Gravity energy storage system suitable for source-load coordination control and operation method thereof
By using GESB brackets, elevator brackets, main and auxiliary motor drive modules and other technologies in the gravity energy storage system, the problems of heavy objects shaking and terrain restrictions in the existing technology are solved, and stable and safe energy storage conversion and power grid regulation are achieved. Improves energy utilization efficiency and reliability.
Patent Information
- Application Number
- CN202411058542.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-02
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing gravity energy storage technology is prone to shaking during lifting and reducing heavy objects, and may cause the tower to collapse during earthquakes or strong winds. In addition, the energy storage construction has high requirements for waterproofing and flood control on the terrain and inner walls, which poses safety hazards, which limits the energy storage technology. Application and development.
The gravity energy storage system consisting of GESB bracket, elevator bracket, main motor drive module and auxiliary motor drive module can achieve accurate lifting and lowering of heavy objects through transmission steel belt and wire rope. Combined with truck and track system, the stability of the energy storage room and Safety, and connect the power grid through inverters and transformers to realize energy scheduling.
It improves the stability and safety of the energy storage system, reduces energy waste, realizes grid load balancing, provides a fast-responsive backup power supply, reduces user electricity costs, and is environmentally friendly and suitable for sustainable development.
Smart Images

Figure CN118971387A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of energy storage technology, and in particular to a gravity energy storage system suitable for source-load coordinated control and an operation method thereof. Background Art
[0002] The output characteristics of new energy sources, mainly wind power and photovoltaic power generation, have disadvantages such as randomness and intermittency. Large-scale new energy grid connection will bring great pressure to the safe and stable operation of the power system and the consumption of new energy. The application of energy storage technology is currently one of the effective solutions to improve the uncertainty of new energy output, improve the utilization rate of new energy and achieve peak load shifting in the power system. Technologies such as pumped storage and compressed air energy storage are significantly restricted by resources and terrain. Battery energy storage technology based on electrochemical cells has disadvantages such as short life, high cost and potential safety hazards, which affect the application and development of energy storage technology.
[0003] In November 2018, a gravity energy storage technology solution based on concrete blocks and steel towers was proposed in the prior art, and a gravity energy storage demonstration project based on concrete blocks was built in July 2020. This technical solution uses a 90-140-meter-high six-arm crane to move 35-ton concrete blocks up and down to realize the circulation between electrical energy and potential energy, thereby achieving the storage and release of electrical energy.
[0004] The prior art also proposes a gravity energy storage technology solution based on abandoned mines (vertical shafts or boreholes).
[0005] The existing technology has the following problems: (1) The process of moving concrete up and down requires too high precision. However, since the lifting and lowering of heavy objects is completed by wire ropes and motors, it is easy to shake when lifting and lowering the height of heavy objects. (2) Once an earthquake, strong wind, etc. occur, the tower of heavy objects piled up and down may shake or even collapse. (3) There are certain restrictions on the selection of energy storage construction sites. Construction cannot be carried out in areas without abandoned mines and drillings. (4) Since this energy storage technology realizes the storage and release of electrical energy in a drilling well with a depth of 150 to 1500, the requirements for the inner wall waterproofing, flood control, and drainage system are too high. If this construction standard is not well guaranteed, once problems such as water seepage in the inner wall occur, the inner wall will loosen, and even serious accidents such as inner wall collapse and ground subsidence may occur. Summary of the invention
[0006] In view of the defects of the prior art, the present invention provides a gravity energy storage system suitable for source-load coordinated control and an operation method thereof.
[0007] In order to achieve the above invention object, the technical solution adopted by the present invention is as follows:
[0008] A gravity energy storage system suitable for source-load coordinated control, comprising: a GESB bracket 1, an elevator bracket 2, a main motor drive module 3 and an auxiliary motor drive module 4;
[0009] The GESB bracket 1 is used to carry the entire gravity energy storage system. The GESB bracket is divided into several horizontal layers and vertical layers. Each horizontal layer is an energy storage unit 1-1 (Unit). The energy storage unit of each layer is divided into two energy storage chambers 1-2 (Pack) by the elevator bracket longitudinally. The energy storage chamber is composed of several energy storage bins 1-3 (Cell);
[0010] The elevator support 2 is layered longitudinally, and each longitudinal layer corresponds to a longitudinal layer of the GESB support. An elevator compartment 2-1 is formed in a longitudinal layer of the elevator support, and a heavy-object lifting elevator 6 is installed in one elevator compartment.
[0011] The main motor drive module 3 is arranged at the top of the elevator support. The main motor drive module is connected to each heavy object elevator through a plurality of transmission steel belts 10. The main motor drive module is used to control the lifting and lowering of all heavy object elevators. During the charging process, the main motor drive module converts electrical energy into mechanical energy and stores energy by lifting heavy objects. During the discharging process, the main motor drive module converts the potential energy of the heavy object into electrical energy and generates electricity through the descending process of the elevator.
[0012] Each heavy-object lifting elevator is also provided with an auxiliary motor drive module 4, which is connected to the heavy-object lifting elevator through an elevator traction wire rope 11 and is used to assist in controlling the lifting and lowering of the elevator and the lifting and lowering of the empty elevator.
[0013] Each energy storage room is provided with a truck 5 and a pair of tracks 7 that cooperate with the truck, the tracks connect all the energy storage compartments in one energy storage room, and the tracks lead to the elevator compartment and are connected to the heavy object lifting elevator in the elevator compartment;
[0014] Some energy storage bins contain a heavy object, and a truck can transport a heavy object in the energy storage bin to a heavy object elevator or transport a heavy object in a heavy object elevator to the energy storage bin via a track.
[0015] A track is provided in the heavy object lift, and a heavy object support frame 9 is provided in both the heavy object lift and the energy storage bin. The heavy object support frame is higher than the track, and is used to support the heavy object and enable the truck to smoothly drive in and out under the heavy object;
[0016] Each truck is provided with a truck loading level lifter 8 for raising or lowering heavy objects.
[0017] The gravity energy storage system connects the power grid and new energy sources through inverters and transformers, and the gravity energy storage system controls the operation of all components through a dispatching center.
[0018] Furthermore, the main motor drive module 3 includes: a large motor, a gearbox, a gear box, a multi-stage transfer case, a clutch and a pulley.
[0019] Large motor: responsible for converting electrical energy into mechanical energy for lifting heavy objects, or converting the potential energy of heavy objects into electrical energy to generate electricity through the descending process of heavy objects.
[0020] The gearbox is connected to the output shaft of the large motor and is used to adjust the output speed.
[0021] The gearbox is located at the output end of the transmission and is used to further adjust the speed and transmit power to the multi-stage transfer case.
[0022] The multi-stage transfer case receives power from the gearbox, distributes and adjusts it internally, and then transmits it to the clutch and pulley. The multi-stage transfer case distributes the power of the main motor to multiple output shafts. Each output shaft can be connected to a heavy object lifting elevator through an independent transmission steel belt.
[0023] The clutch is connected to the output end of the multi-stage transfer case. A clutch is installed on each output shaft of the multi-stage transfer case to control the transmission and interruption of power. By controlling the state of the clutch, power can be selectively transmitted to a specific elevator.
[0024] Furthermore, the truck cargo level lifter 8 comprises: a hydraulic pump and a cargo level.
[0025] The hydraulic pump is installed on the truck 5, and a cargo plane is installed on the hydraulic pump, which can lift and lower the cargo plane, and the cargo plane is used to prevent heavy objects.
[0026] Furthermore, the gravity energy storage system also includes a plurality of wire rope guide wheel assemblies 12, which are arranged on the elevator bracket, and each wire rope guide wheel assembly is connected to a heavy object lifting elevator to ensure that the movement path of the traction wire rope 11 in the heavy object lifting elevator is correct and stable.
[0027] The present invention also discloses an operating method of the gravity energy storage system, comprising:
[0028] 1. System startup and preparation
[0029] a. Read system parameters: Obtain the basic parameters of the gravity energy storage system, including battery energy storage capacity, rated power and initial state of charge.
[0030] b. Update real-time data: Update the system's real-time state of charge data.
[0031] c. Check task requirements: Determine whether a charging or discharging task needs to be executed. If there is no task, the system enters standby mode; if there is a task, it continues to execute, charging enters step 2, and discharging enters step 3.
[0032] 2. Charging process
[0033] a. Charging condition judgment: Check whether the system meets the charging conditions. If not, return to the step of updating real-time data.
[0034] b. Check the position of the heavy lift: Determine whether there is a heavy lift in the energy storage room on the bottom floor, loaded with heavy objects and meets the start-up conditions. If so, jump to step d, otherwise continue.
[0035] c. Transporting heavy objects to the heavy object elevator: Start the truck on the bottom floor and transport the heavy objects to the entrance and exit of the heavy object elevator warehouse or energy storage room. If the heavy object elevator is not on the bottom floor, use the auxiliary motor drive module to move the empty heavy object elevator down to the entrance and exit of the bottom floor and load the heavy objects.
[0036] d. Start the main motor drive module: Start the main motor drive module to put it into charging state.
[0037] e. Connect the heavy object lift: Connect the heavy object lift loaded with heavy objects to the main motor drive module.
[0038] f. Lift the heavy object elevator: Lift the heavy object elevator to the entrance and exit of the upper energy storage room.
[0039] g. Disconnect the heavy object lift: Disconnect the heavy object lift from the main motor drive module and make it hover at the target position.
[0040] h. Continue charging judgment: judge whether to continue charging according to the current charging power change. If not, return to the step of updating real-time data; if yes, continue.
[0041] i. Empty energy storage bin check: Check whether there are any empty energy storage bins left. If yes, cancel the unloading instruction and return to the step of updating real-time data; if no, continue.
[0042] j. Unloading heavy objects: Start the truck and transport the heavy objects from the heavy object elevator to the energy storage bin.
[0043] k. Return of the empty heavy-object elevator: Use the auxiliary motor drive module to move the empty heavy-object elevator down to the entrance and exit of the ground floor.
[0044] 1. Power change check: Determine whether the power has changed. If it has changed, return to the step of updating the real-time data; if it has not changed, return to step a.
[0045] 3. Discharge process
[0046] a. Discharge condition judgment: Check whether the system meets the discharge conditions. If not, return to the step of updating real-time data.
[0047] b. Check the position of the heavy lift: Determine whether there is a heavy lift in the upper energy storage room, loaded with heavy objects and meets the start-up conditions. If so, jump to step d, otherwise continue.
[0048] c. Transporting heavy objects to the heavy object elevator: Start the upper truck and transport the heavy objects to the entrance and exit of the heavy object elevator warehouse or energy storage room. If the heavy object elevator is not on the upper floor, use the auxiliary motor drive module to move the empty heavy object elevator up to the entrance and exit of the upper floor and load the heavy objects.
[0049] d. Start power generation: Start the main motor drive module to put it into power generation state.
[0050] e. Connect the heavy object lift: Connect the heavy object lift loaded with heavy objects to the main motor drive module.
[0051] f. Descending the heavy-object elevator: Make the heavy-object elevator loaded with heavy objects descend to the entrance and exit of the lower energy storage room.
[0052] g. Disconnect the heavy object lift: Disconnect the heavy object lift from the main motor drive module and make it hover at the target position.
[0053] h. Continue discharging judgment: judge whether to continue discharging according to the current discharge power change. If not, return to the step of updating real-time data; if yes, continue.
[0054] i. Empty energy storage bin check: Check whether there are any empty energy storage bins left. If yes, cancel the unloading instruction and return to the step of updating real-time data; if no, continue.
[0055] j. Unloading heavy objects: Start the truck and transport the heavy objects from the heavy object elevator to the energy storage bin.
[0056] k. Return of the empty heavy-object lift: Use the auxiliary motor drive module to move the empty heavy-object lift upward to the upper entrance and exit.
[0057] 1. Power change check: Determine whether the power has changed. If it has changed, return to the step of updating the real-time data; if it has not changed, return to step a.
[0058] Compared with the prior art, the advantages of the present invention are:
[0059] 1. Energy regulation: The gravity energy storage system can store excess electrical energy during energy peak periods and release electrical energy during low periods, thereby achieving load balancing and energy regulation of the power grid and improving the stability and reliability of the power grid.
[0060] 2. Energy storage optimization: Through the gravity energy storage system, the electricity generated by renewable energy (such as wind energy and solar energy) can be stored to make it controllable and adjustable electricity, reducing energy waste and improving energy utilization efficiency.
[0061] 3. Grid support: The gravity energy storage system has the characteristics of rapid response and can provide emergency support when abnormal situations occur in the power grid, such as providing backup power supply, adjusting frequency and voltage, etc., to ensure the stable operation of the power grid.
[0062] 4. Economic benefits: The gravity energy storage system can participate in electricity trading through the electricity market, obtain income through energy storage scheduling and other methods, improve energy utilization efficiency and economic benefits, and reduce users' electricity costs.
[0063] 5. Environmental protection: The gravity energy storage system uses clean energy for energy conversion, does not produce pollutants and greenhouse gas emissions, is environmentally friendly, and is conducive to reducing air pollution and global climate change.
[0064] 6. Power supply reliability: The gravity energy storage system can be used as a backup power source or frequency and voltage regulation equipment to provide stable and reliable power support and ensure the power supply safety and reliability of the power system.
[0065] 7. Sustainable development: Gravity energy storage system is a renewable and sustainable energy storage technology that helps promote energy structure adjustment and sustainable development, and promotes green, low-carbon and sustainable development of energy supply. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] Figure 1 Schematic diagram of the gravity energy storage system structure.
[0067] Figure 2 This is a schematic diagram of the elevator support structure.
[0068] Figure 3 Schematic diagram of the connection relationship between the main motor drive module, the auxiliary motor drive module and the elevator.
[0069] Figure 4 This is a partial enlarged structural diagram of the elevator support.
[0070] Figure 5 A top view of the gravity energy storage system
[0071] Figure 6 A top view of a gravity energy storage system.
[0072] Figure 7 This is the energy conversion process diagram of the gravity energy storage system;
[0073] Figure 8 This is the operation strategy diagram of the gravity energy storage system. DETAILED DESCRIPTION
[0074] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and examples.
[0075] 1. New Gravity Energy Storage System (GESB)
[0076] like Figures 1 to 6 As shown, the gravity energy storage system includes: a GESB bracket 1, an elevator bracket 2, a main motor drive module 3 and an auxiliary motor drive module 4;
[0077] The GESB bracket 1 is used to carry the entire gravity energy storage system. The GESB bracket is divided into several horizontal layers and vertical layers. Each horizontal layer is an energy storage unit 1-1 (Unit). The energy storage unit of each layer is divided into two energy storage chambers 1-2 (Pack) by the elevator bracket longitudinally. The energy storage chamber is composed of several energy storage bins 1-3 (Cell);
[0078] The elevator support 2 is layered longitudinally, and each longitudinal layer corresponds to a longitudinal layer of the GESB support. An elevator compartment 2-1 is formed in a longitudinal layer of the elevator support, and a heavy-object lifting elevator 6 is installed in one elevator compartment.
[0079] The main motor drive module 3 is arranged at the top of the elevator support. The main motor drive module is connected to each heavy object elevator through a plurality of transmission steel belts 10. The main motor drive module is used to control the lifting and lowering of all heavy object elevators. During the charging process, the main motor drive module converts electrical energy into mechanical energy and stores energy by lifting heavy objects. During the discharging process, the main motor drive module converts the potential energy of the heavy object into electrical energy and generates electricity through the descending process of the elevator.
[0080] Each heavy-object lifting elevator is also provided with an auxiliary motor drive module 4, which is connected to the heavy-object lifting elevator through an elevator traction wire rope 11 and is used to assist in controlling the lifting and lowering of the elevator and the lifting and lowering of the empty elevator.
[0081] Each energy storage room is provided with a truck 5 and a pair of tracks 7 that cooperate with the truck, the tracks connect all the energy storage compartments in one energy storage room, and the tracks lead to the elevator compartment and are connected to the heavy object lifting elevator in the elevator compartment;
[0082] Some energy storage bins contain a heavy object, and a truck can transport a heavy object in the energy storage bin to a heavy object elevator or transport a heavy object in a heavy object elevator to the energy storage bin via a track.
[0083] A track is provided in the heavy object lift, and a heavy object support frame 9 is provided in both the heavy object lift and the energy storage bin. The heavy object support frame is higher than the track, and is used to support the heavy object and enable the truck to smoothly drive in and out under the heavy object;
[0084] Each truck is provided with a truck loading level lifter 8 for raising or lowering heavy objects.
[0085] The gravity energy storage system connects the power grid and new energy sources through inverters and transformers, and the gravity energy storage system controls the operation of all components through a dispatching center.
[0086] The parts involved in energy conversion in GESB include the main motor and the auxiliary motor. Each GESB has a main motor (responsible for lifting and lowering the elevator with heavy objects), an auxiliary motor (responsible for lifting and lowering the empty elevator) and a heavy object lifting elevator in a group of energy storage units (Unit), and an elevator in a group of units. The main components and specific functions and effects of GESB are as follows:
[0087] Heavy objects: GESB's energy storage medium can be made of soil, sand, gravel, construction waste and other materials available at the construction site. The heavy object container shell is made of steel and steel plates according to the design engineering requirements.
[0088] GESB bracket: Provides support for heavy objects and other running parts. In order to improve its structural stability, each steel body component is connected by cross-connected steel pipes in the design, so that each structure of GESB has a triangular steel body reinforcement kit.
[0089] Main motor: responsible for the lifting and lowering of elevators loaded with heavy objects. The rated power configured by the main motor should be greater than the minimum power value required for the lifting and lowering of elevators loaded with heavy objects. Starting methods such as step-down starting and variable frequency starting can effectively reduce the impact of the starting current on the power grid when the motor starts. Due to the large power and inertia of the main motor, frequent start and stop operations during operation will reduce the stability of GESB power and the response speed of the system, that is, the large current generated when the motor starts, and increase the impact current level when the system is connected to the grid. At the same time, each start and stop of the main motor takes a certain amount of time, which will affect the charge and discharge response speed of the energy storage system. Therefore, by using a smaller power auxiliary motor to reduce the number of starts and stops of the main motor, the impact current in the system is reduced, and the stability and charge and discharge response speed of GESB are improved.
[0090] Auxiliary motor: responsible for the rise and fall of the elevator without the control of the main motor. The elevator with heavy objects in each unit will be out of the control of the main motor after it goes up / down to the corresponding position. When the truck unloads the heavy objects from the elevator, the auxiliary motor is responsible for moving the empty elevator up / down to the corresponding position.
[0091] Clutch: The function of the clutch varies depending on its location. The clutch on the auxiliary motor side is mainly used to connect and disconnect the transmission structure between the auxiliary motor and the elevator. The clutch on the main motor side is mainly used to connect and disconnect the transmission structure between the main motor and the elevator.
[0092] Transmission steel belt: The function of the kinetic energy transmission belt is to transmit kinetic energy between the main motor / auxiliary motor and the elevator.
[0093] Drive shaft: Responsible for transmitting kinetic energy within the GESB drive module.
[0094] Elevator: The function of the elevator is to lift or lower heavy objects to the corresponding position of a certain energy storage room (Pack).
[0095] Truck: The truck is responsible for the transmission of heavy objects between the energy storage box (Cell) and the elevator. There is a truck in each Pack.
[0096] Freight track: It is divided into two parts: the freight track inside the cell and the freight track inside the elevator, both of which provide running tracks for the travel of freight cars.
[0097] Heavy object bracket: It is divided into Cell internal heavy object bracket and elevator internal heavy object bracket. Both provide support for heavy objects. The design of the heavy object bracket is higher than the plane of the truck track to ensure that the truck can drive in and out from under the heavy objects.
[0098] Wire rope: connects the elevator and the drive module to realize the transmission of force between the elevator and the drive module.
[0099] Wire rope drum: The wire rope connected to the elevator is loosened or tightly wound on the drum surface to achieve the rise and fall of the elevator.
[0100] Wire rope guide wheel assembly: changes the movement direction of the wire rope.
[0101] Gearbox: Change the gear ratio.
[0102] Gearbox: distributes kinetic energy to the left and right moving mechanisms.
[0103] Brake unit: The function of the brake system is to ensure the safe operation of the drive shaft, elevator and wire rope drum. The elevator can be stopped by activating the brake unit.
[0104] 2. GESB Working Mechanism
[0105] 2.1GESB energy conversion process
[0106] The working principle of the gravity energy storage system (GESS) composed of GESB is as follows: when there is excess electricity in the power grid or new energy power generation system, the main motor switches to the motor state, converting the electrical energy into kinetic energy, and pulling the weight to convert the kinetic energy into potential energy, thereby realizing the storage of electrical energy in the form of potential energy; when the system needs to supplement the electrical energy, the main motor is connected to the generator state, converting the potential energy into kinetic energy, so that the kinetic energy drives the generator to operate and convert the kinetic energy into electrical energy, thereby realizing the release of electrical energy, that is, the discharge of GESS. The energy conversion process of GESS is as follows: Figure 7 shown.
[0107] In GESB, the elevator is connected to the main and auxiliary motors in the drive module through steel ropes, steel rope drums, drive shafts, clutches, kinetic energy transmission belts, i.e. steel belts, pulleys, gearboxes and other components. When the elevator moves up and down, the connection method between the elevator and the main and auxiliary motors at this moment is determined according to whether the elevator is loaded with heavy objects. During the lifting process of the elevator loaded with heavy objects, since the total mass of the elevator and the heavy objects is large, the kinetic energy or damping required for moving up and down is also relatively large. Therefore, during this process, the elevator loaded with heavy objects is connected to the main motor with higher power. Since the mass of the elevator is small, the kinetic energy or damping required for moving up and down is also relatively small. Therefore, during this process, the unloaded elevator is connected to the auxiliary motor with lower power.
[0108] GESB charge / discharge function realization:
[0109] (1) During the ascent / descent process of a heavy-loaded elevator, the wire rope drum bearing is connected to the main motor drive pulley on the auxiliary motor side through the main motor drive clutch on the auxiliary motor side, and the elevator smoothly rises or falls under the driving or damping action of the main motor. During the ascent process, the heavy-loaded elevator converts electrical energy into the potential energy of the heavy object and the elevator, thereby realizing the charging function of GESB, which stores electrical energy in the form of potential energy of the elevator and the heavy object in the high-altitude heavy object; during the descent process, the heavy-loaded elevator converts the potential energy of the heavy object and the elevator into electrical energy, thereby realizing the discharging function of GESB. During this process, the auxiliary motor of the Unit is separated from the drive module on the auxiliary motor side by the disconnection action of the clutch on the auxiliary motor side, and the auxiliary motor of the Unit is in an idle state;
[0110] (2) During the ascent / descent process of an empty elevator (no weight in the elevator), the wire rope drum drive shaft is connected to the auxiliary motor through the auxiliary motor drive clutch on the auxiliary motor side and the auxiliary motor gearbox on the auxiliary motor side, and rises / descends smoothly under the driving / damping action of the auxiliary motor. During the ascent process, the empty elevator converts electrical energy into the potential energy of the elevator, thereby storing part of the electrical energy in the form of the potential energy of the elevator in the high-altitude elevator mass; during the descent process, the empty elevator converts the potential energy of the elevator into electrical energy, thereby realizing the partial discharge function of the GESB. Converting the kinetic energy generated during the descent of the empty elevator into electrical energy helps to improve the energy conversion efficiency of the GESB. During this process, the drive module of the unit is separated from the drive module on the main motor side by the disconnection action of the clutch on the main motor side. During this process, the GESB main motor where the unit is located may be in an idle state or in a working state (it may lift / lower the weight of the adjacent unit).
[0111] When the auxiliary motor lifts the empty elevator (indicating that the GESB is in a discharge state, the elevator in a certain unit lifts the heavy object to a certain layer of Pack at a high place, and descends to the entrance and exit of the bottom layer Pack for the second heavy object), the auxiliary motor is connected to the elevator with the help of transmission components, and the kinetic energy of the auxiliary motor is used to pull up the empty elevator. During this process, the auxiliary motor of the unit is separated from the drive module on the auxiliary motor side by the disconnection of the clutch on the auxiliary motor side. During this process, the GESB main motor of the unit may be in an idle state or in a working state.
[0112] 2.2GESB heavy goods transport module
[0113] The main fixed parts in each layer of Pack of different GESB units include the energy storage unit weight support frame, elevator weight support frame, Pack truck track, elevator truck track and other parts. In order to improve the stability of the GESB structure in the design, cross-connected steel pipes are installed on the chassis, and each piece of its steel structure is connected, so that each structure of the Pack and GESB has a triangular steel reinforcement kit. In the design, a truck is configured for each layer of Pack of different GESB units. The truck provides heavy object transportation services between the Cell and the elevator warehouse for the Pack. The distance the truck needs to travel between the elevator and the Cell will directly affect the speed of the charging and discharging response of the Cell. If the number of cells designed in GESB is small, although it can shorten the average mileage of trucks and the time required to transport heavy objects from cells to elevators or from elevators to cells, and speed up the charging and discharging response speed of the Pack and GESB as a whole, this design will reduce the energy storage capacity of GESB; if the number of cells designed is large, although it can increase the energy storage capacity of GESB, it will increase the average mileage of trucks, lengthen the time required to transport heavy objects from cells to elevators or from elevators to cells, and reduce the charging and discharging response speed of the Pack and GESB as a whole. Therefore, in the design of GESB, the present invention adopts a design of dividing the Unit into two in order to speed up the charging and discharging response speed of GESB as a whole, under the premise of ensuring the energy storage capacity of GESB.
[0114] The improved GESB different Units each layer Pack consists of the left energy storage unit included in the elevator compartment, the right energy storage unit and the truck equipped for each layer Pack. Under the premise of ensuring the GESB energy storage capacity in the design, each Unit is divided into the left side of the Unit (L_Unit) and the right side of the Unit (R_Unit), the elevator compartment is arranged in the middle of the L_Unit and R_Unit, and a truck is configured for each layer Pack of the newly formed L_Unit and R_Unit, so as to shorten the transmission distance between the Unit and the main motor, the driving distance of the truck and the time required to transport heavy objects, and improve the charging and discharging response speed of GESB.
[0115] The workflow of a truck transporting heavy objects from a cell to an elevator in GESB is as follows:
[0116] (1) Start a truck with a pack on a certain layer of a unit where heavy objects have been placed, drive it into the cell closest to the elevator where heavy objects have been placed, and stop the truck directly under the heavy objects, ready to load the heavy objects;
[0117] (2) Use the hydraulic cylinder (jack) to raise the height of the truck lifting frame and lift the weight (separate the weight from the weight bracket in the Cell) to confirm whether the bottom of the weight has reached the specified height and there is no contact between the weight bracket in the Cell. If so, it indicates that the truck has been loaded with weights and is allowed to start (transfer the weight). If not, it is not allowed to start and the truck lifting frame is continued to be raised until there is a certain safety distance between the bottom of the weight and the weight bracket in the Cell;
[0118] (3) Drive the loaded truck into the elevator and stop it in the center of the elevator. Lower the truck lifting frame to place the weight on the weight bracket in the elevator. Confirm whether the weight has been placed on the weight bracket in the elevator and is not in contact with the truck lifting frame. If so, allow the truck to leave the elevator and return to the Pack; if not, continue to adjust the position of the weight or lower the height of the truck lifting frame until there is a certain safe distance between the bottom of the weight and the truck lifting frame.
[0119] (4) Drive the unloaded truck out of the elevator to complete the task of transporting the heavy objects from the cell to the elevator. If the truck needs to continue to perform this task, return to (1).
[0120] The workflow of a truck transporting heavy objects from an elevator to a cell in GESB is as follows:
[0121] (1) Start the truck in the Pack corresponding to the elevator where the heavy object needs to be unloaded, and drive it to the position directly below the heavy object in the elevator, ready to load the heavy object;
[0122] (2) Use the hydraulic cylinder (jack) to raise the height of the truck lifting frame and lift the weight (separate the weight from the weight bracket in the elevator) to confirm whether the bottom of the weight has reached the specified height and there is no contact between the weight bracket in the elevator. If so, it indicates that the truck has been loaded with the weight and it is allowed to start (transfer the weight). If not, it is not allowed to start and the truck lifting frame will continue to be raised until there is a certain safety distance between the bottom of the weight and the weight bracket in the elevator;
[0123] (3) Drive the loaded truck out of the elevator and drive it into an empty cell (without any heavy objects), and stop it in the center of the cell. Lower the height of the truck lifting frame, and place the heavy objects on the weight rack in the cell. Confirm whether the heavy objects are placed on the weight rack in the cell and whether there is no contact between the bottom of the heavy objects and the truck lifting frame. If yes, allow the truck to leave the cell; if not, continue to adjust the position of the heavy objects or lower the height of the truck lifting frame until there is a certain safe distance between the bottom of the heavy objects and the truck lifting frame.
[0124] (4) Complete the task of transporting the heavy object from the elevator to the Cell. If the truck needs to continue to perform this task, return to (1).
[0125] 2.3GESB charging and discharging process
[0126] GESB is mainly composed of a main motor and several units, and each unit is an independent control structure. The charging and discharging tasks of the gravity energy storage system (GESS) designed in this paper are based on the charging and discharging workflow of a single GESB. The GESB charging and discharging control strategy is as follows: Figure 8 shown.
[0127] The charging and discharging control strategy of GESB is:
[0128] (1) First read the basic parameters of GESB. The basic parameters of GESB include: battery energy storage capacity, rated power, initial state of charge, etc.
[0129] (2) Update the real-time state of charge data of GESB.
[0130] (3) Determine whether the GESB needs to perform charging and discharging tasks. If not, stop all running structures in the GESB and put the GESB into standby mode; if yes, proceed to the next step.
[0131] (4) Read the target charging and discharging power data of GESB.
[0132] (5) Determine the operating state that GESB needs to switch to at this moment based on the target charge and discharge power data of GESB. If the target charge and discharge power of GESB is greater than zero, it indicates that GESB needs to be connected to the charging state, and GESB performs the charging task at this moment; if the target charge and discharge power of GESB is less than zero, it indicates that GESB needs to be connected to the discharge state, and GESB performs the discharge task at this moment. If the target charge and discharge power of GESB is equal to zero at this moment, it indicates that GESB needs to be connected to the standby (idle) state and perform the charge and discharge tasks in an unordered manner.
[0133] The charging process of GESB is to send the heavy objects in the bottom Pack to the upper Pack, so that the electrical energy is stored in the upper Pack in the form of potential energy of the heavy objects; its discharging process is to make the heavy objects with certain potential energy in the upper Pack descend to the bottom Pack, and the kinetic energy generated by the heavy objects when descending drives the main motor to operate, thereby realizing the process of converting gravitational potential energy into electrical energy.
[0134] The execution process of GESB charging task is as follows:
[0135] a. Determine whether the GESB meets the charging conditions (determine whether the GESB is fully charged, etc.). If yes, return to step (2); if not, proceed to the next step;
[0136] b. Determine whether there is a Unit's elevator in the GESB at the bottom Pack, and that it has been loaded with heavy objects, and that the starting conditions have been met (the truck has driven out of the elevator). If so, jump directly to process d; if not, execute the next process. The purpose of adding this judgment module to the process is to improve the charging response speed of GESB. Before GESB performs the charging task, it first searches and determines whether there is a Unit's elevator at the bottom Pack, and that it has been loaded with heavy objects, and that the starting conditions have been met. The main motor drive module is directly connected to the elevator drive module of this Unit and is ready to start. Through the above-mentioned judgment module, the time required to transport heavy objects to the elevator can be saved. At this moment, the main motor can directly start to lift the elevator that has met the starting conditions, thereby achieving the purpose of speeding up the charging response speed of GESB.
[0137] c. Start the trucks in the lower packs of all units that meet the charging conditions, and transport the heavy objects to the elevator of the unit or the entrance and exit of the pack. If there is no elevator hovering at the entrance and exit of the lower pack at this moment, connect the elevator in the upper pack to the auxiliary motor, make the empty elevator go down, and hover at the entrance and exit of the lower pack where the heavy objects are ready to be loaded into the elevator, and then load the heavy objects into the elevator.
[0138] d. Start the main motor and put it into charging state;
[0139] e. Connect the elevator with heavy objects loaded at the lower part to the main motor;
[0140] f. Pull the loaded elevator to the entrance and exit of the upper Pack (hereinafter referred to as the target free_Pack_up) in the Unit that can accommodate (store) the heavy objects;
[0141] g. Disconnect the elevator from the main motor after it has reached the target free_Pack_up entrance and exit, start the elevator brake system, and suspend the elevator at the free_Pack_up entrance and exit;
[0142] h. According to the current charging and discharging power of GESB, determine whether GESB should continue to perform the charging task. If not, return to step (2). If yes, execute the next step;
[0143] i. Determine whether there is one last empty Cell in all free_Pack_ups in the Unit that can be used to place heavy objects. If so, cancel the instruction for the truck in the free_Pack_up to unload the heavy objects in the elevator (so the Unit is already full at this moment and cannot perform the charging task again, but can only perform the discharging task. If the heavy objects are loaded into the last empty Cell at this moment, when the Unit is in the discharging state, the heavy objects will be loaded from the empty Cell into the elevator again, thereby reducing the discharge response speed of the Unit. Therefore, during the GESB charging process, if there is only one last empty Cell left in the target free_Pack_up of a Unit, cancel the instruction for unloading the heavy objects of the Unit), and return to step (2); if not, execute the next step (execute the instruction for unloading the heavy objects);
[0144] j. Drive the truck in the target free_Pack_up into the elevator and transport the heavy objects from the elevator to the empty cell farthest from the elevator (complete the task of unloading the heavy objects from the elevator);
[0145] k. Connect the unloaded elevator to the auxiliary motor and move the empty elevator down to the entrance and exit of the lower Pack (hereinafter referred to as target load_Pack_down) where the elevator is ready to be loaded with heavy objects or where heavy objects can be loaded into the elevator;
[0146] 1. Determine whether the GESB power has changed. If so, return to step (2); if not, return to step a.
[0147] The execution process of the GESB discharge task is as follows:
[0148] a. Determine whether the GESB meets the discharge conditions (determine whether the GESB is insufficiently charged). If yes, return to step (2); if no, proceed to the next step;
[0149] b. Determine whether there is a Unit's elevator in the GESB at the upper Pack, and that it has been loaded with heavy objects, and that the starting conditions have been met (the truck has driven out of the elevator). If so, jump directly to process d; if not, execute the next process. The purpose of adding this judgment module to the process is to improve the discharge response speed of GESB. Before GESB performs the discharge task, it first searches and determines whether there is a Unit's elevator at the upper Pack, and that it has been loaded with heavy objects, and that the starting conditions have been met. The main motor drive module is directly connected to the elevator drive module of this Unit and is ready to start. Through the above-mentioned judgment module, the time required to transport heavy objects to the elevator can be saved. At this moment, the elevator that has been loaded with heavy objects can directly start to drive the main motor, which can achieve the purpose of speeding up the discharge response speed of GESB;
[0150] c. Start the trucks in the upper Pack of all Units that meet the discharge conditions, and transport the heavy objects to the elevator or Pack entrance of the Unit. If there is no suspended elevator at the upper Pack entrance that meets the discharge conditions, connect the elevator in the Pack to the auxiliary motor, make the empty elevator go up, and suspend it at the upper Pack entrance where the heavy objects are ready to be loaded into the elevator, and further load the heavy objects into the elevator;
[0151] d. Make the elevator loaded with heavy objects go down and put the main motor into power generation state;
[0152] e. Connect the elevator loaded with heavy objects and moving downward to the main motor;
[0153] f. Move the loaded elevator down to the entrance and exit of the lower Pack (hereinafter referred to as target free_Pack_down) in the Unit that can accommodate (store) the heavy objects;
[0154] g. Disconnect the elevator from the main motor after reaching the target free_Pack_down entrance and exit, start the elevator brake system, and hover the elevator at the target free_Pack_down entrance and exit;
[0155] h. According to the current charging and discharging power of GESB, determine whether GESB should continue to perform the discharge task. If not, return to step (2); if yes, execute the next step;
[0156] i. Determine whether there is one last empty Cell in all free_Pack_downs in the Unit that can accommodate heavy objects. If so, cancel the instruction for the truck in the free_Pack_down to unload the heavy objects in the elevator (so the Unit is low on power at this moment and cannot perform the discharge task again, but can only perform the charging task. If the heavy objects are loaded into the last empty Cell at this moment, when the Unit is connected to the charging state, the heavy objects will be loaded from the empty Cell into the elevator again, thereby reducing the charging response speed of the Unit. During the GESB discharge process, if there is only one last empty Cell left in the target free_Pack_down of a Unit, cancel the instruction for unloading the heavy objects of the Unit), and return to step (2); if not, execute the next step (execute the instruction for unloading the heavy objects);
[0157] j. Drive the truck in the target free_Pack_up into the elevator and transport the heavy objects from the elevator to the empty cell farthest from the elevator (complete the task of unloading the heavy objects from the elevator);
[0158] k. Connect the unloaded elevator to the auxiliary motor and make the empty elevator rise to the entrance and exit of the upper Pack (hereinafter referred to as target load_Pack_up) where the elevator is ready to be loaded with heavy objects or where heavy objects can be loaded into the elevator;
[0159] 1. Determine whether the GESB power has changed. If so, return to step (2); if not, return to step.
[0160] Those skilled in the art will appreciate that the embodiments described herein are intended to help readers understand the implementation methods of the present invention, and should be understood that the protection scope of the present invention is not limited to such special statements and embodiments. Those skilled in the art can make various other specific variations and combinations that do not deviate from the essence of the present invention based on the technical revelations disclosed by the present invention, and these variations and combinations are still within the protection scope of the present invention.
Claims
1. A gravity energy storage system suitable for source-load coordinated control, characterized in that: include: GESB bracket (1), elevator bracket (2), main motor drive module (3) and auxiliary motor drive module (4); The GESB bracket (1) is used to carry the entire gravity energy storage system. The GESB bracket is divided into a plurality of transverse layers and longitudinal layers. Each transverse layer is an energy storage unit (1-1). The energy storage unit of each layer is divided into two energy storage chambers (1-2) by the longitudinal direction of the elevator bracket. The energy storage chamber is composed of a plurality of energy storage bins (1-3). The elevator bracket (2) is divided into longitudinal layers, each longitudinal layer corresponds to a longitudinal layer of the GESB bracket, and an elevator compartment (2-1) is formed in a longitudinal layer of the elevator bracket, and a heavy object lifting elevator (6) is installed in each elevator compartment; A main motor drive module (3) is arranged at the top of the elevator support, and the main motor drive module is respectively connected to each heavy object lifting elevator through a plurality of transmission steel belts (10), and the main motor drive module is used to control the lifting and lowering of all heavy object lifting elevators; during the charging process, the main motor drive module converts electrical energy into mechanical energy and stores energy by lifting heavy objects; During the discharge process, the main motor drive module converts the potential energy of the weight into electrical energy, generating electricity through the elevator's descent process; Each heavy-object lifting elevator is also provided with an auxiliary motor drive module (4), which is connected to the heavy-object lifting elevator via an elevator traction wire rope (11) and is used to assist in controlling the lifting and lowering of the elevator and the lifting and lowering of the empty elevator; Each energy storage room is provided with a truck (5) and a pair of tracks (7) cooperating with the truck, the tracks are connected to all the energy storage compartments in one energy storage room, and the tracks lead to the elevator compartment and are connected to the heavy object lifting elevator in the elevator compartment; Some energy storage bins contain a heavy object, and a truck can transport a heavy object in the energy storage bin to a heavy object elevator or transport a heavy object in a heavy object elevator to the energy storage bin via a track; A track is arranged inside the heavy object lifting elevator, and a heavy object support frame (9) is arranged inside the heavy object lifting elevator and the energy storage bin. The heavy object support frame is higher than the track and is used to support the heavy object and enable a truck to smoothly drive in and out under the heavy object. Each truck is provided with a truck loading platform lifter (8) for raising or lowering heavy objects; The gravity energy storage system connects the power grid and new energy sources through inverters and transformers, and the gravity energy storage system controls the operation of all components through a dispatching center.
2. A gravity energy storage system suitable for source-load coordinated control according to claim 1, characterized in that: The main motor drive module (3) includes: a large motor, a gearbox, a gearbox, a multi-stage transfer case, a clutch and a pulley; Large motor: responsible for converting electrical energy into mechanical energy for lifting heavy objects, or converting the potential energy of heavy objects into electrical energy to generate electricity through the descending process of heavy objects; The gearbox is connected to the output shaft of the large motor and is used to adjust the output speed; The gearbox is located at the output end of the gearbox and is used to further adjust the speed and transmit power to the multi-stage transfer case; The multi-stage transfer case receives power from the gearbox, distributes and adjusts it internally, and then transmits it to the clutch and pulley; the multi-stage transfer case distributes the power of the main motor to multiple output shafts; each output shaft can be connected to a heavy object lifting elevator through an independent transmission steel belt; The clutch is connected to the output end of the multi-stage transfer case. A clutch is installed on each output shaft of the multi-stage transfer case to control the transmission and interruption of power. By controlling the state of the clutch, power can be selectively transmitted to a specific elevator.
3. A gravity energy storage system suitable for source-load coordinated control according to claim 1, characterized in that: The truck cargo plane lifter (8) comprises: a hydraulic pump and a cargo plane; The hydraulic pump is installed on the truck (5), and a cargo plane is installed on the hydraulic pump, which can lift and lower the cargo plane, and the cargo plane is used to prevent heavy objects from being loaded.
4. A gravity energy storage system suitable for source-load coordinated control according to claim 1, characterized in that: The gravity energy storage system also includes a plurality of wire rope guide wheel assemblies (12), which are arranged on an elevator bracket, and each wire rope guide wheel assembly is connected to a heavy object lifting elevator to ensure that the movement path of the traction wire rope (11) in the heavy object lifting elevator is correct and stable.
5. An operating method of a gravity energy storage system according to any one of claims 1 to 4, characterized in that: include:
1. System startup and preparation a. Read system parameters: obtain the basic parameters of the gravity energy storage system, including battery energy storage capacity, rated power and initial state of charge; b. Update real-time data: Update the system's real-time state of charge data; c. Check task requirements: determine whether a charging or discharging task needs to be performed; if there is no task, the system enters standby mode; if there is a task, it continues to execute, charging enters step 2, and discharging enters step 3; 2. Charging process a. Charging condition judgment: check whether the system meets the charging conditions; if not, return to the step of updating real-time data; b. Check the position of the heavy lift: determine whether there is a heavy lift in the energy storage room on the bottom floor, and whether it has been loaded with heavy objects and meets the starting conditions; if so, jump to step d, otherwise continue; c. Transport heavy objects to the heavy object elevator: start the truck on the bottom floor and transport the heavy objects to the entrance and exit of the heavy object elevator warehouse or energy storage room; If the heavy object elevator is not at the bottom floor, use the auxiliary motor drive module to move the empty heavy object elevator down to the entrance and exit of the bottom floor and load the heavy object; d. Start the main motor drive module: Start the main motor drive module to put it into charging state; e. Connect the heavy object lift: connect the heavy object lift with the main motor drive module; f. Lift the heavy object elevator: lift the heavy object elevator to the entrance and exit of the upper energy storage room; g. Disconnect the heavy object lift: disconnect the heavy object lift from the main motor drive module and make it hover at the target position; h. Continue charging judgment: judge whether to continue charging according to the current charging power change; if not, return to the step of updating real-time data; if yes, continue; i. Empty energy storage bin check: Check whether there are any empty energy storage bins left; if so, cancel the unloading instruction and return to the step of updating real-time data; if not, continue; j. Unloading heavy objects: Start the truck and transport the heavy objects from the heavy object elevator to the energy storage bin; k. Return of the empty heavy object lift: Use the auxiliary motor drive module to move the empty heavy object lift down to the entrance and exit of the bottom floor; l. Power change check: determine whether the power has changed; if it has changed, return to the step of updating the real-time data; if it has not changed, return to step a; 3. Discharge process a. Discharge condition judgment: check whether the system meets the discharge conditions; if not, return to the step of updating real-time data; b. Check the position of the heavy lift: determine whether there is a heavy lift in the upper energy storage room, loaded with heavy objects and meets the start-up conditions; if so, jump to step d, otherwise continue; c. Transporting heavy objects to the heavy object elevator: Start the upper truck and transport the heavy objects to the entrance and exit of the heavy object elevator warehouse or energy storage room; if the heavy object elevator is not on the upper floor, use the auxiliary motor drive module to move the empty heavy object elevator up to the entrance and exit of the upper floor and load the heavy objects; d. Start power generation: Start the main motor drive module to make it enter the power generation state; e. Connect the heavy object lift: connect the heavy object lift with the main motor drive module; f. Descending the heavy lift: Make the heavy lift loaded with heavy objects descend to the entrance and exit of the energy storage room on the lower floor; g. Disconnect the heavy object lift: disconnect the heavy object lift from the main motor drive module and make it hover at the target position; h. Continue discharge judgment: judge whether to continue discharge according to the current discharge power change; if not, return to the step of updating real-time data; if yes, continue; i. Empty energy storage bin check: Check whether there are any empty energy storage bins left; if so, cancel the unloading instruction and return to the step of updating real-time data; if not, continue; j. Unloading heavy objects: Start the truck and transport the heavy objects from the heavy object elevator to the energy storage bin; k. Return of the empty heavy object lift: Use the auxiliary motor drive module to move the empty heavy object lift upward to the upper entrance and exit; l. Power change check: determine whether the power has changed; if it has changed, return to the step of updating real-time data; if it has not changed, return to step a.
Citation Information
Patent Citations
Gravity energy storage module and modular gravity energy storage system
CN114704445A
Motion control method for gravity energy storage system moving mechanism
CN115108420A
Gravity energy storage system charging and discharging power distribution scheduling method based on sequential control, storage medium and equipment
CN117791683A
Vertical shaft type gravity energy storage system and operation and design method thereof
CN117886198A
Fault detection device for automobile maintenance
CN214270072U