Preparation method of railway concrete prefabricated cable trough
Patent Information
- Application Number
- CN202510978303.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-07-16
- Publication Date
- 2025-10-17
AI Technical Summary
Traditional methods for preparing precast concrete cable troughs for railways suffer from problems such as low precision in mold making, unreasonable selection and proportioning of raw materials, uneven mixing, non-standard pouring and vibration processes, inaccurate placement of reinforcing steel cages, and improper control of the curing process. These problems result in large dimensional deviations, insufficient strength, poor durability, and loose structure of the cable troughs, which fail to meet the high standards required for railway construction.
By employing precise mold making, strict selection and proportioning of raw materials, standardized concrete mixing, pouring and vibration processes, precise placement of steel reinforcement cages and scientific curing, combined with rigorous inspection procedures, we ensure that the cable troughs are dimensionally accurate, structurally compact, high in strength and durable, meeting the needs of railway construction.
It improves the quality and performance of cable troughs, meets the stringent requirements of railway construction, ensures the safe and reliable operation of railway projects, reduces production costs, minimizes rework delays and resource waste, and extends service life.
Smart Images

Figure CN120791971A_ABST