Method for reducing overexcavation in tunnel drilling and blasting construction in jointed rock mass
By obtaining rock and blasting parameters in jointed rock mass and adjusting the location of the surrounding holes to match the explosion stress wave damage range, the problem of overdraft phenomenon in tunnel drilling and blasting construction is solved, the equipment and labor costs are reduced, and construction efficiency and safety are improved. .
Patent Information
- Application Number
- CN202411292377.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-15
AI Technical Summary
In jointed rock mass, tunnel drilling and blasting construction often leads to overexcavation due to deterioration of mechanical parameters of rock mass and jointing, which increases the shipping volume, concrete consumption and construction time. The existing technology equipment is costly and cumbersome, and it is not effective. Solve the problem of rock joint development.
By obtaining rock and blasting parameters, determine the relationship between the damage verification point and the damage range, adjust the position of the surrounding holes to match the damage range of the explosion stress wave and the tunnel design profile, and reduce the over-excavation phenomenon. The formula is used: σt is the tensile strength and λ is the side Pressure coefficient, Rs is the damage range, γ is the angle between the connection between the line and the joint of the gun hole and the verification point after adjustment, α is the joint inclination angle, b is the joint length between the verification point and the joint on both sides, η is the pressure attenuation index, and rb is the radius of the gun hole , P is the peak pressure of the gun hole wall, A1 and B1 are the longitudinal wave incident angle, A2 and B2 are the reflection angles, R0 and R1 are the joint reflection coefficients, and the position of the surrounding holes is adjusted to optimize the blasting effect.
It realizes that stress wave propagation is accurately adjusted without using special devices, reduce equipment and labor costs, reduce over-excavation, and improves construction efficiency and safety.
Smart Images

Figure CN118960497A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tunnel blasting and excavation, and in particular relates to a method for reducing over-excavation in tunnel drilling and blasting construction in jointed rock mass. Background Art
[0002] Most of my country's terrain is hilly. Tunnels have played an important role in overcoming terrain restrictions and shortening mileage, meeting travel needs. The drilling and blasting method is widely used in tunnel excavation due to its high efficiency and low cost. However, since natural rock mass is not homogeneous and contains a large number of defects such as faults and joints, the mechanical parameters of the rock mass are deteriorated, the integrity of the rock mass is destroyed, and its stress state is affected. In particular, the presence of joints hinders the propagation of the blast stress wave. The reflection and refraction of the stress wave on the joint surface leads to extremely uneven energy distribution between joints, and over-excavation often occurs. Over-excavation increases the amount of rock shipped and the consumption of concrete, and increases the construction time of excavation and spraying concrete. Under-excavation requires manual processing, which increases labor intensity and time, and is unsafe. Due to the large cross-section of the tunnel, the hammering after blasting can only use an excavator with a crushing head. The hammering damages the rock fracture and forms over-excavation, which further increases the workload.
[0003] Prior art 1 discloses a vibration-damping charge assembly for controlling over-excavation around a layered rock tunnel, and relates to the technical field of tunnel construction auxiliary equipment, including a charge guide assembly, a detonating cord loading assembly, an explosive loading assembly, and a drive assembly. By setting a charge guide assembly, a detonating cord loading assembly and an explosive loading assembly are respectively arranged at both ends of the charge guide assembly, and the detonating cord loading middle and the explosive loading assembly cooperate, the synchronous loading of the emulsion explosive and the detonating cord can be realized, thereby achieving rapid charging while ensuring the coordination effect of the emulsion explosive and the detonating cord, and controlling the excavation around the layered rock tunnel.
[0004] Prior art 2 discloses a device for preventing tunnel over-excavation, comprising an impact device, a steering device, a fixing device, and a steel chisel. The application steps are as follows: (1) Determine the spacing and number of steel chisels. (2) Calculate the point coordinates of the steel chisel and the inclination angle of the mounting portion during each excavation. (3) Install the device at the first excavation point. (4) Excavate a crack. (5) Excavate the next section of the crack until the blasting construction requirements are met.
[0005] At present, most of the patents related to over-excavation control in tunnel construction use special equipment, which has high application cost and cumbersome implementation steps, and does not take into account the engineering reality of the development of rock joints. Therefore, a simple and highly feasible method is needed to control over-excavation. Summary of the invention
[0006] In order to solve the above technical problems, the present invention proposes a method for reducing over-excavation in tunnel drilling and blasting construction in jointed rock mass. The method can be directly used to adjust the position of peripheral holes so that the boundary of the damage range of the explosion stress wave of the peripheral holes coincides with the design contour line of the tunnel, thereby reducing the over-excavation phenomenon.
[0007] To achieve the above object, the present invention provides a method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass, comprising:
[0008] Step 1: Obtain rock parameters and blasting parameters;
[0009] Step 2: determine the damage verification point on the jointed rock mass, and based on the damage verification point, combine rock parameters and blasting parameters to obtain the damage range and angle relationship of the damage verification point;
[0010] Step 3: obtaining an actual angle, and obtaining a damage range based on the actual angle and the relationship;
[0011] Step 4. Repeat steps 2 and 3 to determine the adjusted positions of all peripheral holes.
[0012] Optionally, the rock parameters include: Poisson's ratio, tensile strength and joint inclination;
[0013] The blasting parameters include: density of explosives, detonation velocity, charge structure and blasthole diameter.
[0014] Optionally, the damage verification point is located on the tunnel contour line and is at an equal horizontal distance from the joints on both sides.
[0015] Optionally, the damage range and angle relationship of the damage verification point is:
[0016]
[0017] Among them, σ t is the tensile strength, λ is the lateral pressure coefficient, R s is the damage range, γ is the angle between the line connecting the blasthole and the verification point after adjustment and the joint, α is the inclination of the joint, b is the distance between the verification point and the joints on both sides, η is the pressure attenuation index, and r b is the radius of the blasthole, P is the peak pressure on the blasthole wall, A1 and B1 are the incident angles of the longitudinal wave on both sides, A2 and B2 are the angles between the longitudinal wave reflection and the vertical line connecting the verification point and the adjusted blasthole, and R0 and R1 are the joint reflections on both sides.
[0018] Optionally, the method further includes: further adjusting the positions of individual peripheral holes.
[0019] Optional, further adjustments to individual peripheral hole positions include:
[0020] Based on the positions of the peripheral holes, obtaining a contour effect after blasting;
[0021] Optional, further adjustments to individual peripheral hole positions include:
[0022] Based on the adjusted peripheral hole positions, the conformity of the blasting contour line formed by blasting with the design requirements and the flatness of the rock surface after blasting are obtained as the contour effect after blasting;
[0023] Based on the post-blasting contour effect, the positions of the peripheral holes corresponding to individual places where over-excavation still exists are further optimized and adjusted.
[0024] Compared with the prior art, the present invention has the following advantages and technical effects:
[0025] The present invention fully considers the reflection and superposition effect of joints on explosion stress waves and can accurately reflect engineering practice. The present invention starts from the stress wave propagation theory to deduce the explosion damage range. When applied on site, only relevant parameters such as rock mechanical properties and joint inclination can be obtained in advance to determine the damage range and adjust the position of the surrounding holes.
[0026] The present invention does not require any special device when used to reduce over-excavation, thereby directly reducing equipment and labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0028] Figure 1 is a stress wave propagation path between joints in an embodiment of the present invention;
[0029] Figure 2 is the stress decomposition and superposition of the stress wave at any point between the joints according to the embodiment of the present invention;
[0030] Figure 3 This is a flow chart of a method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass according to an embodiment of the present invention;
[0031] Figure 4 Schematic diagram of peripheral hole adjustment according to an embodiment of the present invention. DETAILED DESCRIPTION
[0032] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0033] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0034] The present invention proposes a method for reducing over-excavation in tunnel drilling and blasting construction in jointed rock mass, such as Figure 3 As shown, the specific steps include:
[0035] Step 1: Obtain rock parameters and blasting parameters;
[0036] Step 2: determine the damage verification point on the jointed rock mass, and based on the damage verification point, combine the rock parameters and blasting parameters to obtain the damage range and angle relationship of the damage verification point;
[0037] Step 3: Obtain the actual angle, and obtain the damage range based on the actual angle and the relationship;
[0038] Step 4: Repeat steps 2 and 3 to determine the positions of all peripheral holes after adjustment;
[0039] Specifically, the angle γ between the line connecting the adjusted blasthole and the verification point and the joint is determined according to the overall design of the on-site blasting and the actual working conditions, and γ is substituted into the damage range R s The damage range R can be calculated by the relationship between s , and finally determine the position of the adjusted peripheral holes, such as Figure 4 shown.
[0040] Further, rock parameters include: Poisson’s ratio, tensile strength and joint dip;
[0041] Blasting parameters include: density of explosives, detonation velocity, charge structure and borehole diameter.
[0042] Specifically, determine the density ρ0, detonation velocity D0, charge structure, and borehole radius r of the explosive used. b , Poisson's ratio μ of rock, tensile strength σ t , joint inclination α and other related parameters.
[0043] Furthermore, the damage verification point is located on the tunnel contour line and is at an equal horizontal distance from the joints on both sides.
[0044] Specifically, a point is found on the design contour line between the two joints as the damage verification point. The horizontal distance between the verification point and the joints on both sides is equal, and the width is b. Assume that the distance between the adjusted blasthole and the verification point is the damage range radius R s , the angle between the line connecting the blasthole and the verification point and the joint is γ.
[0045] Specifically, Figure 1As shown in the figure, after the blast holes between the joints are detonated, a superimposed stress field will be formed. Assuming that the inclination angle of the joint is α, the joint is filled with air, and any point E above the blast source is selected, γ is the angle between the blast hole O and the point E and the joint, the distances of the blast holes from the two sides of the joint are a and b, the distances of point E from the two sides of the joint are c and d, and the reflection angles of the incident longitudinal waves are A1 and B1. For the convenience of analysis, only the incident longitudinal waves directly from the blast source and the longitudinal waves reflected by the joints on both sides are considered.
[0046] The relationship between radial stress wave pressure and distance attenuation is:
[0047]
[0048] Where: P is the initial shock wave pressure on the blast hole wall after the explosive explodes, which is related to the performance of the explosive; r is the comparison distance, that is, the ratio of the distance from a certain point to the center of the charge to the radius of the blast hole; η is the pressure attenuation index, which can be calculated according to the empirical formula
[0049] The relationship between the attenuation of tangential stress wave pressure and distance is:
[0050]
[0051] Where: λ is the lateral pressure coefficient, μ is the Poisson's ratio of rock.
[0052] like Figure 2 As shown, with point E as the origin and the line OE as the X-axis, a plane rectangular coordinate system is established. The angles between the reflected waves in the two directions and the Y-axis are A2 and B2 respectively. Then the stresses in the X and Y directions at point E are:
[0053] ∑σ x =σ iρ +σ Mrρ (sin 2 A2-λcos 2 A2)+σ Nrρ (sin 2 B2-λcos 2 B2) (3)
[0054] ∑σ y = -λσ iρ +σ Mrρ (cos 2 A2-λsin 2 A2)+σ Nrρ (cos 2 B2-λsin 2 B2) (4)
[0055] Where: iρ is the radial stress generated by the incident longitudinal wave at point O; σMrρ is the radial stress of the longitudinal wave reflected from point M at point E; σ Nrρ is the radial stress at point E of the longitudinal wave reflected from point N;
[0056] Since the tensile strength of rock is very low, when the tensile stress value is greater than the tensile strength of rock, the rock will crack and fail, that is, the failure condition is:
[0057] σ2≥σ t (5)
[0058] In the formula, σ2 is the tensile principal stress, and the principal stress calculation formula is:
[0059]
[0060] When σ2=σ t , L OE The distance is the damage range R s ,but
[0061]
[0062] When the horizontal distance between the verification point and the joints on both sides is equal to the width b, equation (6) can be further derived to obtain equation (7). Substituting the rock mechanics parameters, explosive parameters and other data into equation (7), the damage range R is obtained. s The relationship between the angle γ.
[0063]
[0064] Where: P is the peak pressure on the borehole wall. When the radial uncoupled charge structure is used When using axially uncoupled charge n is the pressure increase coefficient of the bombardment product hitting the blasthole wall, which is usually 8 to 11. L is the charge coefficient, l a is the length of the air column, l c is the charge length. A1 and B1 are the incident angles of the longitudinal waves on both sides. A2 and B2 are the angles between the longitudinal wave after reflection and the vertical line connecting the verification point and the adjusted blasthole R1 is the reflection coefficient of the joints on both sides, in
[0065]
[0066] Furthermore, the method also includes: further adjusting the positions of individual peripheral holes.
[0067] Furthermore, further adjustment of the positions of individual peripheral holes includes:
[0068] Based on the adjusted peripheral hole positions, blasting construction is carried out to obtain the conformity of the blasting contour line formed by blasting with the design requirements, the flatness of the rock surface after blasting, and other post-blasting contour effects;
[0069] Based on the contour effect after blasting, the positions of the surrounding holes corresponding to the areas with poor contour effects are further optimized and adjusted.
[0070] Specifically, drilling and blasting are carried out according to the adjusted blasthole arrangement, and the drilling accuracy and construction quality are improved by selecting suitable drilling rigs and drill bits, accurately measuring and positioning, controlling drilling parameters, strengthening worker training, using guide devices, strengthening quality monitoring, and introducing advanced technologies. The positions of peripheral holes are further optimized according to the contour effect after blasting.
[0071] The above are only preferred specific implementations of the present application, but the protection scope of the present application is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present application should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass, characterized in that: include: Step 1: Obtain rock parameters and blasting parameters; Step 2: determine the damage verification point on the jointed rock mass, and based on the damage verification point, combine rock parameters and blasting parameters to obtain the damage range and angle relationship of the damage verification point; Step 3, obtaining the actual angle, and based on the actual angle and the relationship, obtaining the damage range and adjusting the positions of the peripheral holes based on the damage range; Step 4. Repeat steps 2 and 3 to determine the positions of all peripheral holes after adjustment.
2. A method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass according to claim 1, characterized in that: The rock parameters include: Poisson's ratio, tensile strength and joint inclination; The blasting parameters include: density of explosives, detonation velocity, charge structure and blasthole diameter.
3. A method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass according to claim 1, characterized in that: The damage verification point is located on the tunnel contour line and has an equal horizontal distance from the joints on both sides.
4. A method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass according to claim 1, characterized in that: The relationship between the damage range and angle of the damage verification point is: Among them, σ t is the tensile strength, λ is the lateral pressure coefficient, Rs is the damage range, γ is the angle between the line connecting the blasthole and the verification point and the joint after adjustment, that is, the actual angle, α is the inclination of the joint, b is the width of the joints on both sides of the verification point, η is the pressure attenuation index, r b is the radius of the blasthole, P is the peak pressure on the blasthole wall, A1 and B1 are the incident angles of the longitudinal wave on both sides, A2 and B2 are the angles between the reflected longitudinal wave and the vertical line connecting the verification point and the adjusted blasthole, and R0 and R1 are the reflection coefficients of the joints on both sides.
5. A method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass according to claim 1, characterized in that: The method also includes: further adjusting the positions of individual peripheral holes.
6. A method for reducing overbreak in tunnel drilling and blasting construction in jointed rock mass according to claim 5, characterized in that: Further adjustments to individual peripheral hole positions include: Based on the adjusted peripheral hole positions, the conformity of the blasting contour line formed by blasting with the design requirements and the flatness of the rock surface after blasting are obtained as the contour effect after blasting; Based on the post-blasting contour effect, the positions of the peripheral holes corresponding to individual places where over-excavation still exists are further optimized and adjusted.
Citation Information
Patent Citations
Judging, grading and processing method of rockburst of hard rocks for tunnel
CN104655820A
Precise blasting construction method for argillization interlayer surrounding rock tunnel
CN117781796A
Cited By
High-energy low-loss blasting control system and method for large-section tunnel
CN122015596A