Reinforced concrete and prestressed inhaul cable coupled large-span beam

By pre-embedding fixed prestressed cables and using the design of moving pulleys and tensioning connection mechanisms, the problems of complexity and efficiency of large-span beams are solved, and efficient construction without post-watering operations and stable tensile effect of cables are achieved. , delays oxidation and rust.

CN119221661APending Publication Date: 2024-12-31FUJIAN JINNAN CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411627771.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-14
Publication Date
2024-12-31

AI Technical Summary

Technical Problem

In the prior art, the construction complexity of prestressed concrete beams in large-span sports fields is high, resulting in low construction efficiency, and the prestressed cable needs to be post-poured to fix it after being tightened, which increases the construction difficulty.

Method used

A large span beam coupled with reinforced concrete and prestressed cable is used to fix the prestressed cable at both ends of the concrete beam body by pre-embedding, and tensioning is used to avoid post-pouring operations, and at the same time, adjustment bolts are used. and limiting parts ensure the stability and tensile resistance of the cable.

Benefits of technology

The construction efficiency is improved, the construction complexity of concrete beams is reduced, and the prestressed cable is doubled when the concrete beam is deformed through moving pulleys, which enhances the tensile effect and delays the oxidation and rust of the cables.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119221661A_ABST
    Figure CN119221661A_ABST
Patent Text Reader

Abstract

The invention discloses a reinforced concrete and prestressed inhaul cable coupled large-span beam, and relates to the technical field of building construction, the reinforced concrete and prestressed inhaul cable coupled large-span beam comprises a concrete beam body and a prestressed inhaul cable, and the two ends of the prestressed inhaul cable are pre-buried and fixed to the two ends of the concrete beam body respectively; a movable pulley is arranged at one end of the concrete beam body; a tensioning connecting mechanism is connected between the movable pulley and the beam body and comprises a fixed block and a movable block, an adjusting bolt is connected between the movable block and the fixed block, the adjusting bolt is used for adjusting the distance between the movable block and the fixed block, the adjusting bolt is provided with a limiting piece, and the limiting piece is used for preventing the adjusting bolt from rotating around the axis of the adjusting bolt. The movable pulley is installed on a movable block used for being connected with a tensioning steel cable. The two ends of the prestressed inhaul cable are pre-buried and fixed to the concrete beam body, so that after the prestressed inhaul cable is tensioned, post-pouring operation of concrete does not need to be carried out, and the construction efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of building construction technology, and in particular to a long-span beam coupled with reinforced concrete and prestressed cables. Background Art

[0002] With the large-scale construction of large-span spatial structures, the application of prestressed concrete beams in large-span sports field floors has gradually increased. As the span increases, the deadweight of the prestressed concrete beam will also increase significantly, and the bearing requirements for the beam will be greatly increased.

[0003] In the related art, a long-span beam coupled with reinforced concrete and prestressed cables is disclosed, including a reinforced concrete beam, a vertical strut and a prestressed cable, wherein the prestressed cable is connected to the concrete beam in the exposed area through the vertical strut, the reinforced concrete beam is provided with a steel frame in the support area, the prestressed cable is connected to the steel frame in the support area, the vertical strut is hingedly connected to the bottom embedded part of the reinforced concrete beam through a pin shaft and an ear plate, the vertical strut is hingedly connected to the prestressed cable through a cable clamp, and the prestressed cable is a quadratic curve with an opening facing upward. After the prestressed cable is tensioned, a post-casting strip needs to be poured.

[0004] In the above-mentioned related technologies, since concrete needs to be poured later, the prestressed cables after tensioning are fixed by the concrete. In the above process, the concrete pouring later increases the complexity of beam construction, and the construction efficiency needs to be improved. Summary of the invention

[0005] In order to improve the construction efficiency of the long-span beam tensioned by prestressed cables, the present application provides a long-span beam coupled with reinforced concrete and prestressed cables.

[0006] The long-span beam coupled with reinforced concrete and prestressed cables provided in this application adopts the following technical solution: A long-span beam coupled with reinforced concrete and prestressed cables comprises a concrete beam body and prestressed cables, wherein two ends of the prestressed cables are respectively embedded and fixed at two ends of the concrete beam body; a movable pulley is provided at one end of the concrete beam body, and the prestressed cables pass around the movable pulley; a tensioning connection mechanism is connected between the movable pulley and the beam body, and the tensioning connection mechanism comprises a fixed block and a movable block, an adjusting bolt is connected between the movable block and the fixed block, the adjusting bolt is used to adjust the distance between the movable block and the fixed block, the adjusting bolt is provided with a limiter, and the limiter is used to prevent the adjusting bolt from rotating around its own axis, the movable pulley is installed on the movable block, and the movable block is used to connect the tensioning cable.

[0007] By adopting the above technical solution, during the construction of the concrete beam, a notch for avoiding the prestressed cable is opened on the template facing downward of the concrete beam, and the anchor point of the prestressed cable is set at the joint of the template. After the concrete beam is poured, the two ends of the prestressed cable are fixed to the concrete beam in a pre-embedded connection manner. After the concrete beam solidifies, the fixed block and the movable block of the tensioning connection mechanism are installed, and the tensioning steel cable is connected to the movable block. Then, the movable block is pulled by the hydraulic tensioning equipment, so that the tensioning force is applied to the prestressed cable through the movable pulley. When the stress of the prestressed cable reaches the preset stress value, the movable block is connected to the fixed block by the adjusting bolt, and the limiter is installed on the adjusting bolt, and then the tensioning steel cable is disassembled. Since the two ends of the prestressed cable are pre-embedded and fixed to the concrete beam, after the prestressed cable is tensioned, there is no need to perform post-casting of concrete, which is conducive to improving construction efficiency. On the other hand, the movable pulley changes the direction of the prestressed cable to form two cable segments. When the concrete beam deforms during use, double the deformation will occur, which will enhance the tensile effect of the prestressed cable.

[0008] Optionally, the fixed block is provided with a fixed pulley, and the fixed pulley is used for winding the tensioning steel cable.

[0009] By adopting the above technical solution, the fixed pulley can reverse the tensioning cable so that the tensioning cable can extend downward, which is convenient for installing the hydraulic tensioning equipment on the ground under the large-span beam for construction, and is conducive to making the tensioning process of the prestressed cable easier to carry out.

[0010] Optionally, at least two adjusting bolts are provided and arranged parallel to each other, and the bolt heads of the two adjusting bolts are provided with sockets; the limiting member is a rod, and the limiting member is simultaneously plugged into the sockets of the two adjusting bolts.

[0011] By adopting the above technical solution, the number of adjusting bolts is set to two, so that the movable block is not easy to rotate around the adjusting bolt, and the position of the adjusting bolt is relatively stable; the number of adjusting bolts is set to two, which is conducive to reducing the load of each adjusting bolt, so that the adjusting bolt is relatively stable and reliable during use. The limiting member passes through the insertion holes of the two adjusting bolts at the same time, so that the two adjusting bolts form a mutual limiting effect through the limiting member.

[0012] Optionally, the limiting member includes two pins, and a welding fixing member is welded between the two pins.

[0013] By adopting the above technical solution, when the two adjusting bolts are used to adjust the distance between the movable block and the fixed block at the same time, the insertion holes of the two adjusting bolts are not colinear in most cases, and the welding fixing parts can connect and fix the two non-colinear pins to each other, thereby limiting the freedom of the two adjusting bolts to rotate around their own axes.

[0014] Optionally, both ends of the prestressed cable are tied and fixed to the steel bars inside the concrete beam body.

[0015] By adopting the above technical solution, both ends of the prestressed cable are respectively tied and fixed to the steel bars in the concrete beam body, so that the prestressed cable is not only bound by the concrete, but also by the steel bars, making the connection between the prestressed cable and the concrete beam body more stable and reliable.

[0016] Optionally, guide members are embedded at both ends of the concrete beam body, the guide members are provided with guide holes, the prestressed cables are connected through the guide holes, and the guide holes are exposed on the lower surface of the concrete beam body; the lower edge of the guide holes is chamfered.

[0017] By adopting the above technical solution, when the prestressed cables are tensioned, a large pressure is easily formed between the prestressed cables and the lower surface area of ​​the concrete beam body. By providing guide members and using the guide members to guide the prestressed cables, it is beneficial to reduce the pressure between the prestressed cables and the concrete cables, which is beneficial to protecting the prestressed cables and the concrete beam body.

[0018] Optionally, a plurality of support members are provided on the lower surface of the concrete beam body, and the length dimension of each of the support members first increases and then decreases along the length direction of the concrete beam body. The plurality of support members are distributed at intervals along the length of the concrete beam body, and a cable clamp is provided at the lower end of the support member, and the prestressed cable passes through the cable clamp of each of the support members in turn.

[0019] By adopting the above technical solution, the support member props up the prestressed cable downward, and the prestressed cable in a taut state applies an upward load to the concrete beam body through the support member. The length dimension of each support member is set to increase first and then decrease along the length direction of the concrete beam. When the support member props up the prestressed cable downward, the prestressed cable is in the shape of a quadratic curve as a whole, so that the supporting effect of the middle support member on the concrete beam body is greater than the supporting effect of the support members on the two sides on the concrete beam body, and it can better adapt to the deadweight load of the concrete beam body.

[0020] Optionally, the cable clamp divides the prestressed cable into a plurality of segments, and each segment of the prestressed cable is provided with a spiral sheath; the spiral joints of the spiral sheath are bonded by a sealant.

[0021] By adopting the above technical solution, the spiral sheath can separate the prestressed cable from the external air, which is beneficial to slowing down the oxidation and corrosion rate of the prestressed cable and protecting the prestressed cable.

[0022] Optionally, flanges are respectively provided at both ends of the cable clamp, and the flanges are inserted into the ends of the spiral sheath.

[0023] By adopting the above technical solution, the flanges at both ends of the cable clamp are plugged into the end of the spiral sheath, which can improve the sealing effect of the two ends of the spiral sheath.

[0024] Optionally, the support member includes a first splicing member and a second splicing member, the first splicing member and the second splicing member are connected in series, the first splicing member and the second splicing member are commonly connected with a screw, the screw is threadedly connected to the first splicing member, the screw is connected to the second splicing member through a penetration, a countersunk hole is provided at one end of the second splicing member away from the first splicing member, the countersunk hole is used to accommodate a cap head of the screw, and the cable clamp is located at one end of the first splicing member away from the second splicing member; a plurality of length adjustment members are provided between the first splicing member and the second splicing member, and the screw is connected to the length adjustment member through a penetration.

[0025] By adopting the above technical solution, the first splicing piece, the second splicing piece and the length adjusting piece are connected in series to form a supporting piece by screws. By changing the number and specifications of the length adjusting piece, the length size of the supporting piece can be changed, which is conducive to mass production of supporting pieces and makes the production of supporting pieces more efficient.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. In this application, both ends of the prestressed cable are embedded and fixed in the concrete beam, so that after the prestressed cable is tensioned, there is no need to perform post-casting of concrete, which is conducive to improving construction efficiency. On the other hand, the movable pulley reverses the prestressed cable to form two cable segments. When the concrete beam is deformed during use, it will produce double deformation, which strengthens the tensile effect of the prestressed cable.

[0027] 2. The spiral sheath can separate the prestressed cable from the outside air, which is beneficial to slow down the oxidation and corrosion rate of the prestressed cable and protect the prestressed cable. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the overall structure of Example 1.

[0029] Figure 2 It is a schematic diagram of the structure of the support member in Example 1.

[0030] Figure 3 It is a structural schematic diagram of the tensioning connection mechanism of Example 1.

[0031] Figure 4 It is a schematic diagram used to reflect the connection relationship between the limit member and the adjusting bolt in Example 1.

[0032] Figure 5It is a schematic diagram of the structure of the spiral sheath in Example 1.

[0033] Figure 6 It is a schematic diagram of the tension connection mechanism in Example 2.

[0034] Figure 7 This is a schematic diagram for showing the tension state of the prestressed cable in Example 3. Description of reference numerals: 1. Concrete beam body; 11. Guide member; 111. Guide hole; 112. Screw sleeve; 1121. Rebar; 113. Embedded steel frame; 114. Threading hole; 2. Prestressed cable; 21. Segmentation; 22. Spiral sheath; 3. Support member; 31. First splicing member; 32. Second splicing member; 321. Countersunk hole; 33. Length adjustment member; 34. Cable clamp; 341. Flange; 35. Screw; 36. Articulated seat; 4. Tensioning connection mechanism; 41. Fixed block; 42. Movable block; 44. Movable pulley; 45. Adjusting bolt; 46. Guide rod; 47. Limiting member; 471. Pin shaft; 472. Welding fixture; 48. Fixed pulley; 5. Tensioning cable. DETAILED DESCRIPTION

[0035] The following is combined with Figure 1-7 This application is described in further detail.

[0036] Example 1 The embodiment of the present application discloses a long-span beam coupled with reinforced concrete and prestressed cables. Figure 1 and Figure 2 The long-span beam coupled with reinforced concrete and prestressed cables comprises a concrete beam body 1 and prestressed cables 2, the two ends of the prestressed cables 2 are respectively embedded and fixed at the two ends of the concrete beam body 1, and the prestressed steel cables are tied and connected with the steel bars 1121 inside the concrete beam body 1; a plurality of support members 3 are provided on the lower surface of the concrete beam body 1, and a cable clamp 34 is provided at the lower end of the support member 3, and the prestressed cables 2 pass through each cable clamp 34 in turn; the concrete beam body 1 is provided with a tensioning connection mechanism 4, and the tensioning connection mechanism 4 is used to tension the prestressed cables 2.

[0037] Reference Figure 1 and Figure 3The tension connection mechanism 4 includes a fixed block 41, a movable block 42 and a movable pulley 44. The fixed block 41 is fixedly connected to the concrete beam body 1. Two adjusting bolts 45 are connected between the movable block 42 and the fixed block 41. The two adjusting bolts 45 are parallel to each other, and the performance level of the adjusting bolts 45 is not less than 9.8. The adjusting bolts 45 are connected to the movable block 42 through a threaded connection, and are threadedly connected to the fixed block 41. The adjusting bolts 45 are used to adjust the spacing between the movable block 42 and the fixed block 41. The fixed block 41 is fixedly provided with two guide rods 46. The guide rods 46 are parallel to the adjusting bolts 45, and the guide rods 46 are connected to the movable block 42 through a threaded connection.

[0038] Reference Figure 2 and Figure 3 The adjusting bolt 45 is provided with a limit member 47, and the limit member 47 includes two pin shafts 471. The bolt heads of the two adjusting bolts 45 are provided with sockets 451 adapted to the pin shafts 471. The two pin shafts 471 are respectively inserted into the two sockets 451, and the two pin shafts 471 are welded together with a welding fixing member 472. The limit member 47 can prevent the adjusting bolt 45 from rotating around its own axis, so that the relative position between the movable block 42 and the fixed block 41 remains stable.

[0039] Reference Figure 2 The movable pulley 44 is rotatably mounted on the movable block 42, and the prestressed cable 2 passes through the movable pulley 44; the movable block 42 is used to connect the tensioning cable 5. The fixed block 41 is provided with a fixed pulley 48, and the fixed pulley 48 is used to wind the tensioning cable 5.

[0040] When the tensioning connection mechanism 4 tensions the prestressed steel cable, the tensioning steel cable 5 is tied and fixed to the movable block 42, and then the tensioning steel cable 5 is passed around the fixed pulley 48 and extended downward. The hydraulic tensioning device is installed on the ground or floor below the concrete beam body 1. The hydraulic tensioning device applies tensioning force to the tensioning steel cable 5, so that the movable block 42 indirectly tensions the prestressed cable 2. When the tension state of the prestressed cable 2 reaches a preset state, the adjustment bolt 45 and the limiter 47 are used to lock the distance between the movable block 42 and the fixed block 41.

[0041] Reference Figure 1 Both ends of the concrete beam 1 are pre-buried with guide members 11, which are provided with guide holes 111, and the prestressed cable 2 is connected with the guide holes 111, and the guide holes 111 are exposed on the lower surface of the concrete beam 1; the lower edge of the guide hole 111 is chamfered. The guide members 11 replace the concrete of the concrete beam 1 to contact the prestressed cable 2, so that the prestressed cable 2 and the concrete of the concrete beam 1 are protected.

[0042] Reference Figure 1The length dimensions of each support member 3 on the lower surface of the concrete beam body 1 first increase and then decrease along the length direction of the concrete beam body 1. The multiple support members 3 are distributed at intervals along the length direction of the concrete beam body 1 and are symmetrically distributed along the center of the concrete beam body 1. A cable clamp 34 is provided at the lower end of the support member 3, and the prestressed cable 2 passes through the cable clamp 34 of each support member 3 in turn.

[0043] The support member 3 includes a first splicing member 31 and a second splicing member 32, the first splicing member 31 and the second splicing member 32 are connected in series, the first splicing member 31 and the second splicing member 32 are commonly connected with a screw 35, two screws 35 are provided, the screw 35 is threadedly connected to the first splicing member 31, the screw rod is connected to the second splicing member 32 by penetration, a countersunk hole 321 is provided at one end of the second splicing member 32 away from the first splicing member 31, the countersunk hole 321 is used to accommodate the cap head of the screw 35, and a cable clamp 34 is fixedly arranged at one end of the first splicing member 31 away from the second splicing member 32; a plurality of length adjusting members 33 are provided between the first splicing member 31 and the second splicing member 32, and the screws 35 are connected to the length adjusting members 33 by penetration.

[0044] The cable clamp 34 is fixedly installed on the side of the first splicing piece 31 away from the second splicing piece 32. The second splicing piece 32 is provided with a hinged seat 36. The lower surface of the concrete beam body 1 is pre-embedded with multiple groups of threaded sleeves 112. The multiple groups of threaded sleeves 112 correspond to multiple support members 3 respectively. The number of threaded sleeves 112 in each group is two. The hinged seat 36 of the support member 3 is connected to the corresponding threaded sleeve 112 by screws.

[0045] The upper end of the screw sleeve 112 is closed, and a steel bar 1121 is welded to the outer peripheral surface of the screw sleeve 112 . The steel bar 1121 can strengthen the connection strength between the screw sleeve 112 and the concrete beam body 1 .

[0046] Reference Figure 1 and Figure 5 The surface of the prestressed cable 2 is provided with a sealant layer, the cable clamp 34 and the movable pulley 44 divide the prestressed cable 2 into a plurality of segments 21, each segment 21 of the prestressed cable 2 is sleeved with a spiral sheath 22; the spiral joint of the spiral sheath 22 is sealed with a sealant. The two ends of the cable clamp 34 are respectively provided with flanges 341, which are inserted into the ends of the spiral sheath 22, which is conducive to ensuring the sealing effect of the two ends of the spiral sheath 22.

[0047] The construction process of concrete beam 1 is as follows: The steel bar 1121 skeleton of the concrete beam body 1 is tied, the embedded steel frame 113 is welded at the lower part of the steel bar 1121 skeleton, the fixing block 41 of the tension connection mechanism 4 is fixedly installed on the embedded steel frame 113, and the fixing block 41 and the embedded steel frame 113 are connected in an integral connection manner or a mechanical connection manner; both ends of the prestressed cable 2 are tied to the steel bar 1121 skeleton; A template is supported, and a notch for avoiding the fixing block 41 and a notch for avoiding the prestressed cable 2 are opened on the template facing downward of the concrete beam body 1. A spacing margin is left between the template facing downward of the concrete beam body 1 and the embedded steel frame 113, and the anchor point of the prestressed cable 2 is set at the joint of the template; a screw sleeve 112 is pre-installed on the template facing downward of the concrete beam body 1, and a sealant is used to seal the lower end of the screw sleeve 112 and the template; Casting the concrete beam body 1, and removing the formwork after the concrete beam body 1 solidifies; Install the fixed block 41 and the movable block 42 of the tensioning connection mechanism 4, and connect the tensioning cable 5 to the movable block 42. Then use the hydraulic tensioning equipment to pull the movable block 42, so as to apply tensioning force to the prestressed cable 2 through the movable pulley 44. When the stress of the prestressed cable 2 reaches the preset stress value, use the adjusting bolt 45 to connect the movable block 42 with the fixed block 41, and install the limiter 47 on the adjusting bolt 45, and then remove the tensioning cable 5.

[0048] In the embodiment of the present application, since both ends of the prestressed cable 2 are pre-buried and fixed in the concrete beam body 1, after the prestressed cable 2 is tensioned, there is no need to perform post-casting of concrete, which is beneficial to improving construction efficiency.

[0049] Example 2 Reference Figure 6 The difference between this embodiment and the first embodiment is that the embedded steel frame 113 in this embodiment is a steel section, the lower surface of the steel section is flush with the lower surface of the concrete beam body 1, and the fixing block 41 in this embodiment is fixed to the embedded steel section in the concrete beam body 1 by welding. Accordingly, in this embodiment, there is no need to open a notch corresponding to the fixing block 41 on the downward template of the concrete beam body 1.

[0050] Example 3 Reference Figure 7 In this embodiment, a threading hole 114 is provided at one end of the concrete beam body 1 close to the tensioning connection mechanism 4. The threading hole 114 is formed by pre-embedded rods before pouring concrete. The threading hole 114 vertically passes through the concrete beam body 1. The threading hole 114 is used to pass the tensioning steel cable 5. When the hydraulic tensioning device applies tensioning force to the prestressed steel cable through the tensioning steel cable 5, the hydraulic tensioning device is installed above the concrete beam body 1, so that the hydraulic tensioning device is close to the tensioning connection mechanism, which is convenient for operating the hydraulic tensioning device and adjusting the tensioning connection mechanism at the same time.

[0051] When the prestressed cable 2 is tensioned and the tensioning steel cable 5 is removed, the threading hole 114 is filled with cement slurry.

[0052] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A long-span beam coupled with reinforced concrete and prestressed cables, characterized in that: The invention comprises a concrete beam body (1) and a prestressed cable (2), wherein two ends of the prestressed cable (2) are respectively embedded and fixed at two ends of the concrete beam body (1); the concrete beam body (1) is provided with a tensioning connection mechanism (4), wherein the tensioning connection mechanism (4) comprises a fixed block (41), a movable block (42) and a movable pulley (44); the fixed block (41) is fixedly connected to the concrete beam body (1); an adjusting bolt (45) is connected between the movable block (42) and the fixed block (41); the adjusting bolt (45) is used to adjust the distance between the movable block (42) and the fixed block (41); the adjusting bolt (45) is provided with a limiter (47); the limiter (47) is used to prevent the adjusting bolt (45) from rotating around its own axis; the movable pulley (44) is mounted on the movable block (42); the prestressed cable (2) passes over the movable pulley (44); the movable block (42) is used to connect the tensioning steel cable (5).

2. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 1 is characterized in that: The fixed block (41) is provided with a fixed pulley (48), and the fixed pulley (48) is used for winding the tensioning steel cable (5).

3. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 1, characterized in that: At least two adjusting bolts (45) are provided and are arranged parallel to each other. The bolt heads of the two adjusting bolts (45) are both provided with insertion holes. The limiting member (47) is a rod member, and the limiting member (47) is simultaneously plugged into the insertion holes of the two adjusting bolts (45).

4. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 3 is characterized in that: The limiting member (47) comprises two pin shafts (471), and a welding fixing member (472) is welded between the two pin shafts (471).

5. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 1, characterized in that: Both ends of the prestressed cable (2) are tied and fixed to the steel bars (1121) inside the concrete beam body (1).

6. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 1, characterized in that: Both ends of the concrete beam body (1) are pre-embedded with guide members (11), the guide members (11) are provided with guide holes (111), the prestressed cables (2) are connected to the guide holes (111), and the guide holes (111) are exposed on the lower surface of the concrete beam body (1); the lower edge of the guide holes (111) is provided with chamfers.

7. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 1, characterized in that: A plurality of support members (3) are provided on the lower surface of the concrete beam body (1), the length of each support member (3) first increases and then decreases along the length direction of the concrete beam body (1), the plurality of support members (3) are distributed at intervals along the length of the concrete beam body (1), a cable clamp (34) is provided at the lower end of each support member (3), and the prestressed cable (2) passes through the cable clamp (34) of each support member (3) in sequence.

8. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 7, characterized in that: The cable clamp (34) divides the prestressed cable (2) into a plurality of segments (21); each segment (21) of the prestressed cable (2) is sleeved with a spiral sheath (22); and the spiral joints of the spiral sheaths (22) are bonded by means of a sealant.

9. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 8, characterized in that: Flanges (341) are respectively provided at both ends of the cable clamp (34), and the flanges (341) are inserted into the ends of the spiral sheath (22).

10. The long-span beam coupled with reinforced concrete and prestressed cables according to claim 7, characterized in that: The support member (3) comprises a first splicing member (31) and a second splicing member (32), the first splicing member (31) and the second splicing member (32) being connected in series, the first splicing member (31) and the second splicing member (32) being connected together by a screw (35), the screw (35) being threadedly connected to the first splicing member (31), the screw (35) being connected to the second splicing member (32) by a through-hole, the end of the second splicing member (32) away from the first splicing member (31) being provided with a countersunk hole (321), the countersunk hole (321) being used to accommodate a cap of the screw (35), the cable clamp (34) being located at the end of the first splicing member (31) away from the second splicing member (32); a plurality of length adjusting members (33) are provided between the first splicing member (31) and the second splicing member (32), the screw (35) being connected to the length adjusting member (33) by a through-hole.