Construction method for improving aluminum formwork concrete forming quality
By designing exhaust holes on the aluminum formwork, installing waterproof and breathable membranes and elastic sealing embedded strips, and combining them with attached vibrators, the problems of leakage and bubbles in the construction of aluminum formwork are solved, and the concrete molding quality and the stability of the aluminum formwork are improved.
Patent Information
- Application Number
- CN202510851223.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-24
- Publication Date
- 2025-09-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the construction of aluminum formwork, there are quality defects such as leakage of mortar at the joints of the formwork, formation of bubbles on the concrete surface, and deformation of the corners, which affect the quality of concrete molding.
Design vent holes on the aluminum formwork and install a waterproof and breathable membrane. Combined with high-precision positioning grooves and elastic sealing embedded strips, use an attached vibrator for vibration, and seal the vent holes with a closed cover to optimize the support system and connection method of the aluminum formwork.
It effectively prevents leakage and bubble formation, improves the quality of concrete surface molding, and ensures the stability and service life of the aluminum formwork.
Smart Images

Figure CN120701109A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of aluminum formwork construction, and in particular to a construction method for improving the molding quality of aluminum formwork concrete. Background Art
[0002] Aluminum formwork is a new formwork system widely used in construction. It primarily consists of four components: formwork elements, support systems, connection systems, and auxiliary accessories. Aluminum formwork construction follows a process of "detailed design → factory prefabrication → on-site assembly → concrete pouring → formwork removal → rotational use."
[0003] Aluminum formwork is lightweight and easy to construct: generally weighing around 20-25 kilograms per square meter, it is easy to carry and install manually, which can improve construction efficiency and shorten the construction period. High precision and good molding quality: Aluminum formwork uses high-precision processing technology and the formwork is tightly spliced, which can effectively ensure the surface flatness and verticality after concrete pouring. The poured concrete components are accurate in size, smooth in surface, and straight in inside and outside corners, achieving the effect of exposed concrete, reducing the workload of subsequent decorative works such as plastering. High turnover rate and good economic efficiency: Aluminum formwork can normally be used 200-300 times, which is significantly higher than traditional wooden formwork.
[0004] Although aluminum formwork construction has many advantages, the following quality defects may still occur during the construction process: Leakage at the joints: Although the aluminum formwork is tightly spliced, if the joints are not properly handled during installation, such as the splicing bolts are not tightened, the sealing strips are damaged or missing, etc., leakage is likely to occur during concrete pouring, resulting in honeycombed surfaces on the concrete surface, affecting the appearance quality. Figure 2 shown.
[0005] Bubbles on the concrete surface: The aluminum formwork has a smooth surface and relatively poor air permeability. During the concrete pouring process, the air inside is difficult to expel, which easily forms bubbles on the concrete surface. This problem is especially noticeable when the pouring speed is too fast or the vibration is not dense.
[0006] Deformation at the corners: Due to the relatively weak rigidity of the aluminum formwork, the corners are susceptible to deformation during concrete pouring if subjected to significant lateral pressure or impact from the vibrator. This deformation can affect the exterior dimensions and visual quality of the concrete component.
[0007] Difficulty in demoulding: If the aluminum formwork is not cleaned and maintained promptly after use, the residual concrete slurry on the surface will affect the demoulding performance of the formwork, making demoulding difficult. Forcible demoulding may damage the concrete surface and also damage the aluminum formwork, shortening its service life. Summary of the Invention
[0008] The present invention aims to provide a construction method for improving the quality of aluminum formwork concrete molding, so as to solve the problems of leakage of mortar at the template joints and formation of bubbles on the concrete surface in traditional aluminum formwork construction, which affect the quality of concrete molding.
[0009] The present invention is achieved by adopting the following technical solutions: The present invention provides a construction method for improving the molding quality of aluminum formwork concrete, comprising the following steps: S1: Deepen the design of aluminum formwork; The in-depth design includes designing vent holes on the template, designing positioning grooves at the template joints, designing elastic sealing embedded strips in the positioning grooves of two adjacent templates, and generating processing drawings and assembly drawings; S2: Factory prefabrication: Prefabricate the template in the factory according to the processing drawing, and install a waterproof and breathable membrane on the inner side of the exhaust hole on the template; S3: On-site assembly: Assemble the templates in sequence and fix them with connectors to form an initial frame. When the two templates are assembled, insert the elastic sealing pre-embedded strip from the upper opening of the joint between the two templates. The elastic sealing pre-embedded strip is embedded in the positioning groove of the two adjacent templates. The elastic sealing pre-embedded strip seals the joint between the two templates to prevent leakage. Then reinforce the template. S4: Concrete pouring: Installing attachment vibrator mounting rails on the outer surface of the formwork, installing the attachment vibrator mounting rails on both sides of the exhaust hole, installing the attachment vibrator between the attachment vibrator mounting rails on both sides, so that the attachment vibrator corresponds to the position of the waterproof breathable membrane, and the attachment vibrator acts on the formwork to vibrate the concrete in the formwork, and during the vibration process, water vapor is discharged through the waterproof breathable membrane; After the concrete is vibrated and exhausted, a closing cover is installed on the formwork. The position of the closing cover corresponds to the position of the exhaust hole. The exhaust hole is blocked by the closing cover to prevent leakage. S5: Remove the aluminum mold.
[0010] As the preferred technical solution: The connecting piece may be a pin or pin sheet.
[0011] As the preferred technical solution: Step S1 specifically includes: Based on the construction drawings, BIM technology is used to conduct in-depth template design, determine the size of each template, the location of the exhaust holes on the template, the form of the template joints, design positioning grooves at the template splicing parts, and design elastic sealing embedded strips in the positioning grooves of two adjacent templates. Processing drawings and assembly drawings are generated, and the locations of reserved openings and embedded parts are marked on the drawings; The positioning grooves of the two templates are spliced together to form a trapezoidal groove. The width of the bottom of the trapezoidal groove is greater than the width of the opening of the trapezoidal groove. The cross-section of the elastic sealing embedded strip is designed to be trapezoidal. The elastic sealing embedded strip is adapted to the trapezoidal groove and can be embedded in the trapezoidal groove.
[0012] As the preferred technical solution: Prefabricating the template in the factory according to the processing drawing in step S2 includes: Cut and mill aluminum alloy plates according to the processing drawings to obtain standard templates and special-shaped templates; Step S2 further includes: The surface of the formwork is treated for wear resistance and corrosion resistance, and then each formwork is classified and numbered, and the formwork is packaged and transported to the construction site.
[0013] As the preferred technical solution: Before assembling the templates in sequence in step S3, the following steps are also included: Pop out the axis lines of walls, beams and columns and formwork control lines on the base layer to determine the formwork installation position; Assembling formwork and reinforcing support for formwork include: Starting from the wall corner or column corner, assemble the formwork and support in sequence, and then install the vertical poles and beam and slab formwork vertically on the floor.
[0014] As the preferred technical solution: The reinforcement support of the formwork in step S3 specifically includes: After the wall column formwork is spliced, install the back ribs and diagonal braces on the outside of the wall column formwork, fix the back ribs directly on the formwork, and connect the two ends of the diagonal braces to the formwork and the floor respectively to reinforce the wall column formwork.
[0015] As the preferred technical solution: After the formwork is reinforced and supported in step S3, the following steps are further included: Reinforce the corners and openings to avoid deformation; Use a laser instrument and a ruler to check the size and verticality of the formwork system, and adjust the diagonal braces and back ribs.
[0016] As the preferred technical solution: Step S4 is to check whether the connection between the formwork is firm before pouring concrete. If not, reinforce it, clean up the debris and wet the formwork surface; when pouring, pour the concrete in layers and control the pouring speed.
[0017] As the preferred technical solution: The step S4 of installing the closing cover on the template specifically includes: External threads are designed around the closing cover, and internal threads are designed on the inner wall of the mounting hole of the closing cover on the template. The closing cover is mounted on the template through the threads.
[0018] As the preferred technical solution: Step S5 specifically includes: When the concrete strength reaches 1.2MPa, remove the wall column formwork and support, and retain the vertical poles; according to the concrete strength report, when the beam and slab concrete strength meets the design requirements, remove the vertical poles; After the formwork is removed, clean the surface concrete residue in time, apply the release agent, check the contamination of the waterproof breathable membrane, and choose whether to replace the waterproof breathable membrane according to the contamination situation.
[0019] As the preferred technical solution: The construction method for improving the molding quality of aluminum formwork concrete further includes S6: turnover use: The aluminum formwork should be used in rotation. The wear of the aluminum formwork should be checked after each use, and damaged parts should be repaired or replaced in time. The formwork should be regularly treated for rust prevention and slag removal.
[0020] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: The present invention optimizes the design of the aluminum mold, adds a water vapor separation structure (opening an exhaust hole on the template and installing a waterproof breathable membrane), which can effectively remove water vapor from the concrete surface, avoid the formation of bubbles on the concrete surface, and improve the molding quality of the concrete surface; optimizes the aluminum mold joint structure, designs positioning grooves at the template splicing parts, and designs high-precision positioned elastic sealing embedded strips in the positioning grooves, which effectively avoids the problem of leakage of slurry at the aluminum mold joints; optimizes the direct vibration method of the traditional vibrating pump, provides an attached vibrator, and combines the attached vibrator with the water vapor separation structure to improve the overall vibration effect of the concrete in the aluminum mold, which can improve the molding quality of the concrete in the aluminum mold construction from many aspects and avoid later repairs. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The present invention provides a flow chart of a construction method for improving the molding quality of aluminum formwork concrete.
[0022] Figure 2 This is a structural diagram of the traditional wall column aluminum formwork joint construction node.
[0023] Figure 3 The present invention provides a schematic structural diagram of a wall column aluminum formwork joint structural node formed by the construction method for improving the aluminum formwork concrete molding quality described in the present invention.
[0024] Figure 4 The present invention provides a schematic structural diagram of a wall column aluminum formwork structure formed by the construction method for improving the molding quality of aluminum formwork concrete.
[0025] Figure 5The figure is a side view of a wall column aluminum formwork structure formed by the construction method for improving the molding quality of aluminum formwork concrete according to the present invention.
[0026] Figure 6 Schematic diagram of the structure of the waterproof breathable membrane of the present invention.
[0027] Figure 7 Schematic diagram of the structure of the exhaust hole described in the present invention.
[0028] Figure 8 Schematic diagram of the structure of the closing cover of the present invention.
[0029] Icons: 1-elastic sealing embedded strip, 2-exhaust hole, 3-attached vibrator mounting track, 4-template, 5-waterproof breathable membrane, 6-small hole, 7-closing cover, 8-positioning groove, 9-keel, 10-back rib, 11-diagonal brace. DETAILED DESCRIPTION
[0030] To make the objectives, technical solutions, and advantages of the embodiments of the present invention more clear, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.
[0031] Example 1 like Figure 1 As shown, this embodiment proposes a construction method for improving the molding quality of aluminum formwork concrete, comprising the following steps: S1: Deepen the design of aluminum formwork; According to the construction drawings, use BIM technology to carry out in-depth design of the template 4, determine the size of each template 4, the position of the exhaust hole 2 on the template 4, and the joint form of the template 4, such as Figure 3 As shown, positioning grooves 8 are designed at the joints of the templates 4, and elastic sealing embedded strips 1 with high-precision positioning are designed in the positioning grooves 8 of the two adjacent templates 4. Processing drawings and assembly drawings are generated, and the positions of reserved openings (such as door and window openings, water and electricity pipeline holes) and embedded parts (such as embedded plates, elastic sealing embedded strips 1) are marked on the drawings.
[0032] The positioning grooves 8 of the two templates 4 are spliced together to form a trapezoidal groove. The width of the bottom of the trapezoidal groove is greater than the width of the opening of the trapezoidal groove. The cross-section of the elastic sealing embedded strip 1 is designed to be trapezoidal. The elastic sealing embedded strip 1 is adapted to the trapezoidal groove. The elastic sealing embedded strip 1 can be just embedded in the trapezoidal groove. In this way, the elastic sealing embedded strip 1 will not fall out of the trapezoidal groove.
[0033] The elastic sealing embedded strip 1 forms a sealing barrier at the joint of the formwork 4, completely eliminating the joint gap from the structural design level. Compared with traditional rubber strip sealing or bolt fastening methods, the leakage rate is reduced by more than 90%.
[0034] Optimize the support system of the aluminum formwork, such as optimizing the location of the support points (vertical poles, diagonal braces 11, etc.), calculate the load distribution, and ensure the strength and stability of the aluminum formwork.
[0035] S2: Factory prefabrication: Cut and mill the aluminum alloy sheet according to the processing drawings to obtain the template 4. Install the waterproof breathable membrane 5 on the inner side of the vent 2 on the template 4, so that the waterproof breathable membrane 5 covers the entire vent 2. The waterproof breathable membrane 5 can be directly adhered to the vent 2 on the template 4 with an adhesive.
[0036] like Figure 6 As shown, the waterproof breathable membrane 5 is only breathable but not water-permeable, which can discharge the water vapor accumulated on the surface of the template 4 in real time during the concrete pouring process, fundamentally solving the problem of concrete surface defects caused by water vapor retention, and making the concrete molding surface achieve a mirror effect. Preferably, the exhaust hole 2 includes a plurality of evenly arranged small holes 6, and the exhaust is evenly carried out through the plurality of small holes 6, such as Figure 7 shown.
[0037] The templates 4 are subjected to surface treatment (such as anodizing) to improve wear and corrosion resistance. The templates 4 are then classified and numbered, and the templates 4 are packaged and transported to the construction site.
[0038] Specifically, standard formwork and special-shaped formwork are processed. Standard formwork is a formwork component prefabricated according to uniform specifications and dimensions, which is highly standardized and versatile; special-shaped formwork is a special formwork component customized for non-standard shapes in building structures (such as arcs, bevels, complex openings, etc.).
[0039] S3: On-site assembly: The axis lines of the walls, beams, and columns, as well as the formwork control lines, are drawn on the base layer to determine the installation position of formwork 4. Vertical poles are installed on the floor. These poles are the primary load-bearing components of the aluminum formwork support system and are typically hollow steel tubes (or aluminum alloy tubes). They transfer the load of formwork 4 to the ground or underlying structure. Formwork 4 is then assembled, starting at the corners of the wall or columns, in sequence. The formwork 4 is secured to each other with pins and pins to form the initial framework. When the two formworks 4 are assembled, an elastic sealing strip 1 is inserted from the top of the joint between the two formworks 4. The elastic sealing strip 1 fits into the positioning grooves 8 of the two adjacent formworks 4. The elastic sealing strip 1 mates with the positioning grooves 8 of the two formworks 4, sealing the joint between the two formworks 4 with the elastic sealing strip 1 to ensure a tight joint and prevent leakage. The elastic sealing strip 1 can be a rubber sealing strip with a trapezoidal cross-section.
[0040] like Figure 4 and Figure 5 As shown, back ribs 10 and diagonal braces 11 are then installed on the outside of formwork 4 to ensure verticality (error ≤ 3mm) and flatness (error ≤ 2mm). The back ribs 10 are installed on formwork 4, and the ends of the diagonal braces 11 are connected to the formwork 4 and the floor to reinforce the formwork 4. The aluminum formwork 4 itself has keels 9 and does not need to be installed separately. Keels 9 are used to reinforce the aluminum formwork 4.
[0041] Special parts such as corners, openings, etc. are reinforced to avoid deformation. The reinforcement methods include installing reinforcing ribs at the corners and installing reinforcement frames around the openings.
[0042] Then use laser instrument, ruler and other tools to check the size and verticality of the formwork system, and adjust the diagonal brace 11 and back rib 10.
[0043] S4: Concrete pouring: Before pouring, check whether the connection between the templates 4 is firm. If not, reinforce it. Clean up the debris (such as nails, bolts, gaskets, etc. that fell when assembling the template 4) and wet the surface of the template 4. When pouring, pour the concrete in layers and control the pouring speed to avoid deformation of the template 4 caused by excessive impact. Figure 4 As shown, the attached vibrator mounting rails 3 are installed in partitions on the outer surface of the formwork 4 according to the concrete pouring sequence, and the attached vibrator mounting rails 3 are installed on both sides of the exhaust hole 2. The attached vibrator is installed between the attached vibrator mounting rails 3 on both sides so that the position of the attached vibrator corresponds to the waterproof breathable membrane 5. The attached vibrator acts on the formwork 4 to fully vibrate the concrete in the formwork 4. During the vibration process, water vapor is discharged through the waterproof breathable membrane 5. The attached vibrator is reliably connected to the aluminum formwork panel through the attached vibrator mounting rails 3, which can achieve uniform vibration during the concrete pouring process and effectively eliminate internal defects such as honeycombs and holes. During the pouring process, personnel are sent to inspect and deal with problems such as leakage and deformation in a timely manner. After the concrete is vibrated and exhausted, a closing cover 7 is installed on the formwork 4. The position of the closing cover 7 corresponds to the position of the exhaust hole 2. The closing cover 7 can be installed on the formwork 4 through threads. The exhaust hole 2 is blocked by the closing cover 7 to prevent leakage. The closing cover 7 is made of aluminum alloy, such as Figure 8 shown.
[0044] Among them, the attachment vibrator mounting track 3 adopts a U-shaped aluminum alloy plate, which is convenient for the installation and removal of the attachment vibrator, simple and quick. The attachment vibrator is an existing technology and will not be described in detail here.
[0045] S5: Removing the aluminum formwork: After the concrete strength reaches 1.2 MPa (approximately 12-24 hours), remove the wall column formwork 4, back ribs 10, and diagonal braces 11, retaining the vertical posts. Once the beam and slab concrete strength meets the design requirements (e.g., floor slab strength ≥ 75%), according to the concrete strength report, remove the vertical posts.
[0046] Dismantling order: First remove the non-load-bearing formwork, then the load-bearing formwork; first remove the exterior wall formwork, then the interior wall formwork. After removing the formwork 4, promptly clean the surface of the concrete residue, apply a release agent, and check the waterproof and breathable membrane 5 for contamination. If contamination is severe, replace it immediately.
[0047] S6: Turnover use: Aluminum templates can be reused more than 300 times. Check the wear after each use and repair or replace damaged parts in time. Regularly carry out rust prevention and slag cleaning on the template 4 to extend its service life.
[0048] The present invention optimizes the design of the aluminum mold and adds a water vapor separation structure (an exhaust hole 2 is opened on the template 4 and a waterproof breathable membrane 5 is installed), which can effectively remove water vapor from the concrete surface, avoid the formation of bubbles on the concrete surface, and improve the molding quality of the concrete surface; optimizes the aluminum mold joint structure, designs a positioning groove 8 at the splicing part of the template 4, and designs a high-precision positioned elastic sealing embedded strip 1 in the positioning groove 8, which effectively avoids the problem of leakage of slurry at the aluminum mold joint; optimizes the direct vibration method of the traditional vibrating pump, provides an attached vibrator, and combines the attached vibrator with the water vapor separation structure to improve the overall vibration effect of the concrete in the aluminum mold, which can improve the molding quality of the concrete in the aluminum mold construction from many aspects and avoid later repairs.
[0049] The foregoing description is merely a preferred embodiment of the present invention and is not intended to limit the present invention. Those skilled in the art will readily appreciate that various modifications and variations of the present invention are possible. Any modifications, equivalent substitutions, or improvements made within the spirit and principles of the present invention are intended to be within the scope of protection of the present invention.
Claims
1. A construction method for improving the quality of aluminum formwork concrete forming, characterized by: The following steps are involved: S1: Deepen the design of aluminum formwork; The in-depth design includes designing vent holes on the template, designing positioning grooves at the template joints, designing elastic sealing embedded strips in the positioning grooves of two adjacent templates, and generating processing drawings and assembly drawings; S2: Factory prefabrication: Prefabricate the template in the factory according to the processing drawing, and install a waterproof and breathable membrane on the inner side of the exhaust hole on the template; S3: On-site assembly: Assemble the templates in sequence and fix them with connectors to form an initial frame. When the two templates are assembled, insert the elastic sealing pre-embedded strip from the upper opening of the joint between the two templates. The elastic sealing pre-embedded strip is embedded in the positioning groove of the two adjacent templates. The elastic sealing pre-embedded strip seals the joint between the two templates to prevent leakage. Then reinforce the template. S4: Concrete pouring: Installing attachment vibrator mounting rails on the outer surface of the formwork, installing the attachment vibrator mounting rails on both sides of the exhaust hole, installing the attachment vibrator between the attachment vibrator mounting rails on both sides, so that the attachment vibrator corresponds to the position of the waterproof breathable membrane, and the attachment vibrator acts on the formwork to vibrate the concrete in the formwork, and during the vibration process, water vapor is discharged through the waterproof breathable membrane; After the concrete is vibrated and exhausted, a closing cover is installed on the formwork. The position of the closing cover corresponds to the position of the exhaust hole. The exhaust hole is blocked by the closing cover to prevent leakage. S5: Remove the aluminum mold.
2. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1 is characterized in that: Step S1 specifically includes: Based on the construction drawings, BIM technology is used to conduct in-depth template design, determine the size of each template, the location of the exhaust holes on the template, the form of the template joints, design positioning grooves at the template splicing parts, and design elastic sealing embedded strips in the positioning grooves of two adjacent templates. Processing drawings and assembly drawings are generated, and the locations of reserved openings and embedded parts are marked on the drawings; The positioning grooves of the two templates are spliced together to form a trapezoidal groove. The width of the bottom of the trapezoidal groove is greater than the width of the opening of the trapezoidal groove. The cross-section of the elastic sealing embedded strip is designed to be trapezoidal. The elastic sealing embedded strip is adapted to the trapezoidal groove and can be embedded in the trapezoidal groove.
3. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1 is characterized in that: Prefabricating the template in the factory according to the processing drawing in step S2 includes: Cut and mill aluminum alloy plates according to the processing drawings to obtain standard templates and special-shaped templates; Step S2 further includes: The surface of the formwork is treated for wear resistance and corrosion resistance, and then each formwork is classified and numbered, and the formwork is packaged and transported to the construction site.
4. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1 is characterized in that: Before assembling the templates in sequence in step S3, the following steps are also included: Pop out the axis lines of walls, beams and columns and formwork control lines on the base layer to determine the formwork installation position; Assembling formwork and reinforcing support for formwork include: Starting from the wall corner or column corner, assemble the formwork and support in sequence, and then install the vertical poles and beam and slab formwork vertically on the floor.
5. The construction method for improving the molding quality of aluminum formwork concrete according to claim 4 is characterized in that: The reinforcement support of the formwork in step S3 specifically includes: After the wall column formwork is spliced, install the back ribs and diagonal braces on the outside of the wall column formwork, fix the back ribs directly on the formwork, and connect the two ends of the diagonal braces to the formwork and the floor respectively to reinforce the wall column formwork.
6. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1 is characterized in that: After the formwork is reinforced and supported in step S3, the following steps are further included: Reinforce the corners and openings to avoid deformation; Use a laser instrument and a ruler to check the size and verticality of the formwork system, and adjust the diagonal braces and back ribs.
7. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1 is characterized in that: Step S4 is to check whether the connection between the formwork is firm before pouring concrete. If not, reinforce it, clean up the debris and wet the formwork surface; when pouring, pour the concrete in layers and control the pouring speed.
8. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1 is characterized in that: The step S4 of installing the closing cover on the template specifically includes: External threads are designed around the closing cover, and internal threads are designed on the inner wall of the mounting hole of the closing cover on the template. The closing cover is mounted on the template through the threads.
9. The construction method for improving the molding quality of aluminum formwork concrete according to claim 5, characterized in that: Step S5 specifically includes: When the concrete strength reaches 1.2MPa, remove the wall column formwork and support, and retain the vertical poles; according to the concrete strength report, when the beam and slab concrete strength meets the design requirements, remove the vertical poles; After the formwork is removed, clean the surface concrete residue in time, apply the release agent, check the contamination of the waterproof breathable membrane, and choose whether to replace the waterproof breathable membrane according to the contamination situation.
10. The construction method for improving the molding quality of aluminum formwork concrete according to claim 1, characterized in that: Also includes S6: Turnaround use: The aluminum formwork should be used in rotation. The wear of the aluminum formwork should be checked after each use, and damaged parts should be repaired or replaced in time. The formwork should be regularly treated for rust prevention and slag removal.
Citation Information
Cited By
UHPC-recycled block-aggregate concrete composite floor slab system and construction method thereof
CN121295861A
A UHPC-recycled block-aggregate concrete composite floor slab system and its construction method
CN121295861B