refer to the various unit combinations that constitute the building entity. These components work together to support the structure of the building, giving it integrity and specific functions. Construction engineering components play an important role in construction projects and together constitute the structural system of the entire building.
[0003] Analyzing the usage of construction project components is particularly important for large and complex construction projects. It is not only conducive to ensuring the accuracy and rationality of the project budget, avoiding cost overruns and waste, and improving the economic benefits of the project, but also helps to reduce the cost of project construction, improve the quality and efficiency of the project, and at the same time help avoid construction delays and unnecessary cost expenditures.
[0004] There are some shortcomings in the existing analysis and management methods for the usage of construction project components: on the one hand, when analyzing whether the usage of construction components matches the project progress and evaluating whether the usage of construction components is abnormal, the existing methods compare the actual usage of construction components with the estimated usage of construction components based on historical experience and then draw conclusions. There is no precise and data-based analysis of the estimated usage of construction components, which leads to deviations in the results of the estimated usage of construction components. As a result, the results of judging whether the usage of construction components is abnormal based on the estimated usage of construction components are not reliable and accurate, and are prone to misjudgment.
[0005] On the other hand, the existing methods do not visualize the monitoring results of the usage of engineering components as the progress of the construction project, such as the actual usage, estimated usage and remaining amount of engineering components, which is not conducive to the construction management department of the construction project to promptly discover the abnormal information related to the usage of engineering components and take corresponding measures. For example, if it is found that the usage data of engineering components is recorded incorrectly or there is excessive waste of engineering components, such as adjusting the procurement plan to avoid inventory backlogs or insufficient supply of engineering components, it is impossible to ensure the cost, quality, progress and benefits of the construction project, affecting the sustainable development of the construction project. Summary of the invention
[0006] In view of this, in order to solve the problems raised in the above background technology, a method, device and storage medium for analyzing and processing the usage data of engineering components are now proposed.
[0007] The technical solution adopted by the present invention to solve its technical problem is: in the first aspect, the present invention provides a method for analyzing and processing engineering component usage data, comprising the following steps: Step 1, obtaining historical building engineering component usage information: obtaining the engineering component usage information of each historical reference building project, wherein the engineering component usage information includes the usage of various engineering components and the numerical values of each associated variable of the various engineering component usages.
[0008] Step 2: Establish a construction engineering component usage analysis model: Based on the construction component usage information of each historical reference construction project, obtain the training set and test set of the construction component usage analysis model, and build usage analysis models for various construction components based on the training set of the construction component usage analysis model.
[0009] Step 3: Correction of the usage analysis model of construction engineering components: Based on the test set of the usage analysis model of engineering components, determine whether the usage analysis models of various engineering components need to be corrected, and further obtain the corrected usage analysis models of various engineering components.
[0010] Step 4: Prediction of the usage of construction project components: Obtain the values of each associated variable of the usage of various engineering components in the target construction project, and obtain the construction progress ratio of various engineering components in the current target construction project, and combine the usage analysis models of various engineering components to analyze the estimated usage of various engineering components in the current target construction project.
[0011] Step 5. Evaluation of the rationality of the usage of construction project components: Obtain the actual usage of various engineering components in the current target construction project, combine the estimated usage of various engineering components in the current target construction project, and analyze the rationality coefficient of the usage of various engineering components in the current target construction project.
[0012] Step 6. Warning of abnormal usage of construction project components: Based on the usage rationality coefficients of various construction components in the current target construction project, determine whether the usage of various construction components in the current target construction project is abnormal, and issue a warning.
[0013] Step 7: Visual display of construction project component usage monitoring: Obtain a usage detail information table of various engineering components in the target construction project and display it visually.
[0014] In a possible design, the specific analysis process of step one is: extract the construction project library historically undertaken by the construction department of the target construction project stored in the database, screen out various construction projects of the same type as the target construction project that were historically undertaken by the construction department of the target construction project, and record them as historical reference construction projects.
[0015] Obtain the usage of various engineering components in each historical reference construction project.
[0016] The variables that determine the usage of various engineering components are recorded as the associated variables of the usage of various engineering components, and the values of the associated variables of the usage of various engineering components in each historical reference construction project are obtained.
[0017] In a possible design, the specific analysis process of step two is: according to the component usage information of each historical reference construction project, the data set of the engineering component usage analysis model is obtained, and the data set of the engineering component usage analysis model is divided according to the set ratio of training set to test set to obtain the training set and test set of the engineering component usage analysis model.
[0018] According to the training set of the engineering component usage analysis model, the usage of various engineering components in each historical reference construction project in the training set of the engineering component usage analysis model and the values of each associated variable of the usage of various engineering components are obtained, and the relationship between the usage of various engineering components and the associated variables of their usage of engineering components is analyzed by using a machine learning algorithm to construct a usage analysis model for various engineering components.
[0019] In a possible design, the specific analysis process of step 3 is as follows: F1: According to the test set of the engineering component usage analysis model, the usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model is obtained, and recorded as , Indicates The number of the engineering component. , The test set of the engineering component usage analysis model is The number of the historical reference building project, .
[0020] And obtain the values of the associated variables of the usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model, substitute them into the usage analysis model of various engineering components, and obtain the predicted usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model, which is recorded as .
[0021] By analyzing the formula Obtain the accuracy of various engineering component usage analysis models ,in It represents the correction factor of the accuracy of the preset engineering component usage analysis model. represents a natural constant, represents the number of historical reference construction projects in the test set of the engineering component usage analysis model, The threshold value indicating the deviation between the preset usage of the engineering component and the predicted usage.
[0022] F2: Compare the accuracy of the usage analysis models of various engineering components with the preset accuracy threshold. If the accuracy of a certain engineering component usage analysis model is less than the preset accuracy threshold, the usage analysis model of this engineering component needs to be corrected. The usage analysis models of various engineering components that need to be corrected are counted and recorded as the usage analysis models of each abnormal engineering component.
[0023] F3: Add the test set of the engineering component usage analysis model to the training set to obtain a new training set of each abnormal engineering component usage analysis model; based on the new training set of each abnormal engineering component usage analysis model, reconstruct the usage analysis model of each abnormal engineering component; correct the usage analysis model of each abnormal engineering component, and then obtain the corrected usage analysis models of various engineering components.
[0024] In one possible design, the specific analysis process of step four is: extract the design drawings of the target construction project stored in the database, obtain the values of each associated variable of the usage of various engineering components in the target construction project, substitute them into the usage analysis model of various engineering components, and obtain the estimated usage of various engineering components required for the completion of the target construction project.
[0025] The ratio between the currently completed engineering quantity and the total engineering quantity of each engineering component in the target construction project is obtained, and recorded as the construction progress ratio of various engineering components in the current target construction project.
[0026] According to the estimated usage of various engineering components required for the completion of the target construction project and the construction progress ratio of various engineering components in the current target construction project, the estimated usage of various engineering components in the target construction project corresponding to the current construction progress is obtained, which is recorded as the estimated usage of various engineering components in the current target construction project and expressed as .
[0027] In a possible design, the specific analysis process of step 5 is: obtain the actual usage of various engineering components in the current target construction project and record it as .
[0028] Extract the loss amount corresponding to the unit engineering quantity of each engineering component in the construction project stored in the database, screen and obtain the loss amount corresponding to the unit engineering quantity of various engineering components in the target construction project, and combine the current completed engineering quantity of each engineering component in the target construction project to obtain the estimated cumulative loss amount of each engineering component in the current target construction project, which is recorded as .
[0029] The estimated usage of various engineering components in the current target construction project , Actual usage and estimated cumulative losses Substitute into the analysis formula Get the rationality coefficient of the usage of various engineering components in the current target construction project ,in It represents the correction factor of the rationality coefficient of the preset engineering component usage. Indicates the threshold of the deviation between the estimated usage and the actual usage of a preset engineering component.
[0030] In a possible design, the specific analysis process of step six is: compare the usage rationality coefficients of various engineering components in the current target construction project with a preset usage rationality coefficient threshold; if the usage rationality coefficient of a certain engineering component in the current target construction project is less than the preset usage rationality coefficient threshold, then the usage of this engineering component in the current target construction project is unreasonable; statistics are collected on the engineering components with unreasonable usage in the current target construction project, and feedback is given to the construction department of the target construction project for early warning.
[0031] In a possible design, the specific analysis process of step seven is: obtaining the remaining quantity of each engineering component in the current target construction project.
[0032] Based on the construction progress ratio, actual usage, estimated usage, remaining amount and usage rationality coefficient of various engineering components in the current target construction project, a usage detail information table of various engineering components in the target construction project is generated, fed back to the construction department of the target construction project, and visualized on the large LCD screen.
[0033] In a second aspect, the present invention further provides a device, comprising a processor, a memory, and a communication bus.
[0034] The memory stores a computer-readable program that can be executed by the processor.
[0035] The communication bus realizes the connection and communication between the processor and the memory.
[0036] When the processor executes the computer-readable program, the steps of the engineering component usage data analysis and processing method described in the present invention are implemented.
[0037] In a third aspect, the present invention further provides a storage medium storing one or more programs, wherein the one or more programs can be executed by one or more processors to implement the steps in the method for analyzing and processing the engineering component usage data described in the present invention.
[0038] Compared with the prior art, the beneficial effects of the present invention are as follows: 1. The present invention analyzes the relationship between the usage of engineering components and the various associated variables of the usage of engineering components through the usage information of engineering components in historical construction projects, constructs an engineering component usage analysis model, further analyzes the accuracy of the engineering component usage analysis model and makes corrections, and analyzes the estimated usage of engineering components in construction projects based on the engineering component usage analysis model, and judges whether the usage of engineering components is abnormal in combination with the actual usage of engineering components, thereby realizing precise and digitized analysis of the estimated usage of engineering components, thereby improving the reliability and accuracy of judging whether the usage of engineering components is abnormal based on the estimated usage of engineering components, and avoiding misjudgment and wrong judgment.
[0039] 2. The present invention generates a usage detail information table of engineering components in a construction project based on the construction progress ratio, actual usage, estimated usage, remaining amount and usage rationality coefficient of the engineering components in the construction project, and performs a visual dynamic display, which is beneficial for the construction management department of the construction project to promptly discover information related to abnormal usage of engineering components and take corresponding measures to ensure the cost, quality, progress and benefits of the construction project, thereby ensuring the sustainable development of the construction project. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0041] Figure 1 It is a schematic diagram of the method flow of the present invention. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] See also Figure 1 As shown, the first aspect of the present invention provides a method for analyzing and processing engineering component usage data, comprising the following steps: Step 1, obtaining historical building engineering component usage information: obtaining the engineering component usage information of each historical reference building project, wherein the engineering component usage information includes the usage of various engineering components and the values of various associated variables of the various engineering component usages.
[0044] Exemplarily, the specific analysis process of step one is: extracting the construction project library historically undertaken by the construction department of the target construction project stored in the database, screening out various construction projects of the same type as the target construction project that were historically undertaken by the construction department of the target construction project, and recording them as historical reference construction projects.
[0045] Obtain the usage of various engineering components in each historical reference construction project.
[0046] The variables that determine the usage of various engineering components are recorded as the associated variables of the usage of various engineering components, and the values of the associated variables of the usage of various engineering components in each historical reference construction project are obtained.
[0047] In a specific embodiment, the engineering component in the target construction project is a plate, and the associated variables of the plate usage are the laying area and the laying thickness.
[0048] Step 2: Establish a construction engineering component usage analysis model: Based on the construction component usage information of each historical reference construction project, obtain the training set and test set of the construction component usage analysis model, and build usage analysis models for various construction components based on the training set of the construction component usage analysis model.
[0049] Exemplarily, the specific analysis process of step two is: according to the component usage information of each historical reference construction project, the data set of the engineering component usage analysis model is obtained, and the data set of the engineering component usage analysis model is divided according to the set ratio of training set to test set to obtain the training set and test set of the engineering component usage analysis model.
[0050] As a preferred solution, the training set of the engineering component usage analysis model is larger than the test set. In a specific embodiment, the ratio of the training set to the test set of the engineering component usage analysis model is 2:1 or 3:1.
[0051] According to the training set of the engineering component usage analysis model, the usage of various engineering components in each historical reference construction project in the training set of the engineering component usage analysis model and the values of each associated variable of the usage of various engineering components are obtained, and the relationship between the usage of various engineering components and the associated variables of their usage of engineering components is analyzed by using a machine learning algorithm to construct a usage analysis model for various engineering components.
[0052] As a preferred solution, the relationship between the amount of engineering components and the associated variables of the amount of engineering components can be expressed in the form of graphs, tables, functions, etc.
[0053] Step 3: Correction of the usage analysis model of construction engineering components: Based on the test set of the usage analysis model of engineering components, determine whether the usage analysis models of various engineering components need to be corrected, and further obtain the corrected usage analysis models of various engineering components.
[0054] For example, the specific analysis process of step three is as follows: F1: according to the test set of the engineering component usage analysis model, the usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model is obtained, and recorded as , Indicates The number of the engineering component. , The test set of the engineering component usage analysis model is The number of the historical reference building project, .
[0055] And obtain the values of the associated variables of the usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model, substitute them into the usage analysis model of various engineering components, and obtain the predicted usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model, which is recorded as .
[0056] By analyzing the formula Obtain the accuracy of various engineering component usage analysis models ,in It represents the correction factor of the accuracy of the preset engineering component usage analysis model. represents a natural constant, represents the number of historical reference construction projects in the test set of the engineering component usage analysis model, The threshold value indicating the deviation between the preset usage of the engineering component and the predicted usage.
[0057] F2: Compare the accuracy of the usage analysis models of various engineering components with the preset accuracy threshold. If the accuracy of a certain engineering component usage analysis model is less than the preset accuracy threshold, the usage analysis model of this engineering component needs to be corrected. The usage analysis models of various engineering components that need to be corrected are counted and recorded as the usage analysis models of each abnormal engineering component.
[0058] F3: Add the test set of the engineering component usage analysis model to the training set to obtain a new training set of each abnormal engineering component usage analysis model; based on the new training set of each abnormal engineering component usage analysis model, reconstruct the usage analysis model of each abnormal engineering component; correct the usage analysis model of each abnormal engineering component, and then obtain the corrected usage analysis models of various engineering components.
[0059] As a preferred solution, the present invention corrects the engineering component usage analysis model by expanding the training set, that is, through data enhancement technology. Data enhancement technology increases the diversity and richness of training data so that the model can learn more different features and patterns during the learning process, thereby improving the model's generalization ability for new data.
[0060] Step 4: Prediction of the usage of construction project components: Obtain the values of each associated variable of the usage of various engineering components in the target construction project, and obtain the construction progress ratio of various engineering components in the current target construction project, and combine the usage analysis models of various engineering components to analyze the estimated usage of various engineering components in the current target construction project.
[0061] Exemplarily, the specific analysis process of step four is: extracting the design drawings of the target construction project stored in the database, obtaining the values of each associated variable of the usage of various engineering components in the target construction project, substituting them into the usage analysis model of various engineering components, and obtaining the estimated usage of various engineering components required for the completion of the target construction project.
[0062] The ratio between the currently completed engineering quantity and the total engineering quantity of each engineering component in the target construction project is obtained, and recorded as the construction progress ratio of various engineering components in the current target construction project.
[0063] As a preferred solution, the construction progress ratio is expressed in the form of a percentage.
[0064] According to the estimated usage of various engineering components required for the completion of the target construction project and the construction progress ratio of various engineering components in the current target construction project, the estimated usage of various engineering components in the target construction project corresponding to the current construction progress is obtained, which is recorded as the estimated usage of various engineering components in the current target construction project and expressed as .
[0065] Step 5. Evaluation of the rationality of the usage of construction project components: Obtain the actual usage of various engineering components in the current target construction project, combine the estimated usage of various engineering components in the current target construction project, and analyze the rationality coefficient of the usage of various engineering components in the current target construction project.
[0066] For example, the specific analysis process of step 5 is: obtaining the actual usage of various engineering components in the current target construction project, and recording it as .
[0067] Extract the loss amount corresponding to the unit engineering quantity of each engineering component in the construction project stored in the database, screen and obtain the loss amount corresponding to the unit engineering quantity of various engineering components in the target construction project, and combine the current completed engineering quantity of each engineering component in the target construction project to obtain the estimated cumulative loss amount of each engineering component in the current target construction project, which is recorded as .
[0068] As a preferred solution, the loss amount corresponding to the unit engineering quantity of each engineering component in the construction project is obtained based on historical construction experience.
[0069] In another specific embodiment, the loss amount corresponding to the unit engineering quantity of the engineering component is recorded as the loss rate of the engineering component.
[0070] The estimated usage of various engineering components in the current target construction project , Actual usage and estimated cumulative losses Substitute into the analysis formula Get the rationality coefficient of the usage of various engineering components in the current target construction project ,in It represents the correction factor of the rationality coefficient of the preset engineering component usage. Indicates the threshold of the deviation between the estimated usage and the actual usage of a preset engineering component.
[0071] Step 6. Warning of abnormal usage of construction project components: Based on the usage rationality coefficients of various construction components in the current target construction project, determine whether the usage of various construction components in the current target construction project is abnormal, and issue a warning.
[0072] Exemplarily, the specific analysis process of step six is: compare the usage rationality coefficients of various engineering components in the current target construction project with a preset usage rationality coefficient threshold; if the usage rationality coefficient of a certain engineering component in the current target construction project is less than the preset usage rationality coefficient threshold, then the usage of this engineering component in the current target construction project is unreasonable; statistics are collected on the engineering components with unreasonable usage in the current target construction project, and feedback is given to the construction department of the target construction project for early warning.
[0073] In this embodiment, the present invention uses the engineering component usage information of historical construction projects to analyze the relationship between the usage of engineering components and the various associated variables of the engineering component usage, constructs an engineering component usage analysis model, further analyzes the accuracy of the engineering component usage analysis model and makes corrections, and analyzes the estimated usage of engineering components in the construction project based on the engineering component usage analysis model. In combination with the actual usage of engineering components, it is determined whether the usage of engineering components is abnormal, and an early warning is issued to achieve precise and digitized analysis of the estimated usage of engineering components, thereby improving the reliability and accuracy of judging whether the usage of engineering components is abnormal based on the estimated usage of engineering components, and avoiding misjudgment and wrong judgment.
[0074] Step 7: Visual display of construction project component usage monitoring: Obtain a usage detail information table of various engineering components in the target construction project and display it visually.
[0075] Exemplarily, the specific analysis process of step seven is: obtaining the remaining quantity of each engineering component in the current target construction project.
[0076] Based on the construction progress ratio, actual usage, estimated usage, remaining amount and usage rationality coefficient of various engineering components in the current target construction project, a usage detail information table of various engineering components in the target construction project is generated, fed back to the construction department of the target construction project, and visualized on the large LCD screen.
[0077] As a preferred solution, the usage details information table of various engineering components in the target construction project is dynamic and updated in real time.
[0078] In this embodiment, the present invention generates a usage detail information table of engineering components in a construction project based on the construction progress ratio, actual usage, estimated usage, remaining amount and usage rationality coefficient of the engineering components in the construction project, and performs a visual dynamic display, which is beneficial for the construction management department of the construction project to promptly discover information related to abnormal usage of engineering components and take corresponding measures to ensure the cost, quality, progress and benefits of the construction project, thereby ensuring the sustainable development of the construction project.
[0079] In a second aspect, the present invention further provides a device, comprising: a processor, a memory and a communication bus.
[0080] The memory stores a computer-readable program that can be executed by the processor.
[0081] The communication bus realizes the connection and communication between the processor and the memory.
[0082] When the processor executes the computer-readable program, the steps of the engineering component usage data analysis and processing method described in the present invention are implemented.
[0083] In a third aspect, the present invention further provides a storage medium, characterized in that the storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the steps in the engineering component usage data analysis and processing method described in the present invention.
[0084] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.
Claims
1. A method for analyzing and processing engineering component usage data, characterized in that: The steps include: Step 1: Acquisition of the usage information of historical construction engineering components: Acquisition of the usage information of engineering components of each historical reference construction project, wherein the engineering component usage information includes the usage of various engineering components and the values of various associated variables of the usage of various engineering components; Step 2: Establishing a construction engineering component usage analysis model: According to the engineering component usage information of each historical reference construction project, obtain the training set and test set of the engineering component usage analysis model, and build usage analysis models of various engineering components according to the training set of the engineering component usage analysis model; Step 3: Correction of the usage analysis model of construction engineering components: judging whether the usage analysis models of various engineering components need to be corrected based on the test set of the usage analysis model of engineering components, and further obtaining the corrected usage analysis models of various engineering components; The specific analysis process of step three is as follows: F1: According to the test set of the engineering component usage analysis model, the usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model is obtained and recorded as , Indicates The number of the engineering component. , The test set of the engineering component usage analysis model is The number of the historical reference construction project, ; And obtain the values of the associated variables of the usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model, substitute them into the usage analysis model of various engineering components, and obtain the predicted usage of various engineering components in each historical reference construction project in the test set of the engineering component usage analysis model, which is recorded as ; By analyzing the formula Obtain the accuracy of various engineering component usage analysis models ,in It represents the correction factor of the accuracy of the preset engineering component usage analysis model. represents a natural constant, represents the number of historical reference construction projects in the test set of the engineering component usage analysis model, A threshold indicating the deviation between the preset usage of the engineering component and the predicted usage; F2: Compare the accuracy of the usage analysis models of various engineering components with the preset accuracy threshold. If the accuracy of a usage analysis model of a certain engineering component is less than the preset accuracy threshold, the usage analysis model of this engineering component needs to be corrected. The usage analysis models of various engineering components that need to be corrected are counted and recorded as the usage analysis models of various abnormal engineering components. F3: adding the test set of the engineering component usage analysis model to the training set to obtain a new training set of each abnormal engineering component usage analysis model, reconstructing the usage analysis model of each abnormal engineering component based on the new training set of each abnormal engineering component usage analysis model, and correcting each abnormal engineering component usage analysis model to obtain the corrected usage analysis models of various engineering components; Step 4: Prediction of the usage of construction project components: obtaining the values of the associated variables of the usage of various construction components in the target construction project, and obtaining the construction progress ratio of various construction components in the current target construction project, and combining the usage analysis models of various construction components to analyze the estimated usage of various construction components in the current target construction project; Step 5: Rationality evaluation of the usage of construction engineering components: obtaining the actual usage of various engineering components in the current target construction project, combining the estimated usage of various engineering components in the current target construction project, and analyzing the rationality coefficient of the usage of various engineering components in the current target construction project; Step 6: abnormal usage warning of construction project components: according to the usage rationality coefficients of various engineering components in the current target construction project, determine whether the usage of various engineering components in the current target construction project is abnormal, and issue a warning; Step 7: Visual display of construction project component usage monitoring: Obtain a usage detail information table of various engineering components in the target construction project and display it visually.
2. The method for analyzing and processing the usage data of engineering components according to claim 1, characterized in that: The specific analysis process of step 1 is as follows: Extracting a database of construction projects historically undertaken by the construction department of the target construction project stored in the database, screening out various construction projects of the same type as the target construction project that were historically undertaken by the construction department of the target construction project, and recording them as various historical reference construction projects; Obtain the usage of various engineering components in each historical reference construction project; The variables that determine the usage of various engineering components are recorded as the associated variables of the usage of various engineering components, and the values of the associated variables of the usage of various engineering components in each historical reference construction project are obtained.
3. The method for analyzing and processing the usage data of engineering components according to claim 1, characterized in that: The specific analysis process of step 2 is as follows: According to the component usage information of each historical reference construction project, a data set of the engineering component usage analysis model is obtained, and the data set of the engineering component usage analysis model is divided according to a set ratio of a training set to a test set to obtain a training set and a test set of the engineering component usage analysis model; According to the training set of the engineering component usage analysis model, the usage of various engineering components in each historical reference construction project in the training set of the engineering component usage analysis model and the values of each associated variable of the usage of various engineering components are obtained, and the relationship between the usage of various engineering components and the associated variables of their usage of engineering components is analyzed by using a machine learning algorithm to construct a usage analysis model for various engineering components.
4. The method for analyzing and processing the usage data of engineering components according to claim 1, characterized in that: The specific analysis process of step 4 is as follows: Extract the design drawings of the target construction project stored in the database, obtain the values of the associated variables of the usage of various engineering components in the target construction project, substitute them into the usage analysis model of various engineering components, and obtain the estimated usage of various engineering components required for the completion of the target construction project; Obtaining the ratio between the currently completed engineering quantity and the total engineering quantity of each engineering component in the target construction project, and recording it as the construction progress ratio of each engineering component in the current target construction project; According to the estimated usage of various engineering components required for the completion of the target construction project and the construction progress ratio of various engineering components in the current target construction project, the estimated usage of various engineering components in the target construction project corresponding to the current construction progress is obtained, which is recorded as the estimated usage of various engineering components in the current target construction project and expressed as .
5. The method for analyzing and processing the usage data of engineering components according to claim 4, characterized in that: The specific analysis process of step five is as follows: Get the actual usage of various engineering components in the current target construction project and record it as ; Extract the loss amount corresponding to the unit engineering quantity of each engineering component in the construction project stored in the database, screen and obtain the loss amount corresponding to the unit engineering quantity of various engineering components in the target construction project, and combine the current completed engineering quantity of each engineering component in the target construction project to obtain the estimated cumulative loss amount of each engineering component in the current target construction project, which is recorded as ; The estimated usage of various engineering components in the current target construction project , Actual usage and estimated cumulative losses Substitute into the analysis formula Get the rationality coefficient of the usage of various engineering components in the current target construction project ,in It represents the correction factor of the rationality coefficient of the preset engineering component usage. Indicates the threshold of the deviation between the estimated usage and the actual usage of a preset engineering component.
6. The method for analyzing and processing the engineering component usage data according to claim 1, characterized in that: The specific analysis process of step six is as follows: The usage rationality coefficients of various engineering components in the current target construction project are compared with the preset usage rationality coefficient threshold. If the usage rationality coefficient of a certain engineering component in the current target construction project is less than the preset usage rationality coefficient threshold, the usage of this engineering component in the current target construction project is unreasonable. Statistics are collected on the engineering components with unreasonable usage in the current target construction project, and feedback is given to the construction department of the target construction project for early warning.
7. The method for analyzing and processing the usage data of engineering components according to claim 1, characterized in that: The specific analysis process of step seven is as follows: Obtain the remaining quantity of each engineering component in the current target construction project; Based on the construction progress ratio, actual usage, estimated usage, remaining amount and usage rationality coefficient of various engineering components in the current target construction project, a usage detail information table of various engineering components in the target construction project is generated, fed back to the construction department of the target construction project, and visualized on the large LCD screen.
8. A device, characterized in that: Used to execute the steps in the engineering component usage data analysis and processing method as described in any one of claims 1 to 7, comprising: a processor, a memory and a communication bus; The memory stores a computer-readable program executable by the processor; The communication bus realizes the connection and communication between the processor and the memory; When the processor executes the computer-readable program, the steps in the method for analyzing and processing the engineering component usage data as described in any one of claims 1 to 7 are implemented.
9. A storage medium, characterized in that: The storage medium stores one or more programs, and the one or more programs can be executed by one or more processors to implement the steps in the engineering component usage data analysis and processing method as described in any one of claims 1-7.