Cross-basin water transfer quantity optimization method considering hydraulic response characteristics
By constructing a river flow prediction model and a multi-objective optimization scheduling model, the problem of cross-basin water diversion that the existing technology cannot be applied to mountain rivers is solved, high-precision prediction of mountain river flow and reasonable allocation of water resources are achieved, and water diversion is optimized The scientificity and rationality of the project.
Patent Information
- Application Number
- CN202411072516.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art has not been applicable to mountain rivers when considering the hydraulic response characteristics, and cannot effectively optimize the cross-basin water transfer volume of mountain rivers, resulting in unreasonable and unscientific water transfer plan.
By constructing a river flow prediction model that introduces riverbed sediment density, daily rainfall, temperature, and soil moisture, and combining multi-objective optimization scheduling model, the optimal scheduling scheme is generated using differential evolution algorithm to ensure cross-basin water diversion projects of mountain river types in mountainous areas Rationality and scientificity.
The accuracy of prediction of river flow in mountainous areas has been improved, and the generated scheduling plan can reasonably allocate water resources, optimize energy consumption and ecological impact, and ensure the scientificity and rationality of cross-basin water diversion projects.
Smart Images

Figure CN119005605A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of water resource scheduling, and in particular to a method for optimizing water transfer volume across river basins taking hydraulic response characteristics into consideration. Background Art
[0002] Inter-basin water transfer is a large-scale artificial method of transferring water from a basin with surplus water to a water-deficient basin in order to promote economic development in water-deficient areas and alleviate conflicts in water use in basins. Inter-basin water transfer projects reconfigure water resources in basins by changing the temporal and spatial distribution characteristics of water resources between basins, effectively alleviating conflicts between water supply and demand in production and life in water-scarce areas, and improving the ecological environment of water-receiving areas. Inter-basin water transfer is used in areas with a long history where the distribution of water resources is extremely uncoordinated with that of land, population, and socio-economic centers. There is usually a certain distance between the water source area and the water use center area. Inter-basin water transfer can achieve a balance between water resources between regions.
[0003] In the prior art, a method for compiling a ten-day water volume optimization scheduling plan for a cross-basin water diversion project considering hydraulic response characteristics is disclosed in the publication number "CN112785087B" (main classification number is G06Q10 / 04), which includes constructing a network generalization diagram of a cross-basin water diversion project model based on the hydraulic connection and hydraulic response characteristics of each object of the water diversion project; on the basis of the model network generalization diagram, constructing a ten-day water volume optimization scheduling model for the water diversion project and using a differential evolution algorithm to achieve efficient solution of the model; and formulating a ten-day water volume optimization scheduling plan for the water diversion project based on the optimal solution obtained by solving the model. The advantages are: the hydraulic response characteristics of each object in the water diversion project are fully considered, and the refined simulation of water level, flow rate and pump station energy consumption in the ten-day scheduling process of the water diversion project can be realized; the ten-day water volume optimization scheduling model for the water diversion project can make full use of the storage capacity of the lakes along the water diversion project, optimize the ten-day water diversion process, balance the multi-dimensional goals such as water supply shortage, water diversion energy consumption, and unbalanced water volume of lakes, so as to compile the optimal ten-day water volume optimization scheduling plan for the cross-basin water diversion project.
[0004] However, the existing technology still has major defects. For example, when considering the hydraulic response characteristics, the existing technology considers them by generalizing pumping stations, water transfer channels, lakes, control gates and diversion outlets. However, due to their particularity, mountain rivers are particularly sensitive to rainfall and riverbed sediment density, that is, mountain rivers are very likely to change due to rainfall and riverbed sediment density, and the existing technology does not take this aspect into consideration when considering the hydraulic response characteristics. Therefore, the existing technology is not suitable for inter-basin water transfer projects in mountain rivers. There is an urgent need for an optimization method for inter-basin water transfer volume suitable for mountain rivers.
[0005] The above information disclosed in this Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may contain information that does not constitute the prior art that is already known to one of ordinary skill in the art. Summary of the invention
[0006] The purpose of the present invention is to provide a method for optimizing water transfer across river basins taking into account hydraulic response characteristics, so as to solve the problems raised in the above-mentioned background technology.
[0007] To achieve the above object, the present invention provides the following technical solutions:
[0008] A method for optimizing water transfer across river basins considering hydraulic response characteristics comprises the following steps:
[0009] S1, collect historical data on a daily basis. The historical data include river flow, riverbed sediment density, daily rainfall, temperature and soil moisture of the river to be transferred across the basin. After preprocessing the historical data, randomly divide it into training set and test set. The preprocessing includes removing outliers, supplementing missing values and normalizing operations.
[0010] S2, construct a river flow prediction model that introduces riverbed sediment density, daily rainfall, temperature, and soil moisture, input historical data into the river flow prediction model for training and testing, and obtain a qualified river flow prediction model;
[0011] S3, obtaining a predicted value of the river flow of the river to be transferred across the river basin based on the river flow prediction model, and obtaining the required water supply of each pumping station to be transferred;
[0012] S4, combining the predicted river flow and the water demand and supply of each pumping station, construct a multi-objective optimization scheduling model including minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, and use the differential evolution algorithm to obtain the optimal scheduling plan;
[0013] S5, formulate a water diversion plan according to the optimal scheduling plan generated in step S4.
[0014] Furthermore, the river flow, riverbed sediment density, daily rainfall, temperature and soil moisture collected on the i-th historical collection day after preprocessing are calibrated as Q i ,SD i ,P i ,T i ,SM i , i represents the number of different collection days, i = 1, 2, 3, ..., m, m represents the total number of collection days, and m ≥ 30, m ∈ N + .
[0015] Furthermore, step S2 includes the following steps:
[0016] S21, construct a river flow prediction model based on a recurrent neural network, and the input of the river flow prediction model is the riverbed sediment density, daily rainfall, temperature, and soil moisture, and the output is the river flow prediction value, and establish an expression for the river flow prediction model, the specific expression is as follows:
[0017]
[0018] Among them, λ1, λ2, λ3, λ4, and λ5 are all unknown model parameters;
[0019] S22, presetting a learning rate for the river flow prediction model, inputting the training set into the river flow prediction model for training, and updating the model parameters until a preset number of iteration updates is reached, or the output result of the river flow prediction model reaches a predetermined standard;
[0020] Among them, the update formula of the river flow prediction model is as follows:
[0021] K j+1 =K j +α*(Q i -Q i,j ')
[0022] Among them, K j represents the model parameter set after the jth update, the model parameter set includes λ1, λ2, λ3, λ4, λ5 in step S21, K j+1 represents the set of model parameters after the j+1th update, j represents the number of different model parameter updates, and j=1, 2, 3, ..., n, n represents the total number of parameter updates of the river flow prediction model, and n≥100, n∈N + , Qi,j' represents the river flow prediction value output by the river flow prediction model for the river flow Qi after the jth update, and α represents the learning rate;
[0023] S23, input the test set into the river flow prediction model trained in step S22 for testing. If the test fails, reset the learning rate and return to step S22 for retraining.
[0024] Furthermore, the step S4 includes the following steps:
[0025] S41, constructing a multi-objective optimization function including minimizing energy consumption, maximizing supply-demand balance, and minimizing ecological impact;
[0026] S42, determining the constraint function of the multi-objective optimization scheduling model;
[0027] S43, based on the multi-objective optimization function and constraint function, a multi-objective optimization scheduling model is constructed, and the differential evolution algorithm is used to obtain the optimal scheduling plan, which includes the planned water supply, planned water supply per unit time and planned water supply time of each pumping station.
[0028] Furthermore, the step S41 includes the following steps:
[0029] S411, construct an objective function to minimize energy consumption, as follows:
[0030]
[0031] Among them, NH' k represents the unit energy consumption of the kth pumping station, k represents the number of different pumping stations, and k = 1, 2, 3, ..., K, K represents the total number of pumping stations, Q' k represents the proposed water supply allocated to the k-th pumping station, which is composed of the proposed water supply per unit time P' of the k-th pumping station k Multiply by the planned water supply time ΔT' k To obtain;
[0032] S412, construct an objective function that maximizes the supply-demand balance, as follows:
[0033]
[0034] Among them, Q k represents the water demand of the kth pumping station;
[0035] S413, assigning a value to the quasi-unit-time water supply of the k-th pump station, generating an ecological impact coefficient between 0 and 1 that increases with the increase of the quasi-unit-time water supply, and constructing an objective function that minimizes the ecological impact, as follows:
[0036]
[0037] Among them, ST k Expressed as the water supply per unit time P' k The corresponding ecological impact coefficient;
[0038] S414, after assigning different objective weight vectors ω1, ω2, ω3 to the objective functions of minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, respectively, the three objective functions are combined to form a multi-objective optimization function, and ω1+ω2+ω3=1, and 0<ω3<ω1<ω2.
[0039] Furthermore, the constraint function is specifically as follows:
[0040]
[0041] Among them, max P k represents the maximum water supply per unit time of the kth pumping station, Q' represents the predicted river flow value predicted by the river flow prediction model, and Q min represents the minimum safety threshold of river flow, maxΔT represents the maximum water transfer time, NH max It represents the preset maximum water transfer energy consumption, and Q represents the total water supply required.
[0042] Furthermore, the ecological impact coefficient ST k The assignment criteria are as follows:
[0043] When satisfied When the ecological impact coefficient ST k =0.1;
[0044] When satisfied When the ecological impact coefficient ST k =0.4;
[0045] When satisfied When the ecological impact coefficient ST k =0.7;
[0046] When satisfied When the ecological impact coefficient ST k =0.9;
[0047] Among them, max P k is the maximum water supply per unit time of the kth pumping station.
[0048] Compared with the prior art, the present invention has the following beneficial effects:
[0049] The inter-basin water transfer optimization method taking into account hydraulic response characteristics of the present invention improves the accuracy of predicting river flow in mountainous areas by constructing a river flow prediction model that introduces riverbed sediment density, daily rainfall, temperature, and soil moisture. It then combines high-precision river flow prediction values and a multi-objective optimization scheduling model to generate an optimal scheduling plan, thereby ensuring the rationality and scientificity of inter-basin water transfer projects of mountainous river types. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 It is a schematic flow chart of the cross-basin water transfer optimization method taking hydraulic response characteristics into consideration in the present invention. DETAILED DESCRIPTION
[0051] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with specific embodiments.
[0052] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the present invention should be understood by people with ordinary skills in the field to which the present invention belongs. The words "first", "second" and similar words used in the present invention do not indicate any order, quantity or importance, but are only used to distinguish different components. "Include" or "comprise" and similar words mean that the elements or objects appearing before the word include the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but may include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0053] Example:
[0054] See also Figure 1 The present invention provides a method for optimizing water transfer across river basins taking hydraulic response characteristics into consideration, comprising the following steps:
[0055] S1, collect historical data on a daily basis, the historical data include river flow, riverbed sediment density, daily rainfall, temperature and soil moisture of the river to be inter-basin water diversion, and pre-process the historical data and randomly divide them into training set and test set. The pre-processing includes removing outliers, supplementing missing values and normalizing operations. The existing technology can be used for pre-processing, which will not be elaborated here;
[0056] Among them, the river flow, riverbed sediment density, daily rainfall, temperature and soil moisture collected on the i-th historical collection day after preprocessing are calibrated as Q i ,SD i ,P i ,T i ,SM i , i represents the number of different collection days, i = 1, 2, 3, ..., m, m represents the total number of collection days, and m ≥ 30, m ∈ N + The ratio of training set to test set can be 70:30 or 80:20, which is not limited here;
[0057] It should be noted that river flow can be obtained through hydrological monitoring stations, daily rainfall and temperature can be obtained through automatic weather stations or remote sensing technology, soil moisture can be obtained through geological monitoring stations, and riverbed sediment density can be obtained through density tests after excavating riverbed sediments. Specifically, river flow, daily rainfall, temperature and soil moisture are collected at different times of the same day, and the average value of the whole day is used as the river flow, daily rainfall, temperature and soil moisture data of the historical collection day. Riverbed sediments are collected at multiple locations in the river on the same day, and the density average of multiple riverbed sediments is used as the riverbed sediment density data of the historical collection day. The accuracy of historical data is ensured by setting the average value to reduce accidental errors.
[0058] S2, constructing a river flow prediction model that introduces riverbed sediment density, daily rainfall, temperature, and soil moisture, inputting historical data into the river flow prediction model for training and testing, and obtaining a qualified river flow prediction model, including the following steps:
[0059] S21, construct a river flow prediction model based on a recurrent neural network, and the input of the river flow prediction model is the riverbed sediment density, daily rainfall, temperature, and soil moisture, and the output is the river flow prediction value, and establish an expression for the river flow prediction model, the specific expression is as follows:
[0060]
[0061] It should be noted that λ1, λ2, λ3, λ4, and λ5 are all undetermined model parameters, as follows: λ1 represents the model coefficient, which is used to affect the size of the predicted value of river flow; λ2 represents the rainfall index, which is used to reflect the influence of rainfall on river flow; λ3 represents the soil moisture index, which is used to reflect the influence of soil moisture on river flow; λ4 represents the temperature influence index, which is used to reflect the influence of temperature on river flow; λ5 represents the riverbed sediment influence index, which is used to reflect the influence of riverbed sediment on river flow;
[0062] It should be noted that rainfall is one of the main sources of mountain river flow. The power function form λ1*P is used in the model. i λ2 To describe the daily rainfall P i The impact on river flow is that in mountain rivers, the increase in flow is not linearly related to the increase in rainfall, but shows a nonlinear growth. The exponent λ2 reflects the strength of this nonlinear relationship, and the coefficient λ1 is the scale adjustment of the entire rainfall-runoff process;
[0063] It should be noted that soil moisture SM iThe impact on the runoff of mountain rivers is significant. When the soil moisture is high, more rainfall will be converted into runoff, while lower soil moisture may cause more water to be absorbed by the soil. The index λ3 reflects the degree of influence of soil moisture on runoff.
[0064] It should be noted that the temperature T i Affects evaporation and snowmelt processes, thus affecting the flow of mountain rivers, especially in high altitude areas. Lower temperatures may lead to less snowmelt, thereby reducing flow, exponentially It reflects the negative correlation effect of temperature on flow rate, where λ4 is the scale parameter of temperature effect;
[0065] It should be noted that the riverbed sediment density SD i Increases in the flow rate usually lead to increased bed roughness, which reduces flow. This is particularly important in mountain rivers that are prone to sedimentation clogging. To describe this effect, this is because the effect of sediment may increase nonlinearly with the increase of its density, and the exponent λ5 is the scale parameter of the sediment effect;
[0066] It should be noted that by combining riverbed sediment density, daily rainfall, temperature and soil moisture to construct a river flow prediction model, the hydraulic response characteristics of mountain rivers are fully considered, laying the foundation for the subsequent optimization of water transfer in inter-basin water transfer rivers;
[0067] S22, presetting a learning rate for the river flow prediction model, inputting the training set into the river flow prediction model for training, and updating the model parameters until a preset number of iteration updates is reached, or the output result of the river flow prediction model reaches a predetermined standard;
[0068] Among them, the update formula of the river flow prediction model is as follows:
[0069] K j+1 =K j +α*(Q i -Q i,j ')
[0070] It should be noted that K j represents the model parameter set after the jth update, the model parameter set includes λ1, λ2, λ3, λ4, λ5 in step S21, K j+1 represents the set of model parameters after the j+1th update, j represents the number of different model parameter updates, and j=1, 2, 3, ..., n, n represents the total number of parameter updates of the river flow prediction model, and n≥100, n∈N + , Q i,j ' indicates that the river flow prediction model is updated for the river flow Q after the jth update iThe output river flow prediction value, α represents the learning rate, and its value can be 0.001, 0.002, 0.005, 0.01, etc. It is set by the staff according to the actual situation and is not limited here;
[0071] It should be noted that the number of iterations can be 500, 800 or 1000 times, and the predetermined standard can be that the relative error between the predicted value output by the river flow prediction model and the true value does not exceed 3%, 5% or 7%, which is set by the staff according to the actual situation and is not limited here;
[0072] S23, inputting the test set into the river flow prediction model trained in step S22 for testing, and if the test fails, resetting the learning rate and returning to step S22 for retraining;
[0073] It should be noted that the standard for passing the test may be that the relative error between the predicted value output by the river flow prediction model and the actual value does not exceed 3%, 5% or 7%. The specific setting is made by the staff according to the actual situation and is not restricted here.
[0074] S3, obtaining a predicted value of the river flow of the river to be transferred across the river basin based on the river flow prediction model, and obtaining the required water supply of each pumping station to be transferred;
[0075] It should be noted that when it is necessary to formulate a scheduling plan, the river flow, riverbed sediment density, daily rainfall, temperature and soil moisture of the river to be transferred across the river basin are first collected in real time through the method of step S1, and then the collected data are input into the river flow prediction model to obtain the river flow prediction value, which lays the foundation for the subsequent formulation of the scheduling plan. The required water supply of the pump station is determined by the water demand of the water supply point corresponding to the pump station, which can be obtained through the production scheduling plan and previous water supply data, which will not be elaborated here;
[0076] S4, combining the predicted river flow and the water demand of each pumping station, constructs a multi-objective optimization scheduling model including minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, and uses the differential evolution algorithm to obtain the optimal scheduling plan, including the following steps:
[0077] S41, construct a multi-objective optimization function including minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, as follows:
[0078] S411, construct an objective function to minimize energy consumption, as follows:
[0079]
[0080] It should be noted that NH' kIt represents the unit energy consumption of the kth pumping station, which can be obtained by dividing the energy consumed by the kth pumping station in historical operation by the amount of water it treats. The unit of unit energy consumption can be tons of standard coal / cubic meter. k represents the number of different pumping stations, and k = 1, 2, 3, ..., K. K represents the total number of pumping stations, which is determined according to the actual number of pumping stations. Q' k represents the proposed water supply allocated to the k-th pumping station, which is composed of the proposed water supply per unit time P' of the k-th pumping station k Multiply by the planned water supply time ΔT' k The units of the proposed water supply per unit time and the predicted river flow are consistent;
[0081] S412, construct an objective function that maximizes the supply-demand balance, as follows:
[0082]
[0083] It should be noted that Q k represents the required water supply of the kth pump station, which is obtained through step S3. To calculate the deviation between the required water supply and the planned water supply of the kth pump station, and The larger it is, the greater the deviation between the required water supply and the planned water supply of the kth pumping station is, and the worse the supply-demand balance is.
[0084] S413, assigning a value to the quasi-unit-time water supply of the k-th pump station, generating an ecological impact coefficient between 0 and 1 that increases with the increase of the quasi-unit-time water supply, and constructing an objective function that minimizes the ecological impact, as follows:
[0085]
[0086] It should be noted that ST k Expressed as the water supply per unit time P' k The corresponding ecological impact coefficient;
[0087] As an implementation method, the ecological impact factor ST k The assignment criteria are as follows:
[0088]
[0089] It should be noted that max P k is the maximum water supply per unit time of the kth pumping station, which can be obtained from the safety production manual of the pumping station. k The greater the pump station's impact on the external ecological environment, the greater the ecological impact coefficient ST k The bigger it is;
[0090] S414, after assigning different target weight vectors ω1, ω2, ω3 to the target functions of minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, the three target functions are combined to form a multi-target optimization function. In the scheduling process, the importance of supply and demand balance is higher than that of energy consumption, and the importance of energy consumption is higher than that of ecological impact. Therefore, ω1+ω2+ω3=1, and 0<ω3<ω1<ω2 are set;
[0091] As an implementation method, the value range of ω1 is 0.3-0.4, the value range of ω2 is 0.4-0.5, and the value range of ω3 is 0.1-0.3. The specific setting is made by the staff according to the actual situation and is not limited here;
[0092] S42, determining the constraint function of the multi-objective optimization scheduling model, which is as follows:
[0093]
[0094] It should be noted that max P k represents the maximum water supply per unit time of the kth pumping station, which can be obtained from the safety production manual of the pumping station and obtained through P' k ≤max P k To constrain the quasi-unit-time water supply of the k-th pumping station to be no greater than the maximum unit-time water supply;
[0095] It should be noted that Q' represents the predicted value of river flow predicted by the river flow prediction model, and Q min represents the minimum safe threshold of river flow, which can be obtained through expert evaluation. To limit the problem of excessive water diversion in rivers during the water diversion process;
[0096] It should be noted that maxΔT represents the maximum water transfer time, which can be obtained through the water transfer plan and ΔT' k ≤maxΔT to constrain the water transfer time of the kth pump station to not exceed the maximum water transfer time, thus avoiding the problem of water transfer time exceeding the construction period;
[0097] It should be noted that NH max It represents the preset maximum water transfer energy consumption, which can be obtained through expert evaluation. To limit the energy consumption of the entire water transfer process and avoid the problem of excessive energy consumption;
[0098] It should be noted that Q represents the total amount of water supply required, which can be obtained through the water diversion plan. To ensure that the total water transfer volume of all pumping stations is not less than the total water supply required, thus ensuring sufficient water supply;
[0099] S43, based on the multi-objective optimization function and the constraint function, a multi-objective optimization scheduling model is constructed, and the differential evolution algorithm is used to obtain the optimal scheduling plan, the scheduling plan includes the planned water supply volume, the planned water supply volume per unit time and the planned water supply time of each pump station;
[0100] It should be noted that after constructing a multi-objective optimization scheduling model based on a multi-objective optimization function and a constraint function, the existing technology can be used to obtain the optimal scheduling solution through a differential evolution algorithm, which will not be described in detail here;
[0101] S5, formulate a water diversion plan according to the optimal scheduling plan generated in step S4.
[0102] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0103] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination thereof. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product. Those skilled in the art may appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein may be implemented by electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed by hardware or software methods depends on the specific application and design constraints of the technical solution.
[0104] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, and may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0105] The above description is only a specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application.
Claims
1. A method for optimizing water transfer across river basins considering hydraulic response characteristics, characterized in that: The steps include: S1, collect historical data on a daily basis. The historical data include river flow, riverbed sediment density, daily rainfall, temperature and soil moisture of the river to be transferred across the basin. After preprocessing the historical data, randomly divide it into training set and test set. The preprocessing includes removing outliers, supplementing missing values and normalizing operations. S2, construct a river flow prediction model that introduces riverbed sediment density, daily rainfall, temperature, and soil moisture, input historical data into the river flow prediction model for training and testing, and obtain a qualified river flow prediction model; S3, obtaining a predicted value of the river flow of the river to be transferred across the river basin based on the river flow prediction model, and obtaining the required water supply of each pumping station to be transferred; S4, combining the predicted river flow and the water demand and supply of each pumping station, construct a multi-objective optimization scheduling model including minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, and use the differential evolution algorithm to obtain the optimal scheduling plan; S5, formulate a water diversion plan according to the optimal scheduling plan generated in step S4.
2. The cross-basin water transfer optimization method considering hydraulic response characteristics according to claim 1 is characterized in that: The river flow, riverbed sediment density, daily rainfall, temperature and soil moisture collected on the i-th historical collection day after preprocessing are calibrated as Q i ,SD i ,P i ,T i ,SM i , i represents the number of different collection days, i = 1, 2, 3, ..., m, m represents the total number of collection days, and m ≥ 30, m ∈ N + .
3. The cross-basin water transfer optimization method considering hydraulic response characteristics according to claim 2 is characterized in that: The step S2 comprises the following steps: S21, construct a river flow prediction model based on a recurrent neural network, and the input of the river flow prediction model is the riverbed sediment density, daily rainfall, temperature, and soil moisture, and the output is the river flow prediction value, and establish an expression for the river flow prediction model, the specific expression is as follows: Among them, λ1, λ2, λ3, λ4, and λ5 are all unknown model parameters; S22, presetting a learning rate for the river flow prediction model, inputting the training set into the river flow prediction model for training, and updating the model parameters until a preset number of iteration updates is reached, or the output result of the river flow prediction model reaches a predetermined standard; Among them, the update formula of the river flow prediction model is as follows: K j+1 =K j +α*(Q i -Q i,j ') Among them, K j represents the model parameter set after the jth update, the model parameter set includes λ1, λ2, λ3, λ4, λ5 in step S21, K j+1 represents the set of model parameters after the j+1th update, j represents the number of different model parameter updates, and j=1, 2, 3, ..., n, n represents the total number of parameter updates of the river flow prediction model, and n≥100, n∈N + , Qi,j' represents the river flow prediction value output by the river flow prediction model for the river flow Qi after the jth update, and α represents the learning rate; S23, input the test set into the river flow prediction model trained in step S22 for testing. If the test fails, reset the learning rate and return to step S22 for retraining.
4. The cross-basin water transfer optimization method considering hydraulic response characteristics according to claim 1 is characterized in that: The step S4 comprises the following steps: S41, constructing a multi-objective optimization function including minimizing energy consumption, maximizing supply-demand balance, and minimizing ecological impact; S42, determining the constraint function of the multi-objective optimization scheduling model; S43, based on the multi-objective optimization function and constraint function, a multi-objective optimization scheduling model is constructed, and the differential evolution algorithm is used to obtain the optimal scheduling plan, which includes the planned water supply, planned water supply per unit time and planned water supply time of each pumping station.
5. The cross-basin water transfer optimization method considering hydraulic response characteristics according to claim 4 is characterized in that: The step S41 comprises the following steps: S411, construct an objective function to minimize energy consumption, as follows: Where NH'k represents the unit energy consumption of the kth pumping station, k represents the number of different pumping stations, and k = 1, 2, 3, ..., K, K represents the total number of pumping stations, Q'k represents the proposed water supply allocated to the kth pumping station, which is calculated from the proposed unit time water supply P' of the kth pumping station k Multiply by the planned water supply time ΔT' k To obtain; S412, construct an objective function that maximizes the supply-demand balance, as follows: Among them, Qk represents the water demand of the kth pumping station; S413, assigning a value to the quasi-unit-time water supply of the k-th pump station, generating an ecological impact coefficient between 0 and 1 that increases with the increase of the quasi-unit-time water supply, and constructing an objective function that minimizes the ecological impact, as follows: Among them, ST k Expressed as the water supply per unit time P' k The corresponding ecological impact coefficient; S414, after assigning different objective weight vectors ω1, ω2, ω3 to the objective functions of minimizing energy consumption, maximizing supply and demand balance, and minimizing ecological impact, respectively, the three objective functions are combined to form a multi-objective optimization function, and ω1+ω2+ω3=1, and 0<ω3<ω1<ω2.
6. The cross-basin water transfer optimization method considering hydraulic response characteristics according to claim 5 is characterized in that: The constraint function is as follows: Among them, max P k represents the maximum water supply per unit time of the kth pumping station, Q' represents the predicted river flow value predicted by the river flow prediction model, and Q min represents the minimum safety threshold of river flow, max ΔT represents the maximum water transfer time, NH max It represents the preset maximum water transfer energy consumption, and Q represents the total water supply required.
7. The cross-basin water transfer optimization method considering hydraulic response characteristics according to claim 5 is characterized in that: The ecological impact factor ST k The assignment criteria are as follows: When satisfied When the ecological impact coefficient ST k =0.1; When satisfied When the ecological impact coefficient ST k =0.4; When satisfied When the ecological impact coefficient ST k =0.7; When satisfied When the ecological impact coefficient ST k =0.9; Among them, max P k is the maximum water supply per unit time of the kth pumping station.
Citation Information
Patent Citations
A Method for Optimizing the Decade-by-December Water Quantity Scheduling Plan for Inter-basin Water Transfer Projects Considering Hydraulic Response Characteristics
CN112785087B
River flow prediction method based on three-dimensional convolutional neural network
CN111159149A
Cross-basin water transfer project ten-day water volume optimization scheduling plan compilation method considering hydraulic response characteristics
CN112785087A
Water supply pump set optimization scheduling method considering water consumption prediction
CN113642803A
Urban water supply system gate pump group optimization scheduling method based on deep learning
CN113850692A
Cited By
Water volume scheduling risk decision-making method for cross-basin water transfer project