Flexible interconnection configuration method and system of power distribution network frame, medium and equipment

By constructing a joint planning model for SOPs, tie switches, and lines in the distribution network, the problem of lack of coordination between equipment and line planning was solved, achieving efficient new energy consumption and economic operation, and improving the system's control accuracy and resource utilization efficiency.

CN120934105APending Publication Date: 2025-11-11GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202511095440.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-06
Publication Date
2025-11-11

AI Technical Summary

Technical Problem

Existing power distribution network planning and configuration methods suffer from high investment costs and low operating efficiency due to a lack of coordination between equipment and line planning, making it difficult to achieve efficient consumption of new energy and economical system operation under resource constraints.

Method used

By acquiring the equipment parameters, source load parameters, and network topology parameters of the distribution network, an objective function is constructed with the joint planning of SOPs, tie switches, and lines as the optimization object. Combining physical structure, equipment operation, electrical performance, and network reconfiguration constraints, the planning model is iteratively solved to output a configuration scheme, including the location and capacity of new SOP devices, the location of tie switches, and the path of new lines.

Benefits of technology

It enables collaborative planning of multiple devices, improves the accuracy of regulation, breaks through the limitations of traditional extensive topology reconstruction, optimizes investment economy and operating efficiency, and enhances the capacity for new energy consumption and system stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120934105A_ABST
    Figure CN120934105A_ABST
Patent Text Reader

Abstract

The invention discloses a flexible interconnection configuration method and system for a power distribution network frame, a medium and equipment, and belongs to the technical field of power distribution network planning of an electric power system, and the method comprises the steps: obtaining an equipment parameter, a source load parameter and a network topology parameter of a current power distribution network; based on the equipment parameters, the source load parameters and the network topology parameters, taking the joint planning of SOP, interconnection switches and lines as an optimization object, taking the lowest comprehensive equiannual value cost of an investment scheme as a target, constructing a target function, and combining a physical structure constraint, an equipment operation constraint, an electrical performance constraint and a network reconstruction constraint to construct a planning model; and iteratively solving the planning model, and outputting a configuration scheme for power distribution network reconstruction. Therefore, by implementing the method, the problems of high investment cost, low operation efficiency and difficulty in realizing efficient consumption of new energy and economic operation of the system under resource constraints caused by lack of cooperation of equipment and line planning in a power distribution network planning configuration method in the prior art can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power system distribution network planning technology, and relates to a flexible interconnection configuration method, system, medium and equipment for distribution network structure. Background Technology

[0002] With the increasing penetration rate of new energy power generation and new DC loads, the distribution network is gradually evolving into a complex form of AC / DC hybrid and source-load-storage synergy. The large-scale integration of distributed photovoltaic, energy storage devices, and DC power equipment places higher demands on the distribution network's flexible adjustment capabilities, the level of local consumption of new energy, and asset utilization efficiency. Against this backdrop, optimizing network topology and power flow distribution through flexible interconnection technology has become a key direction for improving the economic efficiency and stability of distribution network operation.

[0003] The existing distribution network mainly relies on traditional expansion and renovation approaches to cope with changes in power sources and loads. This involves increasing capacity by adding new lines or upgrading equipment, resulting in wasted line and equipment resources, low asset utilization efficiency, and difficulty in adapting to load rate differences caused by uneven spatial and temporal distribution of distributed power sources. Traditional tie switches and sectionalizing switches can only achieve extensive topology reconfiguration and cannot precisely regulate power flow between feeders to match fluctuations in renewable energy output. At the same time, the coordination between lines, switches, and power electronic equipment (such as SOPs) is insufficient under the phased planning model. In scenarios with limited corridor resources, it is difficult to break through the adjustment boundaries of individual devices, resulting in limited system operating economy and renewable energy absorption capacity. Summary of the Invention

[0004] This application provides a flexible interconnection configuration method, system, medium, and equipment for a distribution network, which can solve the problems of high investment costs, low operating efficiency, and difficulty in achieving efficient consumption of new energy and economical system operation under resource constraints in the existing distribution network planning and configuration methods due to the lack of coordination between equipment and line planning.

[0005] To achieve the above objectives, in a first aspect, the present invention provides a method for flexible interconnection configuration of a power distribution network, comprising:

[0006] Obtain the current equipment parameters, source load parameters, and network topology parameters of the distribution network; wherein, the equipment parameters include: line parameters, SOP device parameters, and tie switch parameters;

[0007] Based on the equipment parameters, source load parameters, and network topology parameters, the joint planning of SOP, tie switches, and lines is taken as the optimization object, and the goal is to minimize the comprehensive annual cost of the investment scheme. An objective function is constructed, and a planning model is constructed by combining physical structure constraints, equipment operation constraints, electrical performance constraints, and network reconfiguration constraints.

[0008] The planning model is solved iteratively to output a configuration scheme for power distribution network transformation; wherein, the configuration scheme includes: determining the location and capacity of the new SOP device, the location layout of the tie switch, and the design of the route of the new line.

[0009] Compared with existing technologies, the embodiments of this application have the following beneficial effects: By acquiring equipment parameters such as lines, SOP devices, and tie switches, as well as source load and topology data, comprehensive data support is provided for multi-device collaborative planning; taking the joint planning of SOPs, tie switches, and lines as the optimization object, the limitations of traditional step-by-step planning in terms of collaboration are overcome, and the problem of limited adjustment boundaries of single devices is solved; an objective function is constructed with the goal of minimizing the comprehensive equivalent annual cost, achieving a balance between investment economy and operating efficiency; combining physical structure, equipment operation, electrical performance, and network reconfiguration constraints, the planning scheme is ensured to operate safely and stably in complex scenarios; by iteratively solving and outputting configuration schemes including SOP locations and capacities, tie switch locations, and newly built lines, the accuracy of regulation is improved to match the fluctuations in renewable energy output; finally, through the synergistic effect of multi-device joint optimization and precise regulation, the problem that traditional extensive topology reconfiguration cannot adapt to renewable energy fluctuations is effectively solved, and at the same time, the adjustment boundaries of single devices can be broken through in scenarios with limited corridor resources, improving the system's operating economy and renewable energy absorption capacity.

[0010] In some embodiments of the first aspect of this application, constructing an objective function with the goal of minimizing the comprehensive equivalent annual cost of the investment plan includes:

[0011] Using SOP planning investment cost, tie switch planning investment cost, line expansion planning cost, SOP operation and maintenance cost, tie switch operation cost, energy storage operation and maintenance cost, demand response cost, network loss and SOP loss cost, and electricity purchase and sale cost as decision variables, and aiming to minimize the comprehensive equivalent annual cost of the investment plan, an objective function is constructed as follows:

[0012]

[0013] in, C DR C loss and C buy -C sell These represent the investment costs for SOP planning, tie switch planning, line expansion planning, SOP operation and maintenance, tie switch operation, energy storage operation and maintenance, demand response, network loss and SOP loss, and electricity purchase and sale costs, respectively.

[0014] Compared with existing technologies, the above embodiments have the following beneficial effects: using SOP planning investment cost, tie switch planning investment cost, line expansion planning cost, SOP operation and maintenance cost, tie switch operation cost, energy storage operation and maintenance cost, demand response cost, network loss and SOP loss cost, and electricity purchase and sale cost as decision variables, an objective function is constructed, and the optimization objective of minimizing the comprehensive equivalent annual cost is achieved by quantifying various costs; each cost parameter in the formula corresponds to the investment and operation costs of different equipment, and the comprehensiveness and accuracy of cost assessment are ensured through itemized calculation and integration.

[0015] In some embodiments of the first aspect of this application, the physical structure constraints include: line construction status constraints, SOP installation constraints, tie switch installation location constraints, and network topology constraints;

[0016] The constraints on the newly constructed line status include:

[0017] SOP installation constraints include:

[0018] The constraints on the installation location of the tie switch include:

[0019] Network topology constraints include:

[0020]

[0021] in, Ψ indicates whether there is a connecting line between nodes i and j. line This represents the set of candidate locations for the extended route. This indicates the number of SOP units installed between nodes i and j. Indicates the maximum number of SOP units that can be installed. Indicates unit SOP capacity, Ψ represents the total SOP capacity between nodes i and j. sop This represents the candidate set of SOP construction locations. Indicates whether a new connection switch is established between nodes i and j, Ψ switch This represents the set of candidate locations for the construction of the interconnecting switch. Indicates whether a new SOP device is created between nodes i and j, Ψ node Let β represent the set of nodes in the distribution network. ij,t β represents the parent-child relationship between node i and node j at time t. ji,t This represents the parent-child relationship between node j and node i at time t. and Ψ represents the connectivity status of the line between nodes i and j at time t. load Ψ represents the set of locations where loads are connected. sta This represents the set of substation nodes.

[0022] Compared with existing technologies, the above embodiments have the following beneficial effects: the line construction status constraint controls whether the line is expanded through 0-1 variables, avoiding redundant construction and resource waste; the SOP installation constraint ensures that the SOP deployment matches the system requirements by limiting the number and capacity of units; the tie switch installation location constraint clarifies the switch construction node through 0-1 variables, optimizing the network topology; and the network topology constraint ensures the rationality of the network structure and operational safety by limiting the coexistence relationship between lines, switches, and SOPs.

[0023] In some embodiments of the first aspect of this application, the equipment operation constraints include: SOP operation constraints, energy storage operation constraints, node voltage constraints, branch current constraints, and tie switch operation count constraints;

[0024] The SOP operating constraints include:

[0025] Energy storage operation constraints include:

[0026]

[0027]

[0028] Node voltage constraints include:

[0029] Branch current constraints include:

[0030] The constraints on the number of times the handshake switch can be activated include:

[0031] in, and Let represent the active power transmitted by nodes i and j through the SOP port at time t, respectively. and η represents the power loss of the SOP ports connected to nodes i and j at time t, respectively. sop This represents the loss factor of SOP. and Let represent the reactive power transmitted by nodes i and j through the SOP port at time t, respectively. This represents the total SOP capacity between nodes i and j. and Let represent the charging and discharging power of energy storage node i at time t, respectively. and These represent the maximum charging and discharging power of the energy storage, Indicates the upper limit of energy storage capacity. This represents the amount of energy stored at energy storage node i at time t. and V represents the battery loss coefficient, charging loss coefficient, and discharging loss coefficient of energy storage, respectively. i,t Let represent the voltage at node i at time t. and Let I′ represent the minimum and maximum voltage values ​​at node i, respectively. ij,t Let represent the square of the current value of branch ij at time t. Let be the square of the maximum current in branch ij. The maximum number of times the interlock switch operates within period T.

[0032] Compared with existing technologies, the above embodiments have the following beneficial effects: SOP operation constraints achieve precise power flow control and minimize losses through power balance equations and capacity limits; energy storage operation constraints optimize energy storage system scheduling and improve the capacity for renewable energy absorption through charging and discharging power and power limits; node voltage constraints ensure that the voltage is stable within a safe range and avoid equipment overload; branch current constraints ensure line operation safety through the correlation between on / off states and current limits; tie switch operation frequency constraints limit the operation frequency within a cycle, reducing switch losses and maintenance costs.

[0033] In some embodiments of the first aspect of this application, the electrical performance constraints include: voltage drop constraints taking into account network reconfiguration, as well as power flow constraints and power balance constraints;

[0034] The voltage drop constraint considering network reconstruction includes:

[0035]

[0036]

[0037] The power flow constraints and power balance constraints include:

[0038]

[0039]

[0040]

[0041]

[0042]

[0043] Where, rij and x ij Let be the resistance and reactance values ​​of branch ij, respectively. V represents the square of the current between branches ij at time t, where M is an infinite number. i,u,t and V j,u,t P represents the voltage drop across branches iu and ju at time t, respectively. ij,t and Q ij,t Let I′ be the active power and reactive power on branch ij at time t. ki,t Let be the square of the current value of branch ki at time t. and Let Ψ represent the injected active power and reactive power at node i at time t, respectively. N Let represent the set of all nodes, and let κ(i) and ρ(i) represent the set of child nodes and the set of parent nodes of node i, respectively. and These represent the active power and reactive power injected into the substation, respectively. and Let represent the load power demand and distributed power output of node i at time t, respectively. This represents the demand response reduction of the load connected to node i at time t. This represents the amount of renewable energy reduction at node i at time t. This represents the reactive power demand of the load connected to node i at time t.

[0044] Compared with existing technologies, the above embodiments have the following advantages: the voltage drop constraint considering network reconfiguration introduces an infinite coefficient to flexibly adjust the voltage constraint range when the network topology changes, adapting to dynamic operating scenarios; the power flow constraint and power balance constraint ensure the balance of power supply and demand in the system through the correlation equation between node injected power and branch power; in the formula, injected active power and reactive power respectively quantify the power input and output of the node, and achieve precise power flow control through sub-item calculations (such as distributed power output, load demand, etc.).

[0045] In some embodiments of the first aspect of this application, the network reconstruction constraints include:

[0046] Where, N node and N sta These represent the number of nodes and substations, respectively.

[0047] Compared with the prior art, the above embodiments have the following beneficial effects: the network reconfiguration constraint ensures that the network topology is a connected and loop-free structure by the sum of the on / off states of lines and switches being equal to the difference in the number of nodes and substations, thus guaranteeing the stability and reliability of system operation.

[0048] In some embodiments of the first aspect of this application, the iterative solution of the planning model to output a configuration scheme for power distribution network transformation includes:

[0049] Based on the second-order cone relaxation method, the planning model is transformed into a linear cone programming model;

[0050] The linear cone programming model is iteratively solved using a mixed-integer second-order cone programming method to output the configuration scheme.

[0051] Compared with existing technologies, the above embodiments have the following advantages: the planning model is transformed into a linear cone programming model based on the second-order cone relaxation method, which reduces the solution complexity of nonlinear problems; the model solution efficiency and convergence are improved by iteratively solving the mixed-integer second-order cone programming method, ensuring the economy and feasibility of the configuration scheme.

[0052] Secondly, the present invention also provides a flexible interconnection configuration system for a power distribution network, comprising: a data acquisition module, a model building module, and a result output module;

[0053] The data acquisition module is used to acquire the equipment parameters, source load parameters, and network topology parameters of the current power distribution network; wherein the equipment parameters include: line parameters, SOP device parameters, and tie switch parameters;

[0054] The model building module is used to construct an objective function based on the equipment parameters, source load parameters, and network topology parameters, taking the joint planning of SOP, tie switches, and lines as the optimization object, and aiming at the lowest comprehensive annual cost of the investment plan. It also constructs a planning model by combining physical structure constraints, equipment operation constraints, electrical performance constraints, and network reconfiguration constraints.

[0055] The result output module is used to iteratively solve the planning model and output a configuration scheme for power distribution network transformation; wherein, the configuration scheme includes: determining the location and capacity of the new SOP device, the location layout of the tie switch, and the design of the new line route.

[0056] Compared with existing technologies, the above embodiments of this application have the following beneficial effects: By acquiring equipment parameters such as lines, SOP devices, and tie switches, as well as source load and topology data, comprehensive data support is provided for multi-device collaborative planning; taking the joint planning of SOPs, tie switches, and lines as the optimization object, the limitations of traditional step-by-step planning in terms of collaboration are overcome, and the problem of limited adjustment boundaries of single devices is solved; an objective function is constructed with the goal of minimizing the comprehensive equivalent annual cost, achieving a balance between investment economy and operating efficiency; combining physical structure, equipment operation, electrical performance, and network reconfiguration constraints, the planning scheme is ensured to operate safely and stably in complex scenarios; by iteratively solving and outputting configuration schemes including SOP locations and capacities, tie switch locations, and newly built lines, the accuracy of regulation is improved to match the fluctuations in renewable energy output; finally, through the synergistic effect of multi-device joint optimization and precise regulation, the problem that traditional extensive topology reconfiguration cannot adapt to renewable energy fluctuations is effectively solved, and at the same time, the adjustment boundaries of single devices can be broken through in scenarios with limited corridor resources, improving the system's operating economy and renewable energy absorption capacity.

[0057] Thirdly, the present invention also provides a flexible interconnection configuration device for a power distribution network, including a memory, a processor, and a computer program stored in the memory and executable on the processor. When the computer program is loaded onto the processor, it implements the steps of any of the flexible interconnection configuration methods for power distribution networks of the present invention.

[0058] Fourthly, embodiments of this application also provide a computer-readable storage medium storing a computer program that, when executed by a processor, implements the steps of any of the flexible interconnection configuration methods for power distribution network structures of the present invention. Attached Figure Description

[0059] Figure 1 This is a flowchart illustrating a flexible interconnection configuration method for a power distribution network structure provided in some embodiments of the present invention.

[0060] Figure 2 This is a schematic diagram of a flexible interconnection configuration system for a power distribution network provided in some embodiments of the present invention.

[0061] Figure 3 This is a structural diagram of a flexible interconnection configuration device for a power distribution network provided in some embodiments of the present invention.

[0062] Figure 4 This is a schematic diagram of a power distribution network structure provided in some embodiments of the present invention.

[0063] Figure 5 : These are diagrams showing the results of three planning configurations provided in some embodiments of the present invention.

[0064] Figure 6 : This is a network structure diagram of a planning configuration provided in some embodiments of the present invention.

[0065] Figure 7 : This is a network structure diagram of another planning configuration provided in some embodiments of the present invention.

[0066] Figure 8 This is a network structure diagram of another planning configuration provided in some embodiments of the present invention.

[0067] Figure 9 This is a cost diagram illustrating three planning configurations provided in some embodiments of the present invention. Detailed Implementation

[0068] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0069] In the early stages of grid development, the proportion of DC renewable energy generation and DC power load was not high. The interconnection devices in the distribution network were mainly interconnection switches and sectionalizing switches. Interconnection switches were mainly located between main feeders, substations, or branch lines, while sectionalizing switches were generally placed between multiple sections of the line. The distribution network can change the topology of the distribution network by changing the operating state of interconnection switches and sectionalizing switches in the network, thereby optimizing the power flow distribution of the distribution network. The optimization goals are load balance, network loss, and voltage quality of the entire network, so that the distribution network can operate in the optimal state.

[0070] In the intermediate stage of power grid development, as the proportion of new energy sources, new loads, and energy storage gradually increases, the traditional distribution network structure regulated by distribution switches can no longer meet the needs of new energy integration. The load distribution of the entire distribution network will become more uneven, at which point the focus will shift to the flexible transformation of the distribution network. Specifically, new power electronic devices, including flexible multi-state switches, are gradually being piloted in the distribution network to replace traditional distribution switches, achieving flexible transformation of the distribution network, significantly improving the power flow control capability between feeders, and significantly enhancing system flexibility.

[0071] In the advanced stage of grid development, new energy power generation, new DC loads, and new energy storage have been basically completed. The large-scale access of these resources has brought multiple challenges to the system, such as high proportion of new energy consumption, complex network structure optimization, and limited corridor resource constraints.

[0072] However, with the increasing volatility of renewable energy output, traditional tie switches can only perform coarse-grained power flow regulation through topology reconfiguration. In contrast, SOPs, as a new type of power electronic device, can precisely control active and reactive power between feeders, dynamically matching real-time fluctuations in renewable energy. However, multi-terminal access to SOPs requires a closed-loop line structure to provide physical channels, while the deployment of tie switches needs to coordinate with SOPs to create flexible power supply zones. This "SOP dynamic adjustment + tie switch network reconfiguration" approach expands the renewable energy absorption range. Simultaneously, under conditions of limited corridor resources, line planning needs to construct multi-feeder closed-loop or gridded topologies to support a wider range of SOP regulation. Tie switches need to be installed at key nodes to assist SOPs in achieving cross-regional power support. For example, SOPs should be prioritized in areas with high renewable energy penetration. By optimizing line impedance to shorten the electrical distance for renewable energy grid connection, using tie switches to reduce line load imbalance, and using SOPs to suppress reactive circulating current, the combined effect of these three factors can overcome the limitations of a single device's regulation, exponentially increasing the system's regulation capacity within a limited space. Furthermore, facing the increasing demand for AC / DC hybrid connections due to the rising proportion of DC loads and energy storage, the Standard Operating Procedure (SOP) needs to act as an "energy router" to enable plug-and-play access to various energy forms. This requires reserved DC channels in the lines and tie switches to support flexible AC / DC segmentation. The SOP also needs to be compatible with energy sharing across multiple voltage levels. The deep synergy among these three elements in terms of spatial layout and functional coupling forms the foundation for building a highly resilient distribution network. At a deeper level, joint planning achieves this through the organic integration of "carrier-skeleton-core": the lines, as power transmission carriers, determine the physical boundaries of flexible regulation; the tie switches, as the network skeleton, support reconfigurability; and the SOP, as the core controller, enables precise power flow control. The complementary functions of these three elements can simultaneously ensure system stability and economy, avoiding the fragmentation of regulation or stability risks caused by phased planning. Ultimately, this achieves the optimal operating goal of safety, low carbon emissions, and high efficiency under the conditions of high penetration of new energy sources and tight resource constraints.

[0073] Therefore, this application proposes the following solutions to address the current advanced stage requirements:

[0074] Example 1:

[0075] Please refer to Figure 1 To address the problems of high investment costs, low operating efficiency, and difficulty in achieving efficient renewable energy consumption and economical system operation under resource constraints caused by the lack of coordination between equipment and line planning in existing power distribution network planning and configuration methods, an embodiment of the present invention provides a flexible interconnection configuration method for power distribution network, including steps S1 to S3:

[0076] Step S1: Obtain the current distribution network equipment parameters, source load parameters, and network topology parameters; wherein, the equipment parameters include: line parameters, SOP device parameters, and tie switch parameters.

[0077] In practical implementation, the equipment parameters should also include: energy storage equipment parameters; the source-load parameters should include: distributed power source parameters, load parameters, and power purchase and sale parameters; and the network topology parameters should include: existing line topology and candidate planning space.

[0078] Step S2: Based on the equipment parameters, source load parameters, and network topology parameters, take the joint planning of SOP, tie switches, and lines as the optimization object, and aim at minimizing the comprehensive annual cost of the investment scheme. Construct an objective function, and combine it with physical structure constraints, equipment operation constraints, electrical performance constraints, and network reconfiguration constraints to build a planning model.

[0079] Furthermore, step S2, in constructing the objective function, can be implemented through the following preferred embodiments, as detailed below:

[0080] Using SOP planning investment cost, tie switch planning investment cost, line expansion planning cost, SOP operation and maintenance cost, tie switch operation cost, energy storage operation and maintenance cost, demand response cost, network loss and SOP loss cost, and electricity purchase and sale cost as decision variables, and aiming to minimize the comprehensive equivalent annual cost of the investment plan, an objective function is constructed as follows:

[0081]

[0082] in, C DR C loss and C buy -C sell These represent the investment costs for SOP planning, tie switch planning, line expansion planning, SOP operation and maintenance, tie switch operation, energy storage operation and maintenance, demand response, network loss and SOP loss, and electricity purchase and sale costs, respectively.

[0083] In practical implementation, the above-mentioned costs can be represented as follows:

[0084] Among them, the investment cost of SOP planning is:

[0085] Interconnection switch planning investment cost:

[0086] Route expansion planning costs:

[0087] SOP operation and maintenance costs:

[0088] Cost of operating the interlock switch:

[0089]

[0090] Energy storage operation and maintenance costs:

[0091]

[0092] Demand response cost:

[0093] Network loss and SOP loss costs:

[0094] Electricity purchase and sales costs:

[0095]

[0096]

[0097] Where, τ sop τ switch and τ line Ψ represents the annualized value coefficients for SOP, tie switches, and lines, respectively. SOP Ψ Switch Ψ line Ψ ess Ψ represents the candidate sets of expanded construction locations for SOP, tie switches, lines, and energy storage, respectively. load Ψ b and Ψ node Let c represent the set of load access locations, the set of branches, and the set of nodes, respectively. sop c switch and c line These represent the planning costs of SOP, tie switch, and line, respectively. DR c represents the unit cost of demand response. loss c represents the unit cost of network loss and SOP loss. buy and c sell This represents the unit cost of purchasing and selling electricity. and These represent the unit maintenance cost related to the energy consumption and the unit maintenance cost related to the power consumption of the energy storage device, respectively. This indicates the SOP capacity between access nodes ij. The variable is 0-1. If it is 1, it means that a connection switch has been newly established between nodes ij. These are variables ranging from 0 to 1. A value of 1 indicates that there is a connecting line between nodes ij, and the length of the extended planned line is L. ij r is the discount rate, b xThe service life of equipment x, where x is the equipment type, including SOPs, tie switches, and lines, τ x λ represents the annual value coefficient of equipment x. sop and λ switch These are the annual operation and maintenance cost coefficients for SOP and tie switches, respectively. This indicates the on / off state of the connection switch between nodes ij at time t, where 0 represents open, 1 represents closed, and T represents the period. and Let represent the energy stored at node i at time t, and their charging and discharging power, respectively. and These are the loss coefficients during energy storage charging and discharging, respectively. This represents the demand response reduction of the load connected to node i at time t. and r ij Let represent the square of the current and the resistance between branches ij at time t, respectively. This represents the power loss at the SOP port connected to node i at time t. and Let be the load power demand and distributed power output of node i at time t, respectively. This represents the amount of renewable energy reduction at node i at time t.

[0098] In this preferred embodiment, the investment cost of SOP planning, the investment cost of tie switch planning, the cost of line expansion planning, the cost of SOP operation and maintenance, the cost of tie switch operation, the cost of energy storage operation and maintenance, the cost of demand response, the cost of network loss and SOP loss, and the cost of purchasing and selling electricity are used as decision variables to construct an objective function. By quantifying each cost, the optimization objective of minimizing the comprehensive equivalent annual cost is achieved. Each cost parameter in the formula corresponds to the investment and operating costs of different equipment. Through itemized calculation and integration, the comprehensiveness and accuracy of the cost assessment are ensured.

[0099] Furthermore, the physical structure constraints include: line construction status constraints, SOP installation constraints, tie switch installation location constraints, and network topology constraints;

[0100] The constraints on the newly constructed line status include:

[0101] SOP installation constraints include:

[0102] The constraints on the installation location of the tie switch include:

[0103] Network topology constraints include:

[0104]

[0105] in, This indicates whether there is a connecting line between nodes i and j. If it is 1, it means that the line between nodes i and j has been extended. line This represents the set of candidate locations for the extended route. This indicates the number of SOP units installed between nodes i and j. Indicates the maximum number of SOP units that can be installed. Indicates unit SOP capacity, Ψ represents the total SOP capacity between nodes i and j. sop This represents the candidate set of SOP construction locations. Indicates whether a new connection switch is established between nodes i and j, Ψ switch This represents the set of candidate locations for the construction of the interconnecting switch. Indicates whether a new SOP device is created between nodes i and j, Ψ node Let β represent the set of nodes in the distribution network. ij,t This represents the parent-child relationship between node i and node j at time t, where β is 1 if node i is the parent node of node j, and 0 otherwise. ji,t This represents the parent-child relationship between node j and node i at time t. and These represent the connectivity status of the line between nodes i and j at time t, where 1 indicates connectivity and 0 indicates disconnection. load Ψ represents the set of locations where loads are connected. sta This represents the set of substation nodes.

[0106] In this preferred embodiment, the line construction status constraint controls whether the line is expanded through 0-1 variables to avoid redundant construction and resource waste; the SOP installation constraint ensures that the SOP deployment matches the system requirements by limiting the number and capacity of units; the tie switch installation location constraint clarifies the switch construction node through 0-1 variables to optimize the network topology; and the network topology constraint ensures the rationality of the network structure and the operational security by limiting the coexistence relationship between lines, switches and SOPs (i.e., lines, tie switches and SOPs are not redundantly constructed).

[0107] Furthermore, the equipment operation constraints include: SOP operation constraints, energy storage operation constraints, node voltage constraints, branch current constraints, and tie switch operation count constraints;

[0108] The SOP operating constraints include:

[0109] Energy storage operation constraints include:

[0110]

[0111]

[0112] Node voltage constraints include:

[0113] Branch current constraints include:

[0114] The constraints on the number of times the handshake switch can be activated include:

[0115] in, and Let represent the active power transmitted by nodes i and j through the SOP port at time t, respectively. and η represents the power loss of the SOP ports connected to nodes i and j at time t, respectively. sop This represents the loss factor of SOP. and Let represent the reactive power transmitted by nodes i and j through the SOP port at time t, respectively. This represents the total SOP capacity between nodes i and j. and Let represent the charging and discharging power of energy storage node i at time t, respectively. and These represent the maximum charging and discharging power of the energy storage, Indicates the upper limit of energy storage capacity. This represents the amount of energy stored at energy storage node i at time t. and V represents the battery loss coefficient, charging loss coefficient, and discharging loss coefficient of energy storage, respectively. i,t Let represent the voltage at node i at time t. and Let I′ represent the minimum and maximum voltage values ​​at node i, respectively. ij,t Let represent the square of the current value of branch ij at time t. Let be the square of the maximum current in branch ij. The maximum number of times the interlock switch operates within period T.

[0116] In this preferred embodiment, SOP operation constraints achieve precise power flow control and minimize losses through power balance equations and capacity limits; energy storage operation constraints optimize energy storage system scheduling and improve the capacity for renewable energy absorption through charging and discharging power and energy limits; node voltage constraints ensure that the voltage remains stable within a safe range to avoid equipment overload; branch current constraints ensure line operation safety by associating on / off states with current limits (the meaning of current constraints is that if the branch is connected, the current meets the normal constraints, otherwise the current is 0); tie switch operation frequency constraints limit the frequency of operation within a cycle to reduce switch losses and maintenance costs.

[0117] Furthermore, the electrical performance constraints include: voltage drop constraints considering network reconfiguration, as well as power flow constraints and power balance constraints;

[0118] The voltage drop constraint considering network reconstruction includes:

[0119]

[0120]

[0121] The power flow constraints and power balance constraints include:

[0122]

[0123]

[0124]

[0125]

[0126]

[0127] Where, r ij and x ij Let be the resistance and reactance values ​​of branch ij, respectively. Let V represent the square of the current between branches ij at time t, where M is an infinite number. If network reconfiguration causes the original line to disconnect, the voltage drop between the two nodes will be greater than or equal to negative infinity and less than or equal to positive infinity, and can be any number. Otherwise, the voltage drop condition satisfies the conventional constraints. i,u,t and V j,u,t P represents the voltage drop across branches iu and ju at time t, respectively. ij,t and Q ij,t Let I′ be the active power and reactive power on branch ij at time t. ki,t Let be the square of the current value of branch ki at time t. and Let Ψ represent the injected active power and reactive power at node i at time t, respectively.N Let represent the set of all nodes, and let κ(i) and ρ(i) represent the set of child nodes and the set of parent nodes of node i, respectively. and These represent the active power and reactive power injected into the substation, respectively. and Let represent the load power demand and distributed power output of node i at time t, respectively. This represents the demand response reduction of the load connected to node i at time t. This represents the amount of renewable energy reduction at node i at time t. This represents the reactive power demand of the load connected to node i at time t.

[0128] In this preferred embodiment, the voltage drop constraint considering network reconfiguration introduces an infinite coefficient to flexibly adjust the voltage constraint range when the network topology changes, adapting to dynamic operating scenarios; the power flow constraint and power balance constraint ensure the system power supply and demand balance through the correlation equation between node injected power and branch power; in the formula, injected active power and reactive power respectively quantify the power input and output of the node, and achieve precise power flow control through sub-item calculations (such as distributed power output, load demand, etc.).

[0129] Furthermore, the network reconstruction constraints include:

[0130] Where, N node and N sta These represent the number of nodes and substations, respectively.

[0131] In this preferred embodiment, the network reconfiguration constraint ensures that the network topology is a connected and loop-free structure by ensuring that the sum of the on / off states of lines and switches equals the difference between the number of nodes and substations, thus guaranteeing the stability and reliability of system operation.

[0132] Step S3: Iteratively solve the planning model and output a configuration scheme for power distribution network transformation; wherein, the configuration scheme includes: determining the location and capacity of the new SOP device, the location layout of the tie switch, and the design of the new line route.

[0133] Furthermore, step S3, during the iterative solution process, can be implemented using the following preferred embodiments, including steps S31-S32, as detailed below:

[0134] S31: Based on the second-order cone relaxation method, the planning model is converted into a linear cone programming model;

[0135] S32: Based on the mixed integer second-order cone programming method, the linear cone programming model is iteratively solved to output the configuration scheme.

[0136] After constructing the model, due to the presence of numerous large-scale continuous and integer variables in the decision variables, and the inclusion of many quadratic and nonlinear constraints, existing commercial solvers such as CPLEX struggle to address these issues. To resolve this, this method transforms the model into a linear cone programming problem using model transformation and second-order cone relaxation techniques, and then solves it using a mixed-integer second-order cone programming approach. The transformed expression is as follows:

[0137] ||[2P ij,t 2Q ij,t I' ij,t -V i,t ] T ||2≤I′ ij,t +V i,t This formula is used to replace the fifth formula in the power flow constraint and power balance constraint, that is:

[0138] This formula is used to replace the third formula in the SOP execution constraints, that is:

[0139] By replacing the corresponding expressions in the original model with the above expressions, we can obtain the final mathematical model of the planning problem, which is a mixed integer second-order cone programming problem that can be solved using the CPLEX solver.

[0140] In this preferred embodiment, the planning model is converted into a linear cone programming model based on the second-order cone relaxation method, which reduces the solution complexity of the nonlinear problem; the model solution efficiency and convergence are improved by iteratively solving the problem using the mixed-integer second-order cone programming method, ensuring the economy and feasibility of the configuration scheme.

[0141] In summary, compared with the prior art, the above embodiments of this application have the following beneficial effects: by acquiring equipment parameters such as lines, SOP devices, and tie switches, as well as source load and topology data, comprehensive data support is provided for multi-device collaborative planning; taking the joint planning of SOPs, tie switches, and lines as the optimization object, the limitations of traditional step-by-step planning in terms of collaboration are overcome, and the problem of limited adjustment boundaries of single devices is solved; an objective function is constructed with the goal of minimizing the comprehensive equivalent annual cost, achieving a balance between investment economy and operating efficiency; by combining physical structure, equipment operation, electrical performance, and network reconfiguration constraints, the planning scheme is ensured to operate safely and stably in complex scenarios; by iteratively solving and outputting configuration schemes including SOP locations and capacities, tie switch locations, and newly built lines, the accuracy of regulation is improved to match the fluctuations in renewable energy output; finally, through the synergistic effect of multi-device joint optimization and precise regulation, the problem that traditional extensive topology reconfiguration cannot adapt to renewable energy fluctuations is effectively solved, and at the same time, the adjustment boundaries of single devices can be broken through in scenarios with limited corridor resources, improving the system's operating economy and renewable energy absorption capacity.

[0142] To verify the rationality of this method, an experiment was conducted using a 10kV distribution network in a certain area as a case study:

[0143] like Figure 4 The diagram shows a power distribution network structure. The current power distribution network includes 3 substations and 47 source-load nodes. In the diagram, blue nodes represent newly added source-load nodes, solid lines represent existing lines, dashed lines represent candidate sets of lines to be built, and red lines represent candidate installation lines for SOPs and tie switches.

[0144] This example sets up three planning scenarios and performs planning calculations using the method described in this case. After calculation, the comparison results of the three planning schemes are shown as follows. Figure 5 The diagrams shown depict the three planning configurations, with the three planning methods being:

[0145] 1. Consider the line expansion plan for SOP and tie switch;

[0146] Second: Only consider the route expansion plan of the SOP;

[0147] 3. Line expansion planning only considering the interconnection switch.

[0148] After the planning is completed, the power distribution network will be configured and upgraded. The configuration and upgrade process will be referenced later. Figure 6 , Figure 7 and Figure 8 The network diagrams shown for the three planning configurations correspond to Planning Scheme 1, Planning Scheme 2, and Planning Scheme 3, respectively. The costs for each of the three planning configurations can be found in the reference diagrams. Figure 9 The diagram shows the costs associated with the three planning configurations. From the diagram, we can see that:

[0149] The annual investment cost for the new line, SOP, and tie switch in Scheme 1 is RMB 1,526,400 (i.e., RMB 1,315,300 + RMB 199,600 + RMB 11,500). The annual investment costs for various equipment in Schemes 2 and 3 are RMB 1,565,000 and RMB 1,511,300, respectively. Scheme 2 has the highest annual investment cost, while Scheme 3 has the lowest. The operational revenue for the three schemes is RMB 50,977,800, RMB 51,008,900, and RMB 48,570,700, respectively. Scheme 2 has the highest simulated operational revenue, while Scheme 3 has the lowest. Overall, the line expansion plan Scheme 1, which considers the SOP and tie switch, has a higher annual comprehensive revenue than Schemes 2 and 3, which only consider the SOP or tie switch. The annual comprehensive revenue of Scheme 1 is RMB 11,800 and RMB 2,390,300 higher than that of Schemes 2 and 3, respectively, representing an increase of more than 5% compared to Scheme 3.

[0150] Option 2 achieved full utilization of renewable energy. The penalty costs for wind and solar curtailment in Option 1 and Option 3 were RMB 25,100 and RMB 180,600, respectively, indicating that Option 1 and Option 2 achieved better renewable energy utilization than Option 3. Furthermore, compared to Option 3, Option 1 and Option 2 increased annual electricity purchase and sale revenue by RMB 1,329,200 and RMB 1,333,500, respectively, while reducing grid losses and SOP (Standard Operating Procedure) losses by RMB 754,400 and RMB 761,300, respectively, demonstrating the role of SOPs in operation.

[0151] Option 2 has a 2.5% higher annual investment cost than Option 1, but its operating revenue is only 0.6% higher than Option 1. This demonstrates the economic advantage of tie switches. In some cases, due to the limitation of SOP unit capacity installation cost, tie switches are more economical.

[0152] In summary, the total investment costs (in ten thousand yuan) for the three schemes are 1027.72, 1028.9, and 1134, respectively, and the total revenues (in ten thousand yuan) are 10901.04, 10900.29, and 10529.09, respectively. That is, Scheme 1 has lower investment costs than Schemes 2 and 3, but higher revenues, even significantly higher than Scheme 2. This indicates that the line expansion scheme, which simultaneously introduces tie switch variables and SOPs, not only does not linearly increase costs as "generally believed," but also reduces total investment through synergy. The combination of these two elements also triggers a much higher-than-expected revenue surge. In other words, Scheme 1's joint planning achieves a sharp reduction in investment costs and a leap in overall revenue with only a negligible loss in grid connection rate (i.e., a curtailment penalty of 25,100 yuan). Therefore, the combined planning approach of line + tie switch + SOP results in a synergistic effect of cost reduction and increased revenue that far exceeds the effects of some existing single-device planning methods or step-by-step planning, demonstrating the effectiveness, practicality and ingenuity of the proposed solution.

[0153] Example 2:

[0154] Please refer to Figure 2 Based on the same inventive concept, the present invention discloses a flexible interconnection configuration system for a power distribution network, comprising: a data acquisition module M1, a model building module M2, and a result output module M3;

[0155] The data acquisition module M1 is used to acquire the equipment parameters, source load parameters, and network topology parameters of the current distribution network; wherein the equipment parameters include: line parameters, SOP device parameters, and tie switch parameters.

[0156] The model building module M2 is used to construct an objective function based on the equipment parameters, source load parameters, and network topology parameters, taking the joint planning of SOP, tie switches, and lines as the optimization object, and aiming at minimizing the comprehensive annual cost of the investment scheme. It also constructs a planning model by combining physical structure constraints, equipment operation constraints, electrical performance constraints, and network reconfiguration constraints.

[0157] Furthermore, the model building module M2 constructs the objective function, which can be implemented through the following preferred embodiments, as follows:

[0158] Using SOP planning investment cost, tie switch planning investment cost, line expansion planning cost, SOP operation and maintenance cost, tie switch operation cost, energy storage operation and maintenance cost, demand response cost, network loss and SOP loss cost, and electricity purchase and sale cost as decision variables, and aiming to minimize the comprehensive equivalent annual cost of the investment plan, an objective function is constructed as follows:

[0159]

[0160]

[0161] in, C DR C loss and C buy -C sell These represent the investment costs for SOP planning, tie switch planning, line expansion planning, SOP operation and maintenance, tie switch operation, energy storage operation and maintenance, demand response, network loss and SOP loss, and electricity purchase and sale costs, respectively.

[0162] In this preferred embodiment, the investment cost of SOP planning, the investment cost of tie switch planning, the cost of line expansion planning, the cost of SOP operation and maintenance, the cost of tie switch operation, the cost of energy storage operation and maintenance, the cost of demand response, the cost of network loss and SOP loss, and the cost of purchasing and selling electricity are used as decision variables to construct an objective function. By quantifying each cost, the optimization objective of minimizing the comprehensive equivalent annual cost is achieved. Each cost parameter in the formula corresponds to the investment and operating costs of different equipment. Through itemized calculation and integration, the comprehensiveness and accuracy of the cost assessment are ensured.

[0163] Furthermore, the physical structure constraints include: line construction status constraints, SOP installation constraints, tie switch installation location constraints, and network topology constraints;

[0164] The constraints on the newly constructed line status include:

[0165] SOP installation constraints include:

[0166] The constraints on the installation location of the tie switch include:

[0167] Network topology constraints include:

[0168]

[0169] in, Ψ indicates whether there is a connecting line between nodes i and j. line This represents the set of candidate locations for the extended route. This indicates the number of SOP units installed between nodes i and j. Indicates the maximum number of SOP units that can be installed. Indicates unit SOP capacity, Ψ represents the total SOP capacity between nodes i and j. sop This represents the candidate set of SOP construction locations. Indicates whether a new connection switch is established between nodes i and j, Ψ switch This represents the set of candidate locations for the construction of the interconnecting switch. Indicates whether a new SOP device is created between nodes i and j, Ψ node Let β represent the set of nodes in the distribution network. ij,t β represents the parent-child relationship between node i and node j at time t. ji,t This represents the parent-child relationship between node j and node i at time t. and Ψ represents the connectivity status of the line between nodes i and j at time t. loadΨ represents the set of locations where loads are connected. sta This represents the set of substation nodes.

[0170] In this preferred embodiment, the line construction status constraint controls whether the line is expanded through 0-1 variables to avoid redundant construction and waste of resources; the SOP installation constraint ensures that the SOP deployment matches the system requirements by limiting the number and capacity of units; the tie switch installation location constraint clarifies the switch construction node through 0-1 variables to optimize the network topology; and the network topology constraint ensures the rationality of the network structure and the operational security by limiting the coexistence relationship between lines, switches and SOPs.

[0171] Furthermore, the equipment operation constraints include: SOP operation constraints, energy storage operation constraints, node voltage constraints, branch current constraints, and tie switch operation count constraints;

[0172] The SOP operating constraints include:

[0173] Energy storage operation constraints include:

[0174]

[0175]

[0176] Node voltage constraints include:

[0177] Branch current constraints include:

[0178] The constraints on the number of times the handshake switch can be activated include:

[0179] in, and Let represent the active power transmitted by nodes i and j through the SOP port at time t, respectively. and η represents the power loss of the SOP ports connected to nodes i and j at time t, respectively. sop This represents the loss factor of SOP. and Let represent the reactive power transmitted by nodes i and j through the SOP port at time t, respectively. This represents the total SOP capacity between nodes i and j. and Let represent the charging and discharging power of energy storage node i at time t, respectively. and These represent the maximum charging and discharging power of the energy storage, Indicates the upper limit of energy storage capacity. This represents the amount of energy stored at energy storage node i at time t. and V represents the battery loss coefficient, charging loss coefficient, and discharging loss coefficient of energy storage, respectively. i,t Let represent the voltage at node i at time t. and Let I′ represent the minimum and maximum voltage values ​​at node i, respectively. ij,t Let represent the square of the current value of branch ij at time t. Let be the square of the maximum current in branch ij. The maximum number of times the interlock switch operates within period T.

[0180] In this preferred embodiment, SOP operation constraints achieve precise power flow control and minimize losses through power balance equations and capacity limits; energy storage operation constraints optimize energy storage system scheduling and enhance the absorption capacity of new energy sources through charging and discharging power and power limits; node voltage constraints ensure that the voltage is stable within a safe range and avoid equipment overload; branch current constraints ensure line operation safety through the correlation between on / off states and current limits; and tie switch operation frequency constraints limit the operation frequency within a cycle, reducing switch losses and maintenance costs.

[0181] Furthermore, the electrical performance constraints include: voltage drop constraints considering network reconfiguration, as well as power flow constraints and power balance constraints;

[0182] The voltage drop constraint considering network reconstruction includes:

[0183]

[0184]

[0185] The power flow constraints and power balance constraints include:

[0186]

[0187]

[0188]

[0189]

[0190]

[0191] Where, r ij and x ij Let be the resistance and reactance values ​​of branch ij, respectively. V represents the square of the current between branches ij at time t, where M is an infinite number.i,u,t and V j,u,t P represents the voltage drop across branches iu and ju at time t, respectively. ij,t and Q ij,t Let I′ be the active power and reactive power on branch ij at time t. ki,t Let be the square of the current value of branch ki at time t. and Let Ψ represent the injected active power and reactive power at node i at time t, respectively. N Let represent the set of all nodes, and let κ(i) and ρ(i) represent the set of child nodes and the set of parent nodes of node i, respectively. and These represent the active power and reactive power injected into the substation, respectively. and Let represent the load power demand and distributed power output of node i at time t, respectively. This represents the demand response reduction of the load connected to node i at time t. This represents the amount of renewable energy reduction at node i at time t. This represents the reactive power demand of the load connected to node i at time t.

[0192] In this preferred embodiment, the voltage drop constraint considering network reconfiguration introduces an infinite coefficient to flexibly adjust the voltage constraint range when the network topology changes, adapting to dynamic operating scenarios; the power flow constraint and power balance constraint ensure the system power supply and demand balance through the correlation equation between node injected power and branch power; in the formula, injected active power and reactive power respectively quantify the power input and output of the node, and achieve precise power flow control through sub-item calculations (such as distributed power output, load demand, etc.).

[0193] Furthermore, the network reconstruction constraints include:

[0194] Where, N node and N sta These represent the number of nodes and substations, respectively.

[0195] In this preferred embodiment, the network reconfiguration constraint ensures that the network topology is a connected and loop-free structure by ensuring that the sum of the on / off states of lines and switches equals the difference between the number of nodes and substations, thus guaranteeing the stability and reliability of system operation.

[0196] The result output module M3 is used to iteratively solve the planning model and output a configuration scheme for power distribution network transformation; wherein, the configuration scheme includes: determining the location and capacity of the new SOP device, the location layout of the tie switch, and the design of the new line route.

[0197] Furthermore, the result output module M3 includes: a model conversion unit and a model solving unit;

[0198] The model conversion unit is used to convert the planning model into a linear cone programming model based on the second-order cone relaxation method.

[0199] The model solving unit is used to iteratively solve the linear cone programming model based on the mixed integer second-order cone programming method and output the configuration scheme.

[0200] In this preferred embodiment, the planning model is converted into a linear cone programming model based on the second-order cone relaxation method, which reduces the solution complexity of the nonlinear problem; the model solution efficiency and convergence are improved by iteratively solving the problem using the mixed-integer second-order cone programming method, ensuring the economy and feasibility of the configuration scheme.

[0201] In summary, compared with existing technologies, the embodiments of this application have the following beneficial effects: by acquiring equipment parameters such as lines, SOP devices, and tie switches, as well as source load and topology data, comprehensive data support is provided for multi-device collaborative planning; taking the joint planning of SOPs, tie switches, and lines as the optimization object, the limitations of traditional step-by-step planning in terms of collaboration are overcome, and the problem of limited adjustment boundaries of single devices is solved; an objective function is constructed with the goal of minimizing the comprehensive equivalent annual cost, achieving a balance between investment economy and operating efficiency; by combining physical structure, equipment operation, electrical performance, and network reconfiguration constraints, the safe and stable operation of the planning scheme in complex scenarios is ensured; by iteratively solving and outputting configuration schemes including SOP locations and capacities, tie switch locations, and newly built lines, the accuracy of regulation is improved to match the fluctuations in renewable energy output; finally, through the synergistic effect of multi-device joint optimization and precise regulation, the problem that traditional extensive topology reconfiguration cannot adapt to renewable energy fluctuations is effectively solved, and at the same time, the adjustment boundaries of single devices can be broken through in scenarios with limited corridor resources, improving the system's operating economy and renewable energy absorption capacity.

[0202] Example 3:

[0203] Figure 3 A structural diagram of a flexible interconnection configuration device for a power distribution network structure, as described in this application, is presented. Figure 3 As shown, the flexible interconnection configuration equipment of the power distribution network may include: processor N1, memory N2, data interface N3, and communication bus N4.

[0204] Wherein: processor N1, memory N2, and data interface N3 communicate with each other through communication bus N4; data interface N3 is used for data communication with other devices such as input devices or output devices; processor N1 is used to execute program N5, which can specifically execute the relevant steps in any of the above embodiments of the flexible interconnection configuration method of power distribution network.

[0205] Specifically, program N5 may include program code, which includes computer-executable instructions.

[0206] The processor N1 may be a central processing unit (CPU), an application-specific integrated circuit (ASIC), or one or more integrated circuits configured to implement the embodiments of this application. The flexible interconnection configuration equipment for the power distribution network structure includes one or more processors, which may be processors of the same type, such as one or more CPUs, or processors of different types, such as one or more CPUs and one or more ASICs.

[0207] Memory N2 is used to store program N5. Memory N2 may include high-speed RAM memory, and may also include non-volatile memory, such as at least one disk storage.

[0208] The algorithms or displays provided herein are not inherently related to any particular computer, virtual system, or other device. Furthermore, the embodiments in this application are not directed to any particular programming language.

[0209] Example 4:

[0210] This invention also provides a computer-readable storage medium storing at least one executable instruction. When the executable instruction is executed on a flexible interconnection configuration device / system of a power distribution network, the flexible interconnection configuration device / system of the power distribution network executes a flexible interconnection configuration method for a power distribution network in any of the above method embodiments.

[0211] Numerous specific details are set forth in the specification provided herein. However, it will be understood that embodiments of this application may be practiced without these specific details. Similarly, for the purpose of simplification and aiding understanding of one or more aspects of the invention, in the above description of exemplary embodiments of this application, various features of the embodiments are sometimes grouped together in a single embodiment, figure, or description thereof. The claims, which follow the detailed description, are hereby expressly incorporated into that detailed description, wherein each claim itself is a separate embodiment of this application.

[0212] Those skilled in the art will understand that the modules in the device of the embodiment can be adaptively changed and placed in one or more devices different from that embodiment. Modules, units, or components in the embodiment can be combined into a single module, unit, or component, and further, they can be divided into multiple sub-modules, sub-units, or sub-components, except that at least some of such features and / or processes or units are mutually exclusive.

Claims

1. A method for flexible interconnection configuration of a power distribution network, characterized in that, include: Obtain the current equipment parameters, source load parameters, and network topology parameters of the distribution network; wherein, the equipment parameters include: line parameters, SOP device parameters, and tie switch parameters; Based on the equipment parameters, source load parameters, and network topology parameters, the joint planning of SOP, tie switches, and lines is taken as the optimization object, and the goal is to minimize the comprehensive annual cost of the investment scheme. An objective function is constructed, and a planning model is constructed by combining physical structure constraints, equipment operation constraints, electrical performance constraints, and network reconfiguration constraints. The planning model is solved iteratively to output a configuration scheme for power distribution network transformation; wherein, the configuration scheme includes: determining the location and capacity of the new SOP device, the location layout of the tie switch, and the design of the route of the new line.

2. The flexible interconnection configuration method for a power distribution network as described in claim 1, characterized in that, The objective function, which aims to minimize the comprehensive equivalent annual cost of the investment plan, is constructed as follows: Using SOP planning investment cost, tie switch planning investment cost, line expansion planning cost, SOP operation and maintenance cost, tie switch operation cost, energy storage operation and maintenance cost, demand response cost, network loss and SOP loss cost, and electricity purchase and sale cost as decision variables, and aiming to minimize the comprehensive equivalent annual cost of the investment plan, an objective function is constructed as follows: in, C DR C loss and C buy -C sell These represent the investment costs for SOP planning, tie switch planning, line expansion planning, SOP operation and maintenance, tie switch operation, energy storage operation and maintenance, demand response, network loss and SOP loss, and electricity purchase and sale costs, respectively.

3. The flexible interconnection configuration method for a power distribution network as described in claim 1, characterized in that, The physical structure constraints include: line construction status constraints, SOP installation constraints, tie switch installation location constraints, and network topology constraints; The constraints on the newly constructed line status include: SOP installation constraints include: The constraints on the installation location of the tie switch include: Network topology constraints include: in, Ψ indicates whether there is a connecting line between nodes i and j. line This represents the set of candidate locations for the extended route. This indicates the number of SOP units installed between nodes i and j. Indicates the maximum number of SOP units that can be installed. Indicates unit SOP capacity, Ψ represents the total SOP capacity between nodes i and j. sop This represents the candidate set of SOP construction locations. Indicates whether a new connection switch is established between nodes i and j, Ψ switch This represents the set of candidate locations for the construction of the interconnecting switch. Indicates whether a new SOP device is created between nodes i and j, Ψ node Let β represent the set of nodes in the distribution network. ij,t β represents the parent-child relationship between node i and node j at time t. ji,t This represents the parent-child relationship between node j and node i at time t. and Ψ represents the connectivity status of the line between nodes i and j at time t. load Ψ represents the set of locations where loads are connected. sta This represents the set of substation nodes.

4. The flexible interconnection configuration method for a power distribution network as described in claim 3, characterized in that, The equipment operation constraints include: SOP operation constraints, energy storage operation constraints, node voltage constraints, branch current constraints, and tie switch operation count constraints. The SOP operating constraints include: Energy storage operation constraints include: Node voltage constraints include: Branch current constraints include: The constraints on the number of times the handshake switch can be activated include: in, and Let represent the active power transmitted by nodes i and j through the SOP port at time t, respectively. and η represents the power loss of the SOP ports connected to nodes i and j at time t, respectively. sop This represents the loss factor of SOP. and Let represent the reactive power transmitted by nodes i and j through the SOP port at time t, respectively. This represents the total SOP capacity between nodes i and j. and Let represent the charging and discharging power of energy storage node i at time t, respectively. and These represent the maximum charging and discharging power of the energy storage, Indicates the upper limit of energy storage capacity. This represents the amount of energy stored at energy storage node i at time t. and V represents the battery loss coefficient, charging loss coefficient, and discharging loss coefficient of energy storage, respectively. i,t Let represent the voltage at node i at time t. and Let I′ represent the minimum and maximum voltage values ​​at node i, respectively. ij,t Let represent the square of the current value of branch ij at time t. Let be the square of the maximum current in branch ij. The maximum number of times the interlock switch operates within period T.

5. The flexible interconnection configuration method for a power distribution network as described in claim 4, characterized in that, The electrical performance constraints include: voltage drop constraints considering network reconfiguration, as well as power flow constraints and power balance constraints; The voltage drop constraint considering network reconstruction includes: The power flow constraints and power balance constraints include: Where, r ij and x ij Let be the resistance and reactance values ​​of branch ij, respectively. V represents the square of the current between branches ij at time t, where M is an infinite number. i,u,t and V j,u,t P represents the voltage drop across branches iu and ju at time t, respectively. ij,t and Q ij,t Let I′ be the active power and reactive power on branch ij at time t. ki,t Let be the square of the current value of branch ki at time t. and Let Ψ represent the injected active power and reactive power at node i at time t, respectively. N Let represent the set of all nodes, and let κ(i) and ρ(i) represent the set of child nodes and the set of parent nodes of node i, respectively. and These represent the active power and reactive power injected into the substation, respectively. and Let represent the load power demand and distributed power output of node i at time t, respectively. This represents the demand response reduction of the load connected to node i at time t. This represents the amount of renewable energy reduction at node i at time t. This represents the reactive power demand of the load connected to node i at time t.

6. The flexible interconnection configuration method for a power distribution network as described in claim 5, characterized in that, The network reconstruction constraints include: Where, N node and N sta These represent the number of nodes and substations, respectively.

7. The flexible interconnection configuration method for a power distribution network as described in claim 1, characterized in that, The iterative solution to the planning model outputs a configuration scheme for power distribution network transformation, including: Based on the second-order cone relaxation method, the planning model is transformed into a linear cone programming model; The linear cone programming model is iteratively solved using a mixed-integer second-order cone programming method to output the configuration scheme.

8. A flexible interconnection configuration system for a power distribution network, characterized in that, include: Data acquisition module, model building module, and result output module; The data acquisition module is used to acquire the equipment parameters, source load parameters, and network topology parameters of the current power distribution network; wherein the equipment parameters include: line parameters, SOP device parameters, and tie switch parameters; The model building module is used to construct an objective function based on the equipment parameters, source load parameters, and network topology parameters, taking the joint planning of SOP, tie switches, and lines as the optimization object, and aiming at the lowest comprehensive annual cost of the investment plan. It also constructs a planning model by combining physical structure constraints, equipment operation constraints, electrical performance constraints, and network reconfiguration constraints. The result output module is used to iteratively solve the planning model and output a configuration scheme for power distribution network transformation; wherein, the configuration scheme includes: determining the location and capacity of the new SOP device, the location layout of the tie switch, and the design of the new line route.

9. A flexible interconnection configuration device for a power distribution network, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that, When the computer program is loaded into the processor, it implements the steps of a flexible interconnection configuration method for a power distribution network according to any one of claims 1-7.

10. A computer-readable storage medium storing a computer program, characterized in that, When the computer program is executed by the processor, it implements the steps of a flexible interconnection configuration method for a power distribution network according to any one of claims 1-7.

Citation Information

Cited By

  • Multi-microgrid direct interconnection planning method and system, and storage medium

    CN121417383A

  • Low-voltage power distribution flexible direct current interconnection method and device

    CN122315599A