Installation and construction method for connecting ALC (autoclaved lightweight concrete) plate and section steel beam
By welding the long steel plate and stiffened steel plate on the steel beam, combined with the laying and post-treatment of the ALC plate, the problems of deformation and structural integrity damage of the steel beam are solved, efficient connection construction is achieved, and construction efficiency and structure are improved. Load-bearing capacity.
Patent Information
- Application Number
- CN202411431702.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-12-13
AI Technical Summary
The embedded connection technology of existing steel beams and ALC plates causes deformation, local stress concentration and structural integrity damage during groove opening or drilling, and is difficult to construct, affecting construction efficiency.
Weld the long steel plate on the web of the profiled steel beam, and weld the trapezoidal and rectangular stiffened steel plates on the connection side to avoid direct connection with the ALC plate, and ensure flatness and gap filling through laying and post-treatment.
The integrity and load-bearing capacity of the profiled steel beams are maintained, the construction difficulty is reduced, the construction efficiency is improved, and the impact of structural damage and secondary treatment on the ALC plate is avoided.
Smart Images

Figure CN119122300A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of connection between an ALC plate and a steel beam, in particular to an installation construction method for connection between an ALC plate and a steel beam. Background Art
[0002] With the acceleration of urbanization and the rapid development of the construction industry, my country's construction industry is facing increasing pressure on resources and the environment, extensive production methods, and unregulated markets, which restrict the sustainable development of the construction industry. Therefore, the construction industry needs to shift from high-speed development to high-quality development to achieve the goal of sustainable development. Green buildings and building industrialization are important development directions for the current high-quality development of the construction industry, which can effectively improve building quality and efficiency, reduce energy consumption and resource waste. ALC boards (steam lightweight concrete boards) have been widely used as a new type of building material in the process of building industrialization. At the same time, in order to meet the needs of building structures, the connection technology between steel beams and ALC boards is also constantly developing and improving.
[0003] In the connection between steel beams and ALC floor slabs, embedded connection technology is currently a commonly used method. This connection technology involves slotting or drilling holes in the steel beams, inserting the ALC slabs into them, and then fixing them by bolts or welding. However, slotting and drilling holes in the steel beams will cause deformation of the steel beams, affecting the stability of the beams; causing local stress concentration, affecting their service life. In addition, slotting and drilling holes will destroy the structural integrity of the steel beams and reduce their bearing capacity. In actual construction, the amount of ALC slabs laid is often huge, and it is difficult to use traditional embedded connection construction. Summary of the invention
[0004] In view of the above-mentioned prior art, the present invention proposes an installation and construction method for connecting an ALC plate with a steel beam.
[0005] The present invention provides an installation construction method for connecting an ALC plate with a steel beam, comprising the following steps: S1. Installation of steel beam: Install the steel beam in place; S2. Installation of full-length steel plate: a full-length steel plate is welded on the web of the steel beam. The full-length steel plate is set in a rectangular shape and is the same length as the steel beam. S3, installation of stiffening steel plates: weld several trapezoidal stiffening steel plates on the side of the steel beam connected with the ALC plate, the trapezoidal stiffening steel plates are arranged at the lower end of the full-length steel plate, and weld several rectangular stiffening steel plates on the side of the steel beam not connected with the ALC plate; S4. Laying of ALC plate: Lay the ALC plate on the upper end of the full-length steel plate along the length direction of the steel beam; S5. Post-processing of the board surface: adjusting the flatness and verticality of the board surface of the ALC board; using adhesive to process the gaps between the board units of the ALC board; using filler to process the gaps between the ALC board and the steel beam; bonding mesh cloth at the gaps between the two boards of the ALC board.
[0006] Preferably, the thickness of the full-length steel plate, the trapezoidal stiffening steel plate and the rectangular stiffening steel plate are all not less than 6 mm.
[0007] Preferably, in S2, the distance between the top surface of the full-length steel plate and the top surface of the steel beam is the thickness of the ALC plate.
[0008] Preferably, in S3, the welding intervals of the trapezoidal stiffening steel plates and the rectangular stiffening steel plates are both no greater than 600 mm.
[0009] Preferably, in S4, the distance between the side of the ALC plate and the flange of the steel beam is 10 mm, and the plate units of the ALC plate are closely attached to each other.
[0010] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention proposes an installation construction method for connecting an ALC plate with a steel beam. By using a combination of a steel beam and an ALC plate, the need for grooving or drilling on the steel is avoided, thereby maintaining the integrity of the steel. Adding a stiffening steel plate to the web of the steel not only improves the load-bearing capacity of the structure, but also ensures the integrity of the ALC plate, avoiding structural damage to it caused by secondary processing. In addition, the method reduces the difficulty of construction and effectively improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Figure 1 Schematic diagram of the structure of the connection between the ALC plate and the steel beam in an embodiment of the present invention.
[0012] Figure 2 This is a schematic diagram of the bidirectional laying of ALC plates on a section steel beam in an embodiment of the present invention.
[0013] Figure 3 This is a schematic diagram of the connection of ALC plates laid in one direction on a section steel beam in an embodiment of the present invention.
[0014] Among them, 1. Steel beam; 2. ALC plate; 3. Full-length steel plate; 4. Trapezoidal stiffening steel plate; 5. Rectangular stiffening steel plate. DETAILED DESCRIPTION
[0015] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments.
[0016] Example: Figure 1-Figure 3 As shown, an installation construction method for connecting an ALC plate with a steel beam comprises the following steps: S1. Installation of steel beams: Review the drawings to ensure that the design complies with the specifications and meets the requirements of structural safety and functional use. Conduct technical audits to ensure the feasibility and safety of the construction technology. Perform accurate measurement and layout work to determine the installation position and elevation of the steel beams. Review the measurement results to ensure the accuracy of the installation position. Use hoisting to install the I-shaped steel beam 1 in place.
[0017] S2. Installation of full-length steel plates: Before welding, clean up impurities such as oil, rust, and scale on the surfaces of the steel beam 1 and the full-length steel plate 2 to ensure welding quality. Use seamless welding to weld the full-length steel plate 3 on the web of the steel beam 1. The full-length steel plate 3 is set to be rectangular and has the same length as the steel beam 1. The side of the full-length steel plate 3 extends to the outside of the steel beam 1. The distance between the top surface of the full-length steel plate 3 and the top surface of the steel beam 1 is the thickness of the ALC plate. After welding is completed, the weld quality is checked.
[0018] S3. Installation of stiffening steel plates: weld several trapezoidal stiffening steel plates 4 on the side of the steel beam 1 connected with the ALC plate. The trapezoidal stiffening steel plates 4 are arranged at the lower end of the full-length steel plate 3. Weld several rectangular stiffening steel plates 5 on the side of the steel beam 1 without the ALC plate connection. The welding interval of the trapezoidal stiffening steel plates 4 and the rectangular stiffening steel plates 5 are both 600mm. Three-side seamless welding is adopted. Check the weld quality after welding is completed.
[0019] S4. ALC plate laying: ALC plate 2 is laid on the upper end of the full-length steel plate 3 along the length direction of the steel beam 1. The distance between the side of the ALC plate 2 and the flange of the steel beam 1 is 10 mm, and the plate units of the ALC plate 2 are closely attached to each other.
[0020] S5. Post-processing of the board surface: adjust the flatness and verticality of the board surface of ALC board 2; use adhesive to process the gap between the board units of ALC board 2; use filler to process the gap between ALC board 2 and steel beam 1; bond mesh cloth at the gap position between the two boards of ALC board 2.
[0021] Among them, the thickness of the full-length steel plate 3, the trapezoidal stiffening steel plate 4 and the rectangular stiffening steel plate 5 are all 6 mm.
[0022] This embodiment avoids the need to groove or punch holes in the steel beam 1 by using a combination of the steel beam 1 and the ALC plate 2, thereby maintaining the integrity of the steel beam 1. Adding a stiffening steel plate to the web of the steel beam 1 not only improves the load-bearing capacity of the structure, but also ensures the integrity of the ALC plate 2, avoiding structural damage to it caused by secondary processing. In addition, this method reduces the difficulty of construction and effectively improves construction efficiency.
[0023] The above are only implementation modes of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent schemes made using the contents of the present invention specification, directly or indirectly applied in other related technical fields, are also within the patent protection scope of the present invention.
Claims
1. An installation and construction method for connecting an ALC plate with a steel beam. It is characterized in that The steps include: S1. Installation of steel beam: Install the steel beam (1) in place; S2. Installation of the full-length steel plate: welding a full-length steel plate (3) on the web of the steel beam (1), wherein the full-length steel plate (3) is arranged in a rectangular shape and is equal in length to the steel beam (1); S3, installation of stiffening steel plates: welding a plurality of trapezoidal stiffening steel plates (4) on the side of the steel beam (1) connected with the ALC plate, wherein the trapezoidal stiffening steel plates (4) are arranged at the lower end of the full-length steel plate (3), and welding a plurality of rectangular stiffening steel plates (5) on the side of the steel beam (1) not connected with the ALC plate; S4, ALC plate laying: laying the ALC plate (2) at the upper end of the full-length steel plate (3) along the length direction of the steel beam (1); S5, post-processing of the plate surface: adjusting the plate surface flatness and verticality of the ALC plate (2); treating the gaps between the plate units of the ALC plate (2) with an adhesive; treating the gaps between the ALC plate (2) and the steel beam (1) with a filler; and bonding a mesh cloth at the gaps between the two plates on the plate surface of the ALC plate (2).
2. The installation construction method of connecting the ALC board and the steel beam as claimed in claim 1, It is characterized in that The thickness of the full-length steel plate (3), the trapezoidal stiffening steel plate (4) and the rectangular stiffening steel plate (5) are all not less than 6 mm.
3. The installation construction method for connecting the ALC board with the steel beam as claimed in claim 1 or 2, It is characterized in that In S2, the distance between the top surface of the full-length steel plate (3) and the top surface of the profiled steel beam (1) is the thickness of the ALC plate (2).
4. The installation construction method for connecting the ALC board with the steel beam as claimed in claim 1 or 2, It is characterized in that In S3, the welding intervals of the trapezoidal stiffening steel plates (4) and the rectangular stiffening steel plates (5) are both no greater than 600 mm.
5. The installation construction method for connecting the ALC board with the steel beam as claimed in claim 1 or 2, It is characterized in that In S4, the distance between the side of the ALC plate (2) and the flange of the steel beam (1) is 10 mm, and the plate units of the ALC plate (2) are closely attached to each other.
Citation Information
Patent Citations
Fabricated light steel-ALC board-bamboo wood composite beam and construction method
CN112627416A
Can space -saving building sandwich structure
CN205172031U
Plate-type steel structure modular building wall module floor module connecting device
CN214994700U
Modified Wide-flange Steel Beam for Reduction of StoryHeight
KR1020030094950A
Reinforcement pipe of the pillar attachment
KR1020220114117A