Simulation test device and test method for influence of tunnel excavation on adjacent buildings
By designing a tunnel excavation simulation test device including transparent model box and laser emitter, the problem that the existing technology cannot effectively simulate the impact of tunnel excavation on buildings in complex urban environments is solved, and the tunnel excavation process is realized. Three-dimensional visual analysis and simulation of coupled evolutionary laws are simple and low-cost.
Patent Information
- Application Number
- CN202410982311.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-08
AI Technical Summary
The existing tunnel excavation simulation test device cannot effectively simulate the impact of tunnel excavation on the displacement, deformation and settlement of adjacent buildings in complex urban environments, and cannot conduct overall, systematic and comprehensive analysis, and cannot truly reflect tunnel excavation. The law of coupling evolution of the superstructure, foundation and lower soil.
A simulated test device for the impact of tunnel excavation on adjacent buildings was designed, including transparent model boxes, transparent soil, plexiglass tubes, airbag rings, elastic connectors and stress plates, and data was collected through laser emitters and CCD industrial cameras. The PIV three-dimensional measurement technology is used to analyze the displacement field changes, simulate the surrounding rock stress redistribution and soil displacement field during tunnel excavation, and realize the three-dimensional visual analysis of the impact on tunnel excavation.
The overall and three-dimensional visual analysis of the impact of the tunnel excavation process on adjacent buildings is realized. It is simple and low-cost, and can simulate the coupling evolution law of the superstructure-foundation-lower soil, and accurately measure the pressure changes of lining surrounding rocks and soil loss. Analyze the influence of different construction parameters on soil layer characteristics.
Smart Images

Figure CN118914066A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel engineering tests, in particular to a simulation test device and a test method for the influence of tunnel excavation on adjacent buildings and structures. Background Art
[0002] With the development of new urbanization in my country, the available land resources in cities are becoming increasingly scarce, and the development and utilization of underground space has received more and more attention. When constructing tunnel projects such as railways, highways, and underground comprehensive pipelines in complex urban underground environments, the construction disturbance caused by tunnel excavation causes stress redistribution of the tunnel surrounding rock and soil displacement, which can easily lead to deformation and settlement of adjacent buildings (structures), such as cracking and collapse of buildings above, large deformation and uneven settlement of the roadbed, and cracking of the lining structure of adjacent operating tunnels.
[0003] At present, the research on the influence of tunnel excavation is mainly carried out through theoretical and numerical analysis, on-site monitoring, model test and other technical means. Among them, the model test mainly collects and monitors the stress, deformation and other data of the research object by arranging pressure sensors, displacement sensors, strain gauges, optical fiber sensors and the like. The traditional model test mainly obtains point data through pre-buried sensors to analyze and study various parameter indicators and development evolution laws. This type of test may affect the accuracy and effectiveness of the model test results due to unreasonable sensor layout, insufficient data collection, position offset and damage of pre-buried test components. The traditional model test cannot simulate the stress field and displacement field of the soil in the actual project. Some researchers have also proposed to prepare transparent soil materials using transparent solid particles and liquid media to analyze the changes in the displacement field inside the soil. However, the existing model test device cannot conduct an overall, systematic and comprehensive analysis of the displacement, deformation, settlement and other effects of adjacent buildings and structures caused by tunnel excavation in a complex urban environment, and cannot more truly and comprehensively reflect the coupled evolution law of the upper structure-foundation-lower soil under the action of tunnel excavation. In order to solve the existing technical problems, the present invention provides a simulation test device and test method for the influence of tunnel excavation on adjacent buildings and structures. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the shortcomings of the prior art, the present invention provides a simulation test device and test method for the impact of tunnel excavation on adjacent buildings and structures, which has the advantages of being able to effectively simulate the impact of actual tunnel construction on adjacent soil and buildings through a simple model structure, and solves the problem that existing simulation experiments cannot conduct an overall, systematic and comprehensive analysis of the impacts of displacement, deformation, settlement, etc. of adjacent buildings and structures caused by tunnel excavation in complex urban environments.
[0006] (II) Technical solution
[0007] In order to achieve the above-mentioned purpose of being able to effectively simulate the impact of actual tunnel construction on adjacent soil and buildings and structures through a simple model structure, the present invention provides the following technical solutions: a simulation test device for the impact of tunnel excavation on adjacent buildings and structures, comprising a test platform, a camera and recording mechanism is installed on the top of the test platform, a linkage mechanism arranged in a vertical direction with the camera and recording mechanism is installed on the top of the test platform, a simulation test system is installed on the top of the test platform, and a top component for photographing the top of the simulation test system is installed on the top of the test platform;
[0008] The simulation test system comprises a lifting hydraulic cylinder group fixedly installed on the top of the test platform, a transparent model box fixedly installed on the output end of the lifting hydraulic cylinder group and having an opening on the top, transparent soil filled in the transparent model box, and a tunnel excavation simulation system installed on the inner side of the transparent model box and used for conducting tests in conjunction with the transparent soil; a pressure control cabinet is fixedly installed on the top of the test platform, the inner side of the transparent model box is filled with transparent soil, and a building model assembly is installed on the top of the transparent soil;
[0009] The recording mechanism includes a first linear module fixedly mounted on the top of the test platform, a first mobile mechanical arm slidably mounted on the outside of the first linear module and capable of being driven by the first linear module to move linearly, and a CCD industrial camera fixedly mounted on the output shaft of the first mobile mechanical arm;
[0010] The linkage mechanism includes a second linear module fixedly mounted on the top of the test platform, a second mobile mechanical arm slidably mounted on the outside of the second linear module and capable of being driven by the second linear module to move linearly, and a laser transmitter fixedly mounted on the output shaft of the second mobile mechanical arm;
[0011] The tunnel excavation simulation system includes a connecting hole opened on a side of a transparent model box close to a pressure control cabinet, a plurality of organic glass tubes arranged inside the transparent soil and corresponding to the position of the connecting hole, a face air bag abutting against the end of the first organic glass tube on the left, an air bag ring covering the outside of the organic glass tube, a plurality of elastic connectors bonded between opposite sides of two adjacent organic glass tubes, a plurality of first air pipes passing through the inside of the connecting hole, a second air pipe passing through the inside of the connecting hole, and a plurality of control valves fixedly installed on the outside of the first air pipe and the second air pipe, respectively. , several flow sensors are respectively fixedly installed on the outside of the first air pipe and the second air pipe; the organic glass tube, the face airbag, the airbag ring and several elastic connecting parts constitute a tunnel model, several adhesives are bonded between the inner side of the airbag ring and the outer side of the corresponding organic glass tube and between the face airbag and the opposite side of the first organic glass tube on the left, several stress sheets are bonded between the inner side of the airbag ring and the outer side of the corresponding organic glass tube and between the face airbag and the opposite side of the first organic glass tube on the left, and the signal connection end of the stress sheet is fixedly installed with a cable.
[0012] Furthermore, the top component includes four vertical poles fixed to the top of the test platform, a top plate fixed between the top ends of the four vertical poles, a third linear module fixedly installed on the bottom of the top plate, and a camera movably installed on the outside of the third linear module.
[0013] Furthermore, the building model assembly includes a building model box abutting against the end surface of the transparent soil, and a plurality of pile foundations fixed to the bottom of the building model box and with ends inserted into the interior of the transparent soil.
[0014] Furthermore, the building model box is made of aluminum alloy, and a black and white outer film is pasted on the surface, and the pile foundation is a transparent PVC rod.
[0015] Furthermore, the four upright poles are located outside the transparent model box, and the camera is located above the transparent model box.
[0016] Furthermore, the shooting surface of the CCD industrial camera and the output end of the laser emitter are both facing the side close to the transparent model box, the number of the organic glass tubes is four, and both ends of the organic glass tubes except the first organic glass tube on the left are open.
[0017] Furthermore, the right end of the first plexiglass tube on the left is open, and the other end is closed. A thickened rubber ring is bonded between the first plexiglass tube on the right and the inner right side wall of the transparent model box, and the elastic connecting piece is an annular rubber block.
[0018] Furthermore, the end of the cable passes through the inner wall of the corresponding organic glass tube and passes through the inside of the connecting hole and is connected to the output end of the pressure control cabinet. The number of the first air pipes is four, and the ends of the four first air pipes respectively pass through the inner wall of the corresponding organic glass tube and are connected to the outer side of the corresponding airbag ring. The end of the second air pipe passes through the inner wall of the first organic glass tube on the left and is connected to the outer side of the palm face airbag. The control valve and the flow sensor are both integrated and installed inside the pressure control cabinet, and a main pipeline is fixed between the ends of the first air pipe and the second air pipe close to the pressure control cabinet.
[0019] The test method of the simulation test device for the influence of tunnel excavation on adjacent buildings and structures according to any one of the above items comprises the following steps:
[0020] S1: Model platform construction, including the installation of the test platform and the transparent model box, installing and fixing the first mobile robot arm and the CCD industrial camera, and then installing and fixing the second mobile robot arm and the laser transmitter, and testing whether their functions are normal, and fixing the camera on the outside of the third linear module;
[0021] S2: According to the test requirements, the transparent soil is proportioned, the particle gradation of fused quartz sand is selected, the proportion of the mixed solvent of No. 1 white oil and n-dodecane solution is selected, and the refractive index of the transparent soil liquid is adjusted to be consistent with the refractive index of the transparent solid particles to form a transparent soil product. The preparation of the transparent soil is completed, and the transparent soil is filled into the transparent model box according to the preset plan;
[0022] S3: Assemble the plexiglass tube, airbag ring, face airbag, elastic connector and stress sheet, place the assembled tunnel model at the designed position in the transparent model box, and check its waterproofness and airtightness; continue to fill the transparent soil until it is close to the designed position of the building model box, abut the building model box against the end face of the transparent soil, and bury the pile foundation inside the transparent soil; vacuum the transparent soil to saturate it, and ensure the pressure balance between the airbag ring and the face airbag;
[0023] S4: Lay out several displacement meters, and connect the displacement meters, CCD industrial cameras, laser transmitters, cameras and computers and other related control equipment to carry out final debugging before the test;
[0024] S5: Install the designed working condition control pressure control cabinet to cooperate with the control valve and flow sensor to control the air pressure inside the airbag ring and the face airbag. By adjusting the inflation and deflation of different airbag rings and face airbags, the corresponding pressure changes, thereby causing the deformation and displacement of the surrounding transparent soil and the transparent soil in front of the face, so as to simulate the surrounding rock stress redistribution and soil displacement field change characteristics during tunnel excavation, as well as the process of soil collapse or uplift around the tunnel and in front of the face caused by the change of pressure;
[0025] S6: During the tunnel excavation simulation, the laser transmitter and the CCD industrial camera can continuously collect speckle field photos, which can be poured into the computer to analyze the displacement field changes of the end face in different time domains using P IV three-dimensional measurement technology; the video image and displacement data of the upper building structure are collected by the camera and displacement meter to obtain the three-dimensional displacement field and strain field data and change rules of the building model box at the predetermined position;
[0026] S7: By conducting parallel experiments, controlling the first linear module to move the first mobile robot arm, and controlling the second linear module to move the second mobile robot arm, so as to collect position image parameters of different end faces, the analysis of buildings at different positions and the analysis of the three-dimensional deformation inside the soil can be realized.
[0027] Furthermore, when filling the transparent soil in S2, it is only necessary to fill it to the depth set by the tunnel excavation simulation system in the test plan. In S4, the displacement meters are arranged around the transparent model box, and the four sides and the bottom of the transparent model box are transparent organic glass plates.
[0028] (III) Beneficial effects
[0029] Compared with the prior art, the present invention provides a simulation test device and test method for the impact of tunnel excavation on adjacent buildings and structures, which has the following beneficial effects:
[0030] 1. The simulation test device and test method for the impact of tunnel excavation on adjacent structures provide an overall and three-dimensional visual analysis of the impact of tunnel excavation on adjacent structures, effectively simulate the coupled evolution law of superstructure-foundation-lower soil, and have a simple model structure, easy operation, low test cost, and good simulation effect. It is of great significance to the development of urban underground space. The inflation and exhaust of the airbag ring and the face airbag are used to effectively simulate the deformation of the soil around the lining and the uplift or collapse of the face soil caused by tunnel excavation. The segmented airbag inlet and outlet air is used to simulate the unloading effect of soil excavation, which can realize the accurate measurement of the change of lining surrounding rock pressure and soil loss rate, analyze the ground uplift caused by excessive support force, or the ground settlement law caused by too small support force, not only can the influence of tunnel pressure change on soil be obtained, but also the change law of soil around the lining can be analyzed. At the same time, through parameter control, the linkage changes caused by soil characteristics of different construction parameters of tunnel excavation can be simulated.
[0031] 2. The simulation test device and test method for the impact of tunnel excavation on adjacent buildings and structures can realize image acquisition at different slice positions along the set trajectory by adopting the cooperation between the first mobile robot arm and the CCD industrial camera and the cooperation between the second mobile robot arm and the laser emitter, and use a computer to analyze the data to establish an effective linkage mechanism to simulate the entire process of real excavation and visualize and comprehensively simulate the stress, strain and displacement. Through the transparent soil configuration, different geological conditions can be simulated, and the upper construction structure and foundation structure form, load size and spatial relationship can be adjusted to achieve effective simulation of different structural forms such as roadbed, underground retaining wall, pile group foundation, independent pile foundation, etc., so that the impact of tunnel excavation on adjacent foundation pits and their retaining structures, and existing tunnels with a small clearance can be effectively simulated and analyzed by deploying corresponding sensors and test methods, which can realize the impact of tunnel excavation on surrounding adjacent buildings and structures in complex urban underground environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 It is a schematic diagram of the structure of the simulation test device and test method for the influence of tunnel excavation on adjacent buildings and structures proposed by the present invention;
[0033] Figure 2 The present invention provides a simulation test device and test method for the influence of tunnel excavation on adjacent buildings and structures. Figure 1 A schematic front cross-sectional view of the connection structure of the transparent model box;
[0034] Figure 3 The present invention provides a simulation test device and test method for the influence of tunnel excavation on adjacent buildings and structures. Figure 2 A cross-sectional schematic diagram of the connection structure of the plexiglass tube;
[0035] Figure 4 The present invention provides a simulation test device and test method for the influence of tunnel excavation on adjacent buildings and structures. Figure 3 A partial enlarged schematic diagram of the middle A part;
[0036] Figure 5 The present invention provides a simulation test device and test method for the influence of tunnel excavation on adjacent buildings and structures. Figure 3 Schematic diagram of the top view distribution of the first trachea connection structure.
[0037] In the figure: 1 test platform, 200 recording mechanism, 201 first linear module, 202 first mobile mechanical arm, 203 CCD industrial camera, 300 linkage mechanism, 301 second linear module, 302 second mobile mechanical arm, 303 laser transmitter, 400 top assembly, 401 upright pole, 402 top plate, 403 third linear module, 404 camera, 500 simulation test system, 501 lifting hydraulic cylinder group, 502 transparent model box, 503 pressure control cabinet, 504 connecting hole, 505 organic glass tube, 506 face airbag, 507 airbag ring, 508 adhesive, 509 elastic connector, 510 stress sheet, 511 cable, 512 first air pipe, 513 second air pipe, 514 control valve, 515 flow sensor, 601 building model box, 602 pile foundation, 7 transparent soil. DETAILED DESCRIPTION
[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0039] See also Figures 1 to 5 The present invention provides a technical solution: a simulation test device for the influence of tunnel excavation on adjacent buildings and structures, comprising a test platform 1, a camera mechanism 200 is installed on the top of the test platform 1, a linkage mechanism 300 arranged in a vertical direction with the camera mechanism 200 is installed on the top of the test platform 1, a simulation test system 500 is installed on the top of the test platform 1, and a top component 400 for shooting the top of the simulation test system 500 is installed on the top of the test platform 1;
[0040] In the above-mentioned embodiment, an overall and three-dimensional visualization analysis of the impact of the tunnel excavation process on adjacent buildings and structures is provided, and the coupled evolution law of the upper structure-foundation-lower soil is effectively simulated. The model has a simple structure, easy operation, low test cost, and good simulation effect, which is of great significance to the development of urban underground space. The air filling and exhaust of the internal structure of the simulation test system 500 are used to effectively simulate the deformation of the soil around the lining and the uplift or collapse of the soil at the face caused by tunnel excavation. Not only can the impact of tunnel pressure changes on the soil be obtained, but also the change law of the soil around the lining can be analyzed. At the same time, through parameter control, the linkage changes caused by the soil layer characteristics of different construction parameters of tunnel excavation can be simulated. By adopting the cooperation of the recording mechanism 200 and the linkage mechanism 300, image acquisition at different slice positions along the set trajectory can be realized. By using a computer to analyze data, an effective linkage mechanism is established to simulate the whole process of real excavation and visualize and comprehensively simulate the stress, strain and displacement conditions, which can realize the impact of tunnel excavation on the surrounding adjacent buildings and structures in a complex urban underground environment.
[0041] The simulation test system 500 in this embodiment is a structure for simulating the actual situation in the tunnel excavation process more closely to reality.
[0042] like Figure 1 and Figure 2 As shown, the simulation test system 500 includes a lifting hydraulic cylinder group 501 fixedly installed on the top of the test platform 1, a transparent model box 502 fixedly installed at the output end of the lifting hydraulic cylinder group 501 and with an opening on the top, transparent soil 7 filled in the transparent model box 502, and a tunnel excavation simulation system installed on the inner side of the transparent model box 502 and used for conducting tests in conjunction with the transparent soil 7; a pressure control cabinet 503 is fixedly installed on the top of the test platform 1, and a building model component is installed on the top of the transparent soil 7.
[0043] It should be noted that the lifting hydraulic cylinder group 501 is composed of four hydraulic cylinders and a master controller, and the master controller is used to control the input or output of the liquid inside the hydraulic cylinder, so as to achieve the lifting and lowering adjustment of the transparent model box 502.
[0044] It should also be noted that the transparent soil 7 is composed of transparent solid particles, transparent liquid and a binder in a certain proportion. The transparent fixed particles are selected from fused quartz sand particles of different particle sizes and gradations of 0.1mm-2mm. The transparent liquid is prepared by a mixed solvent of No. 15 white oil and n-dodecane solution, maintaining a refractive index of 1.4585. The actual conditions of different soil bodies are simulated by adjusting the proportion.
[0045] In this embodiment, the recording mechanism 200 is a structure for recording the internal structure of the transparent model box 502 .
[0046] like Figure 1 As shown, the recording mechanism 200 includes a first linear module 201 fixedly installed on the top of the test platform 1, a first mobile robot 202 slidably installed on the outside of the first linear module 201 and capable of being driven by it to move linearly, and a CCD industrial camera 203 fixedly installed on the output shaft of the first mobile robot 202.
[0047] It should be noted that the first linear module 201 is located on the front side of the transparent model box 502 to facilitate the shooting of the internal structure.
[0048] In this embodiment, the linkage mechanism 300 is a structure used to cooperate with the recording mechanism 200 to facilitate recording of a designated plane.
[0049] like Figure 1 As shown, the linkage mechanism 300 includes a second linear module 301 fixedly installed on the top of the test platform 1, a second mobile robot arm 302 slidably installed on the outside of the second linear module 301 and capable of being driven by it to move linearly, and a laser emitter 303 fixedly installed on the output shaft of the second mobile robot arm 302.
[0050] It should be noted that the shooting surface of the CCD industrial camera 203 and the output end of the laser emitter 303 are both facing the side close to the transparent model box 502, so that the laser emitted by the laser emitter 303 can be transmitted to the inner side of the transparent model box 502 and can be photographed and recorded by the CCD industrial camera 203.
[0051] The tunnel excavation simulation system in this embodiment is a structure used to simulate the compression conditions of each part and the deformation conditions of the soil during the tunnel excavation process.
[0052] like Figure 3 , Figure 4 and Figure 5As shown, the tunnel excavation simulation system includes a connecting hole 504 opened on a side of a transparent model box 502 close to a pressure control cabinet 503, a plurality of organic glass tubes 505 arranged inside the transparent soil 7 and located corresponding to the position of the connecting hole 504, a face air bag 506 abutting against the end of the first organic glass tube 505 on the left, an air bag ring 507 covering the outer side of the organic glass tube 505, a plurality of elastic connectors 509 bonded between opposite sides of two adjacent organic glass tubes 505, a plurality of first air pipes 512 penetrating the inner side of the connecting hole 504, a second air pipe 513 penetrating the inner side of the connecting hole 504, a plurality of control valves 514 respectively fixedly installed on the outer sides of the first air pipe 512 and the second air pipe 513, and a plurality of control valves 515 respectively fixedly installed on the outer sides of the first air pipe 512 and the second air pipe 513, and a plurality of control valves 516 respectively fixedly installed on the outer sides of the first air pipe 512 and the second air pipe 513, and a plurality of control valves 517 respectively fixedly installed on the outer sides of the first air pipe 512 and the second air pipe 513, and a plurality of control valves 518 respectively fixedly installed on the outer sides of the first air pipe 512 and the second air pipe 513, and a plurality of control valves 519 respectively fixedly installed on the outer sides of the first air pipe 512 and the second air pipe 513, and a plurality of control valves 519 respectively fixedly installed on the outer sides of the second air pipe 513, and a plurality of control valves 519 respectively fixedly installed on the outer sides of the second air pipe 513, and a plurality of control valves 519 respectively fixedly installed on the outer sides of the first air A plurality of flow sensors 515 are fixedly installed on the outside of the first air pipe 512 and the second air pipe 513 respectively; the organic glass tube 505, the face airbag 506, the airbag ring 507 and a plurality of elastic connecting parts 509 constitute a tunnel model, a plurality of adhesives 508 are bonded between the inner side of the airbag ring 507 and the outer side of the corresponding organic glass tube 505 and between the face airbag 506 and the opposite side of the first organic glass tube 505 on the left, a plurality of stress sheets 510 are bonded between the inner side of the airbag ring 507 and the outer side of the corresponding organic glass tube 505 and between the face airbag 506 and the opposite side of the first organic glass tube 505 on the left, and a cable 511 is fixedly installed on the signal connection end of the stress sheet 510.
[0053] It should be noted that there are four plexiglass tubes 505, and both ends of the plexiglass tubes 505 except the first plexiglass tube 505 on the left are open, the right end of the first plexiglass tube 505 on the left is open, and the other end is closed, a thickened rubber ring is bonded between the first plexiglass tube 505 on the right and the inner right side wall of the transparent model box 502, and the elastic connecting piece 509 is a ring-shaped rubber block, so that the four plexiglass tubes 505 can form an overall structure that can be appropriately shifted in position through the elastic connecting piece 509 and the thickened rubber ring, which is convenient for observing the pressure conditions of each part, and the adhesive 508 can be glue, which can achieve a good bonding effect.
[0054] In addition, the end of the cable 511 passes through the inner wall of the corresponding organic glass tube 505 and passes through the interior of the connecting hole 504 and is connected to the output end of the pressure control cabinet 503. The number of the first air pipes 512 is four, and the ends of the four first air pipes 512 respectively pass through the inner wall of the corresponding organic glass tube 505 and are connected to the outer side of the corresponding air bag ring 507. The end of the second air pipe 513 passes through the inner wall of the first organic glass tube 505 on the left and is connected to the outer side of the face air bag 506. The control valve 514 and the flow sensor 515 are both integrated and installed inside the pressure control cabinet 503. A main pipeline is fixed between the ends of the first air pipe 512 and the second air pipe 513 close to the pressure control cabinet 503. The main pipeline is used to input or exhaust gas, so that the pressure control cabinet 503 can control whether the gas inside the main pipeline can enter the first air pipe 512 or the second air pipe 513 through the control valve 514, and the gas flow is monitored through the flow sensor 515 to ensure that the total amount of input gas meets the preset value.
[0055] Meanwhile, the stress sheet 510 is a thin sheet capable of testing pressure, and can be used to monitor the pressure conditions of the airbag ring 507 and the tunnel face airbag 506, so as to determine the current pressure amount.
[0056] In this embodiment, the top component 400 is a structure for photographing the top of the building model component.
[0057] like Figure 1 and Figure 2 As shown, the top component 400 includes four vertical poles 401 fixed on the top of the test platform 1, a top plate 402 fixed between the top ends of the four vertical poles 401, a third linear module 403 fixedly installed on the bottom of the top plate 402, and a camera 404 movably installed on the outside of the third linear module 403.
[0058] It should be noted that the four uprights 401 are located outside the transparent model box 502 , and the camera 404 is located above the transparent model box 502 , so that the camera 404 can record the top image of the transparent model box 502 from above the transparent model box 502 .
[0059] It should also be noted that the first linear module 201, the second linear module 301 and the third linear module 403 are all composed of a mounting base, a drive motor, two guide rails, a screw and a slider. The drive motor is used to drive the screw to rotate, and then the slider is driven by the screw to move in a straight line under the limiting action between the two corresponding guide rails. The camera 404, the first mobile robotic arm 202 and the second mobile robotic arm 302 are respectively fixedly installed on the outside of the corresponding slider so as to be driven to move.
[0060] In this embodiment, the building model component is used to simulate the structure of the ground building.
[0061] like Figure 1 and Figure 2 As shown, the building model assembly includes a building model box 601 abutting against the end surface of the transparent soil 7, and a plurality of pile foundations 602 fixed to the bottom of the building model box 601 and with ends inserted into the inside of the transparent soil 7.
[0062] It should be noted that the building model box 601 is made of aluminum alloy, and a black and white outer film is pasted on the surface. The pile foundation 602 is a transparent PVC rod, so that the building model box 601 can simulate the actual ground building, and the pile foundation 602 serves as the foundation and is easy to observe.
[0063] According to the above embodiment, the present invention also provides a test method of a simulation test device for the impact of tunnel excavation on adjacent buildings and structures, comprising the following steps:
[0064] S1: Model platform construction, including the installation of the test platform 1 and the transparent model box 502, the installation and fixation of the first mobile mechanical arm 202 and the CCD industrial camera 203, the installation and fixation of the second mobile mechanical arm 302 and the laser transmitter 303, and the testing of whether their functions are normal, and the fixing of the camera 404 on the outside of the third linear module 403;
[0065] S2: The transparent soil 7 is proportioned according to the test requirements, the particle gradation of fused quartz sand, the proportion of the mixed solvent of No. 15 white oil and n-dodecane solution are selected, and the refractive index of the transparent soil 7 liquid is adjusted to be consistent with the refractive index of the transparent solid particles to form a transparent soil 7 finished product, and the preparation of the transparent soil 7 is completed. The transparent soil 7 is filled into the transparent model box 502 according to the preset plan; wherein, when filling the transparent soil 7, it is only necessary to fill it to the depth set by the tunnel excavation simulation system in the test plan;
[0066] S3: Assemble the organic glass tube 505, the airbag ring 507, the tunnel face airbag 506, the elastic connector 509 and the stress sheet 510, place the assembled tunnel model at the designed position in the transparent model box 502, and check its waterproofness and airtightness; continue to fill the transparent soil 7 until it is close to the designed position of the building model box 601, abut the building model box 601 against the end face of the transparent soil 7, and bury the pile foundation 602 inside the transparent soil 7; vacuum the transparent soil 7 to saturate it, and ensure the pressure balance between the airbag ring 507 and the tunnel face airbag 506;
[0067] S4: Arrange several displacement meters, and connect the displacement meters, CCD industrial camera 203, laser transmitter 303 and camera 404 to computers and other related control equipment for final debugging before the test; wherein, the displacement meters are arranged around the transparent model box 502, and the surroundings and bottom of the transparent model box 502 are transparent organic glass plates;
[0068] S5: The designed working condition control pressure control cabinet 503 is installed to cooperate with the control valve 514 and the flow sensor 515 to control the air pressure inside the airbag ring 507 and the tunnel face airbag 506. The corresponding pressure is changed by adjusting the inflation and deflation of different airbag rings 507 and tunnel face airbags 506, thereby causing the deformation and displacement of the surrounding transparent soil 7 and the transparent soil 7 in front of the tunnel face, so as to simulate the surrounding rock stress redistribution and soil displacement field change characteristics during tunnel excavation, as well as the process of soil collapse or uplift around the tunnel and in front of the tunnel face caused by the change of pressure;
[0069] S6: During the tunnel excavation simulation, the laser emitter 303 and the CCD industrial camera 203 cooperate to continuously collect speckle field photos, which can be transferred into the computer to analyze the displacement field changes of the end face in different time domains using the PIV three-dimensional measurement technology; the video image and displacement data of the upper building structure are collected by the camera 404 and the displacement meter to obtain the three-dimensional displacement field and strain field data and the change law of the building model box 601 at the predetermined position;
[0070] S7: By conducting parallel experiments, the first linear module 201 is controlled to move the first mobile robot 202, and the second linear module 301 is controlled to move the second mobile robot 302, so as to collect position image parameters of different end faces, thereby realizing the analysis of buildings at different positions and the analysis of the three-dimensional deformation inside the soil.
[0071] Compared with the prior art, the simulation test device and test method for the influence of tunnel excavation on adjacent structures provide an overall and three-dimensional visualization analysis of the influence of the tunnel excavation process on adjacent structures, effectively simulate the coupled evolution law of the upper structure-foundation-lower soil, and have a simple model structure, easy operation, low test cost, and good simulation effect, which is of great significance to the development of urban underground space. The airbag ring 507 and the face airbag 506 are used to effectively simulate the deformation of the soil around the lining and the uplift or collapse of the face soil caused by tunnel excavation. The segmented airbag inlet and outlet air is used to simulate the unloading effect of soil excavation, which can realize the accurate measurement of the change of lining surrounding rock pressure and soil loss rate, analyze the ground uplift caused by excessive support force, or the ground settlement law caused by too small support force, not only can the influence of tunnel pressure change on soil be obtained, but also the change law of soil around the lining can be analyzed. At the same time, through parameter control, the linkage change caused by soil characteristics of different construction parameters of tunnel excavation can be simulated.
[0072] By adopting the cooperation between the first mobile mechanical arm 202 and the CCD industrial camera 203 and the cooperation between the second mobile mechanical arm 302 and the laser emitter 303, it is possible to realize image acquisition at different slice positions along the set trajectory, use a computer to analyze data, establish an effective linkage mechanism, simulate the entire process of real excavation, and visualize and comprehensively simulate the stress, strain and displacement conditions; by configuring the transparent soil 7 to realize simulation of different geological conditions, adjust the upper construction structure and the foundation structure form, load size and spatial relationship, and realize effective simulation of different structural forms such as roadbed, underground retaining wall, pile group foundation, independent pile foundation, etc., so that the influence of tunnel excavation on adjacent foundation pits and their supporting structures, and existing tunnels with small clearance can be effectively simulated and analyzed by deploying corresponding sensors and test methods, and the influence of tunnel excavation on surrounding adjacent construction structures in complex urban underground environments can be realized, which solves the problem that the existing simulation experiments cannot conduct an overall, systematic and comprehensive analysis of the displacement, deformation, settlement and other influences of adjacent buildings caused by tunnel excavation in complex urban environments.
[0073] The electrical components appearing in the article are all electrically connected to the main controller and the power supply. The provision of power supply is common knowledge in the field. The main controller can be a conventional known device for control such as a computer, which can be realized through simple programming by technicians in the field. They are all existing public power connection technologies and will not be described in detail in the article.
[0074] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0075] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A simulation test device for the impact of tunnel excavation on adjacent buildings and structures, comprising a test platform (1), characterized in that: The top of the test platform (1) is equipped with a recording mechanism (200), the top of the test platform (1) is equipped with a linkage mechanism (300) arranged in a vertical direction with the recording mechanism (200), the top of the test platform (1) is equipped with a simulation test system (500), and the top of the test platform (1) is equipped with a top component (400) for shooting the top of the simulation test system (500); The simulation test system (500) comprises a lifting hydraulic cylinder group (501) fixedly mounted on the top of a test platform (1), a transparent model box (502) fixedly mounted on the output end of the lifting hydraulic cylinder group (501) and having an opening on the top, transparent soil (7) filled in the transparent model box (502), and a tunnel excavation simulation system mounted on the inner side of the transparent model box (502) and used for conducting tests in conjunction with the transparent soil (7); a pressure control cabinet (503) is fixedly mounted on the top of the test platform (1), and a building model assembly is mounted on the top of the transparent soil (7); The recording mechanism (200) comprises a first linear module (201) fixedly mounted on the top of the test platform (1), a first mobile mechanical arm (202) slidably mounted on the outside of the first linear module (201) and capable of being driven by the first linear module to move linearly, and a CCD industrial camera (203) fixedly mounted on the output shaft of the first mobile mechanical arm (202); The linkage mechanism (300) comprises a second linear module (301) fixedly mounted on the top of the test platform (1), a second mobile mechanical arm (302) slidably mounted on the outside of the second linear module (301) and capable of being driven by the second linear module to move linearly, and a laser emitter (303) fixedly mounted on the output shaft of the second mobile mechanical arm (302); The tunnel excavation simulation system comprises a connecting hole (504) provided on a side of the transparent model box (502) close to the pressure control cabinet (503), a plurality of organic glass tubes (505) arranged inside the transparent soil (7) and located corresponding to the location of the connecting hole (504), a face air bag (506) abutting against the end of the first organic glass tube (505) on the left side, an air bag ring (507) covering the outside of the organic glass tube (505), a plurality of elastic connecting members (509) bonded between opposite sides of two adjacent organic glass tubes (505), a plurality of first air pipes (512) penetrating the inside of the connecting hole (504), a second air pipe (513) penetrating the inside of the connecting hole (504), a plurality of control valves (514) fixedly installed on the outside of the first air pipe (512) and the second air pipe (513), A plurality of flow sensors (515) are respectively fixedly mounted on the outside of the first air pipe (512) and the second air pipe (513); the organic glass tube (505), the face airbag (506), the airbag ring (507) and a plurality of elastic connectors (509) form a tunnel model; a plurality of adhesives (508) are bonded between the inner side of the airbag ring (507) and the outer side of the corresponding organic glass tube (505) and between the face airbag (506) and the opposite side of the first organic glass tube (505) on the left; a plurality of stress sheets (510) are bonded between the inner side of the airbag ring (507) and the outer side of the corresponding organic glass tube (505) and between the face airbag (506) and the opposite side of the first organic glass tube (505) on the left; and a cable (511) is fixedly mounted on the signal connection end of the stress sheet (510).
2. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 1, characterized in that: The top assembly (400) comprises four vertical poles (401) fixed to the top of the test platform (1), a top plate (402) fixed between the top ends of the four vertical poles (401), a third linear module (403) fixedly mounted on the bottom of the top plate (402), and a camera (404) movably mounted on the outside of the third linear module (403).
3. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 1, characterized in that: The building model assembly comprises a building model box (601) abutting against the end surface of the transparent soil (7), and a plurality of pile foundations (602) fixed to the bottom of the building model box (601) and with ends inserted into the interior of the transparent soil (7).
4. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 3, characterized in that: The building model box (601) is made of aluminum alloy, and a black and white outer film is pasted on the surface, and the pile foundation (602) is a transparent PVC rod.
5. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 2, characterized in that: The four vertical poles (401) are located outside the transparent model box (502), and the camera (404) is located above the transparent model box (502).
6. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 1, characterized in that: The shooting surface of the CCD industrial camera (203) and the output end of the laser emitter (303) are both facing the side close to the transparent model box (502), the number of the organic glass tubes (505) is four, and both ends of the organic glass tubes (505) except the first organic glass tube (505) on the left are open.
7. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 1, characterized in that: The right end of the first organic glass tube (505) on the left is open, and the other end is closed. A thickened rubber ring is bonded between the first organic glass tube (505) on the right and the inner right side wall of the transparent model box (502), and the elastic connecting member (509) is a ring-shaped rubber block.
8. The simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 1, characterized in that: The end of the cable (511) passes through the inner wall of the corresponding organic glass tube (505) and passes through the inside of the connecting hole (504) and is connected to the output end of the pressure control cabinet (503). The number of the first air pipes (512) is four, and the ends of the four first air pipes (512) respectively pass through the inner wall of the corresponding organic glass tube (505) and are connected to the outer side of the corresponding air bag ring (507). The end of the second air pipe (513) passes through the inner wall of the first organic glass tube (505) on the left and is connected to the outer side of the face air bag (506). The control valve (514) and the flow sensor (515) are both integrated and installed inside the pressure control cabinet (503). A main pipeline is fixed between the ends of the first air pipe (512) and the second air pipe (513) close to the pressure control cabinet (503).
9. A test method based on the simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to any one of claims 1 to 8, characterized in that: The following steps are involved: S1: Model platform construction, including installation of the test platform (1) and the transparent model box (502), installation and fixing of the first mobile mechanical arm (202) and the CCD industrial camera (203), installation and fixing of the second mobile mechanical arm (302) and the laser transmitter (303), and testing whether their functions are normal, and fixing the camera (404) on the outside of the third linear module (403); S2: The transparent soil (7) is proportioned according to the test requirements, the particle gradation of fused quartz sand is selected, the proportion of the mixed solvent of No. 15 white oil and n-dodecane solution is selected, and the refractive index of the transparent soil (7) liquid is adjusted to be consistent with the refractive index of the transparent solid particles to form a transparent soil (7) finished product, and the transparent soil (7) is prepared, and the transparent soil (7) is filled into the transparent model box (502) according to the preset plan; S3: Assemble the organic glass tube (505), the airbag ring (507), the tunnel face airbag (506), the elastic connector (509) and the stress sheet (510), arrange the assembled tunnel model at the designed position in the transparent model box (502), and check its waterproofness and airtightness; continue to fill the transparent soil (7) until it is close to the designed position of the building model box (601), abut the building model box (601) against the end face of the transparent soil (7), and bury the pile foundation (602) inside the transparent soil (7); vacuum the transparent soil (7) to saturate it, and ensure the pressure balance between the airbag ring (507) and the tunnel face airbag (506); S4: Arrange a number of displacement meters, and connect the displacement meters, CCD industrial cameras (203), laser transmitters (303) and cameras (404) to computers and other related control devices to perform final debugging before the test; S5: Installing a designed working condition control pressure control cabinet (503) in cooperation with a control valve (514) and a flow sensor (515) to control the air pressure inside the airbag ring (507) and the tunnel face airbag (506), and adjusting the inflation and deflation of different airbag rings (507) and tunnel face airbags (506) to change the corresponding pressure, thereby causing deformation and displacement of the surrounding transparent soil (7) and the transparent soil (7) in front of the tunnel face, so as to simulate the surrounding rock stress redistribution and soil displacement field change characteristics during tunnel excavation, as well as the process of soil collapse or uplift around the tunnel and in front of the tunnel face caused by the change in pressure; S6: During the tunnel excavation simulation, the laser emitter (303) and the CCD industrial camera (203) cooperate to continuously collect speckle field photos, which can be transferred into a computer to analyze the displacement field changes of the end face in different time domains using the PIV three-dimensional measurement technology; the video image and displacement data of the upper building structure are collected by the camera (404) and the displacement meter to obtain the three-dimensional displacement field and strain field data and the change law of the building model box (601) at the predetermined position; S7: By carrying out parallel experiments, the first linear module (201) is controlled to move the first mobile mechanical arm (202), and the second linear module (301) is controlled to move the second mobile mechanical arm (302), so as to collect position image parameters of different end faces, thereby realizing analysis of buildings at different positions and analysis of three-dimensional deformation inside the soil.
10. The test method of the simulation test device for the impact of tunnel excavation on adjacent buildings and structures according to claim 9, characterized in that: When filling the transparent soil (7) in S2, it is only necessary to fill it to the depth set by the tunnel excavation simulation system in the test plan. In S4, the displacement meters are arranged around the transparent model box (502), and the surroundings and bottom of the transparent model box (502) are transparent organic glass plates.
Citation Information
Cited By
Device and method for testing tunnel deformation caused by underground water level change and vibration
CN119438540A
Centrifugal test device for simulating interaction between tunnel and embedded strip-shaped foundation structure
CN119900306A