Interbedding soil direct shear test device and test method for controlling vertical position of shear surface

By designing a direct shear test device for interlayer soil, the vertical position of the shear surface is accurately controlled, and the problem of insufficient determination accuracy of the shear strength index of interlayer soil in the prior art is solved, and the accurate testing of the shear strength is achieved and high-precision detection.

CN119000354APending Publication Date: 2024-11-22CHINA COMM CONSTR FIRST HARBOR CONSULTANTS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411298435.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing direct shear test methods cannot accurately control the vertical position of the shear surface of the interlayer soil, resulting in high discreteness of the test values ​​of the shear strength index, unable to perform effective statistical analysis and use, and cannot meet the accuracy requirements of actual engineering.

Method used

A direct shear test device including a shear box unit of interlayer soil sample, a lift control unit, a vertical loading unit, a horizontal loading unit and a measurement and acquisition unit is designed. By accurately controlling the vertical direction of the shear surface of interlayer soil sample position to achieve accurate testing of shear strength indicators.

Benefits of technology

Accurate testing of the shear strength index of the interlayer soil is achieved, which meets the accuracy requirements of actual engineering, reduces the discretism of the test values, and improves the reliability and accuracy of the detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119000354A_ABST
    Figure CN119000354A_ABST
Patent Text Reader

Abstract

The invention discloses an interbedded soil direct shear test device capable of controlling the vertical position of a shear surface and a test method. The interbedded soil direct shear test device comprises an interbedded soil sample shear box unit, a lifting control unit, a vertical loading unit, a horizontal loading unit, a measurement and acquisition unit and a workbench, the interbed soil direct shear test method comprises the following steps: placing an interbed soil sample, lifting the interbed soil sample, pressurizing the interbed soil sample, shearing the interbed soil sample and processing data. The vertical position of a shearing surface can be accurately controlled, the shear strength index of interbedded soil can be accurately tested, and the precision requirement required by actual engineering is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of rock and soil testing, and in particular relates to an interlayer soil direct shear test device and a test method for controlling the vertical position of a shear surface. Background Art

[0002] Interlayer soil is a special soil layer distribution commonly seen in coastal port projects. It is a common Quaternary sedimentary soil layer in coastal plains, deltas and other areas. The formation of interlayer soil is as follows: soil particles are formed in a sedimentary environment with repeated alternations of rising and falling tides, static water and dynamic water. Fine particles are formed in the dry season and during floods, and coarse particles are formed during the flood season and during large floods. Under the influence of the above-mentioned periodic dynamic water changes, a layered soil layer with alternating fine and coarse particles is formed (the fine particle layer is mostly silty soil and clay soil layer, and the coarse particle layer is a sand layer), which has relatively complex physical and mechanical properties such as obvious horizontal bedding structure, heterogeneity, and anisotropy.

[0003] Direct shear strength is a commonly used mechanical property index for checking foundation bearing capacity and slope stability in coastal port projects. Based on the characteristics of interlayer soil, the shear strength index of its weak layer is particularly important, which places extremely high demands on the accuracy of the detection method. The conventional detection method is usually the direct shear test method. When using this method to conduct direct shear tests on interlayer soil, there is a problem that effective statistical analysis and use cannot be performed due to the large discreteness of the test values ​​of the shear strength indicators cohesion and internal friction angle, making it impossible to guarantee accuracy. The fundamental reason for the above problems is that the shear surface of the interlayer soil sample cannot be accurately controlled during the direct shear test. The shear surface may be located in the fine particle layer or the coarse particle layer, which is random.

[0004] In summary, the conventional direct shear test method cannot accurately determine the shear strength index of interlayer soil. Therefore, a direct shear test device and test method for interlayer soil are needed, which can accurately control the vertical position of the shear surface to meet the accuracy requirements of actual engineering. Summary of the invention

[0005] The purpose of the present invention is to provide an interlayer soil direct shear test device and a test method for controlling the vertical position of the shear surface, which can accurately control the vertical position of the shear surface, realize accurate testing of the shear strength index of the interlayer soil, and meet the accuracy requirements required by actual engineering.

[0006] In order to achieve the above object, the present invention adopts the following technical solutions:

[0007] In the first aspect, the present invention provides an interlayer soil direct shear test device for controlling the vertical position of the shear surface, comprising an interlayer soil sample shear box unit, a lifting control unit, a vertical loading unit, a horizontal loading unit, a measurement and collection unit and a workbench; the interlayer soil sample shear box unit comprises an upper shear box, a lower shear box, an outer box body and a sliding track, and the side walls of the upper shear box and the lower shear box are both provided with windows; the lower shear box is movably arranged at the bottom of the upper shear box; the outer box body is fixedly connected to the bottom of the lower shear box; a piston hole is provided on the bottom surface of the outer box body; the sliding track is arranged on the workbench, and the outer box body is movably arranged on the sliding track; the lifting control unit comprises a piston plate, a push rod and a power source, and the piston plate is movably and sealingly arranged The push rod is disposed in the piston hole and the lower shear box; the upper end and the lower end of the push rod are respectively connected to the piston plate and the power source; the horizontal loading unit includes a push rod and a rate control power box, and the two ends of the push rod are respectively connected to the outer box body and the rate control power box; the vertical loading unit includes a vertical loading rod, a pressure cover and a water treatment plate, and the vertical loading rod, the pressure cover and the water treatment plate are arranged from top to bottom, and the pressure cover and the water treatment plate are arranged in the upper shear box; the measurement and acquisition unit includes a contact rod, a dynamometer and a shear data collector, the contact rod is fixedly connected to the workbench, and one end thereof is in contact with the upper shear box; the dynamometer is installed on the contact rod and connected to the shear data collector.

[0008] In a second aspect, the present invention provides a direct shear test method for interlayer soil for controlling the vertical position of the shear surface, which is implemented based on the direct shear test device for interlayer soil described in the first aspect of the present invention, and is characterized by comprising the following steps:

[0009] Placing the interlayer soil sample: placing the water treatment plate below, the interlayer soil sample including the interlayer of clay soil layer and sand soil layer, and the water treatment plate above in the lower shear box in sequence, so that the water treatment plate is placed in contact with the piston plate, and the upper and lower surfaces of the interlayer soil sample are in contact with the upper and lower water treatment plates respectively;

[0010] Lifting the interlayer soil sample: starting the power source to drive the push rod and the piston plate to drive the interlayer soil sample to move up and down; at the same time, when the shear surface of the target soil layer of the interlayer soil sample reaches the interface between the upper and lower shear boxes through the window, turning off the power source so that the push rod and the piston plate stop driving the interlayer soil sample to move up and down;

[0011] Pressurizing the interlayer soil sample: placing the pressurizing cover in the upper shear box so that the pressurizing cover contacts the water treatment plate placed thereon; rotating the vertical loading rod so that it moves downward and the bottom end presses the pressurizing cover so that the pressurizing cover presses the water treatment plate and the interlayer soil sample, thereby applying a vertical pressure P to the interlayer soil sample;

[0012] Shearing the interlayer soil sample: starting the rate control power box, the dynamometer and the shear data collector, so that the rate control power box drives the push rod to push the outer box body to move horizontally on the sliding track, thereby driving the lower shear box to move horizontally, so that a relative displacement is generated between the lower shear box and the upper shear box, and a shear stress τ is generated on the shear surface of the target soil layer of the interlayer soil sample; at the same time, the shear stress τ is transmitted to the dynamometer through the contact rod, and the shear stress τ is measured by the dynamometer, and the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ are collected by the shear data collector;

[0013] The shear displacement deformation ΔL corresponding to the shear stress τ is obtained by formula (1):

[0014] ΔL=vt (1)

[0015] In formula (1), ΔL represents shear displacement deformation, v represents the speed at which the rate control power box drives the push rod to push the outer box body to move horizontally on the sliding track, and t represents the time of horizontal movement;

[0016] Data processing: a shear displacement deformation ΔL-shear stress τ relationship curve is drawn through the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ, and a peak point or stable value on the shear displacement deformation ΔL-shear stress τ relationship curve is selected as the shear strength S; when there is no obvious peak point, the shear stress τ corresponding to the shear displacement deformation ΔL being a preset value is selected as the shear strength S; with the shear strength S as the ordinate axis and the vertical pressure P as the abscissa axis, a vertical pressure P-shear strength S relationship curve is drawn, and according to each numerical point on the vertical pressure P-shear strength S relationship curve, a straight line is fitted by the least squares method, and the inclination angle of the straight line is the internal friction angle of the interlayer soil sample. The longitudinal intercept of the straight line is the cohesion c of the interlayer soil sample.

[0017] As a preferred method, when performing the data processing step, the shear strength S, cohesion c, vertical pressure P and internal friction angle of the interlayer soil sample are The relationship is as shown in formula (2),

[0018]

[0019] In formula (2), n = 1, 2, 3, ..., n represents the number of direct shear tests, S n represents the shear strength of the interlayer soil sample in each direct shear test, in kPa; c n represents the cohesion of the interlayer soil sample in each direct shear test, in kPa; P represents the vertical pressure acting on the shear surface of the interlayer soil sample in each direct shear test, in kPa; Represents the internal friction angle of the interlayer soil sample in each direct shear test, in degrees.

[0020] Preferably, after the step of data processing, the following steps are performed:

[0021] Recovery test device: clean the upper shear box and the lower shear box, start the power source, drive the push rod to drive the piston plate to move up and down, so that the piston plate moves into the piston hole, and then turn off the power source and stop driving the push rod to drive the piston plate to move up and down;

[0022] Replace the interlayer soil sample and change the value of the vertical pressure: take out the original interlayer soil sample, replace it with a new interlayer soil sample, and then repeat the steps of placing the interlayer soil sample, lifting the interlayer soil sample, pressurizing the interlayer soil sample, shearing the interlayer soil sample and data processing; and in the step of pressurizing the interlayer soil sample, rotate the vertical loading rod to press the pressurizing cover to move up and down, so as to change the vertical pressure P applied to the interlayer soil sample; then perform the data processing step to obtain the shear strength S, cohesion c and internal friction angle of the new interlayer soil sample corresponding to the changed vertical pressure P

[0023] Preferably, when performing the step of pressurizing the interlayer soil sample, the vertical pressure P is set to 100 kPa;

[0024] When performing the data processing step, the preset value of the shear displacement deformation ΔL is set to 4 mm;

[0025] The steps of restoring the test device, replacing the interlayer soil sample and changing the vertical pressure were repeated three times, and each time the vertical pressure P was set to 200 kPa, 300 kPa and 400 kPa respectively.

[0026] Preferably, after the direct shear test is completed, a step of restoring the test device is performed.

[0027] The first aspect of the present invention provides a direct shear test device for interlayer soil for controlling the vertical position of the shear surface. Preferably, the upper shear box and the lower shear box are both configured as transparent boxes, and the window is provided with a magnifying glass; a rubber ring is provided between the piston plate and the lower shear box.

[0028] Preferably, the vertical loading unit further comprises a crossbeam and a column, wherein the crossbeam is arranged above the upper shear box and is provided with a threaded hole; the vertical loading rod is provided with an external thread, and the vertical loading rod is threadedly connected in the threaded hole of the crossbeam; the vertical loading rod is threadedly connected with a fixing nut, and the fixing nut is arranged on the top of the crossbeam and contacts the crossbeam;

[0029] There are two upright posts, and symmetrical connecting holes are respectively opened at both ends of the cross beam. The two upright posts pass through and are connected to the two connecting holes respectively; the upper end of the upright post is provided with an external thread and is screwed with a reinforcing nut, and the reinforcing nut is arranged on the top of the cross beam and contacts the cross beam.

[0030] Preferably, the water treatment plate is configured as a permeable plate or a water-blocking plate, the permeable plate is used for performing a consolidation quick shear test on the interlayer soil samples, and the water-blocking plate is used for performing a quick shear test on the interlayer soil samples.

[0031] Preferably, the power source is arranged below the workbench, and a strip hole is arranged on the workbench; the length direction of the strip hole is the same as the length direction of the sliding track, and the push rod passes through the strip hole.

[0032] The interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface provided by the present invention have the following characteristics:

[0033] Beneficial effects:

[0034] 1. The interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface of the interlayer soil sample of the present invention are conducive to the precise control of the vertical height position of the shear surface of the target soil layer of the interlayer soil sample through the cooperation and application of the interlayer soil sample shear box unit, the lifting control unit, the vertical loading unit, the horizontal loading unit and the measurement and acquisition unit in the test, thereby effectively solving the problem that when the conventional direct shear test method is used to detect the interlayer soil, the test values ​​of the shear strength indicators cohesion and internal friction angle are highly discrete, resulting in the inability to perform effective statistical analysis and use, thereby achieving accurate testing of the shear strength indicators of the interlayer soil and meeting the accuracy requirements required for actual engineering.

[0035] 2. The interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface of the present invention are conducive to dividing the interlayer soil samples into independent target soil layers and obtaining the shear strength index of each target soil layer.

[0036] 3. The interlayer soil direct shear test device and test method of the present invention control the vertical position of the shear surface. Since, under normal circumstances, the slip surface of the interlayer soil passes through the weak layer under the action of external force, it is easy to obtain the shear strength index of the soft layer, which is beneficial to making the engineering construction safer and more reliable.

[0037] 4. In the interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface of the present invention, the upper and lower shear boxes can be made of transparent materials so that they meet the requirements of the direct shear test strength and stiffness, and at the same time, it is convenient to observe the soil layer conditions of the interlayer soil sample macroscopically and clearly through the transparent material; windows with magnifying glasses can be set in the middle of the left, right and front three sides of the upper and lower shear boxes, which are transparent and can have a magnifying effect, so that it is convenient to microscopically distinguish the interfaces between the target soil layers of the interlayer soil sample through the windows, which is conducive to finding and determining the shear surface positions of the target soil layers in the interlayer soil sample.

[0038] 5. In the interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface of the present invention, the power source of the lifting control unit can adopt the speed-adjustable electric hydraulic rod in the prior art, so that the lifting and lowering speed of the interlayer soil sample can be adjusted to be relatively slow, which is beneficial to avoid disturbance of the soil sample and is beneficial to have sufficient time to observe the soil layer conditions and accurately control and determine the vertical position of the shear surface.

[0039] 6. The interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface of the present invention can collect the shear stress value and shear displacement deformation in the direct shear test in real time through the shear data collector, which is conducive to timely determining the shear strength index; after the test, the test data and the corresponding parameter change curve can be output, which greatly facilitates the test personnel to carry out corresponding data processing; it is conducive to improving the degree of automation of data collection and the degree of partial visualization of the test process, and is easy to operate, greatly improving the test accuracy, and is conducive to practical engineering applications. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a structural schematic diagram of an interlayer soil direct shear test device for controlling the vertical position of the shear surface provided by one embodiment of the present invention.

[0041] Figure 2 It is a top view of the upper shear box and the lower shear box of the interlayer soil direct shear test device for controlling the vertical position of the shear surface provided by one embodiment of the present invention.

[0042] Figure 3 It is a front view of an interlayer soil direct shear test device for controlling the vertical position of the shear surface provided by one embodiment of the present invention.

[0043] Figure 4 It is a flow chart of a direct shear test method for interlayered soil for controlling the vertical position of the shear surface provided by one embodiment of the present invention.

[0044] Figure 5 It is a flow chart of a direct shear test method for interlayered soil for controlling the vertical position of the shear plane provided by another embodiment of the present invention.

[0045] Figure 6 It is a schematic diagram of the vertical position of the shear plane in the interlayer soil direct shear test method for controlling the vertical position of the shear plane provided in Example 2 of the present invention.

[0046] Figure 7 It is a schematic diagram of the vertical position of the shear plane in the interlayer soil direct shear test method for controlling the vertical position of the shear plane provided in Example 3 of the present invention.

[0047] Figure 8 It is a schematic diagram of the vertical position of the shear plane in the interlayer soil direct shear test method for controlling the vertical position of the shear plane provided in Example 4 of the present invention.

[0048] Fig. 9 This is a relationship curve of shear displacement deformation ΔL-shear stress τ in the direct shear test method for interlayer soil for controlling the vertical position of the shear plane provided in Example 2.

[0049] Fig.10 It is a curve diagram of the relationship between vertical pressure P and shear strength S in the direct shear test method for interlayer soil for controlling the vertical position of the shear plane provided in Example 2.

[0050] Reference numerals in the figures:

[0051] 1 is an upper shear box, 2 is a lower shear box, 3 is an outer box body, 4 is a sliding track, 5 is a water treatment plate, 6 is a piston plate, 7 is an interlayer soil sample, 8 is an interface between the upper and lower shear boxes, 9 is a rubber ring, 10 is a push rod, 11 is a power source, 12 is a handheld controller, 13 is a push rod, 14 is a rate control power box, 15 is a pressure cover, 16 is a column, 17 is a fixing nut, 18 is a vertical loading rod, 19 is a dynamometer, 20 is a shear data collector, 21 is a contact rod, 22 is a workbench, 23 is a magnifying window, 24 is a crossbeam, and 25 is a strip hole. DETAILED DESCRIPTION

[0052] The present invention is further described in detail below through the accompanying drawings and specific embodiments.

[0053] Example 1

[0054] Please refer to Figures 1 to 3The present embodiment provides an interlayer soil direct shear test device for controlling the vertical position of the shear surface, including an interlayer soil sample shear box unit, a lifting control unit, a vertical loading unit, a horizontal loading unit, a measurement and collection unit and a workbench 22; the interlayer soil sample shear box unit includes an upper shear box 1, a lower shear box 2, an outer box body 3 and a sliding track 4, and the side walls of the upper shear box 1 and the lower shear box 2 are both provided with windows 23; the lower shear box 2 is movably arranged at the bottom of the upper shear box 1; the outer box body 3 is fixedly connected to the bottom of the lower shear box 2; a piston hole is opened on the bottom surface of the outer box body 3; the sliding track 4 is arranged on the workbench 22, and the outer box body 3 is movably arranged on the sliding track 4; the lifting control unit includes a piston plate 6, a push rod 10 and a power source 11, and the piston plate 6 is movably and sealingly arranged on the movable The plug hole and the lower shear box 2; the upper and lower ends of the push rod 10 are respectively connected to the piston plate 6 and the power source 11; the horizontal loading unit includes a push rod 13 and a rate control power box 14, and the two ends of the push rod 13 are respectively connected to the outer box body 3 and the rate control power box 14; the vertical loading unit includes a vertical loading rod 18, a pressure cover 15 and a water treatment plate 5, and the vertical loading rod 18, the pressure cover 15 and the water treatment plate 5 are arranged from top to bottom, and the pressure cover 15 and the water treatment plate 5 are arranged in the upper shear box 1; the measurement and acquisition unit includes a contact rod 21, a dynamometer 19 and a shear data collector 20, the contact rod 21 is fixedly connected to the workbench 22, and one end thereof is in contact with the upper shear box 1; the dynamometer 19 is installed on the contact rod 21 and is connected to the shear data collector 20.

[0055] In the interlayer soil direct shear test device for controlling the vertical position of the shear surface of this embodiment, the power source 11 can adopt existing technology products, for example, a remote-controlled electric push rod telescopic rod can be adopted, which can be equipped with a handheld controller 12. The handheld controller 12 is connected to the power source 11, and a control signal can be sent to the power source 11 through the handheld controller 12, so as to control the opening, closing and telescopic movement of the power source 11, and then the push rod 10 is driven by the power source 11 to drive the piston plate 6 to move up and down. The rate control power box 14 is used to drive the push rod 13 to push the outer box body 3 and the lower shear box 2 to produce horizontal displacement. The rate control power box 14 can adopt existing technology products such as adjustable speed linear motors to provide horizontal shear power and control the horizontal shear rate. The vertical loading rod 18 is used to rotate and press the pressure cover 15 to adjust the height, so as to be suitable for direct shear tests on interlayer soil samples 7 of different thicknesses. The dynamometer 19 is used to measure the shear stress value when the interlayer soil sample 7 produces horizontal displacement. The shear data collector 20 is used to collect and receive the shear stress values ​​measured by the dynamometer 19 and the shear displacement values ​​corresponding to the shear stress values. The shear data collector 20 can adopt existing technical products such as computers. The computer can be installed with relevant software for data collection, storage, and processing, which is used to collect and store the shear stress values ​​measured by the dynamometer 19, calculate the shear displacement values ​​corresponding to the shear stress values, and fit, draw and store related curve graphs. The workbench 22 is used to provide a working space for the direct shear test to meet the strength requirements of the workbench 22 for the pressure loaded by the vertical loading unit and the load of each unit on the table. The workbench 22 can be made of stainless steel.

[0056] Please refer to Figures 1 to 4 and Fig. 9 and Fig.10 This embodiment provides a direct shear test method for interlayer soil to control the vertical position of the shear surface, which is implemented based on the interlayer soil direct shear test device provided in this embodiment, and includes the following steps:

[0057] Step S1, placing the interlayer soil sample: sequentially placing the lower water treatment plate 5, the interlayer soil sample 7 including the interlayer of clay soil layer and sand soil layer, and the upper water treatment plate 5 in the lower shear box 2, so that the water treatment plate 5 is placed in contact with the piston plate 6, and the upper and lower surfaces of the interlayer soil sample 7 are in contact with the upper and lower water treatment plates 5 respectively;

[0058] Step S2, lifting the interlayer soil sample: start the power source 11, drive the push rod 10 and the piston plate 6 to drive the interlayer soil sample 7 to lift and move; at the same time, when the shear surface of the target soil layer of the interlayer soil sample 7 reaches the upper and lower shear box interface 8 through the window 23, turn off the power source 11, so that the push rod 10 and the piston plate 6 stop driving the interlayer soil sample 7 to lift and move;

[0059] Step S3, pressurizing the interlayer soil sample: placing a pressurizing cover 15 in the upper shear box 1, so that the pressurizing cover 15 contacts the water treatment plate 5 placed thereon; rotating the vertical loading rod 18, so that it moves downward and the bottom end presses the pressurizing cover 15, so that the pressurizing cover 15 presses the water treatment plate 5 and the interlayer soil sample 7, so as to apply a vertical pressure P to the interlayer soil sample 7;

[0060] Step S4, shearing the interlayer soil sample: start the rate control power box 14, the dynamometer 19 and the shear data collector 20, so that the rate control power box 14 drives the push rod 13 to push the outer box body 3 to move horizontally on the sliding track 4, thereby driving the lower shear box 2 to move horizontally, so that a relative displacement is generated between the lower shear box 2 and the upper shear box 1, and a shear stress τ is generated on the shear surface of the target soil layer of the interlayer soil sample 7; at the same time, the shear stress τ is transmitted to the dynamometer 19 through the contact rod 21, and the shear stress τ is measured by the dynamometer 19, and the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ are collected by the shear data collector 20;

[0061] The shear displacement deformation ΔL corresponding to the shear stress τ is obtained by formula (1):

[0062] ΔL=vt (1)

[0063] In formula (1), ΔL represents shear displacement deformation, v represents the speed at which the rate control power box 14 drives the push rod 13 to push the outer box body 3 to move horizontally on the sliding track 4, and t represents the time of horizontal movement;

[0064] Step S5, data processing: a shear displacement deformation ΔL-shear stress τ relationship curve is drawn through the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ, and a peak point or a stable value on the shear displacement deformation ΔL-shear stress τ relationship curve is selected as the shear strength S; when there is no obvious peak point, the shear stress τ corresponding to the shear displacement deformation ΔL being a preset value is selected as the shear strength S; with the shear strength S as the ordinate axis and the vertical pressure P as the abscissa axis, a vertical pressure P-shear strength S relationship curve is drawn, and according to each numerical point on the vertical pressure P-shear strength S relationship curve, a straight line is fitted by the least squares method, and the inclination angle of the straight line is the internal friction angle of the interlayer soil sample 7 The vertical intercept of the straight line is the cohesion c of the interlayer soil sample 7.

[0065] It should be noted that in step S2, when lifting the interlayer soil sample 7, the shear plane of the interlayer soil sample 7 can be set to the plane where the middle position of the target soil layer in the interlayer soil sample 7 is located; that is, when lifting the interlayer soil sample 7, the plane where the middle position of the target soil layer in the interlayer soil sample 7 is located needs to be lifted and moved to the interface 8 between the upper and lower shear boxes; for example, the plane where the middle position of the target soil layer in the interlayer soil sample 7 is located needs to be lifted and moved to the plane where the bottom surface of the upper shear box 1 and the top surface of the lower shear box 2 coincide with each other.

[0066] The interlayer soil sample 7 is preferably raised at a slow rate to avoid disturbance of the target soil layer in the interlayer soil sample 7. At the same time, sufficient time can be reserved for observing changes in the target soil layer, so that the middle position of the target soil layer is accurately placed at the interface 8 between the upper and lower shear boxes; and it is beneficial to accurately place the shear surface at the interface 8 between the upper and lower shear boxes at one time, avoiding disturbance of the target soil layer caused by repeated lifting and lowering of the interlayer soil sample 7.

[0067] After performing the lifting and lowering of the interlayer soil sample in step S2, relevant electrical components of the vertical loading unit, the horizontal loading unit and the measurement and collection unit may be powered on.

[0068] Specifically, in step S5, during data processing, the shear strength S, cohesion c, vertical pressure P and internal friction angle of the interlayer soil sample 7 are The relationship is as shown in formula (2),

[0069]

[0070] In formula (2), n = 1, 2, 3, ..., n represents the number of direct shear tests, S n represents the shear strength of interlayer soil sample 7 in each direct shear test, in kPa; c n represents the cohesion of the interlayer soil sample 7 in each direct shear test, and the unit is kPa; P represents the vertical pressure acting on the shear surface of the interlayer soil sample 7 in each direct shear test, and the unit is kPa; Represents the internal friction angle of interlayer soil sample 7 in each direct shear test, in degrees (°).

[0071] Fig. 9 In the figure, the four curves represent the shear displacement deformation ΔL-shear stress τ relationship curves when the vertical pressures P1, P2, P3, and P4 are applied, respectively, and the arrow points on each curve represent the coordinate points with the corresponding coordinates (shear displacement deformation ΔL, shear stress τ).

[0072] Fig.10In the figure, the position of the first asterisk on the straight line from left to right represents the vertical pressure P1=100kPa, the shear strength S1=81.1kPa, the position of the second asterisk represents P1=200kPa, the shear strength S2=123.0kPa..., and so on, as shown in the table in the upper left corner. Fig.10 The table in the lower right corner shows the cohesion c=46.8 kPa and the internal friction angle of the target soil layer of the interlayer soil sample 7.

[0073] Please refer to Figure 5 Specifically, after performing the data processing step of step S5, the following steps are performed:

[0074] Step S6, restoring the test device: cleaning the upper shear box 1 and the lower shear box 2, starting the power source 11, driving the push rod 10 to drive the piston plate 6 to move up and down, so that the piston plate 6 moves into the piston hole, and then turning off the power source 11, stopping driving the push rod 10 to drive the piston plate 6 to move up and down;

[0075] Step S7, replace the interlayer soil sample and change the value of the vertical pressure: take out the original interlayer soil sample 7, replace it with a new interlayer soil sample 7, and then repeat the steps of placing the interlayer soil sample in step S1, lifting the interlayer soil sample in step S2, pressurizing the interlayer soil sample in step S3, shearing the interlayer soil sample in step S4, and data processing in step S5; and when performing the pressurizing of the interlayer soil sample in step S3, rotate the vertical loading rod 18 to press the pressurizing cover 15 to move up and down, so as to change the vertical pressure P applied to the interlayer soil sample 7; then perform the data processing in step S5 to obtain the shear strength S, cohesion c and internal friction angle of the new interlayer soil sample 7 corresponding to the changed vertical pressure P.

[0076] That is, a direct shear test with different vertical pressures P is performed on the same soil layer of the same group of interlayer soil samples 7. Different vertical pressures P are applied to the interlayer soil samples 7 by the vertical loading rod 18, and a horizontal thrust is applied to the lower shear box 2 by the horizontal loading unit, so that the lower shear box 2 moves horizontally on the sliding track 4, thereby causing a relative horizontal displacement between the upper shear box 1 and the lower shear box 2. The operation is standardized according to the requirements of the "Standard for Geotechnical Test Methods" GB / T 50123-2019, and the shear stress τ of the interlayer soil sample 7 during the shear process is measured by the dynamometer 19, and the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ are collected by the shear data collector 20.

[0077] When the shear stress reading measured by the dynamometer 19 reaches a stable state or decreases significantly, it means that the interlayer diagram sample 7 has been sheared. At this time, it is preferred to shear the target soil layer of the interlayer diagram sample 7 until the shear displacement deformation ΔL reaches a preset value, for example, the target soil layer of the interlayer diagram sample 7 is sheared until the shear displacement deformation ΔL reaches 4 mm; when the shear stress reading measured by the dynamometer 19 continues to increase, preferably when the shear displacement deformation ΔL reaches 6 mm, stop data collection.

[0078] Specifically, in step S3, when pressurizing the interlayer soil sample, the vertical pressure P is set to 100 kPa;

[0079] When performing the data processing step S5, the preset value of the shear displacement deformation ΔL is set to 4 mm;

[0080] The steps of restoring the test device in step S6 and replacing the interlayer soil sample and changing the vertical pressure in step S7 were repeated three times, and each time the vertical pressure P was set to 200 kPa, 300 kPa and 400 kPa respectively.

[0081] Specifically, after the direct shear test is completed, the recovery test device is performed in step S6.

[0082] Specifically, before starting the direct shear test, it is first confirmed that the recovery test device of step S6 has been performed after the last direct shear test, that is, it is confirmed that the piston plate 6 is located in the piston hole.

[0083] Please refer to Figures 1 to 3 The present embodiment provides an interlayer soil direct shear test device for controlling the vertical position of the shear surface. Specifically, the upper shear box 1 and the lower shear box 2 are both configured as transparent boxes, and the window 23 is configured as a transparent window to meet the direct shear test requirements for the strength and stiffness of the upper shear box 1 and the lower shear box 2 and the window 23. At the same time, it is convenient to clearly observe the position of the target soil layer in the interlayer soil sample 7 and accurately determine the shear surface position of the interlayer soil sample 7.

[0084] The window 23 is provided with a magnifying glass, which can achieve a magnifying effect, help to microscopically distinguish the interface between the soil layers in the interlayer soil sample 7, and help to accurately determine the position of the shear surface. The magnifying glass can be a product of the existing technology.

[0085] A rubber ring 9 is provided between the piston plate 6 and the lower shear box 2, and a sealing effect is achieved by the side wall of the piston plate 6 and the inner wall of the lower shear box 2 being in contact with the rubber ring 9 respectively.

[0086] Specifically, the vertical loading unit also includes a cross beam 24 and a column 16. The cross beam 24 is arranged above the upper shear box 1 and is provided with a threaded hole. The vertical loading rod 18 is provided with an external thread, and the vertical loading rod 18 is threadedly connected to the threaded hole of the cross beam 24. The vertical loading rod 18 is threaded with a fixing nut 17, and the fixing nut 17 is arranged on the top of the cross beam 24 and contacts with the cross beam 24. There are two columns 16, and symmetrical connecting holes are respectively opened at both ends of the cross beam 24. The two columns 16 pass through and are connected to the two connecting holes respectively. The upper end of the column 16 is provided with an external thread and is threaded with a reinforcement nut, and the reinforcement nut is arranged on the top of the cross beam 24 and contacts with the cross beam 24.

[0087] Specifically, the water treatment plate 5 is configured as a permeable plate or a water-blocking plate. The permeable plate is used to perform a consolidation quick shear test on the interlayer soil sample 7 , and the water-blocking plate is used to perform a quick shear test on the interlayer soil sample 7 .

[0088] Specifically, the power source 11 is disposed below the workbench 22 , and a strip hole 25 is disposed on the workbench 22 ; the length direction of the strip hole 25 is the same as the length direction of the sliding track 4 , and the push rod 10 passes through the strip hole 25 .

[0089] The length direction of the strip hole 25 is adapted to the horizontal displacement direction of the lower shear box 3, and the width of the strip hole 25 is greater than the outer diameter of the push rod 10, so that the push rod 10 can pass through the strip hole 25 to meet the need for the piston plate 6, the push rod 10 and the power source 11 of the lifting control unit to move horizontally with the outer box body 3 and the lower shear box 3 during the direct shear test.

[0090] Specifically, a platform is provided below the workbench 22, and the power source 11 is placed on the platform. Rollers are installed at the bottom of the power source 11, so that the power source 11 can move horizontally on the platform.

[0091] like Figure 1 As shown in the left and right directions in FIG, the sliding track 4 is set as a horizontal transverse track, and the length direction of the sliding track 4 is arranged along the left and right directions. The workbench 22 is set as a horizontal transverse rectangular platform. The sliding track 4 is fixedly connected to the workbench 22.

[0092] like Figure 2 The up-down direction shown is the front-back direction, and the outer box body 3 is configured as a rectangular box with an opening at the upper end and a bottom surface at the lower end. The sliding track 4 has the same front-back width as the outer box body 3 .

[0093] The upper shear box 1 and the lower shear box 2 can both be set as vertical tubes, the outer walls of the two are set as the outer walls of rectangular tubes, the inner walls are set as the inner walls of circular tubes, and the inner diameters and outer diameters of the two are the same. The bottom surface of the upper shear box 1 contacts and overlaps with the bottom surface of the lower shear box 2 to form an upper and lower shear box interface 8.

[0094] Windows 23 are respectively provided on the left, right and front side walls of the upper shear box 1 and the lower shear box 2 .

[0095] The bottom surface of the lower shear box 2 is fixedly connected to the bottom surface of the outer box body 3 , and the vertical center axes of the lower shear box 2 and the outer box body 3 coincide with each other.

[0096] A piston hole is provided at the center of the bottom surface of the outer box body 3. The interlayer soil sample 7 is arranged as a vertical cylinder, and the piston hole is arranged as a circular hole. The diameter of the piston hole is the same as the diameter of the interlayer soil sample 7. The piston plate 6 is arranged as a horizontal and transverse circular plate, the outer diameter of the piston plate 6 is the same as the inner diameter of the piston hole, and the thickness of the piston plate 6 is the same as the thickness of the bottom surface of the outer box body 3. The piston plate 6 is fixedly connected to the top end of the push rod 10 of the lifting control unit. The piston plate 6 is movably and sealingly arranged in the piston hole and the lower shear box 2, so that the piston plate 6 and the lower shear box 2 form a piston connection structure.

[0097] Alternatively, the piston plate 6 can directly form the bottom surface of the outer box body 3, that is, the outer box body 3 is configured as a vertical circular tube, the outer diameter of the piston plate 6 is the same as the inner diameter of the outer box body 3, and the piston plate 6 is directly disposed in the outer box body 3.

[0098] The inner diameter of the piston hole and the outer diameter of the piston plate 6 can be set to 63mm, and the bottom surface of the lower shear box 2 and the thickness of the piston plate 6 can be set to 5mm. The push rod 10 is set as a vertical rod. The bottom end of the push rod 10 is connected to the power source 11.

[0099] When the power source 11 drives the push rod 10 to drive the piston plate 6 to move up and down, when the piston plate 6 is at the lowest height position, its top surface coincides with the bottom surface of the lower shear box 2; when the piston plate 6 is at the highest height position, its top surface coincides with the top surface of the lower shear box 2.

[0100] The push rod 13 is arranged as a horizontal transverse rod. One end of the push rod 13 is connected to the speed control power box 14, and the other end is fixedly connected to the outer side wall of the outer box body 3.

[0101] A conduction rod is connected to the outer wall of the upper shear box 2 , and the conduction rod is configured as an L-shaped bending rod. The conduction rod contacts the contact rod 21 , and is used to conduct the shear stress to the contact rod 21 , and is measured by the dynamometer 19 .

[0102] The columns 16 are arranged as vertical columns. The cross beam 24 is arranged as a horizontal cross beam. The two columns 16 are parallel to each other and are perpendicular to the cross beam 24. The vertical loading rod 18 is arranged as a vertical rod, and a threaded hole is provided in the middle of the cross beam 24. The vertical loading rod 18 passes through and is screwed into the threaded hole of the cross beam 24.

[0103] The two sides of the workbench 22 are provided with strip holes, and the length direction of the strip holes is along the front-back direction. The bottom ends of the two columns 16 pass through the two strip holes to the bottom of the workbench 22, and the two columns 6 can move in the two strip holes. Weights are installed at the bottom ends of the two columns 16. The weights can be removed and replaced, and are used to apply vertical pressure to the crossbeam 24 and the vertical loading rod 18.

[0104] A horizontal and transverse water treatment plate 5 is arranged in the upper shear box 2, and the water treatment plate 5 is arranged as a water-permeable plate or a water-blocking plate. The water-permeable plate is provided with water-permeable holes for water to penetrate. The water-permeable plate can be made of permeable stone. A pressure cover 15 is placed on the water treatment plate 5. The pressure cover 15 is arranged as a horizontal and transverse cover plate.

[0105] The pressure cover 15 is configured as a horizontal flat plate. The bottom end of the vertical loading rod 18 is placed at the center of the pressure cover 15 to apply vertical pressure to the pressure cover 15 in a balanced manner.

[0106] The water treatment plate 5 is configured as a horizontal flat plate, and the vertical center axis of the water treatment plate 5 coincides with the vertical center axis of the pressure cover 15 .

[0107] Please refer to Figures 5 to 10 In the interlayer soil direct shear test method provided in this embodiment, the interlayer soil sample 7 can be composed of a clay layer T n and sandy soil layerX n The target soil layers are composed of interlayers. Direct shear tests are carried out on each target soil layer under four vertical pressures P1, P2, P3, and P1 of 100 kPa, 200 kPa, 300 kPa, and 400 kPa, respectively. Fig. 9 As shown, the shear displacement deformation ΔL-shear stress τ relationship curve is obtained; Fig.10 As shown in the figure, the vertical pressure P-shear strength S relationship curve is obtained. By drawing the graph, the cohesion c of each layer of soil can be obtained. n and internal friction angle Specifically, the vertical pressure P can be selected according to the hardness of the target soil layer. Generally, under the action of external force, the slip surface of the interlayer soil passes through the weak layer, so the shear strength index of the soft layer can be obtained through the interlayer direct shear test device and method provided in this embodiment.

[0108] Example 2

[0109] Please refer to Figures 1 to 3 and Figure 5 In the interlayer soil direct shear test method provided in this embodiment, the interlayer soil sample 7 is composed of clay layers T1, T2 and sandy soil layers X1, X2, and the soil layers from top to bottom are: X1, T1, X2, T2.

[0110] The target soil layer is set as the clay layer T1. The interlayer soil sample 7 including the clay layers T1 and T2 and the sandy soil layers X1 and X2 is placed in the lower shear box 2, the lower water treatment plate 5 is placed on the piston plate 6, and the interlayer soil sample 7 is placed on the lower water treatment plate 5; the water treatment plate 5 can be set as a permeable plate or a water-blocking plate, and the permeable plate can be made of permeable stone;

[0111] Please refer to Figure 6 , start the power source 11, observe the position of the target soil layer T1 through the transparent upper shear box 1 and the lower shear box 2 and the window 23, and drive the push rod 10 through the power source 11 to drive the piston plate 6 to move upward, and the rising rate should be relatively slow to ensure that the interlayer soil sample 7 is not disturbed and to reserve sufficient time to observe the changes in each soil layer; the middle position of the target soil layer T1 is the shear surface, and when the shear surface is located at the interface 8 between the upper and lower shear boxes, the vertical position of the shear surface of the target soil sample has been determined; turn off the power source 11 and stop the lifting and lowering movement; in this process, try to find the height of the middle position of the target soil layer at one time to avoid repeated up and down movement of the interlayer soil sample 7;

[0112] After the vertical position of the shear plane of the target soil sample is determined, the filter paper and the upper water treatment plate 5 are placed on the interlayer soil sample 7, and then the pressure cover 15 is placed on the upper water treatment plate 5, and the height of the vertical loading rod 18 is adjusted by rotation to achieve a vertical pressure P1 of 100 kPa on the interlayer soil sample 7;

[0113] Start the rate control power box 14 and drive the push rod 13 to apply horizontal thrust to the outer box body 3 and the lower shear box 2, so that the lower shear box 2 moves horizontally on the sliding track 4, thereby causing the upper shear box 1 and the lower shear box 2 to produce a relative displacement in the horizontal direction, and operate in accordance with the requirements of the "Standard for Geotechnical Test Methods" GB / T 50123-2019.

[0114] The shear stress value of the interlayer soil sample 7 during the direct shear test is measured by the dynamometer 19, and the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress are collected by the shear data collector 20. When the reading of the shear stress τ reaches a stable state or decreases significantly, it indicates that the interlayer soil sample 7 has been sheared, and the shearing should be carried out until the shear displacement deformation ΔL reaches 4 mm. When the shear stress τ reading continues to increase, the shear displacement deformation ΔL reaches 6 mm, and the data collection should be stopped.

[0115] After the test is finished, the interlayer direct shear test device is reset, and the power source 11 drives the push rod 10 to drive the piston plate 6 to move up and down to the lower surface position of the lower shear box 2;

[0116] Then, the direct shear test of the other three interlayer soil samples 7 of the same group is carried out, that is, the shear planes of the target soil layers of the other three interlayer soil samples 7 of the same group are respectively lifted and moved to the upper and lower shear box interface 8 by the lifting control unit again, and vertical pressures P2, P3, and P4 of 200 kPa, 300 kPa, and 400 kPa are respectively applied to the three interlayer soil samples 7;

[0117] Please refer to Fig. 9 The shear stress value τ of each interlayer soil sample 7 in the direct shear test under the corresponding vertical pressure P and the shear displacement deformation ΔL corresponding to the shear stress value τ are collected through the shear data collector 20, and a shear displacement deformation ΔL-shear stress τ relationship curve is drawn, and the peak point or stable value on the shear displacement deformation ΔL-shear stress τ relationship curve is selected as the shear strength S.

[0118] Please refer to Fig.10 , with shear strength S as the ordinate and vertical pressure P as the abscissa, draw a vertical pressure P-shear strength S-relationship curve. According to the points on the graph, a straight line is fitted by the least squares method. The inclination of the straight line is the internal friction angle of the soil. The intercept of the straight line on the ordinate axis is the cohesion c of the soil T1 .

[0119] It can be seen that through the interlayer direct shear test device and test method of this embodiment, the vertical position of the shear surface of the target soil sample can be accurately controlled, and the internal friction angle of the clay layer T1 can be obtained. and cohesion c T1 .

[0120] Example 3

[0121] Please refer to Figures 1 to 3 , Figure 5 and Figure 7 In the interlayer soil direct shear test method provided in this embodiment, the target soil layer is set as the sand layer X2, and the lifting control unit cooperates with the transparent upper shear box 1, the lower shear box 2 and the window 23 to achieve the middle position of the target soil layer X2, that is, the shear surface of the target soil layer X2 is placed at the interface 8 between the upper and lower shear boxes;

[0122] By performing a direct shear test on the sand layer X2 according to the corresponding steps in Example 2, the vertical position of the shear plane of the target soil layer can be accurately controlled, and the internal friction angle of the clay layer X2 can be obtained. and cohesion c X2 .

[0123] Example 4

[0124] Please refer to Figures 1 to 3 , Figure 5 and Figure 8In the interlayer soil direct shear test method provided in this embodiment, the target soil layer is set as the clay layer T2, and the lifting control unit cooperates with the transparent upper shear box 1, the lower shear box 2 and the window 23 to achieve the middle position of the target soil layer T2, that is, the shear surface of the target soil layer T2 is placed at the interface 8 between the upper and lower shear boxes;

[0125] By performing a direct shear test on the clay layer T2 according to the corresponding steps in Example 2, the vertical position of the shear plane of the target soil layer can be accurately controlled, and the internal friction angle of the clay layer T2 can be obtained. and cohesion c T2 .

[0126] It can be seen that the interlayer soil direct shear test device and test method for controlling the vertical position of the shear surface provided in this embodiment can facilitate the acquisition of the internal friction angles of the clay layers T1, T2 and the sandy soil layer X2 in the interlayer soil. and cohesion c T1 、c T2 、c X2 , making it easy to judge the size of the shear strength index of each soil layer in the interlayer soil sample 7.

[0127] The above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

[0128] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0129] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to has a specific orientation, is constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0130] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

Claims

1. A direct shear test device for interlayer soils for controlling the vertical position of the shear surface, characterized in that: It includes an interlayer soil sample shear box unit, a lifting control unit, a vertical loading unit, a horizontal loading unit, a measurement and collection unit and a workbench; The interlayer soil sample shear box unit comprises an upper shear box, a lower shear box, an outer box body and a sliding track, and the side walls of the upper shear box and the lower shear box are both provided with windows; the lower shear box is movably arranged at the bottom of the upper shear box; The outer box body is fixedly connected to the bottom of the lower shear box; a piston hole is provided on the bottom surface of the outer box body; the sliding track is arranged on the workbench, and the outer box body is movably arranged on the sliding track; The lifting control unit comprises a piston plate, a push rod and a power source, wherein the piston plate is movably and sealingly arranged in the piston hole and the lower shear box; the upper end and the lower end of the push rod are connected to the piston plate and the power source respectively; The horizontal loading unit comprises a push rod and a rate control power box, and two ends of the push rod are respectively connected to the outer box body and the rate control power box; The vertical loading unit comprises a vertical loading rod, a pressure cover and a water treatment plate, wherein the vertical loading rod, the pressure cover and the water treatment plate are arranged from top to bottom, and the pressure cover and the water treatment plate are arranged in the upper shear box; The measurement and acquisition unit includes a contact rod, a dynamometer and a shear data collector. The contact rod is fixedly connected to the workbench, and one end of the contact rod is in contact with the upper shear box. The dynamometer is installed on the contact rod and connected to the shear data collector.

2. The interlayer soil direct shear test device for controlling the vertical position of the shear surface according to claim 1 is characterized in that: The upper shear box and the lower shear box are both configured as transparent boxes, and the window is provided with a magnifying glass; a rubber ring is provided between the piston plate and the lower shear box.

3. The interlayer soil direct shear test device for controlling the vertical position of the shear surface according to claim 1 is characterized in that: The vertical loading unit further comprises a crossbeam and a column, wherein the crossbeam is arranged above the upper shear box and is provided with a threaded hole; the vertical loading rod is provided with an external thread, and the vertical loading rod is threadedly connected in the threaded hole of the crossbeam; the vertical loading rod is threadedly connected with a fixing nut, and the fixing nut is arranged on the top of the crossbeam and contacts the crossbeam; There are two upright posts, and symmetrical connecting holes are respectively opened at both ends of the cross beam. The two upright posts respectively pass through and are connected to the two connecting holes; the upper end of the upright post is provided with an external thread and is screwed with a reinforcing nut, and the reinforcing nut is arranged on the top of the cross beam and contacts the cross beam.

4. The interlayer soil direct shear test device for controlling the vertical position of the shear surface according to claim 1, characterized in that: The water treatment plate is configured as a permeable plate or a water-blocking plate. The permeable plate is used for performing a consolidation quick shear test on an interlayer soil sample, and the water-blocking plate is used for performing a quick shear test on an interlayer soil sample.

5. The interlayer soil direct shear test device for controlling the vertical position of the shear surface according to any one of claims 1 to 4, characterized in that: The power source is arranged below the workbench, and a strip hole is arranged on the workbench; the length direction of the strip hole is the same as the length direction of the sliding track, and the push rod passes through the strip hole.

6. A direct shear test method for interlayered soil with a vertical position of a shear plane controlled, implemented based on the direct shear test device for interlayered soil as described in claims 1 to 5, characterized in that: The following steps are involved: Placing the interlayer soil sample: placing the water treatment plate below, the interlayer soil sample including the interlayer of clay soil layer and sand soil layer, and the water treatment plate above in the lower shear box in sequence, so that the water treatment plate is placed in contact with the piston plate, and the upper and lower surfaces of the interlayer soil sample are in contact with the upper and lower water treatment plates respectively; Lifting the interlayer soil sample: starting the power source to drive the push rod and the piston plate to drive the interlayer soil sample to move up and down; at the same time, when the shear surface of the target soil layer of the interlayer soil sample reaches the interface between the upper and lower shear boxes through the window, turning off the power source so that the push rod and the piston plate stop driving the interlayer soil sample to move up and down; Pressurizing the interlayer soil sample: placing the pressurizing cover in the upper shear box so that the pressurizing cover contacts the water treatment plate placed thereon; rotating the vertical loading rod so that it moves downward and the bottom end presses the pressurizing cover so that the pressurizing cover presses the water treatment plate and the interlayer soil sample, thereby applying a vertical pressure P to the interlayer soil sample; Shearing the interlayer soil sample: starting the rate control power box, the dynamometer and the shear data collector, so that the rate control power box drives the push rod to push the outer box body to move horizontally on the sliding track, thereby driving the lower shear box to move horizontally, so that a relative displacement is generated between the lower shear box and the upper shear box, and a shear stress τ is generated on the shear surface of the target soil layer of the interlayer soil sample; at the same time, the shear stress τ is transmitted to the dynamometer through the contact rod, and the shear stress τ is measured by the dynamometer, and the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ are collected by the shear data collector; The shear displacement deformation ΔL corresponding to the shear stress τ is obtained by formula (1): ΔL=vt (1) In formula (1), ΔL represents shear displacement deformation, v represents the speed at which the rate control power box drives the push rod to push the outer box body to move horizontally on the sliding track, and t represents the time of horizontal movement; Data processing: drawing a shear displacement deformation ΔL-shear stress τ relationship curve diagram through the shear stress τ and the shear displacement deformation ΔL corresponding to the shear stress τ, and selecting a peak point or a stable value on the shear displacement deformation ΔL-shear stress τ relationship curve diagram as the shear strength S; When there is no obvious peak point, the shear stress τ corresponding to the shear displacement deformation ΔL being the preset value is selected as the shear strength S; with the shear strength S as the ordinate axis and the vertical pressure P as the abscissa axis, a vertical pressure P-shear strength S relationship curve is drawn, and according to each numerical point on the vertical pressure P-shear strength S relationship curve, a straight line is fitted by the least squares method, and the inclination angle of the straight line is the internal friction angle of the interlayer soil sample The longitudinal intercept of the straight line is the cohesion c of the interlayer soil sample.

7. The interlayer soil direct shear test method for controlling the vertical position of the shear surface according to claim 6 is characterized in that: During the data processing step, the shear strength S, cohesion c, vertical pressure P and internal friction angle of the interlayer soil sample are The relationship is as shown in formula (2), In formula (2), n = 1, 2, 3, ..., n represents the number of direct shear tests, S n represents the shear strength of the interlayer soil sample in each direct shear test, in kPa; c n represents the cohesion of the interlayer soil sample in each direct shear test, in kPa; P represents the vertical pressure acting on the shear surface of the interlayer soil sample in each direct shear test, in kPa; Represents the internal friction angle of the interlayer soil sample in each direct shear test, in degrees.

8. The interlayer soil direct shear test method for controlling the vertical position of the shear surface according to claim 7 is characterized in that: After the data processing steps, the following steps are performed: Recovery test device: clean the upper shear box and the lower shear box, start the power source, drive the push rod to drive the piston plate to move up and down, so that the piston plate moves into the piston hole, and then turn off the power source and stop driving the push rod to drive the piston plate to move up and down; Replace the interlayer soil sample and change the value of the vertical pressure: take out the original interlayer soil sample, replace it with a new interlayer soil sample, and then repeat the steps of placing the interlayer soil sample, lifting the interlayer soil sample, pressurizing the interlayer soil sample, shearing the interlayer soil sample and data processing; and in the step of pressurizing the interlayer soil sample, rotate the vertical loading rod to press the pressurizing cover to move up and down, so as to change the vertical pressure P applied to the interlayer soil sample; then perform the data processing step to obtain the shear strength S, cohesion c and internal friction angle of the new interlayer soil sample corresponding to the changed vertical pressure P 9. The interlayer soil direct shear test method for controlling the vertical position of the shear surface according to claim 8, characterized in that: When performing the step of pressurizing the interlayer soil sample, the vertical pressure P is set to 100 kPa; When performing the data processing step, the preset value of the shear displacement deformation ΔL is set to 4 mm; The steps of restoring the test device, replacing the interlayer soil sample and changing the vertical pressure were repeated three times, and each time the vertical pressure P was set to 200 kPa, 300 kPa and 400 kPa respectively.

10. The direct shear test method for interlayer soil for controlling the vertical position of the shear plane according to any one of claims 6 to 9, characterized in that: After the direct shear test is completed, the steps for restoring the test device are carried out.