Industrial lighting system

By using lamp modules, control modules and lighting intensity testers in industrial lighting systems, lighting plans are established, and the problem of energy waste in the existing technology is solved, and intelligent control and power optimization of the lighting system are realized.

CN118945945AInactive Publication Date: 2024-11-12HUANENG CHAOHU POWER GENERATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410998721.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-24
Publication Date
2024-11-12
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The lack of intelligent control of existing industrial lighting systems leads to waste of energy.

Method used

An industrial lighting system was designed, including a lamp module, a control module and a light intensity tester. It establishes a predictive model through historical workload and working hours, generates a lighting plan, and automatically controls the switches and brightness of the lighting area to avoid power during unmanned periods. waste.

Benefits of technology

实现了照明系统的定时开关,确保工作时段正常供电,非工作时段自动断电,避免了电力资源的浪费,并通过实时亮度检测和功率计算,优化了照明强度和电力使用。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118945945A_ABST
    Figure CN118945945A_ABST
Patent Text Reader

Abstract

The invention provides an industrial lighting system, which relates to the technical field of industrial lighting, and comprises a plurality of lamp modules respectively arranged in different lighting areas of a working environment; the control module is used for generating a control instruction for controlling the lamp module to work; and the communication module is used for transmitting the control instruction between the lamp module and the control module. The working time length prediction model of each lighting area is obtained by using the historical workload of each lighting area and the corresponding historical working time, so that the predicted working time length of the day can be obtained through the working time length prediction model of the corresponding lighting area according to the workload of the day of each working area; according to the method, the current day illumination plan corresponding to the illumination area is established, so that the illumination is performed according to the plan, and the power is automatically cut off at the time outside the current day illumination plan, thereby enabling the illumination system to obtain a timing switching effect, avoiding the empty operation of the illumination system under the unmanned condition, and avoiding the waste of electric power resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of industrial lighting, and in particular to an industrial lighting system. Background Art

[0002] Industrial lighting, or factory lighting design, includes indoor lighting, outdoor device lighting, station and field lighting, underground lighting, road lighting, guard lighting, obstacle lighting, etc. A factory is a place where a given product is produced, generally consisting of a factory building, office and other ancillary rooms, various outdoor devices, stations, fields, roads, etc.

[0003] In the prior art, industrial lighting systems are mostly controlled manually, lacking intelligent control over them, which easily leads to energy waste. Summary of the invention

[0004] The present invention provides an industrial lighting system to solve the defects in the prior art that the industrial lighting system lacks intelligent control and easily causes waste of energy.

[0005] In one aspect, the present invention provides an industrial lighting system, comprising:

[0006] Several lighting modules are arranged in different lighting areas of the working environment;

[0007] A control module, used to generate control instructions for controlling the operation of the lighting module;

[0008] Several light intensity testers are installed at several monitoring points set in the lighting area to detect the actual brightness of the monitoring points;

[0009] The communication module is used to transmit control instructions between the lighting module and the control module.

[0010] Preferably, the lamp module comprises:

[0011] Lighting group, the lighting group is composed of several LED lamps connected in series;

[0012] DC power supply, used to provide stable DC power supply for LED lamps;

[0013] The controller is arranged inside the DC power supply, and is used to control the output current of the DC power supply.

[0014] Preferably, the control module includes:

[0015] A model building unit, used to build a working time prediction model for each lighting area based on the historical workload and corresponding historical working time of each lighting area;

[0016] A plan making unit, for establishing a lighting plan for the corresponding lighting area on the day according to the workload of each lighting area on the day and based on a working time model of the corresponding lighting area;

[0017] Temporary lighting unit, used to establish temporary lighting plans;

[0018] A power calculation unit, used to regularly calculate the working power required by the LED lamps in each lighting area;

[0019] Manual modification unit, used to manually modify the lighting plan for the day and temporary lighting plan;

[0020] The command generation unit is used to generate control instructions.

[0021] Preferably, the planning unit includes:

[0022] The workload acquisition subunit is used to acquire the workload of each lighting area on the day;

[0023] A working time calculation subunit is used to input the daily workload of each lighting area into the corresponding working time prediction model to obtain the daily predicted working time of each lighting area;

[0024] The plan generation subunit is used to generate a lighting plan for the corresponding lighting area on the day based on the predicted working hours of each lighting area on the day.

[0025] Preferably, the power calculation unit comprises:

[0026] A determination subunit, used to determine whether lighting needs to be turned on in the lighting area;

[0027]

[0028] Among them, W i is the lighting judgment parameter of the i-th lighting area; Q i1 is the number of monitoring points in the i-th lighting area whose actual brightness is lower than the lighting brightness; Q i0 is the total number of monitoring points in the i-th lighting area;

[0029] When W i is greater than or equal to the preset first threshold, the lighting is turned on. i If the value is less than the preset first threshold, the lighting will not be turned on;

[0030] A power calculation subunit, used to calculate the working power required by the LED lamp;

[0031]

[0032] Among them, P iA is the working power required by the LED lamps in the i-th lighting area; i is the lighting area of ​​the i-th lighting area; L i is the required lighting intensity of the i-th lighting area; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; W i is the luminous efficiency of the LED lamp in the i-th lighting area, in lumens per watt; σ is the magnification factor; M i is the total number of monitoring points in the i-th lighting area; G ij0 is the actual brightness detection value of the jth monitoring point in the i-th lighting area before lighting.

[0033] Preferably, the temporary lighting unit comprises:

[0034] A first data input subunit, used for inputting a lighting area and a lighting duration;

[0035] A plan establishment subunit is used to generate a temporary lighting plan based on the lighting area and lighting duration;

[0036] The temporary lighting plan includes: lighting start and end times and lighting areas.

[0037] Preferably, the manual modification unit includes:

[0038] A plan selection unit is used to select the lighting plan for the day or the temporary lighting plan that needs to be modified;

[0039] The authority authentication subunit is used to verify the operator's authority to use;

[0040] A second data input subunit is used to input a modified lighting plan for the day or a temporary lighting plan;

[0041] The data overwriting subunit is used to overwrite the original lighting plan for the day with the modified lighting plan for the day or to overwrite the original temporary lighting plan with the modified temporary lighting plan.

[0042] Preferably, the industrial lighting system further includes a self-checking module, which includes:

[0043] A task establishment unit, used to establish a self-check task before starting lighting in each lighting area each time;

[0044] A judging unit, used to judge whether the usage time of the LED lamp in the current lighting area is greater than a preset duration time of the optimal state of the LED lamp, and when the usage time of the LED lamp is greater than or equal to the preset duration time of the optimal state of the LED lamp, the state of the LED lamp is evaluated, and when the usage time of the LED lamp is less than the preset duration time of the optimal state of the LED lamp, the state of the LED lamp is not evaluated, and the self-checking task is directly ended;

[0045] Evaluation unit, used to evaluate the status of LED lamps;

[0046] The alarm unit sends a maintenance alarm when the evaluation result of the status of the LED lamp is that maintenance is required.

[0047] Preferably, the evaluation unit comprises:

[0048] A first parameter calculation subunit, used to calculate a first evaluation parameter of the lighting area;

[0049]

[0050] Among them, F 1i is the first evaluation parameter of the i-th lighting area; S is the cost of LED lamp maintenance; t0 is the unit time; t is the used time of the LED lamp; ln is the logarithmic function with e as the base; e is the natural base; t s is the theoretical life of the lighting group; G ij is the actual brightness detection value of the jth monitoring point in the i-th lighting area after lighting; G ij0 is the actual brightness detection value of the jth monitoring point in the i-th lighting area before lighting; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; D ijk M is the distance from the kth undamaged LED lamp in the ith lighting area to the jth monitoring point; i is the total number of monitoring points in the i-th lighting area; W i is the luminous efficiency of the LED lamps in the i-th lighting area, in lumens per watt; P is is the actual working power of the LED lamp in the i-th lighting area; t m is the preset optimal state duration of the LED lamp; S0 is the preset threshold of the average daily maintenance cost;

[0051] A second parameter calculation subunit, used to calculate a second evaluation parameter of the lighting area;

[0052]

[0053] Among them, F 2i is the second evaluation parameter of the i-th lighting area; μ is the safety factor; U is the theoretical maximum brightness of the LED lamp; σ is the amplification factor; A i is the lighting area of ​​the i-th lighting area; L i is the required lighting intensity of the i-th lighting area; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area;

[0054] The result output subunit, when the first evaluation parameter is greater than 1 or the second evaluation parameter is greater than or equal to 0, the evaluation result is that no maintenance is required, otherwise the evaluation result is that maintenance is required.

[0055] Compared with the prior art, the present invention has the following beneficial effects:

[0056] By utilizing the historical workload and corresponding historical working hours of each lighting area, a working hour prediction model for each lighting area is obtained. Thus, the predicted working hours for the day can be obtained according to the workload of each working area on that day through the working hour prediction model of the corresponding lighting area. Then, a daily lighting plan for the corresponding lighting area is established based on the work and rest time through the predicted working hours on that day. Thus, lighting is carried out based on the daily lighting plan of each lighting area, and power is automatically cut off at times outside the daily lighting plan. Thus, the lighting system functions as a timer switch, ensuring normal power supply to each lighting area during normal working hours, and automatic power cut off during non-working hours, thus avoiding idling of the lighting system when no one is around, and avoiding waste of electricity resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0058] Figure 1 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION

[0059] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0060] In addition, in the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes, and do not specifically refer to the order or sequence, nor are they used to limit the present invention. They are only used to distinguish components or operations described with the same technical terms, and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions and technical features between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0061] Example 1

[0062] An embodiment of the present invention provides an industrial lighting system, including:

[0063] Several lighting modules are arranged in different lighting areas of the working environment;

[0064] In this embodiment, the working environment is the area where the industrial lighting system works, such as a workshop, and the lighting area is the area in the working environment that needs lighting.

[0065] A control module, used to generate control instructions for controlling the operation of the lighting module;

[0066] Several light intensity testers are installed at several monitoring points set in the lighting area to detect the actual brightness of the monitoring points;

[0067] The communication module is used to transmit control instructions between the lighting module and the control module.

[0068] Preferably, the lamp module comprises:

[0069] Lighting group, the lighting group is composed of several LED lamps connected in series;

[0070] DC power supply, used to provide stable DC power supply for LED lamps;

[0071] The controller is arranged inside the DC power supply, and is used to control the output current of the DC power supply.

[0072] Preferably, the control module includes:

[0073] A model building unit, used to build a working time prediction model for each lighting area based on the historical workload and corresponding historical working time of each lighting area;

[0074] A plan making unit, for establishing a lighting plan for the corresponding lighting area on the day according to the workload of each lighting area on the day and based on a working time model of the corresponding lighting area;

[0075] Temporary lighting unit, used to establish temporary lighting plans;

[0076] A power calculation unit, used to regularly calculate the working power required by the LED lamps in each lighting area;

[0077] Manual modification unit, used to manually modify the lighting plan for the day and temporary lighting plan;

[0078] The command generation unit is used to generate control instructions.

[0079] Preferably, the planning unit includes:

[0080] The workload acquisition subunit is used to acquire the workload of each lighting area on the day;

[0081] A working time calculation subunit is used to input the daily workload of each lighting area into the corresponding working time prediction model to obtain the daily predicted working time of each lighting area;

[0082] The plan generation subunit is used to generate a lighting plan for the corresponding lighting area on the day based on the predicted working hours of each lighting area on the day.

[0083] In this embodiment, the control instruction includes a switch command and a brightness dimming command.

[0084] In this embodiment, the working hours prediction model is a model that inputs the workload of the day and outputs the predicted working hours of the day.

[0085] In this embodiment, the lighting plan for the day is the time period during which power is supplied to the lighting on the day; for example, power is supplied to the lighting from 8 am to 8 pm on the same day.

[0086] The beneficial effects of the above technical problems are:

[0087] By utilizing the historical workload and corresponding historical working hours of each lighting area, a working hour prediction model for each lighting area is obtained. Thus, the predicted working hours for the day can be obtained according to the workload of each working area on that day through the working hour prediction model of the corresponding lighting area. Then, a daily lighting plan for the corresponding lighting area is established based on the work and rest time through the predicted working hours on that day. Thus, lighting is carried out based on the daily lighting plan of each lighting area, and power is automatically cut off at times outside the daily lighting plan. Thus, the lighting system functions as a timer switch, ensuring normal power supply to each lighting area during normal working hours, and automatic power cut off during non-working hours, thus avoiding idling of the lighting system when no one is around, and avoiding waste of electricity resources.

[0088] Example 2

[0089] Based on Embodiment 1, the power calculation unit includes:

[0090] A determination subunit, used to determine whether lighting needs to be turned on in the lighting area;

[0091]

[0092] Among them, W i is the lighting judgment parameter of the i-th lighting area; Q i1 is the number of monitoring points in the i-th lighting area whose actual brightness is lower than the lighting brightness; Q i0 is the total number of monitoring points in the i-th lighting area;

[0093] When W i is greater than or equal to the preset first threshold, the lighting is turned on. i If the value is less than the preset first threshold, the lighting will not be turned on;

[0094] A power calculation subunit, used to calculate the working power required by the LED lamp;

[0095]

[0096] Among them, P i A is the working power required by the LED lamps in the i-th lighting area; i is the lighting area of ​​the i-th lighting area; L i is the required lighting intensity of the i-th lighting area; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; W i is the luminous efficiency of the LED lamp in the i-th lighting area, in lumens per watt; σ is the magnification factor; M i is the total number of monitoring points in the i-th lighting area; G ij0 is the actual brightness detection value of the jth monitoring point in the i-th lighting area before lighting.

[0097] In this embodiment, the lighting brightness is a threshold value of the brightness required to start lighting.

[0098] In this embodiment, the number of damaged LED lamps is obtained by counting after manual reporting.

[0099] In this embodiment, the specifications of the LED lamps in one lighting area are the same.

[0100] The beneficial effects of the above technical solution are:

[0101] During the lighting plan period of the day, the actual brightness of several monitoring points in the lighting area is regularly obtained, and the proportion of the number of monitoring points whose actual brightness is lower than the lighting brightness is determined to determine whether the lighting in the lighting area needs to be turned on. When lighting is needed, Calculate the required working power of LED lamps to ensure that the required lighting intensity is achieved in the lighting area, ensure that the staff is always under the light of appropriate brightness, and avoid the LED lamps always working at maximum power, causing excessive brightness to affect the visual sense of the staff, waste of power resources, and reduce the service life of LED lamps. i -N is ) determines the number of LED lamps that can actually work normally, which improves the accuracy of the calculated working power required by the LED lamps. Then, the calculated working power required by the LED lamps is amplified by σ to eliminate the effect of the brightness drop caused by the actual luminous brightness being lower than the theoretical luminous brightness due to the long-term use of the LED lamps, further ensuring that the required lighting intensity is achieved in the lighting area.

[0102] Example 3

[0103] Based on embodiment 1 or 2, the temporary lighting unit includes:

[0104] A first data input subunit, used for inputting a lighting area and a lighting duration;

[0105] A plan establishment subunit is used to generate a temporary lighting plan based on the lighting area and lighting duration;

[0106] The temporary lighting plan includes: lighting start and end times and lighting areas.

[0107] In this embodiment, when the temporary lighting plan is executed, the working power required by the LED lamp is calculated by the power calculation unit.

[0108] The beneficial effects of the above technical solution are:

[0109] When it is necessary to turn on the lights temporarily for a short period of time outside the lighting plan time of the day (such as temporarily taking out certain items, temporarily repairing the equipment, etc.), a temporary lighting plan is established by entering the lighting start and end time and the lighting area, thereby achieving the purpose of temporarily turning on the lights, avoiding the situation where the lights cannot be turned on outside the lighting plan time of the day, and ensuring the smooth use of lights.

[0110] Example 4

[0111] Based on any one of Embodiments 1-3, the manual modification unit includes:

[0112] A plan selection unit is used to select the lighting plan for the day or the temporary lighting plan that needs to be modified;

[0113] The authority authentication subunit is used to verify the operator's authority to use;

[0114] A second data input subunit is used to input a modified lighting plan for the day or a temporary lighting plan;

[0115] The data overwriting subunit is used to overwrite the original lighting plan for the day with the modified lighting plan for the day or to overwrite the original temporary lighting plan with the modified temporary lighting plan.

[0116] The beneficial effects of the above technical solution are:

[0117] When the daily lighting plan or temporary lighting plan needs to be modified, the operator's permission is verified to avoid arbitrary modification of the daily lighting plan or temporary lighting plan. By modifying the daily lighting plan or temporary lighting plan, the lighting power supply time can be ended early or extended, ensuring that the actual lighting time matches the actual working time. By modifying the daily lighting plan or temporary lighting plan in advance, power outages during the work process are avoided, ensuring the continuity of lighting. When the lighting power supply time is ended early, lighting is avoided when no one is there, avoiding the waste of electricity resources.

[0118] Example 5

[0119] Based on any one of embodiments 1-4, the industrial lighting system further includes a self-test module, and the self-test module includes:

[0120] A task establishment unit, used to establish a self-check task before starting lighting in each lighting area each time;

[0121] A judging unit, used to judge whether the usage time of the LED lamp in the current lighting area is greater than a preset duration time of the optimal state of the LED lamp, and when the usage time of the LED lamp is greater than or equal to the preset duration time of the optimal state of the LED lamp, the state of the LED lamp is evaluated, and when the usage time of the LED lamp is less than the preset duration time of the optimal state of the LED lamp, the state of the LED lamp is not evaluated, and the self-checking task is directly ended;

[0122] Evaluation unit, used to evaluate the status of LED lamps;

[0123] The alarm unit sends a maintenance alarm when the evaluation result of the status of the LED lamp is that maintenance is required.

[0124] Preferably, the evaluation unit comprises:

[0125] A first parameter calculation subunit, used to calculate a first evaluation parameter of the lighting area;

[0126]

[0127] Among them, F 1i is the first evaluation parameter of the i-th lighting area; S is the cost of LED lamp maintenance; t0 is the unit time; t is the used time of the LED lamp; ln is the logarithmic function with e as the base; e is the natural base; t s is the theoretical life of the lighting group; G ij is the actual brightness detection value of the jth monitoring point in the i-th lighting area after lighting; G ij0 is the actual brightness detection value of the jth monitoring point in the i-th lighting area before lighting; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; D ijk M is the distance from the kth undamaged LED lamp in the ith lighting area to the jth monitoring point; i is the total number of monitoring points in the i-th lighting area; W i is the luminous efficiency of the LED lamps in the i-th lighting area, in lumens per watt; P is is the actual working power of the LED lamp in the i-th lighting area; t m is the preset optimal state duration of the LED lamp; S0 is the preset threshold of the average daily maintenance cost;

[0128] A second parameter calculation subunit, used to calculate a second evaluation parameter of the lighting area;

[0129]

[0130] Among them, F 2i is the second evaluation parameter of the i-th lighting area; μ is the safety factor (the value is greater than 0 and less than 1); U is the theoretical maximum brightness of the LED lamp; σ is the amplification factor (the value is greater than 1); A i is the lighting area of ​​the i-th lighting area; L i is the required lighting intensity of the i-th lighting area; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area;

[0131] The result output subunit, when the first evaluation parameter is greater than 1 or the second evaluation parameter is greater than or equal to 0, the evaluation result is that no maintenance is required, otherwise the evaluation result is that maintenance is required.

[0132] In this embodiment, the optimal state duration of the LED lamp is a preset length of time during which the LED lamp is considered to be in the optimal state (without brightness decay) during the initial use of the LED lamp.

[0133] The beneficial effects of the above technical solution are:

[0134] A self-check task is established before each lighting starts to ensure the accuracy and timeliness of the LED lamp status assessment. When the LED lamp is in the optimal state duration, the LED lamp status assessment is not performed, which reduces the assessment frequency and avoids the consumption of computing resources.

[0135] When evaluating, the maintenance cost of LED lamps is spread over each day according to the length of time the LED lamps have been used, and the average daily maintenance cost is obtained. And the lighting effect of LED lamps is achieved through The preset threshold of the average daily maintenance cost is revised. When the average daily maintenance cost is lower than the revised threshold of the average daily maintenance cost, the LED lamps are repaired and replaced, which ensures the safety of the use of the industrial lighting system, controls the maintenance cost, and reduces the cost of the industrial lighting system during use.

[0136] According to the situation where all lighting brightness needs to be provided by LED lamps, The required brightness of each LED lamp is calculated, and then subtracted from the theoretical maximum brightness of the LED lamp after correction by the safety factor to determine whether the current number of LED lamps (as the use time of LED lamps increases, the number of damaged LED lamps gradually increases, and the number of workable LED lamps gradually decreases) can meet the required brightness requirements. When the calculation shows that the brightness requirements cannot be met, the LED lamps are judged to need to be repaired and replaced (because the theoretical maximum brightness of the LED lamp is reduced by the safety factor, and the calculated required brightness of each LED lamp is slightly greater than the actual required brightness of the LED lamp, the LED lamp can still meet the brightness requirements when working at maximum power in a short period of time, and does not need to be replaced immediately, with sufficient buffer time for preparing for the repair and replacement of the LED lamps).

[0137] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. An industrial lighting system, characterized in that: include: Several lighting modules are arranged in different lighting areas of the working environment; A control module, used to generate control instructions for controlling the operation of the lighting module; Several light intensity testers are installed at several monitoring points set in the lighting area to detect the actual brightness of the monitoring points; The communication module is used to transmit control instructions between the lighting module and the control module.

2. An industrial lighting system according to claim 1, characterized in that: The lamp module includes: Lighting group, the lighting group is composed of several LED lamps connected in series; DC power supply, used to provide stable DC power supply for LED lamps; The controller is arranged inside the DC power supply, and is used to control the output current of the DC power supply.

3. An industrial lighting system according to claim 2, characterized in that: The control module includes: A model building unit, used to build a working time prediction model for each lighting area based on the historical workload and corresponding historical working time of each lighting area; A plan making unit, for establishing a lighting plan for the corresponding lighting area on the day according to the workload of each lighting area on the day and based on a working time model of the corresponding lighting area; Temporary lighting unit, used to establish temporary lighting plans; A power calculation unit, used to regularly calculate the working power required by the LED lamps in each lighting area; Manual modification unit, used to manually modify the lighting plan for the day and temporary lighting plan; The command generation unit is used to generate control instructions.

4. An industrial lighting system according to claim 3, characterized in that: The planning module includes: The workload acquisition subunit is used to acquire the workload of each lighting area on the day; A working time calculation subunit is used to input the daily workload of each lighting area into the corresponding working time prediction model to obtain the daily predicted working time of each lighting area; The plan generation subunit is used to generate a lighting plan for the corresponding lighting area on the day based on the predicted working hours of each lighting area on the day.

5. An industrial lighting system according to claim 3, characterized in that: Power calculation unit The calculation unit includes: A determination subunit, used to determine whether lighting needs to be turned on in the lighting area; Among them, W i is the lighting judgment parameter of the i-th lighting area; Q i1 is the number of monitoring points in the i-th lighting area whose actual brightness is lower than the lighting brightness; Q i0 is the total number of monitoring points in the i-th lighting area; When W i is greater than or equal to the preset first threshold, the lighting is turned on. i If the value is less than the preset first threshold, the lighting will not be turned on; A power calculation subunit, used to calculate the working power required by the LED lamp; Among them, P i A is the working power required by the LED lamps in the i-th lighting area; i is the lighting area of ​​the i-th lighting area; L i is the required lighting intensity of the i-th lighting area; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; W i is the luminous efficiency of the LED lamp in the i-th lighting area, in lumens per watt; σ is the magnification factor; M i is the total number of monitoring points in the i-th lighting area; G ij0 is the actual brightness detection value of the jth monitoring point in the i-th lighting area before lighting.

6. An industrial lighting system according to claim 3, characterized in that: Temporary lighting units include: A first data input subunit, used for inputting a lighting area and a lighting duration; A plan establishment subunit is used to generate a temporary lighting plan based on the lighting area and lighting duration; The temporary lighting plan includes: lighting start and end times and lighting areas.

7. An industrial lighting system according to claim 3, characterized in that: Manual modification units include: A plan selection unit is used to select the lighting plan for the day or the temporary lighting plan that needs to be modified; The authority authentication subunit is used to verify the operator's authority to use; A second data input subunit is used to input a modified lighting plan for the day or a temporary lighting plan; The data overwriting subunit is used to overwrite the original lighting plan for the day with the modified lighting plan for the day or to overwrite the original temporary lighting plan with the modified temporary lighting plan.

8. An industrial lighting system according to claim 2, characterized in that: The industrial lighting system also includes a self-test module, which includes: A task establishment unit, used to establish a self-check task before starting lighting in each lighting area each time; A judging unit, used to judge whether the usage time of the LED lamp in the current lighting area is greater than a preset duration time of the optimal state of the LED lamp, and when the usage time of the LED lamp is greater than or equal to the preset duration time of the optimal state of the LED lamp, the state of the LED lamp is evaluated, and when the usage time of the LED lamp is less than the preset duration time of the optimal state of the LED lamp, the state of the LED lamp is not evaluated, and the self-checking task is directly ended; Evaluation unit, used to evaluate the status of LED lamps; The alarm unit sends a maintenance alarm when the evaluation result of the status evaluation of the LED lamp is that maintenance is required.

9. An industrial lighting system according to claim 8, characterized in that: Assessment units include: A first parameter calculation subunit, used to calculate a first evaluation parameter of the lighting area; Among them, F 1i is the first evaluation parameter of the i-th lighting area; S is the cost of LED lamp maintenance; t0 is the unit time; t is the used time of the LED lamp; ln is the logarithmic function with e as the base; e is the natural base; t s is the theoretical life of the lighting group; G ij is the actual brightness detection value of the jth monitoring point in the i-th lighting area after lighting; G ij0 is the actual brightness detection value of the jth monitoring point in the i-th lighting area before lighting; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; D ijk M is the distance from the kth undamaged LED lamp in the ith lighting area to the jth monitoring point; i is the total number of monitoring points in the i-th lighting area; W i is the luminous efficiency of the LED lamps in the i-th lighting area, in lumens per watt; P is is the actual working power of the LED lamp in the i-th lighting area; t m is the preset optimal state duration of the LED lamp; S0 is the preset threshold of the average daily maintenance cost; A second parameter calculation subunit, used to calculate a second evaluation parameter of the lighting area; Among them, F 2i is the second evaluation parameter of the i-th lighting area; μ is the safety factor; U is the theoretical maximum brightness of the LED lamp; σ is the amplification factor; A i is the lighting area of ​​the i-th lighting area; L i is the required lighting intensity of the i-th lighting area; N i N is the total number of LED lamps in the i-th lighting area; is is the number of damaged LED lamps in the i-th lighting area; The result output subunit, when the first evaluation parameter is greater than 1 or the second evaluation parameter is greater than or equal to 0, the evaluation result is that no maintenance is required, otherwise the evaluation result is that maintenance is required.