Rapid pre-pressing device of turnout beam support enlarged foundation
By designing an adjustable jack installation structure and rotary handle, the shortcomings of the switch beam bracket expansion foundation prepression device in different center points and verticality adjustments are solved, and a fast and flexible prepression effect is achieved to adapt to different geological and geomorphological conditions are achieved. construction requirements.
Patent Information
- Application Number
- CN202411285874.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-11-26
AI Technical Summary
The rapid prepressing device for the expansion foundation of the switch beam bracket cannot adapt to prepressing at different center points in the prior art, and the installation position of the jack is fixed, resulting in the inconvenience of the verticality being unable to be adjusted in time during the prepressing process.
A device including pre-pressed steel plate, jack mounting plate, pre-pressed cross beam and fixing frame is designed. The position adjustment of the jack is achieved by adjusting the screw and guide rod, and the verticality correction is performed using the side adjustment jack and the rotating handle to ensure the pre-pressed cross beam. perpendicularity.
It realizes flexible adjustment of the center point and verticality of the pre-pressed beam, improves the efficiency and convenience of pre-pressing, and adapts to the construction needs of different geological and geomorphological conditions.
Smart Images

Figure CN119021107A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building construction, and in particular to a rapid pre-stressing device for expanding a foundation of a turnout beam support. Background Art
[0002] The rapid preloading device of the expanded foundation of the turnout beam support is a device for preloading the preloading cross beam during the construction of the turnout beam support foundation. During the construction of the turnout beam support, since the continuous beam support of the same turnout is in different geological and geomorphic conditions, preloading span by span in the conventional way will be a costly, time-consuming and labor-intensive task. Therefore, the branch intends to use a static pile driver to preload the expanded foundation according to the rapid static load method of the static load test. The rapid preloading device of the expanded foundation of the turnout beam support is used for preloading, forming a flow operation mode, eliminating settlement in advance, and ensuring the final bridge line shape and support structure safety;
[0003] The Chinese patent with the publication number "CN111576223A" discloses "a preloading device and preloading method of the cross beam support under the main tower, belonging to the technical field of civil engineering construction equipment, which specifically includes a column, a cross beam, a tensioning mechanism, a transmission mechanism, a rotary drive mechanism and a bottom support frame, the column is arranged under the cross beam to support the cross beam, and the tensioning mechanism is arranged under the cross beam". Although it can play the role of "applying a vertical downward pulling force to the cross beam through the transmission mechanism and the tensioning mechanism, and applying a vertical downward preloading force to the column through the cross beam. The preloading device of the cross beam support under the main tower of the present invention can ensure the force balance on both sides of the column, The pressure on the proof column is also vertically downward, and the pre-stressing process is simple. However, when the quick pre-stressing device of the turnout beam support expansion foundation is used, the pre-stressing is performed by the operation of the jack, and the installation position of the jack is fixed, so the center point of the pre-stressing cannot be adjusted. During the pre-stressing process, the device cannot be suitable for pre-stressing at different center points, and the jack can only apply force from the top surface. If the pre-stressing beam is tilted during pre-stressing, the pre-stressing beam has no force application point, resulting in the inability to adjust the verticality in time. The beam needs to be re-pre-stressed for pre-stressing, which also brings inconvenience to the pre-stressing of the pre-stressing beam. Summary of the invention
[0004] The main purpose of the present invention is to provide a rapid preloading device for enlarging the foundation of a turnout beam support, which can effectively solve the technical problems raised by the background technology.
[0005] To achieve the above object, the technical solution adopted by the present invention is:
[0006] A quick prestressing device for expanding the foundation of a turnout beam support comprises a prestressing steel plate, a jack mounting plate, a prestressing crossbeam and a fixing frame, wherein the jack mounting plate is fixedly mounted on the upper end of the prestressing steel plate, the prestressing crossbeam is placed on the lower end of the prestressing steel plate, the fixing frame is sleeved on the outer side of the bottom of the prestressing steel plate, the upper four corners of the jack mounting plate are fixedly mounted with positioning jacks, the upper center of the jack mounting plate is placed with a top adjustment jack, the four sides of the jack mounting plate are fixedly mounted with guide rails, the outer side of the guide rails is movably sleeved with a sliding sleeve, a telescopic support rod is fixedly mounted above the outer side of the sliding sleeve, and a movably mounted support rod is provided between the tops of every two telescopic support rods. There is an adjusting screw, a mounting connecting rod is fixedly installed on the outer side of the pre-stressed steel plate, an adjusting ring is fixedly installed on the outer side of the mounting connecting rod, an adjusting mounting sleeve is movably sleeved on the outer side of the adjusting ring, a sleeve block is welded on one side of the adjusting mounting sleeve, a side supporting column is movably installed on the inner side of the sleeve block, a sealing top plate is movably installed inside the side supporting column, a jack mounting structure is fixedly installed on one side of the side supporting column, a side adjusting jack is fixedly installed on one side of the jack mounting structure, a sliding connecting block is fixedly installed on the lower end of the side supporting column, a sliding mounting seat is fixedly installed on the outer side of the fixed frame, and a sliding slot is provided on the top of the sliding mounting seat.
[0007] As a further solution of the present invention, hexagonal blocks are provided at both ends of the adjusting screw, the two adjusting screws are arranged in a cross shape, and the adjusting screws pass through the end of the top adjusting jack and are threadedly connected thereto.
[0008] As a further solution of the present invention, a sliding installation groove is provided inside the adjusting installation sleeve, the sliding installation groove is clamped on the outside of the adjusting ring, and the adjusting installation sleeve slides around the adjusting ring through the sliding installation groove.
[0009] As a further solution of the present invention, a reinforcement rod is fixedly mounted on the outer side of the sliding mounting seat, and an outer frame is welded to the outer side of the reinforcement rod.
[0010] As a further solution of the present invention, a sealing top plate is fixedly mounted on the upper end of the side support column, the side support column is located above the sliding mounting seat, and the sliding connection block is inserted into the sliding slot for movably connection.
[0011] As a further solution of the present invention, the lifting structure includes a lifting screw, a rotating handle and a lifting block. The lifting screw is movably installed inside the side support column, the rotating handle is fixedly installed on the upper end of the lifting screw and located above the sealing top plate, and the lifting block is threadedly installed on the outside of the lifting screw.
[0012] As a further solution of the present invention, the upper end of the lifting screw is movably connected to the sealing top plate, the lower end of the lifting screw is movably connected to the sliding connection block, the lifting block is fit-connected to the inner wall of the side support column, and the lifting block extends to one side of the side support column.
[0013] As a further solution of the present invention, the jack mounting structure includes an installation panel, a side panel reinforcement plate, a docking slot, an installation fixing plate and an adjustment docking block. The installation panel is fixedly installed on one side of the lifting block, the side panel reinforcement plate is fixedly installed on the side of the installation panel adjacent to the lifting block, the docking slot is opened on the other side of the side panel reinforcement plate, the installation fixing plate is arranged on the other side of the side panel reinforcement plate, and the adjustment docking block is fixedly installed on one side of the installation fixing plate.
[0014] As a further solution of the present invention, the side panel reinforcement plate is fitly connected to the outer side of the side support column, the adjustment docking block is inserted into the docking slot for movably connection, the installation fixing plate is movably connected to the other side of the side panel reinforcement plate through the adjustment docking block and the docking slot, and the side adjustment jack is fixedly installed on the other side of the installation fixing plate.
[0015] As a further solution of the present invention, a side panel top plate is fixedly installed at the end of the side adjustment jack, and the side panel top plate is fit-connected to one side of the pre-stressed cross beam.
[0016] Compared with the prior art, the present invention has the following beneficial effects: when the positioning jack and the top adjustment jack are working, the top adjustment jack is driven to move on the jack mounting plate by the rotation of the adjustment screw, and the top adjustment jack can be moved and adjusted to different positions by the rotation of the two adjustment screws, thereby changing the position of the top adjustment jack on the jack mounting plate, and when the pre-stressing beam is pre-stressed and deviated, the pre-stressing center point of the pre-stressing beam is adjusted in time by utilizing the position change of the top adjustment jack, so as to facilitate the pre-stressing use of different center points of the pre-stressing beam;
[0017] When the positioning jack and the top adjustment jack are working, the side adjustment jack is operated to push the side plate top plate and the side of the pre-stressing beam. By pressing the side of the pre-stressing beam, the verticality of the pre-stressing beam is adjusted, and the inclined pre-stressing beam can be corrected in time to prevent inclined pre-stressing;
[0018] By adjusting the position of the side adjustment jack and pulling the side support column, the upper adjustment mounting sleeve is rotated and slid around the adjustment ring, and the lower sliding connection block is rotated and moved around the sliding slot, and then the side adjustment jack is adjusted to the other side of the preload beam to work, so as to adjust the verticality of the four sides of the preload beam, which is convenient for adjusting and correcting the verticality of different surfaces of the preload beam;
[0019] By adjusting the position of the side adjustment jack, the rotating handle is used to drive the installation panel and the side adjustment jack on one side to adjust the lifting height, the docking block is adjusted to slide left and right in the docking slot, the left and right positions of the installation fixing plate and the side adjustment jack are adjusted, and then the side position of the side adjustment jack on the pre-stressing beam is adjusted, so that the side adjustment jack can press any point of the pre-stressing beam, and the verticality of the pre-stressing beam can be adjusted more finely, which further facilitates the use of pre-stressing. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of a rapid preloading device for enlarging the foundation of a turnout beam support of the present invention;
[0021] Figure 2 This is a connection diagram of a prestressing steel plate and a prestressing cross beam in a rapid prestressing device for enlarging a foundation of a turnout beam support of the present invention;
[0022] Figure 3 It is an enlarged view of a jack mounting plate in a quick preloading device for enlarging the foundation of a turnout beam support of the present invention;
[0023] Figure 4 It is a partial enlarged view of a quick preloading device for enlarging the foundation of a turnout beam support of the present invention;
[0024] Figure 5 This is an enlarged view of an adjusting ring in a quick preloading device for enlarging the foundation of a turnout beam support of the present invention;
[0025] Figure 6 It is a sectional view of a side support column in a rapid preloading device for enlarging the foundation of a turnout beam support of the present invention;
[0026] Figure 7 It is an enlarged view of the jack installation structure in a rapid preloading device for enlarging the foundation of a turnout beam support of the present invention.
[0027] In the figure: 1. pre-stressed steel plate; 2. jack mounting plate; 3. positioning jack; 4. top adjustment jack; 5. guide rod; 6. sliding sleeve; 7. telescopic support rod; 8. adjusting screw; 9. mounting rod; 10. adjusting ring; 11. adjusting mounting sleeve; 12. sliding mounting groove; 13. sleeve block; 14. side support column; 15. sealing top plate; 16. lifting structure; 17. lifting screw; 18. rotating handle; 19. lifting block; 20. jack mounting structure; 21. mounting panel; 22. side panel reinforcement plate; 23. docking slot; 24. mounting fixing plate; 25. adjusting docking block; 26. side adjustment jack; 27. side panel top plate; 28. sliding connection block; 29. pre-stressed beam; 30. fixing frame; 31. sliding mounting seat; 32. sliding slot; 33. reinforcement rod; 34. outer frame. DETAILED DESCRIPTION
[0028] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0029] like Figure 1-Figure 7 As shown, a rapid prestressing device for expanding the foundation of a turnout beam support comprises a prestressing steel plate 1, a jack mounting plate 2, a prestressing cross beam 29 and a fixing frame 30, wherein the jack mounting plate 2 is fixedly mounted on the upper end of the prestressing steel plate 1, the prestressing cross beam 29 is placed on the lower end of the prestressing steel plate 1, the fixing frame 30 is sleeved on the outer side of the bottom of the prestressing steel plate 1, the four corners of the upper end of the jack mounting plate 2 are fixedly mounted with positioning jacks 3, the center of the upper end of the jack mounting plate 2 is placed with a top adjustment jack 4, the four sides of the jack mounting plate 2 are fixedly mounted with guide rails 5, the outer side of the guide rails 5 is movably sleeved with a sliding sleeve 6, a telescopic support rod 7 is fixedly mounted on the upper side of the outer side of the sliding sleeve 6, and an adjusting screw is movably installed between the tops of every two telescopic support rods 7 8. A mounting connecting rod 9 is fixedly installed on the outer side of the prestressed steel plate 1, an adjusting ring 10 is fixedly installed on the outer side of the mounting connecting rod 9, an adjusting mounting sleeve 11 is movably sleeved on the outer side of the adjusting mounting sleeve 11, a socket block 13 is welded on one side of the adjusting mounting sleeve 11, a side supporting column 14 is movably installed on the inner side of the socket block 13, a sealing top plate 15 is movably installed inside the side supporting column 14, a jack mounting structure 20 is fixedly installed on one side of the side supporting column 14, a side adjusting jack 26 is fixedly installed on one side of the jack mounting structure 20, a sliding connecting block 28 is fixedly installed on the lower end of the side supporting column 14, a sliding mounting seat 31 is fixedly installed on the outer side of the fixed frame 30, and a sliding slot 32 is provided on the top of the sliding mounting seat 31.
[0030] In this embodiment, hexagonal blocks are provided at both ends of the adjusting screw 8, and the two adjusting screws 8 are arranged in a cross shape. The adjusting screw 8 passes through the end of the top adjusting jack 4 and is threadedly connected to it. The hexagonal block is used to rotate the adjusting screw 8 with a connecting socket wrench, and the adjusting screw 8 has the effect of positioning and adjusting the top adjusting jack 4.
[0031] In this embodiment, a sliding installation groove 12 is opened inside the adjusting installation sleeve 11, and the sliding installation groove 12 is stuck on the outside of the adjusting ring 10. The adjusting installation sleeve 11 slides around the adjusting ring 10 through the sliding installation groove 12, and the sliding installation groove 12 plays the role of adjusting the installation sleeve 11 and sliding installation.
[0032] In this embodiment, a reinforcement rod 33 is fixedly installed on the outer side of the sliding mounting seat 31, and an outer frame 34 is welded to the outer side of the reinforcement rod 33. The reinforcement rod 33 and the outer frame 34 have the effect of reinforcing and supporting the sliding mounting seat 31 and the fixed frame 30, thereby improving the support stability of the pre-stressed beam 29.
[0033] In this embodiment, a sealing top plate 15 is fixedly installed on the upper end of the side support column 14, and the side support column 14 is located above the sliding mounting seat 31. The sliding connection block 28 is inserted into the sliding slot 32 for movably connecting. The connection between the sliding connection block 28 and the sliding slot 32 has the effect of movably installing the side support column 14 and the sliding mounting seat 31.
[0034] In this embodiment, the lifting structure 16 includes a lifting screw 17, a rotating handle 18 and a lifting block 19. The lifting screw 17 is movably installed inside the side support column 14, the rotating handle 18 is fixedly installed on the upper end of the lifting screw 17 and is located above the sealing top plate 15, and the lifting block 19 is threadedly installed on the outside of the lifting screw 17. The lifting screw 17 is driven to rotate by the rotating handle 18, and the lifting screw 17 then drives the lifting block 19 to move up and down.
[0035] In this embodiment, the upper end of the lifting screw 17 is movably connected to the sealing top plate 15, the lower end of the lifting screw 17 is movably connected to the sliding connection block 28, the lifting block 19 is fit-connected to the inner wall of the side support column 14, and the lifting block 19 extends to one side of the side support column 14. The lifting block 19 is used to install the installation panel 21 and drive its lifting movement.
[0036] In this embodiment, the jack mounting structure 20 includes a mounting panel 21, a side panel reinforcement plate 22, a docking slot 23, a mounting fixing plate 24 and an adjustment docking block 25. The mounting panel 21 is fixedly mounted on one side of the lifting block 19, the side panel reinforcement plate 22 is fixedly mounted on the side of the mounting panel 21 adjacent to the lifting block 19, the docking slot 23 is opened on the other side of the side panel reinforcement plate 22, the mounting fixing plate 24 is arranged on the other side of the side panel reinforcement plate 22, and the adjustment docking block 25 is fixedly mounted on one side of the mounting fixing plate 24. The adjustment docking block 25 plays the effect of installing the side adjustment jack 26.
[0037] In this embodiment, the side panel reinforcement plate 22 is fitted and connected to the outer side of the side support column 14, the adjustment docking block 25 is inserted into the docking slot 23 for movably connecting, the installation fixing plate 24 is movably connected to the other side of the side panel reinforcement plate 22 through the adjustment docking block 25 and the docking slot 23, and the side adjustment jack 26 is fixedly installed on the other side of the installation fixing plate 24. The adjustment docking block 25 can slide left and right around it by being inserted into the docking slot 23 to adjust the installation position of the installation fixing plate 24 and the installation panel 21. The side panel reinforcement plate 22 has the effect of reinforcing the installation panel 21.
[0038] In this embodiment, a side panel top plate 27 is fixedly installed at the end of the side adjustment jack 26 , and the side panel top plate 27 is closely connected to one side of the pre-stress beam 29 . When the side adjustment jack 26 is in operation, the pre-stress beam 29 is pushed by the side panel top plate 27 .
[0039] It should be noted that the present invention is a rapid prestressing device for expanding the foundation of a turnout beam support. When in use, a static pile driver is used as a reaction frame, a prestressing beam 29 is installed at the center of the prestressing point, a fixing frame 30 is sleeved on the bottom outer side of the prestressing beam 29 for positioning, a counter-pressure beam installed on the distribution beam on the static pile driver, the ends of the positioning jack 3 and the top adjustment jack 4 are fitted with the lower end of the counter-pressure beam, and the positioning jack 3 and the top adjustment jack 4 are connected to the oil pump, so that the positioning jack 3 and the top adjustment jack 4 are operated, so that the positioning jack 3 and the top adjustment jack 4 push the counter-pressure beam downward to apply force, and the prestressing beam 29 is pressed down through the jack mounting plate 2 and the prestressing steel plate 1, so that the prestressing beam 29 is prestressed to expand the foundation of the turnout beam support;
[0040] When the positioning jack 3 and the top adjustment jack 4 are working, the top adjustment jack 4 is positioned by two adjustment screws 8. Therefore, when a single adjustment screw 8 is rotated by the hexagonal head, the top adjustment jack 4 can be driven to move on the jack mounting plate 2 through the threaded connection. The other adjustment screw 8 is moved simultaneously by the sliding sleeve 6 around the guide rail rod 5. The rotation of the two adjustment screws 8 can adjust the top adjustment jack 4 to different positions, thereby changing the position of the top adjustment jack 4 on the jack mounting plate 2. When the pre-stressing beam 29 is pre-stressed and offset, the position change of the top adjustment jack 4 is used to timely adjust the pre-stressing center point of the pre-stressing beam 29;
[0041] When the positioning jack 3 and the top adjustment jack 4 are working, the side adjustment jack 26 is operated so that the side adjustment jack 26 relies on the side support column 14 and the mounting panel 21 as counter-pressure points to push the side plate top plate 27 and the side of the pre-compression beam 29, and the verticality of the pre-compression beam 29 is adjusted by pressing the side of the pre-compression beam 29;
[0042] By adjusting the position of the side adjustment jack 26, before the side adjustment jack 26 is operated, by pulling the side support column 14, the upper adjustment mounting sleeve 11 rotates and slides around the adjustment ring 10, and the lower sliding connection block 28 rotates and moves around the sliding slot 32, and then the side adjustment jack 26 is adjusted to the other side of the pre-pressing beam 29 to work, so as to perform vertical pressure adjustment on the four sides of the pre-pressing beam 29;
[0043] By adjusting the position of the side adjustment jack 26, the lifting screw 17 is driven to rotate by rotating the handle 18. The rotation of the lifting screw 17 drives it to move up and down in the side support column 14 through the threaded connection with the lifting block 19, thereby driving the installation panel 21 and the side adjustment jack 26 on one side to adjust the lifting height. By pulling the side adjustment jack 26 to move left and right, the adjustment docking block 25 slides left and right in the docking slot 23, thereby adjusting the left and right positions of the installation fixing plate 24 and the side adjustment jack 26, and then adjusting the side position of the side adjustment jack 26 on the pre-stressing beam 29, so that the side adjustment jack 26 can press any point of the pre-stressing beam 29.
[0044] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A rapid preloading device for expanding the foundation of a turnout beam support, characterized by: The invention comprises a prestressing steel plate (1), a jack mounting plate (2), a prestressing crossbeam (29) and a fixing frame (30), wherein the jack mounting plate (2) is fixedly mounted on the upper end of the prestressing steel plate (1), the prestressing crossbeam (29) is placed on the lower end of the prestressing steel plate (1), and the fixing frame (30) is sleeved on the outer side of the bottom of the prestressing steel plate (1), and is characterized in that: the four corners of the upper end of the jack mounting plate (2) are fixedly mounted with positioning jacks (3), the center of the upper end of the jack mounting plate (2) is placed with a top adjustment jack (4), the four sides of the jack mounting plate (2) are fixedly mounted with guide rails (5), the outer side of the guide rails (5) is movably sleeved with a sliding sleeve (6), a telescopic support rod (7) is fixedly mounted above the outer side of the sliding sleeve (6), and an adjusting screw (8) is movably installed between the tops of each two telescopic support rods (7), the prestressing steel plate (1 ) is fixedly installed with a mounting rod (9) on the outside, an adjusting ring (10) is fixedly installed on the outside of the mounting rod (9), an adjusting mounting sleeve (11) is movably sleeved on the outside of the adjusting mounting sleeve (11), a sleeve block (13) is welded on one side of the adjusting mounting sleeve (11), a side support column (14) is movably installed on the inside of the sleeve block (13), a sealing top plate (15) is movably installed inside the side support column (14), a jack mounting structure (20) is fixedly installed on one side of the side support column (14), a side adjustment jack (26) is fixedly installed on one side of the jack mounting structure (20), a sliding connection block (28) is fixedly installed on the lower end of the side support column (14), a sliding mounting seat (31) is fixedly installed on the outside of the fixed frame (30), and a sliding slot (32) is provided on the top of the sliding mounting seat (31).
2. A rapid preloading device for expanding the foundation of a turnout beam support according to claim 1, characterized in that: Both ends of the adjusting screw (8) are provided with hexagonal blocks, and the two adjusting screws (8) are arranged in a cross shape. The adjusting screw (8) passes through the end of the top adjusting jack (4) and is threadedly connected thereto.
3. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 1, characterized in that: The interior of the adjusting installation sleeve (11) is provided with a sliding installation groove (12), which is clamped on the outside of the adjusting ring (10), and the adjusting installation sleeve (11) slides around the adjusting ring (10) through the sliding installation groove (12).
4. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 1, characterized in that: A reinforcement rod (33) is fixedly mounted on the outer side of the sliding mounting seat (31), and an outer frame (34) is welded to the outer side of the reinforcement rod (33).
5. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 1, characterized in that: A sealing top plate (15) is fixedly mounted on the upper end of the side support column (14), the side support column (14) is located above the sliding mounting seat (31), and the sliding connection block (28) is inserted into the sliding slot (32) for active connection.
6. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 5, characterized in that: The lifting structure (16) includes a lifting screw (17), a rotating handle (18) and a lifting block (19). The lifting screw (17) is movably installed inside the side support column (14). The rotating handle (18) is fixedly installed on the upper end of the lifting screw (17) and is located above the sealing top plate (15). The lifting block (19) is threadedly installed on the outside of the lifting screw (17).
7. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 6, characterized in that: The upper end of the lifting screw (17) is movably connected to the sealing top plate (15), the lower end of the lifting screw (17) is movably connected to the sliding connection block (28), the lifting block (19) is fitted and connected to the inner wall of the side support column (14), and the lifting block (19) extends to one side of the side support column (14).
8. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 5, characterized in that: The jack mounting structure (20) comprises a mounting panel (21), a side panel reinforcement plate (22), a docking slot (23), a mounting fixing plate (24) and an adjusting docking block (25); the mounting panel (21) is fixedly mounted on one side of the lifting block (19); the side panel reinforcement plate (22) is fixedly mounted on a side of the mounting panel (21) adjacent to the lifting block (19); the docking slot (23) is provided on the other side of the side panel reinforcement plate (22); the mounting fixing plate (24) is arranged on the other side of the side panel reinforcement plate (22); and the adjusting docking block (25) is fixedly mounted on one side of the mounting fixing plate (24).
9. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 8, characterized in that: The side panel reinforcement plate (22) is fitted and connected to the outer side of the side support column (14); the adjustment docking block (25) is inserted into the docking slot (23) for movably connection; the installation fixing plate (24) is movably connected to the other side of the side panel reinforcement plate (22) through the adjustment docking block (25) and the docking slot (23); and the side adjustment jack (26) is fixedly installed on the other side of the installation fixing plate (24).
10. The rapid preloading device for expanding the foundation of a turnout beam support according to claim 1, characterized in that: A side plate top plate (27) is fixedly mounted on the end of the side adjustment jack (26), and the side plate top plate (27) is fitted and connected to one side of the pre-stressed crossbeam (29).
