Closed-loop test system and method for moonlet autonomous orbit maintenance
Through the small satellite autonomous orbit maintenance closed-loop test system, ground orbit maintenance equipment and thruster load simulators are used to simulate on-orbit autonomous orbit maintenance conditions, which solves the problem that traditional test methods cannot be applied and realizes effective closed-loop small satellite autonomous orbit maintenance. Testing and safety verification.
Patent Information
- Application Number
- CN202410848922.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2024-10-01
AI Technical Summary
The traditional special test method for small satellite orbit control cannot be applied to the closed-loop test of autonomous orbit maintenance of small satellites, cannot meet the needs of current and future small satellite development, and the test effectiveness and safety are insufficient.
Provide a closed-loop test system for autonomous orbit maintenance of small satellites, including ground orbit maintenance equipment, thruster load simulators, measurement and control equipment, and attitude control dynamics ground inspection equipment. By receiving and calculating satellite thrust broadcast data in real time, the system simulates on-orbit Autonomous orbit maintenance conditions ensure closed-loop interaction between the control subsystem and the electric propulsion subsystem, set a reasonable orbit maintenance target semi-major axis, and ensure test safety through strict test steps and instruction sequences.
It realizes an effective closed-loop test for autonomous orbit maintenance of small satellites, simulates the actual working conditions on orbit, improves the effectiveness and safety of the test, ensures the collaborative work of the control subsystem and the electric propulsion subsystem, and can flexibly set up and verify autonomous maintenance. track strategy.
Smart Images

Figure CN118731982A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a closed-loop test system and method for autonomous orbit maintenance of a small satellite, belonging to the technical field of satellite intelligent testing. Background Art
[0002] In the ground simulation test, the ground test equipment for satellites to obtain GNSS orbit information includes two types: GNSS dynamic simulator and ground orbit maintenance equipment. The GNSS dynamic simulator outputs GNSS signals with fixed orbit information by running point files. The ground orbit maintenance equipment can receive thrust broadcast information on the satellite CAN bus, and after calculation, it feeds back to the simulated GNSS orbit data in real time. Therefore, the small satellite autonomous orbit maintenance test using the GNSS dynamic simulator is an open-loop test, which can repeatedly trigger the small satellite autonomous orbit maintenance strategy, while the small satellite autonomous orbit maintenance test using the ground orbit maintenance equipment is a closed-loop test, which automatically exits the orbit maintenance strategy after the satellite's orbital position exceeds the target orbital altitude threshold.
[0003] In the traditional small satellite orbit control special test, there is only the ground orbit control test of the chemical thruster, which injects the orbit control data block on the ground. The data block contains information such as the orbit control start time and orbit control duration. After the satellite reaches the orbit control time, it starts to run the orbit control content set in the data block. The test process is relatively simple. The satellite does not receive and filter the current orbit information of the satellite in real time, nor does it set the orbit maintenance target value.
[0004] The closed-loop test of autonomous orbit maintenance of small satellites involves ground equipment such as ground orbit maintenance equipment and thruster simulators, including the coordinated work of multiple subsystems such as the satellite's control subsystem, electric propulsion subsystem, and satellite service subsystem. It requires a high degree of consistency in the time and orbit information of each subsystem on the satellite, and requires the setting of a reasonable and effective semi-major axis of the orbit maintenance target. After the satellite orbit maintenance strategy is triggered, the execution of the electric propulsion subsystem ignition mode needs to be effectively judged. The entire test process requires logically clear, safe and reliable test methods and test steps. The traditional control subsystem orbit control test method can no longer be simply applied to the closed-loop test of autonomous orbit maintenance of small satellites, and cannot meet the urgent needs of current and future small satellite development. It can be seen that it is urgent for technicians in this field to provide a scientific and effective closed-loop test system and method for autonomous orbit maintenance of small satellites to improve the effectiveness and safety of the test. Summary of the invention
[0005] The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and solve the problem that the traditional attitude control and orbit control test method is not suitable for the closed-loop test of autonomous orbit maintenance of small satellites.
[0006] The purpose of the present invention is achieved through the following technical solutions:
[0007] In a first aspect, the present invention provides a closed-loop test system for autonomous orbit maintenance of a small satellite, including ground orbit maintenance equipment, a thruster load simulator, measurement and control equipment, and attitude control dynamics ground inspection equipment;
[0008] The ground orbit maintenance equipment is preloaded with an orbit point file with set target orbit root information. During the autonomous orbit maintenance closed-loop test, the ground orbit maintenance equipment receives the thrust broadcast output by the electric propulsion subsystem of the target satellite in real time, and calculates the orbit altitude through the thrust value and the operating orbit information. The orbit altitude changes in real time as the electric propulsion ignition mode of the electric propulsion subsystem works, simulating the target satellite's on-orbit autonomous orbit maintenance working condition to form a closed-loop interaction between thrust and orbit altitude.
[0009] The thruster load simulator is used to simulate the load working state of the target satellite thruster when it is working;
[0010] The measurement and control equipment transmits data with the target satellite under test through a wired or wireless link to obtain the status and response of the target satellite under test;
[0011] Attitude control dynamics ground inspection equipment is used to provide dynamic information for the closed-loop operation of the control subsystem of the target satellite.
[0012] In a second aspect, the present invention provides a closed-loop test method based on the small satellite autonomous orbit maintenance closed-loop test system according to the first aspect, comprising:
[0013] Before the target satellite is powered on, the target satellite is connected to the ground orbit maintenance equipment through the CAN bus cable, the ground orbit maintenance equipment is preloaded with the GNSS orbit point file with the target orbit root information set, the electric propulsion power controller of the target satellite is connected to the ground thruster load simulator through the high-voltage cable, and the ground orbit maintenance equipment and the thruster load simulator are initialized;
[0014] Power on the target satellite, set the initial state before satellite orbit maintenance, set the state of attitude control dynamics ground inspection equipment, and set the state of the electric propulsion subsystem before control closed loop;
[0015] The orbit information of the control subsystem is uploaded through the measurement and control uplink, and the correctness of the uploaded orbit information is judged through the orbit telemetry of the onboard control subsystem and the attitude control ground inspection related telemetry;
[0016] By operating the satellite-rocket separation button in the attitude control dynamics ground inspection equipment, the attitude control dynamics ground inspection is started, and at the same time, the whole satellite timing instruction is sent, the control subsystem is set to enter a closed loop, the software of the ground orbit maintenance equipment is started, and the control subsystem is sent the "introduce UTC time calibration" remote control instruction to unify and keep the time of the target satellite's satellite service center computer, control center computer, attitude control dynamics ground inspection equipment and ground orbit maintenance equipment consistent. Through the control subsystem working mode telemetry, it is judged that the attitude control has entered the quasi-solar directional cruise mode, and the closed-loop mode setting of the control subsystem is completed;
[0017] Set the control subsystem to introduce GNSS data verification and GNSS orbit calculation, set the target satellite's orbit information by annotating the "orbit maintenance target semi-major axis" instruction, and after the control subsystem completes the GNSS navigation data filtering calculation of an orbit cycle, determine whether to trigger the satellite orbit maintenance strategy through telemetry of the control subsystem and electric propulsion subsystem;
[0018] After the target satellite orbit maintenance strategy is triggered, the execution of the electric propulsion subsystem ignition mode in each orbital circle is observed through the electric propulsion subsystem telemetry, the elevation and change of the satellite orbit are determined through the control subsystem navigation filter orbit data, and the electric propulsion thrust broadcast data and navigation orbit data are checked through the software of the ground orbit maintenance equipment;
[0019] After the navigation filter orbit altitude calculated by the target satellite exceeds the set orbit maintenance target altitude, the target satellite exits the autonomous orbit maintenance strategy, the electric propulsion subsystem stops working in ignition mode, and exits the closed-loop orbit maintenance mode after the autonomous orbit maintenance test is completed, and the target satellite is set to return to its initial state.
[0020] Based on the second aspect, in one embodiment of the present invention, the initial state of the satellite before orbit maintenance includes: the satellite-to-ground tracking and control channel is opened, the battery pack is connected, the array simulator 5A curve is powered up, the active segment components of the control subsystem are powered on, and the on-board state is set before the control loop is closed.
[0021] Based on the second aspect, in one embodiment of the present invention, the electric propulsion subsystem status before the control closed loop includes the electric propulsion controller power-on and on-duty status selection.
[0022] Based on the second aspect, in one embodiment of the present invention, the target satellite restores its initial state including the control subsystem exiting the closed loop, powering off components of the control subsystem, powering off the electric propulsion subsystem, and powering off the entire satellite after the satellite restores its initial state.
[0023] Based on the second aspect, in one embodiment of the present invention, the electric propulsion subsystem needs to be set to a state before the control subsystem enters a closed loop, including: powering on the main power supply of the electric propulsion controller, notifying the control AOCC through remote control commands that the electric propulsion controller has been turned on, setting the thrust main branch on-duty status, setting the no-storage test mode enable, and setting the control master on-duty status setting.
[0024] Based on the second aspect, in one embodiment of the present invention, the setting of the satellite orbit maintenance target orbit information includes: setting the control subsystem to introduce GNSS data verification and perform GNSS orbit calculation by sending remote control commands, setting the satellite orbit maintenance target orbit information by injecting the orbit maintenance target semi-major axis command, the satellite orbit maintenance target semi-major axis needs to be larger than the orbit semi-major axis output by the software of the ground orbit maintenance equipment, after sending the orbit control setting related instructions, waiting for at least one orbital cycle of navigation orbit filter data processing, after completing the calculation of the satellite's current orbit information, judging through telemetry whether to trigger the small satellite's autonomous orbit maintenance.
[0025] Based on the second aspect, in one embodiment of the present invention, after the autonomous orbit maintenance of the small satellite is triggered, the execution of the ignition mode of the electric propulsion subsystem in each orbital circle is observed through telemetry of the electric propulsion subsystem; during the closed-loop test of autonomous orbit maintenance, the software of the ground orbit maintenance equipment receives the thrust value output by the electric propulsion subsystem broadcast in the satellite CAN bus in real time, and comprehensively calculates the orbital altitude change through the thrust value, the ignition duration of each orbital circle and the operating orbit altitude information, and reflects the orbital altitude change in the GNSS orbit data output by the software of the ground orbit maintenance equipment, simulating the autonomous orbit maintenance condition on orbit to form a closed-loop interaction and feedback between thrust and orbit altitude, and the orbital altitude of the small satellite after the autonomous orbit maintenance is executed can be checked through telemetry of satellite navigation orbit filtering data, and the received thrust broadcast and output orbit data content can be checked through the software of the ground orbit maintenance equipment.
[0026] Based on the second aspect, in one embodiment of the present invention, the execution status of the ignition mode of the electric propulsion subsystem in each orbital circle includes the ignition working mode, the ignition duration, and the target thrust value.
[0027] Based on the second aspect, in one embodiment of the present invention, after the ignition mode of several orbital circle electric propulsion subsystems is executed, when the orbital altitude calculated by the control subsystem output GNSS orbit filtering exceeds the set orbit maintenance target altitude, the satellite automatically exits the autonomous orbit maintenance strategy.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] (1) The method of the present invention can use ground orbit maintenance equipment to provide satellites with orbit information. By designing and running orbit point files at different altitudes, orbit information at different altitudes can be provided to satellites conveniently and quickly. During the autonomous orbit maintenance closed-loop test, the software of the ground orbit maintenance equipment receives the thrust broadcast output by the satellite electric propulsion subsystem in real time, and calculates the orbit altitude change through the thrust value and the orbit information. The orbit altitude data output by the software of the ground orbit maintenance equipment changes in real time as the electric propulsion ignition mode works, simulating the autonomous orbit maintenance condition on orbit to form a closed-loop interaction between thrust and orbit altitude. It can effectively simulate the actual autonomous orbit maintenance working state of small satellites on orbit.
[0030] (2) The method of the present invention can use a thruster load simulator to simulate the load working state of the thruster when it is working. The thruster load simulator is connected through a high-voltage cable. When the electric propulsion subsystem is working in the ignition mode, energy is output through the thruster load simulator, which can truly and effectively simulate the working state of the electric propulsion subsystem outputting a constant target thrust value on orbit.
[0031] (3) The method of the present invention operates the satellite-rocket separation button in the attitude control dynamics ground check software, and the attitude control dynamics ground check is started and the whole satellite timing instruction is sent simultaneously, and the control subsystem is set to enter a closed loop, and the control subsystem introduces UTC time correction, so that the satellite time of the satellite service center computer, the control center computer, the attitude control ground check and the ground orbit maintenance equipment are unified and kept consistent.
[0032] (4) The present invention sends a remote control command to set the control subsystem to introduce GNSS data verification and GNSS orbit calculation, ensuring that the orbit data obtained by the satellite control subsystem is consistent with the orbit data output by the software of the ground orbit maintenance equipment. The satellite orbit maintenance target orbit information can be flexibly set by adding the orbit maintenance target command. The semi-major axis of the satellite orbit maintenance target needs to be larger than the semi-major axis of the orbit actually run by the software of the ground orbit maintenance equipment. After sending the orbit control setting related instructions, after waiting for at least one orbital cycle of navigation orbit filter data processing, after completing the calculation of the current orbit information of the satellite, the control subsystem and the electric propulsion subsystem telemetry are used to determine whether to trigger the small satellite's autonomous orbit maintenance. When the small satellite's autonomous orbit maintenance is not effectively triggered, the small satellite's autonomous orbit maintenance strategy can be triggered by modifying the orbit maintenance target semi-major axis command, which can effectively test and verify the small satellite's autonomous orbit maintenance strategy.
[0033] (5) The test method of the present invention has strict sequence and time requirements for the command setting of the control subsystem, electric propulsion subsystem, and satellite service subsystem, ensuring the validity and correctness of the interpretation of each step in the test process and ensuring the safety of the entire satellite test. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1This is a composition diagram of the closed-loop test system for autonomous orbit maintenance of small satellites of the present invention;
[0035] Figure 2 The present invention is a flowchart of the steps of the closed-loop test method for autonomous orbit maintenance of a small satellite. DETAILED DESCRIPTION
[0036] To make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0037] A closed-loop test system for autonomous orbit maintenance of a small satellite includes ground orbit maintenance equipment, a thruster load simulator, measurement and control equipment, and attitude control dynamics ground inspection equipment.
[0038] The ground orbit maintenance equipment is preloaded with an orbit point file that has set the target orbit root information. During the autonomous orbit maintenance closed-loop test, the ground orbit maintenance equipment receives the thrust broadcast output by the target satellite's electric propulsion subsystem in real time, and calculates the orbit altitude based on the thrust value and operating orbit information. The orbit altitude changes in real time as the electric propulsion ignition mode of the electric propulsion subsystem operates, simulating the target satellite's on-orbit autonomous orbit maintenance conditions to form a closed-loop interaction between thrust and orbit altitude.
[0039] The thruster load simulator is used to simulate the load working state of the target satellite thruster when it is working.
[0040] The measurement and control equipment transmits data with the target satellite under test through a wired or wireless link to obtain the status and response of the target satellite under test.
[0041] Attitude control dynamics ground inspection equipment is used to provide dynamic information for the closed-loop operation of the control subsystem of the target satellite.
[0042] A closed-loop test method for autonomous orbit maintenance of a small satellite, comprising:
[0043] Before the target satellite is powered on, the target satellite is connected to the ground orbit maintenance equipment via a CAN bus cable. The ground orbit maintenance equipment is preloaded with a GNSS orbit point file with the target orbit root information set. The electric propulsion power controller of the target satellite is connected to the ground thruster load simulator via a high-voltage cable. The ground orbit maintenance equipment and the thruster load simulator complete the initialization settings.
[0044] The target satellite is powered on and the initial state of the satellite is set before orbit maintenance, including: opening the satellite-to-ground tracking and control channels, connecting the battery pack, powering up the 5A curve of the array simulator, powering up the active segment components of the control subsystem, setting the on-board state before the control loop is closed, setting the state of the attitude control and dynamics ground inspection equipment, and setting the state of the electric propulsion subsystem before the control loop is closed (including powering up the electric propulsion controller, selecting the on-duty state, etc.).
[0045] The operating orbit information (i.e. orbit data block) of the control subsystem is uploaded through the measurement and control uplink, and the correctness of the uploaded orbit information is judged through the orbit telemetry of the onboard control subsystem and the related telemetry of attitude control ground detection.
[0046] By operating the satellite-rocket separation button in the attitude control dynamics ground check equipment, the attitude control dynamics ground check is started and the whole satellite timing instruction is sent at the same time (jump to the start time of the orbit), the control subsystem is set to enter a closed loop, the software of the ground orbit maintenance equipment is started, and the control subsystem is sent an "introduce UTC time correction" remote control instruction to unify and keep the time of the satellite service center computer, control center computer, attitude control dynamics ground check equipment and ground orbit maintenance equipment consistent. Through the control subsystem working mode telemetry, it is judged that the attitude control has entered the quasi-solar directional cruise mode, and the closed-loop mode setting of the control subsystem is completed.
[0047] The control subsystem is set to introduce GNSS data verification and GNSS orbit calculation, and the target orbit information of the target satellite is set by issuing the "orbit maintenance target semi-major axis" instruction. After the control subsystem completes the GNSS navigation data filtering calculation of an orbital cycle, the control subsystem and electric propulsion subsystem telemetry are used to determine whether to trigger the satellite orbit maintenance strategy.
[0048] After the target satellite orbit maintenance strategy is triggered, the execution of the electric propulsion subsystem ignition mode in each orbital circle is observed through the electric propulsion subsystem telemetry, the elevation and change of the satellite orbit are determined through the control subsystem navigation filter orbit data, and the electric propulsion thrust broadcast data and navigation orbit data are checked through the software of the ground orbit maintenance equipment;
[0049] After the navigation filter orbit altitude calculated by the target satellite exceeds the set orbit maintenance target altitude, the target satellite exits the autonomous orbit maintenance strategy, the electric propulsion subsystem stops working in ignition mode, exits the closed-loop orbit maintenance mode after the autonomous orbit maintenance test is completed, and sets the target satellite to restore to its initial state, including the control subsystem exiting the closed loop, powering off all components of the control subsystem, powering off the electric propulsion subsystem, and powering off the entire satellite after the satellite restores to its initial state.
[0050] Before the target satellite is powered on, the thruster load simulator has been set to a fixed working gear, and the power of the electric propulsion ignition mode is output through the thruster load simulator.
[0051] Before the control subsystem enters the closed loop, the electric propulsion subsystem needs to be set to a certain state, including: powering on the main power supply of the electric propulsion controller, notifying the control AOCC through remote control commands that the electric propulsion controller has been turned on, setting the main thrust branch duty status, enabling the no-storage test mode, setting the control master duty status, etc.
[0052] The control subsystem enters the closed-loop state setting, including: by operating the satellite-rocket separation button in the attitude control dynamics ground check software, the attitude control dynamics ground check is started and the whole satellite timing instruction is sent at the same time, and the satellite time jumps to the starting time of the operating orbit. It is necessary to ensure that the orbit information of the attitude control dynamics ground check equipment and the orbit information of the control subsystem are consistent with the orbit information of the ground orbit maintenance equipment. After the control subsystem enters the closed loop, it is necessary to ensure that the time of the satellite center computer, the control center computer, the attitude control dynamics ground check and the ground orbit maintenance equipment software are consistent by sending the control subsystem "introduce second UTC time synchronization" instruction.
[0053] The satellite orbit maintenance target orbit information setting includes: setting the control subsystem to introduce GNSS data verification and perform GNSS orbit calculation by sending remote control commands, setting the satellite orbit maintenance target orbit information by issuing orbit maintenance target semi-major axis commands, the satellite orbit maintenance target semi-major axis needs to be larger than the orbit semi-major axis output by the software of the ground orbit maintenance equipment, and after sending the orbit control setting related instructions, waiting for at least one orbital cycle of navigation orbit filter data processing, and after completing the calculation of the satellite's current orbit information, judging whether to trigger the small satellite's autonomous orbit maintenance through telemetry of the satellite service subsystem, control subsystem and electric propulsion subsystem.
[0054] After the small satellite's autonomous orbit maintenance is triggered, the execution of the electric propulsion subsystem ignition mode in each orbital circle is observed through the electric propulsion subsystem telemetry, including telemetry information such as ignition working mode, ignition duration, and target thrust value. During the autonomous orbit maintenance closed-loop test, the ground orbit maintenance equipment's software receives the thrust value output by the electric propulsion subsystem broadcasted in the satellite CAN bus in real time, and calculates the orbital altitude change through the thrust value, the ignition duration of each orbital circle, and the operating orbit altitude information, and reflects the orbital altitude change in the GNSS orbit data output by the ground orbit maintenance equipment's software, simulating the autonomous orbit maintenance condition on orbit to form a closed-loop interaction and feedback between thrust and orbit altitude. The orbital altitude of the small satellite after autonomous orbit maintenance can be checked through satellite navigation orbit filter data telemetry, and the received thrust broadcast and output orbit data content can be checked through the ground orbit maintenance equipment's software. Because the orbit information of each circle output by the software of the ground orbit maintenance equipment changes in real time, the actual orbital height position changes caused by the electric propulsion subsystem ignition mode can be fed back to the software of the ground orbit maintenance equipment in real time. Therefore, after the electric propulsion subsystem ignition mode is executed for several orbital circles, when the orbital height calculated by the GNSS orbit filter output by the control subsystem exceeds the set orbit maintenance target height, the satellite automatically exits the autonomous orbit maintenance strategy.
[0055] After the autonomous orbit maintenance test is completed, the closed-loop orbit maintenance mode is exited, including: during the time period when the electric propulsion subsystem is not working in the ignition mode, setting the satellite-rocket separation switch in the attitude control ground dynamics ground inspection software to the non-separated state, sending the remote control command "control AOCC reset", controlling the subsystem to exit the closed loop, and powering off all components of the control subsystem. After confirming that the power supply of the electric propulsion subsystem has been turned off, the electric propulsion subsystem is powered off, the entire satellite is powered off after the satellite returns to its initial state, and the ground test equipment is turned off.
[0056] The contents not described in detail in the specification of the present invention belong to the common knowledge of those skilled in the art.
[0057] Although the present invention has been disclosed as above in the form of a preferred embodiment, it is not intended to limit the present invention. Any person skilled in the art may make possible changes and modifications to the technical solution of the present invention by using the methods and technical contents disclosed above without departing from the spirit and scope of the present invention. Therefore, any simple modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention shall fall within the protection scope of the technical solution of the present invention.
Claims
1. A closed-loop test system for autonomous orbit maintenance of small satellites, characterized in that: Including ground track maintenance equipment, thruster load simulator, measurement and control equipment, attitude control dynamics ground inspection equipment; The ground orbit maintenance equipment is preloaded with an orbit point file with set target orbit root information. During the autonomous orbit maintenance closed-loop test, the ground orbit maintenance equipment receives the thrust broadcast output by the electric propulsion subsystem of the target satellite in real time, and calculates the orbit altitude through the thrust value and the operating orbit information. The orbit altitude changes in real time as the electric propulsion ignition mode of the electric propulsion subsystem works, simulating the target satellite's on-orbit autonomous orbit maintenance working condition to form a closed-loop interaction between thrust and orbit altitude. The thruster load simulator is used to simulate the load working state of the target satellite thruster when it is working; The measurement and control equipment transmits data with the target satellite under test through a wired or wireless link to obtain the status and response of the target satellite under test; Attitude control dynamics ground inspection equipment is used to provide dynamic information for the closed-loop operation of the control subsystem of the target satellite.
2. A closed-loop test method based on the small satellite autonomous orbit maintenance closed-loop test system according to claim 1, characterized in that: include: Before the target satellite is powered on, the target satellite is connected to the ground orbit maintenance equipment through the CAN bus cable, the ground orbit maintenance equipment is preloaded with the GNSS orbit point file with the target orbit root information set, the electric propulsion power controller of the target satellite is connected to the ground thruster load simulator through the high-voltage cable, and the ground orbit maintenance equipment and the thruster load simulator are initialized; Power on the target satellite, set the initial state before satellite orbit maintenance, set the state of attitude control dynamics ground inspection equipment, and set the state of the electric propulsion subsystem before control closed loop; The orbit information of the control subsystem is uploaded through the measurement and control uplink, and the correctness of the uploaded orbit information is judged through the orbit telemetry of the onboard control subsystem and the attitude control ground inspection related telemetry; By operating the satellite-rocket separation button in the attitude control dynamics ground inspection equipment, the attitude control dynamics ground inspection is started, and the whole satellite timing instruction is sent at the same time, the control subsystem is set to enter a closed loop, the software of the ground orbit maintenance equipment is started, and the control subsystem is sent the "introduce UTC time calibration" remote control instruction to unify and keep the time of the satellite service center computer, the control center computer, the attitude control dynamics ground inspection equipment and the ground orbit maintenance equipment consistent. Through the control subsystem working mode telemetry, it is judged that the attitude control has entered the quasi-solar directional cruise mode, and the closed-loop mode setting of the control subsystem is completed; Set the control subsystem to introduce GNSS data verification and GNSS orbit calculation, set the target satellite's orbit information by annotating the "orbit maintenance target semi-major axis" instruction, and after the control subsystem completes the GNSS navigation data filtering calculation of an orbit cycle, determine whether to trigger the satellite orbit maintenance strategy through telemetry of the control subsystem and electric propulsion subsystem; After the target satellite orbit maintenance strategy is triggered, the execution of the electric propulsion subsystem ignition mode in each orbital circle is observed through the electric propulsion subsystem telemetry, the elevation and change of the satellite orbit are determined through the control subsystem navigation filter orbit data, and the electric propulsion thrust broadcast data and navigation orbit data are checked through the software of the ground orbit maintenance equipment; After the navigation filter orbit altitude calculated by the target satellite exceeds the set orbit maintenance target altitude, the target satellite exits the autonomous orbit maintenance strategy, the electric propulsion subsystem stops working in ignition mode, and exits the closed-loop orbit maintenance mode after the autonomous orbit maintenance test is completed, and the target satellite is set to return to its initial state.
3. The closed-loop testing method according to claim 2, characterized in that: The initial status of the satellite before orbit maintenance includes: opening of satellite-to-ground tracking and control channels, connection of battery packs, power-up of the array simulator 5A curve, power-on of each active segment component of the control subsystem, and setting of on-board status before control closed loop.
4. The closed-loop testing method according to claim 2, characterized in that: The status of the electric propulsion subsystem before the control loop is closed includes the power-on of the electric propulsion controller and the selection of the on-duty status.
5. The closed-loop testing method according to claim 2, characterized in that: The target satellite returns to its initial state by exiting the closed loop of the control subsystem, powering off all components of the control subsystem, powering off the electric propulsion subsystem, and then powering off the entire satellite after the satellite returns to its initial state.
6. The closed-loop testing method according to claim 2, characterized in that: Before the control subsystem enters the closed loop, the electric propulsion subsystem needs to be set to its status, including: powering on the main power supply of the electric propulsion controller, notifying the control AOCC through remote control commands that the electric propulsion controller has been turned on, setting the thrust main branch duty status, enabling the no-storage test mode, and setting the control master duty status setting.
7. The closed-loop testing method according to claim 2, characterized in that: The satellite orbit maintenance target orbit information setting includes: setting the control subsystem to introduce GNSS data verification and perform GNSS orbit calculation by sending remote control commands, setting the satellite orbit maintenance target orbit information by issuing orbit maintenance target semi-major axis commands, the satellite orbit maintenance target semi-major axis needs to be larger than the orbit semi-major axis output by the software of the ground orbit maintenance equipment, and after sending orbit control setting related instructions, waiting for at least one orbital cycle of navigation orbit filter data processing, and after completing the calculation of the satellite's current orbit information, judging through telemetry whether to trigger the small satellite's autonomous orbit maintenance.
8. The closed-loop testing method according to claim 2, characterized in that: After the small satellite's autonomous orbit maintenance is triggered, the execution of the electric propulsion subsystem ignition mode in each orbital circle is observed through the electric propulsion subsystem telemetry; during the autonomous orbit maintenance closed-loop test, the ground orbit maintenance equipment's software receives the thrust value output by the electric propulsion subsystem broadcast in the satellite CAN bus in real time, and calculates the orbital altitude change through the thrust value, the ignition duration of each orbital circle and the operating orbit altitude information, and reflects the orbital altitude change in the GNSS orbit data output by the ground orbit maintenance equipment's software, simulating the on-orbit autonomous orbit maintenance condition to form a closed-loop interaction and feedback between thrust and orbital altitude, and the orbital altitude of the small satellite after autonomous orbit maintenance can be checked through satellite navigation orbit filter data telemetry, and the received thrust broadcast and output orbital data content can be checked through the ground orbit maintenance equipment's software.
9. The closed-loop testing method according to claim 8, characterized in that: The execution of the electric propulsion subsystem ignition mode in each orbit includes the ignition working mode, ignition duration, and target thrust value.
10. The closed-loop testing method according to claim 2, characterized in that: After the electric propulsion subsystem ignition mode is executed for several orbital circles, the satellite automatically exits the autonomous orbit maintenance strategy after the orbit altitude calculated by the GNSS orbit filter output by the control subsystem exceeds the set orbit maintenance target altitude.
Citation Information
Cited By
Self-checking device, system and method of sensor for satellite propulsion polarity test
CN119667193A
