Construction method of beam type combined support spanning existing structure
By adopting a beam-type combined bracket method with multiple components, the problems of high site requirements, slow construction progress and major safety risks when bridge construction spans existing structures are solved, rapid assembly and efficient construction are achieved, and resource waste is reduced and Construction cost.
Patent Information
- Application Number
- CN202411248276.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-06
- Publication Date
- 2024-11-15
AI Technical Summary
When existing bridge construction methods span existing structures, the site requirements are high, the construction progress is slow, the safety risks are high, the work efficiency is low, and the complex steel support installation process leads to low construction efficiency.
Using beam-type combined brackets composed of multiple components, by setting up strip foundations, steel pipe columns, load-bearing beams, large truss units and distribution beams, combined with embedded steel bars and anchor plates, a stable overall structure is formed to reduce mechanical shifts and Manual, achieve rapid assembly and safe construction.
It provides a safe and stable construction platform to minimize the impact on existing structures, has good assembly and detachability, can be quickly assembled, shortened construction period, reduced construction costs, and improved construction efficiency.
Smart Images

Figure CN118958157A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge engineering, in particular to a construction method of a beam-type combined bracket spanning an existing structure. Background Art
[0002] With the rapid development of bridge engineering construction, the steel pipe column Bailey beam-column support system has been widely used in the construction of high-pier and large-span cast-in-place beam projects because of its advantages such as strong applicability to construction sites and environments, simple erection, and fast construction progress. The conventional beam-column support removal process uses a crane with a winch and manual labor to install the support structure from bottom to top in sequence: steel pipe column, sand box, horizontal I-beam main beam, longitudinal Bailey sheet main beam, horizontal I-beam distribution beam, longitudinal square wood distribution beam and bottom formwork. The conventional support installation process requires a long time of lifting operation using a car crane, which has high site requirements, requires occupation of construction access roads, slow construction progress, low work efficiency, and high safety risks. When the construction scope needs to cross existing structures, there are higher requirements for construction, and the construction efficiency will be slower. Summary of the invention
[0003] The purpose of the present invention is to provide a construction method of a beam-type combined support for crossing an existing structure based on the above-mentioned deficiencies in the prior art. By setting up a support composed of a combination of multiple components, the crossing of the existing structure is achieved. The site requirements are not high, there is no need to occupy construction access roads, the safety risks of high-altitude operations are extremely small, and less manpower and machine hours are consumed.
[0004] The purpose of the present invention is achieved by the following technical solutions: A construction method for a beam-type combined support spanning an existing structure, characterized in that it comprises the following steps: Treat the foundation and set up a strip foundation that can provide sufficient bearing capacity; Constructing steel pipe columns above the strip foundation, the steel pipe columns are respectively located at two sides of the existing structure to be crossed, and the bottom of each steel pipe column is respectively fixed to the strip foundation; Constructing a load-bearing beam above the steel pipe column; constructing a large truss unit above the load-bearing beam; A distribution beam is constructed above the large truss.
[0005] Rebars and anchor plates are embedded in the strip foundation, wherein the rebars are arranged at the bottom of the anchor plates, and the anchor plates are used to be connected and fixed to the steel pipe columns, so as to strengthen the connection between the steel pipe columns and the strip foundation.
[0006] A parallel connection and a diagonal brace are arranged between the steel pipe columns located on the same side of the existing structure, so that the steel pipe columns on the same side are connected to form an integral structure.
[0007] A column cap is constructed on the top of the steel pipe column, and a stiffening plate is constructed between the column cap and the load-bearing beam.
[0008] A limiting device and a transversely penetrating cross-connecting groove are constructed between the large truss unit and the load-bearing beam to achieve the limiting between the truss unit and the load-bearing beam.
[0009] The large truss unit is composed of two large trusses spliced together through a support frame, and the large truss is composed of a plurality of identical or different small trusses.
[0010] The advantages of the present invention are: 1) It can not only provide a safe and stable construction platform for the bridge to be constructed above, but also cross the existing structures in the bridge construction area, minimizing the impact of bridge construction on the existing structures; 2) It has good assembly and disassembly properties and can be used repeatedly on multiple identical or similar projects, which helps to reduce resource waste and construction costs; 3) To overcome the problem of low construction efficiency caused by the complex erection process of existing steel support brackets, a beam-type combined bracket that is relatively simple to erect and can be quickly assembled is provided, which can greatly save workers from repeated erection of the support frame, effectively shorten the construction period and speed up the construction speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 is a cross-sectional view of the combined support of the present invention; Figure 2 It is a longitudinal section view of the combined support in the present invention. DETAILED DESCRIPTION
[0012] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art: like Figure 1-2 As shown, the marks 1-12 in the figure respectively represent: strip foundation 1, column foot 2, flat brace 3, steel pipe column 4, column cap 5, stiffening plate 6, load-bearing beam 7, limit device 8, transversely penetrating cross-connecting groove 9, large truss unit 10, distribution beam 11, pump room 12.
[0013] Example: Figure 1 and Figure 2 As shown, the beam-type combined support construction method for spanning an existing structure in this embodiment is used to achieve spanning of an existing structure. In this embodiment, the existing structure is an existing pump room 12 .
[0014] Specifically, the construction method of the beam-type combined support spanning the existing structure in this embodiment includes the following steps: 1. Preliminary preparation: 1. Foundation treatment: Strip foundation 1 is used in the construction site. The location of strip foundation 1 requires a foundation bearing capacity greater than 180kpa according to calculation requirements. After the foundation treatment is completed, the bearing capacity is tested. After the bearing capacity requirements are met, the construction slag is backfilled and the floor is cast and hardened before the hoisting, support erection and other construction can be carried out.
[0015] 2. Embedded parts processing: During the construction of the support foundation 1, the support position above it is laid out, and steel bars and thick steel plates are pre-buried at the corresponding positions of the strip foundation 1. In this embodiment, the steel bars and the thick steel plates used as anchor plates are buried in the strip foundation 1, wherein the steel bars are welded to the bottom of the anchor plates and penetrate into the strip foundation 1 to increase the connection strength between the thick steel plates and the strip foundation 1, and the surface of the thick steel plates used as anchor plates is exposed on the surface of the strip foundation 1 to provide an installation position for the steel pipe columns 4 to be constructed later. Figure 1 As shown, the steel bars are gate-type steel bars, and both sides of the bottom thereof have bent parts to further improve the connection performance between the steel bars and the strip foundation 1.
[0016] 3. Steel pipe column 4. Distribution beam 11. Load-bearing beam 7. Flat joint processing: The distribution beam 11, the load-bearing beam 7, the flat joint and the steel pipe column 4 must be butt-jointed and processed in advance before installation to ensure that the components meet the planned dimensions.
[0017] (1) Processing of distribution beam 11: The distribution beam 11 is welded by groove welding, and the distribution beams 11 on both sides are cut into 30° slope feet and then welded. Then, a stiffening plate is used for welding at the web position of the distribution beam 11, and the weld forms a 1cm*1cm slope.
[0018] (2) Processing of load-bearing beam 7: The 2HN600×200 load-bearing beam 7 is butt welded with grooves, and the interface is welded with a stiffening plate, and the weld forms a 1.4cm*1.4cm slope. In order to make the stiffening plate fit the weighing beam closely, one side of the stiffening plate 6 is also processed into a chamfer.
[0019] The number of 2HN600*200 steels to be processed is 6 with a length of 8m. The load-bearing beam 7 must be a full-length beam with no joints in the middle of the span. The position of the stiffening plate corresponds to the fulcrum. The joint position of the load-bearing beam 7 should not be placed in the middle of the span of the adjacent column fulcrum, but must be placed at the top of the steel pipe column 4. There is only one joint, and the position of the stiffening plate 6 corresponds to the fulcrum. The joint position of the steel is welded with equal strength.
[0020] (3) Processing of steel pipe column 4: The steel pipe column 4 should be processed to the planned size. If the length is insufficient, two steel pipes can be welded. The material of the steel pipe column 4 is Q235B, and its material should comply with the provisions of "Technical Conditions for Ordinary Carbon Structural Steel" and "GB / T 700-2006". If steel pipe welding is used, the weld metal should be tight, the weld should be uniform, and the transition between the weld metal and the parent material should be smooth. There should be no cracks, incomplete fusion, incomplete penetration and other defects. The wall thickness tolerance of the steel pipe column 4 should meet the relevant requirements of the "SY / T5037-2012" standard; the contact surface between the flat steel pipe and the steel pipe pile: circumferential weld, weld leg height 6mm. Steel pipe connecting plate and steel pipe: circumferential weld, weld leg height 8mm. Steel pipe butt weld: groove fusion weld, using groove structure.
[0021] The column cap 5 on the top of the steel pipe column 4 is not divided, and the partition plate and the steel pipe column 4 use a continuous fillet weld of hf=8mm. The stiffening plate 6 and the cover plate of the steel pipe column 4 use a continuous fillet weld of hf=6mm.
[0022] (4) Flat processing: A continuous fillet weld of hf=8mm is used between the flat brace 3 and the plate. The plate can be welded at the construction site according to the actual situation. The iron plate is the welding position of the flat brace 3 and the surface of the steel pipe column 4.
[0023] 4. Assembly of large truss unit 10: The 1×3m truss and the 2×6m truss are assembled horizontally into a large truss, and then the two large trusses are assembled into a truss unit through a 1.5m support frame, and the pins are used to connect the two large trusses. Finally, 7 large truss units 10 are assembled. At the same time, heat treatment HRC35-42 is carried out to remove burrs and round corners are processed as shown in the figure.
[0024] 2. Construction of beam type combined bracket: In this embodiment, if Figure 1 and Figure 2 As shown, the arrangement of the beam-type combined support is as follows: 2 rows of Q235 steel pipe columns 4 with a diameter of 800mm and a thickness of 8mm are arranged along the longitudinal bridge direction, seven steel pipe columns 4 are arranged in the longitudinal bridge direction, strip foundations 1 are set with a spacing of 13.73m, and the steel pipe columns 4 on the same side are connected by flat joints to ensure overall stability. A transverse 2HN600x200 steel is placed on the top of the steel pipe column 4 as a load-bearing beam 7, a large truss unit 10 is used for the main beam, an I22a longitudinal beam is arranged on the main beam as a distribution beam 11, and a buckle is set on the I22a longitudinal beam to adjust the horizontal and vertical slopes of the beam bottom.
[0025] 1. Steel pipe welding construction: A 25t truck crane is used to lift the steel pipe bracket into place. A total station is used to locate the bracket, and the total station is used to check the horizontal position and the level ruler is used to check the verticality. After the bracket is in place, the bottom of the steel pipe is welded and fixed to the embedded steel plate. The stiffening plate and the steel pipe column anchor plate are welded with nf=6mm continuous fillet welds.
[0026] 2. Channel steel flat joint welding construction: After checking the verticality, 20# channel steel flat joints are welded and installed between the steel pipe columns 4 according to the bracket design plan. The maximum height of the 85m T-structure bracket steel pipe bracket is 11.51m. A flat joint group includes two 20# channel steels (upper and lower flat joints), with a spacing of 2.0m between the upper and lower flat joints, and a flat joint diagonal brace 3 is set in the middle.
[0027] The flat joint is connected to the steel pipe column 4 by a node plate, the node plate and the steel pipe column adopt a double-sided continuous fillet weld of hf=8mm, and the node plate and the flat joint adopt a continuous fillet weld of hf=8mm.
[0028] 3. Beam construction: After the steel pipe column 4 is installed, the top elevation is adjusted and checked, and 2HN600×200H steel is installed on it as a load-bearing beam 7. A thick steel plate is welded on the top of the steel pipe column 4 as a column cap 5 and further provides a support point. During the hoisting process, the wind ropes at both ends of the component are manually pulled to limit the rotation and ensure that the component is stable and does not swing.
[0029] 4. Construction of large truss unit 10: Use a crane to hoist the large truss unit 10. The box girder Bailey frame door opening support material is hoisted. The maximum weight of the material is 6.9t (two pieces of XT large trusses are hoisted as a whole). The material hoisting uses an 80t truck crane. The maximum length of the XT large truss member is 14.5m. During the hoisting process, the two ends of the XT large truss member are restricted from rotating by manually pulling cable wind ropes to ensure that the member does not swing.
[0030] Install vertical reinforcement rods. The use of reinforcement rods at the fulcrum should be designed according to the actual situation. There are five holes designed on the reinforcement rod, and only three are needed for actual use. The installation bolts must ensure that the upper and lower holes are installed symmetrically. The reinforcement vertical rods are standard parts, and they are connected with bolts after being firmly fixed, without welding. The transverse distribution beam fixing device is only set between the longitudinal beams on both sides.
[0031] Install the stopper 8. After the large truss unit 10 is in place, the stopper 8 is installed at the fulcrum of the large truss unit 10 at the steel pipe support 4 and welded to ensure the stability of the large truss unit 10. In this embodiment, the bottom of each large truss unit 10 is provided with a transverse cross-connection groove 9 to connect and fix the large truss units 10 to form an integral structure.
[0032] Although the above embodiments have described in detail the concepts and embodiments of the present invention with reference to the accompanying drawings, ordinary technicians in this field can recognize that various improvements and changes can still be made to the present invention without departing from the scope of the claims, so they are not described one by one here.
Claims
1. A construction method for a beam-type combined support spanning an existing structure, characterized in that: The steps include: Treat the foundation and set up a strip foundation that can provide sufficient bearing capacity; Constructing steel pipe columns above the strip foundation, the steel pipe columns are respectively located at two sides of the existing structure to be crossed, and the bottom of each steel pipe column is respectively fixed to the strip foundation; Constructing a load-bearing beam above the steel pipe column; constructing a large truss unit above the load-bearing beam; A distribution beam is constructed above the large truss.
2. The construction method of a beam-type combined support spanning an existing structure according to claim 1, characterized in that: Rebars and anchor plates are embedded in the strip foundation, wherein the rebars are arranged at the bottom of the anchor plates, and the anchor plates are used to be connected and fixed to the steel pipe columns, so as to strengthen the connection between the steel pipe columns and the strip foundation.
3. The construction method of a beam-type combined support spanning an existing structure according to claim 1, characterized in that: A parallel connection and a diagonal brace are arranged between the steel pipe columns located on the same side of the existing structure, so that the steel pipe columns on the same side are connected to form an integral structure.
4. The construction method of a beam-type combined support spanning an existing structure according to claim 1, characterized in that: A column cap is constructed on the top of the steel pipe column, and a stiffening plate is constructed between the column cap and the load-bearing beam.
5. The construction method of a beam-type combined support spanning an existing structure according to claim 1, characterized in that: A limiting device and a transversely penetrating cross-connecting groove are constructed between the large truss unit and the load-bearing beam to achieve the limiting between the truss unit and the load-bearing beam.
6. A construction method for a beam-type combined support spanning an existing structure according to claim 1 or 5, characterized in that: The large truss unit is composed of two large trusses spliced together through a support frame, and the large truss is composed of a plurality of identical or different small trusses.