Resource recycling full-permeable asphalt pavement structure
By designing a fully permeable asphalt pavement structure that includes a multi-layer structure and specific components, the problem of poor water permeability of the existing asphalt pavement is solved, achieving higher water permeability and pavement safety, and enhancing the overall integrity of the pavement. strength.
Patent Information
- Application Number
- CN202411734933.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-28
- Publication Date
- 2025-01-21
AI Technical Summary
The existing asphalt pavement has poor water permeability and is prone to accumulation of water, which affects the safety of the pavement.
A resource regeneration is designed with a full -transparent asphalt pavement structure, including soil base, stable layer, water transmittance, enhanced layer, asphalt layer, water collection pipe, branch tube, and permeable hole. And overall strength.
It effectively improves the water permeability of the asphalt pavement, reduces water accumulation, increases the safety of the pavement, and enhances the overall strength of the pavement to avoid pavement damage.
Smart Images

Figure CN119332562A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of asphalt pavement structures, in particular to a resource recycling and fully permeable asphalt pavement structure. Background Art
[0002] Asphalt is a dark brown complex mixture of hydrocarbons of different molecular weights and their non-metallic derivatives, and is a type of high-viscosity organic liquid. Asphalt pavement refers to various types of pavement paved with road asphalt materials mixed into mineral materials. Asphalt binder improves the ability of paving aggregate to resist damage to the road surface caused by traffic and natural factors, making the road surface smooth and less dusty.
[0003] After the asphalt road is paved, the asphalt has small gaps, which makes the water permeability of the asphalt road poor, making it easy for water to accumulate on the asphalt road, causing passing vehicles to slip. The accumulated water in the asphalt road is not easy to drain, affecting the safety of the road surface. Summary of the invention
[0004] 1. Technical issues to be resolved
[0005] In view of the deficiencies of the prior art, the present invention provides a resource recycling fully permeable asphalt pavement structure, which solves the problem of poor water permeability of asphalt pavement.
[0006] (II) Technical solution
[0007] To achieve the above objectives, the present invention is implemented through the following technical solutions: a resource recycling fully permeable asphalt pavement structure, including a soil base, a stabilizing layer is fixedly connected to the upper side of the soil base, a plurality of arc grooves are provided on the outer side of the stabilizing layer, a water collecting pipe is arranged on the inner side of the arc groove, a plurality of fixed pipes are fixedly connected to the upper side of the water collecting pipe, a plurality of upper ends of the fixed pipes are fixedly connected to branch pipes, a plurality of water permeable holes are arranged on the outer side of the branch pipe, a water permeable layer is fixedly connected to the upper side of the stabilizing layer, a reinforcing layer is fixedly connected to the upper side of the water permeable layer, an asphalt layer is fixedly connected to the upper side of the reinforcing layer, a mounting groove adapted to the branch pipe is provided on the inner side of the water permeable layer, and reinforcing ribs are arranged on the inner side of the stabilizing layer;
[0008] The permeable layer is made of slag material, the stabilizing layer is made of concrete material, and the reinforcing layer is made of coal slag material.
[0009] Preferably, the asphalt layer comprises a reinforcing layer and a filling layer, the filling layer is made of a polymer fiber material, and the reinforcing layer is made of a permeable colored silica material.
[0010] Preferably, the reinforcing ribs include a plurality of reinforcing vertical rods, the plurality of reinforcing vertical rods are all arranged on the inner side of the stabilizing layer, the outer sides of the reinforcing vertical rods are provided with insertion holes, and the outer sides of the plurality of reinforcing vertical rods are fixedly connected with a plurality of reinforcing cross rods.
[0011] Preferably, the branch pipes and water collecting pipes are both made of metal materials.
[0012] Preferably, the branch pipes and water collecting pipes are both made of stainless steel.
[0013] Preferably, one end of the water collecting pipe extends to the outside of the stabilizing layer.
[0014] Preferably, the method for making the asphalt layer comprises the following steps:
[0015] S1. Prepare materials: prepare asphalt, polymer fiber, and permeable colored glue stone materials;
[0016] S2, mixing: mixing asphalt and transparent colored colloid stone, and stirring to obtain a mixture A;
[0017] S3. Filling: Adding polymer fibers into mixture A for mixing and stirring to obtain the asphalt layer.
[0018] A method for laying a resource-recycling fully permeable asphalt pavement structure according to any one of the above items comprises the following steps:
[0019] S1. Laying a stabilization layer: laying concrete for a stabilization layer on the soil foundation;
[0020] S2. Installing the water collecting layer and branch pipes: placing the water collecting layer on the stabilizing layer and laying part of concrete, and connecting the branch pipes to the water collecting pipes through fixed pipes;
[0021] S3, laying reinforcing ribs: the permeable layer is on the upper side of the stabilizing layer, half of the height of the branch pipe is laid, the reinforcing ribs are placed on the upper side of the permeable layer, and the other half of the permeable layer is laid;
[0022] S4, laying a reinforcement layer: laying a reinforcement layer on the permeable layer;
[0023] S5. Laying an asphalt layer: laying an asphalt layer on the reinforcement layer.
[0024] (III) Beneficial effects
[0025] The present invention provides a resource recycling fully permeable asphalt pavement structure. It has the following beneficial effects:
[0026] 1. By setting up a stabilizing layer, a permeable layer, a reinforcing layer, a branch pipe, a water collection layer and permeable holes, the permeability of the asphalt pavement can be increased, the surface water on the asphalt pavement can be reduced, and rainwater can be discharged in a centralized manner to avoid car accidents on the road and increase the safety of the road.
[0027] 2. By setting up reinforcing ribs, reinforcing cross bars and reinforcing vertical bars, the overall strength of the asphalt road can be increased, making the asphalt pavement structure less likely to be damaged. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is the overall three-dimensional structure diagram of the present invention;
[0029] Figure 2 It is a side sectional stereoscopic structural diagram of the present invention;
[0030] Figure 3 for Figure 2 The enlarged view of point A in the middle;
[0031] Figure 4 It is a front cutaway stereoscopic structural diagram of the present invention;
[0032] Figure 5 It is a three-dimensional structural diagram of the reinforcing rib in the present invention.
[0033] Among them, 1. soil base; 2. stabilizing layer; 3. permeable layer; 4. reinforcing layer; 5. asphalt layer; 6. arc groove; 7. water collecting pipe; 8. fixed pipe; 9. installation groove; 10. branch pipe; 11. permeable hole; 12. reinforcing ribs; 13. reinforced vertical rod; 14. socket; 15. reinforced horizontal rod. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] Example:
[0036] like Figure 1 - Figure 5As shown, a resource recycling fully permeable asphalt pavement structure includes a soil base 1, a stabilizing layer 2 is fixedly connected to the upper side of the soil base 1, a plurality of arc grooves 6 are provided on the outer side of the stabilizing layer 2, a water collecting pipe 7 is arranged on the inner side of the arc groove 6, a plurality of fixed pipes 8 are fixedly connected to the upper side of the water collecting pipe 7, a branch pipe 10 is fixedly connected to the upper end of the plurality of fixed pipes 8, a plurality of water permeable holes 11 are provided on the outer side of the branch pipe 10, a water permeable layer 3 is fixedly connected to the upper side of the stabilizing layer 2, a reinforcing layer 4 is fixedly connected to the upper side of the water permeable layer 3, an asphalt layer 5 is fixedly connected to the upper side of the reinforcing layer 4, a mounting groove 9 adapted to the branch pipe 10 is provided on the inner side of the water permeable layer 3, and a plurality of fixed pipes 8 are fixedly connected to the upper side of the water permeable layer 3. A reinforcing rib 12 is arranged on the inner side, the permeable layer 3 is made of slag material, the stable layer 2 is made of concrete material, the reinforcing layer 4 is made of coal slag material, and one end of the water collecting pipe 7 extends to the outside of the stable layer 2. The slag and coal slag used in the stable layer 2 and the permeable layer 3 are convenient for the recycling of resources. The materials used in the stable layer 2 and the permeable layer 3 have good water permeability, which is convenient for penetrating the upper side of the asphalt road into the lower layer, and through multiple permeable holes 11, water enters the branch pipe 10, and through multiple fixed pipes 8, water is concentrated in the water collecting pipe 7, and the accumulated water is discharged through the water collecting pipe 7, so that the water accumulation on the asphalt road surface is reduced and the safety of the road surface is increased.
[0037] The asphalt layer 5 includes a reinforcing layer and a filling layer. The filling layer is made of a polymer fiber material, and the reinforcing layer is made of a permeable colored glue stone material. The reinforcing ribs 12 include a plurality of reinforcing vertical rods 13. The plurality of reinforcing vertical rods 13 are all arranged on the inner side of the stabilizing layer 2. A plug hole 14 is provided on the outer side of the reinforcing vertical rods 13. The outer sides of the plurality of reinforcing vertical rods 13 are fixedly connected with a plurality of reinforcing cross rods 15. The polymer fiber material in the asphalt layer 5 increases the tensile strength of the asphalt pavement, and the permeable colored glue stone added increases the permeability of the pavement. The reinforcing ribs 12 increase the strength of the asphalt pavement.
[0038] The branch pipe 10 and the water collecting pipe 7 are both made of metal materials, and the branch pipe 10 and the water collecting pipe 7 are both made of stainless steel materials.
[0039] The method for making an asphalt layer comprises the following steps:
[0040] S1. Prepare materials: prepare asphalt, polymer fiber, and permeable colored glue stone materials;
[0041] S2, mixing: mixing asphalt and transparent colored colloid stone, and stirring to obtain a mixture A;
[0042] S3. Filling: Adding polymer fibers into the mixture A for mixing and stirring to obtain an asphalt layer 5 , thereby increasing the tensile strength and water permeability of the asphalt layer 5 .
[0043] A method for laying a resource-recycling fully permeable asphalt pavement structure according to any one of the above items comprises the following steps:
[0044] S1, laying stabilization layer 2: laying concrete of stabilization layer 2 on soil base 1;
[0045] S2. Installing the water collecting layer 7 and the branch pipe 10: placing the water collecting layer 7 on the stabilizing layer 2 and laying part of the concrete. The branch pipe 10 is connected to the water collecting pipe 7 through the fixing pipe 8;
[0046] S3, laying the reinforcing ribs 12: the permeable layer 3 is on the upper side of the stabilizing layer 2, half the height of the branch pipe 10 is laid, the reinforcing ribs 12 are placed on the upper side of the permeable layer 3, and the other half of the permeable layer 3 is laid;
[0047] S4, laying the reinforcement layer 4: laying the reinforcement layer 4 on the permeable layer 3;
[0048] S5, laying asphalt layer 5: laying asphalt layer 5 on reinforcement layer 4.
[0049] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A resource recycling fully permeable asphalt pavement structure, comprising a soil base (1), characterized in that: The upper side of the soil base (1) is fixedly connected to a stabilizing layer (2), the outer side of the stabilizing layer (2) is provided with a plurality of arc-shaped grooves (6), the inner side of the arc-shaped grooves (6) is provided with a water collecting pipe (7), the upper side of the water collecting pipe (7) is fixedly connected to a plurality of fixed pipes (8), the upper ends of the plurality of fixed pipes (8) are fixedly connected to branch pipes (10), the outer side of the branch pipes (10) is provided with a plurality of water permeable holes (11), the upper side of the stabilizing layer (2) is fixedly connected to a water permeable layer (3), the upper side of the water permeable layer (3) is fixedly connected to a reinforcing layer (4), the upper side of the reinforcing layer (4) is fixedly connected to an asphalt layer (5), the inner side of the water permeable layer (3) is provided with a mounting groove (9) adapted to the branch pipe (10), and the inner side of the stabilizing layer (2) is provided with reinforcing ribs (12); The water-permeable layer (3) is made of slag material, the stabilizing layer (2) is made of concrete material, and the reinforcing layer (4) is made of coal slag material.
2. The resource recycling fully permeable asphalt pavement structure according to claim 1 is characterized by: The asphalt layer (5) comprises a reinforcing layer and a filling layer, wherein the filling layer is made of a polymer fiber material, and the reinforcing layer is made of a permeable colored silica material.
3. The resource recycling fully permeable asphalt pavement structure according to claim 1 is characterized by: The reinforcing ribs (12) include a plurality of reinforcing vertical rods (13), the plurality of reinforcing vertical rods (13) are all arranged on the inner side of the stabilizing layer (2), the outer sides of the reinforcing vertical rods (13) are provided with insertion holes (14), and the outer sides of the plurality of reinforcing vertical rods (13) are fixedly connected with a plurality of reinforcing cross rods (15).
4. The resource recycling fully permeable asphalt pavement structure according to claim 1 is characterized by: The branch pipe (10) and the water collecting pipe (7) are both made of metal materials.
5. The resource recycling fully permeable asphalt pavement structure according to claim 4 is characterized by: The branch pipe (10) and the water collecting pipe (7) are both made of stainless steel.
6. The resource recycling fully permeable asphalt pavement structure according to claim 1 is characterized by: One end of the water collecting pipe (7) extends to the outside of the stabilizing layer (2).
7. The resource recycling fully permeable asphalt pavement structure according to claim 2 is characterized in that: The method for making an asphalt layer comprises the following steps: S1. Prepare materials: prepare asphalt, polymer fiber, and permeable colored glue stone materials; S2, mixing: mixing asphalt and transparent colored colloid stone, and stirring to obtain a mixture A; S3. Filling: Adding polymer fibers into the mixture A for mixing and stirring to obtain the asphalt layer (5).
8. A method for laying a resource-recycling fully permeable asphalt pavement structure according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1, laying a stabilization layer (2): laying concrete of a stabilization layer (2) on the soil base (1); S2, installing the water collection layer (7) and the branch pipe (10): placing the water collection layer (7) on the stabilizing layer (2) and laying a portion of concrete, and the branch pipe (10) is connected to the water collection pipe (7) via a fixing pipe (8); S3, laying reinforcing ribs (12): the water-permeable layer (3) is on the upper side of the stabilizing layer (2), half the height of the branch pipe (10) is laid, the reinforcing ribs (12) are placed on the upper side of the water-permeable layer (3), and the other half of the water-permeable layer (3) is laid; S4, laying a reinforcement layer (4): laying a reinforcement layer (4) on the water-permeable layer (3); S5, laying an asphalt layer (5): laying an asphalt layer (5) on the reinforcement layer (4).
Citation Information
Patent Citations
Permeable structure runway for industrial park
CN211734934U
Normal-temperature asphalt concrete pavement structure
CN212294215U
Pavement deflection-resistant permeable pavement
CN217869784U
Composite solid waste full-thickness roadbed pavement structure
CN218711866U