Efficient filling method for underground small goaf group

By employing 3D scanning and modeling, gravity-fed self-flowing filling networks, and intelligent monitoring, the problems of filling blind spots and material waste in small underground goaf groups have been solved, achieving efficient and safe filling results that meet the needs of modern mining.

CN120946399APending Publication Date: 2025-11-14SICHUAN RONG GRP YIBIN CHUANNAN CONSTRUCT ENG CO LT +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202511217965.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-08-28
Publication Date
2025-11-14

AI Technical Summary

Technical Problem

Traditional methods for filling small goaf groups in underground mines suffer from numerous filling blind spots, significant material waste, low operational efficiency, and poor filling effects in poorly connected areas, making it difficult to meet the demands of efficient mining in modern mines.

Method used

The filling zone was divided using 3D scanning and modeling technology. A gravity-fed self-flowing filling network and fractal topology drainage channels were designed. Combined with stepped pressure adaptive filling and intelligent monitoring, multifunctional filling bodies and composite admixtures were used to achieve full coverage of the slurry and local compensation filling.

Benefits of technology

It improved the quality of filling, reduced costs and time, ensured the safety of underground operations, and enhanced mining efficiency and economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120946399A_ABST
    Figure CN120946399A_ABST
Patent Text Reader

Abstract

The invention discloses an efficient filling method for an underground small goaf group, and the method comprises the steps: constructing a three-dimensional model through laser radar scanning, and marking a communication relation and the stability of a top plate; dividing the goaf group into a main filling area and a secondary filling area, and designing a fractal topological structure drainage channel to form a gravity flow network; preparing filling slurry taking a cementing material, tailings and the like as main materials, and controlling parameters such as slump, initial setting time and the like; then, stepped pressure self-adaptive filling is adopted, slurry is injected in two stages, and the pressure and the flow speed are controlled; according to the method, the problems that traditional filling blind areas are large in number, material waste is serious and efficiency is low are solved, low-pump-pressure global coverage is achieved, the roof contact rate is remarkably increased, safe and efficient mining of mines is guaranteed, the comprehensive cost is reduced, and the method is suitable for underground small goaf group filling.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of goaf filling technology, specifically to an efficient filling method for small goaf groups underground. Background Technology

[0002] In the field of mineral resource extraction, with the continuous increase in mining depth and breadth, the formation of small underground goaf clusters is becoming increasingly common. An underground small goaf cluster refers to a collection of multiple relatively small, spatially complex, and interconnected or isolated goaf areas formed within the same mining area due to factors such as mining technology and geological structure. The existence of these goaf clusters is like a "time bomb" hidden underground, posing a serious threat to mine safety, subsequent mining activities, and the stability of the surrounding geological environment.

[0003] Currently, traditional methods for filling goafs in underground mines exhibit numerous insurmountable shortcomings when dealing with clusters of small goafs. Firstly, the prevalence of filling blind spots is a significant problem. Because small goafs are scattered and independent, filling operations often require developing individual construction plans and drilling grouting holes for each goaf. This independent construction method makes it difficult for the filling material to fully adhere to the goaf roof, resulting in a roof contact rate generally below 60%. Areas without roof contact cannot effectively support the roof, and over time, the roof strata are highly susceptible to deformation and collapse under their own weight and geostress, seriously threatening the safety of underground operations.

[0004] Secondly, there is significant material waste. Traditional methods involve multiple grouting operations at different small goaf areas, which not only consumes large amounts of filling material but also increases costs related to equipment and manpower. Statistics show that using traditional methods for underground goaf filling increases the overall cost by more than 30% compared to more efficient solutions. This undoubtedly increases the economic burden on mining operations significantly, reducing the economic benefits and market competitiveness of enterprises.

[0005] Furthermore, low operational efficiency is another drawback of traditional methods. The filling cycle for a single area typically exceeds 48 hours. Such a long filling time severely impacts the continuity of mining operations, leading to decreased mining efficiency and failing to meet the demands of modern high-efficiency mining. Although the concept of collaborative filling in multiple areas has been proposed in existing technologies to improve the filling effect of small goaf groups, in practical applications, the key issues of slurry flow and compaction control in low-connectivity areas have not been effectively resolved. Slurry in low-connectivity areas is difficult to flow smoothly under normal conditions and achieve uniform and dense filling, making these areas weak points in filling quality and hindering efficient and high-quality filling of small goaf groups underground. Summary of the Invention

[0006] (I) Technical Issues

[0007] The present invention aims to provide an efficient filling method for small goaf groups in underground mines, so as to solve the problems of many filling blind spots, serious material waste, low operation efficiency and poor filling effect in low connectivity areas that exist in traditional methods.

[0008] (II) Technical Content

[0009] To solve the above-mentioned technical problems, the technical solution of the present invention is: an efficient filling method for a group of small goafs in underground mines, comprising the following steps:

[0010] Step S1: 3D scanning and modeling of goaf groups: Use a laser scanner or 3D lidar to scan the target goaf group, obtain spatial morphology, volume and distribution data, construct a 3D digital model, and mark the connectivity relationship between adjacent goaf areas and the stability level of the roof.

[0011] Step S2: Filling zone and drainage channel design: Based on the three-dimensional model, the goaf group is divided into a main filling zone (high connectivity area) and a secondary filling zone (isolated or low connectivity area); at least one main injection hole is pre-set at the top of the main filling zone, and drainage holes are opened at the bottom of the secondary filling zone. The drainage holes are connected to the main filling zone through pre-embedded pipes to form a gravity self-flowing filling network.

[0012] Step S3: Preparation of multifunctional filling body: Prepare a filling slurry with cementitious materials, tailings and coal gangue as the main materials, add composite admixtures, control the slump of the slurry at 180-220mm, adjust the initial setting time to 2-4 hours, and the final setting strength is not less than 5MPa.

[0013] Step S4: Stepped pressure adaptive filling: In the first stage, filling grout is injected into the main filling zone through the main injection hole to 70-80% of its volume, and the grout flows to the secondary filling zone by its own weight; in the second stage, the main injection hole is closed, and the remaining grout is injected in the reverse direction through the drainage hole until the top plate of the secondary filling zone contacts the filling body; the filling pressure is dynamically controlled at 0.5-1.2MPa, and the flow rate is ≤3m / s;

[0014] Step S5: Intelligent monitoring and closed-loop control: Sensors are pre-embedded in the filling body to monitor the filling density in real time; combined with the three-dimensional model data, if an area that is not connected to the top is detected, the high-pressure grouting system is started to perform local compensation filling.

[0015] Furthermore, the design of the drainage channel in step S2 adopts a fractal topology: the diameter of the main drainage pipe is ≥100mm, the diameter of the branch pipes decreases in stages of 50mm and 30mm, and the branch angle is 30°–60°, to ensure that the slurry achieves full coverage under low pump pressure conditions.

[0016] Further, the composite admixture in step S3 consists of the following parts by weight: 1–3 parts of sulfoaluminate cement quick-setting agent, 2–5 parts of ettringite-based expansive agent, 0.5–1.5 parts of polycarboxylate superplasticizer, and 0.1–0.3 parts of cellulose fiber.

[0017] Furthermore, in the stepped filling in step S4, the slurry flowability in the first stage is ≥260mm, and the slurry flowability in the second stage is adjusted to 180–200mm to improve the top contact rate.

[0018] Furthermore, in step S5, the local compensation filling uses ultrafine cement-based grouting material with a particle size ≤20μm, and the grouting pressure is increased to 2.0–3.5MPa.

[0019] (III) Technical Effects

[0020] The advantages of this invention compared to the prior art are:

[0021] 1. Improve filling quality: Through 3D scanning and modeling of the goaf group, the spatial morphology and connectivity are accurately grasped. Combined with the design of filling zones and drainage channels, especially the drainage channels with fractal topology, the slurry can achieve full coverage under low pump pressure. Stepped pressure adaptive filling and intelligent monitoring and closed-loop control utilize the slurry's own weight flow in the first stage and reverse injection in the second stage. With the help of local compensation filling, the filling body's roof contact rate is greatly improved, effectively supporting the roof, reducing the risk of roof collapse, and ensuring the safety of underground operations.

[0022] 2. Reduced costs: By avoiding multiple independent grouting operations as required by traditional methods, the costs of filling materials, equipment, and labor are reduced. Compared with traditional methods, the overall cost is significantly reduced, thereby improving the company's economic benefits and market competitiveness.

[0023] 3. Improve operational efficiency: Gravity self-flowing filling network and stepped filling method shorten the filling cycle of a single area, no longer limited by the traditional method of more than 48 hours, accelerate the mining continuity, and meet the needs of modern mines for efficient mining. Attached Figure Description

[0024] Figure 1 This is a flowchart illustrating an efficient filling method for a group of small goafs in underground mines according to the present invention. Detailed Implementation

[0025] The present invention will be further described in detail below with reference to the embodiments.

[0026] Combined with appendix Figure 1 An efficient filling method for small goaf groups in underground mines includes the following steps:

[0027] Step S1: 3D scanning and modeling of goaf groups: Use a laser scanner or 3D lidar to scan the target goaf group, obtain spatial morphology, volume and distribution data, construct a 3D digital model, and mark the connectivity relationship between adjacent goaf areas and the stability level of the roof.

[0028] Step S2: Filling zone and drainage channel design: Based on the three-dimensional model, the goaf group is divided into a main filling zone (high connectivity area) and a secondary filling zone (isolated or low connectivity area); at least one main injection hole is pre-set at the top of the main filling zone, and drainage holes are opened at the bottom of the secondary filling zone. The drainage holes are connected to the main filling zone through pre-embedded pipes to form a gravity self-flowing filling network.

[0029] Step S3: Preparation of multifunctional filling body: Prepare a filling slurry with cementitious materials, tailings and coal gangue as the main materials, add composite admixtures, control the slump of the slurry at 180-220mm, adjust the initial setting time to 2-4 hours, and the final setting strength is not less than 5MPa.

[0030] Step S4: Stepped pressure adaptive filling: In the first stage, filling grout is injected into the main filling zone through the main injection hole to 70-80% of its volume, and the grout flows to the secondary filling zone by its own weight; in the second stage, the main injection hole is closed, and the remaining grout is injected in the reverse direction through the drainage hole until the top plate of the secondary filling zone contacts the filling body; the filling pressure is dynamically controlled at 0.5-1.2MPa, and the flow rate is ≤3m / s;

[0031] Step S5: Intelligent monitoring and closed-loop control: Sensors are pre-embedded in the filling body to monitor the filling density in real time; combined with the three-dimensional model data, if an area that is not connected to the top is detected, the high-pressure grouting system is started to perform local compensation filling.

[0032] In step S2, the drainage channel is designed with a fractal topology: the main drainage pipe diameter is ≥100mm, the branch pipe diameter decreases in stages at 50mm and 30mm, and the branch angle is 30°–60° to ensure that the slurry achieves full coverage under low pump pressure conditions.

[0033] The composite admixture in step S3 consists of the following parts by weight: 1–3 parts of sulfoaluminate cement quick-setting agent, 2–5 parts of ettringite-based expansion agent, 0.5–1.5 parts of polycarboxylate superplasticizer, and 0.1–0.3 parts of cellulose fiber.

[0034] In the stepped filling in step S4, the grout flowability in the first stage is ≥260mm, and the grout flowability in the second stage is adjusted to 180–200mm to improve the top contact rate.

[0035] In step S5, the local compensation filling uses ultrafine cement-based grouting material with a particle size ≤20μm, and the grouting pressure is increased to 2.0–3.5MPa.

[0036] Taking a group of small goaf areas underground in a certain mining area as the implementation object, this group of goaf areas consists of 12 scattered small goaf areas. Some areas have poor connectivity and differences in roof stability. The efficient filling method for small goaf areas underground of the present invention is used for operation. The specific operation process is as follows:

[0037] S1. Three-dimensional scanning and modeling of goaf areas

[0038] A high-precision 3D lidar was used to conduct a comprehensive scan of the target goaf area group. During the scanning process, the equipment was kept at a suitable distance and angle from each part of the goaf to obtain complete and accurate spatial data. After the scan was completed, a 3D digital model was constructed using professional modeling software. The spatial shape, volume, and distribution of each goaf were accurately marked in the model, the connectivity between adjacent goaf areas was analyzed in detail, and the stability of the roof was classified according to geological survey data and field test results, providing a reliable basis for subsequent backfilling design.

[0039] S2. Filling Zone and Drainage Channel Design

[0040] Based on the constructed 3D model, the goaf group was divided into primary filling zones and secondary filling zones. Six goafs with good connectivity were designated as primary filling zones, while the remaining six isolated or poorly connected goafs were designated as secondary filling zones. At the top of the primary filling zones, three 150mm diameter main injection holes were pre-drilled using drilling equipment, with the holes positioned to facilitate slurry diffusion. At the bottom of the secondary filling zones, drainage holes were drilled using specialized drilling equipment, and pre-embedded pipes were laid according to a fractal topology. The main drainage pipes had a diameter of 120mm, and branch pipes were set in decreasing increments of 50mm and 30mm, with the branch angle controlled at approximately 45°. The drainage holes of the secondary filling zones were connected to the primary filling zones, forming a gravity-fed filling network to ensure smooth slurry flow.

[0041] S3, Multifunctional Filler Formulation

[0042] At the ground-based mixing plant, the filling grout is prepared according to the specified proportions. The main materials are cementitious materials, tailings, and coal gangue, with the addition of a composite admixture. The composite admixture consists of 2 parts sulfoaluminate cement accelerator, 3 parts ettringite-based expanding agent, 1 part polycarboxylate superplasticizer, and 0.2 parts cellulose fiber. Through precise metering and thorough mixing, the slump of the grout is controlled at 200 mm, the initial setting time is adjusted to 3 hours, and the final setting strength reaches 6 MPa, ensuring the filling grout meets construction requirements.

[0043] S4, stepped pressure adaptive filling

[0044] In the first stage, the grouting equipment is started, and the prepared filling grout is injected into the main filling zone through the main injection hole. During the grouting process, the injection volume and pressure changes in the main filling zone are monitored in real time. When the injected grout reaches 75% of the volume of the main filling zone, the injection is stopped. At this time, the grout is allowed to flow naturally to the secondary filling zone through the drainage channel using its own weight. In the second stage, after the grout flow in the main filling zone has basically stabilized, the main injection hole is closed, and the remaining grout is injected in reverse through the drainage hole of the secondary filling zone. Throughout the filling process, the filling pressure is dynamically controlled between 0.5-1.2 MPa, and the flow velocity is maintained at ≤3 m / s. At the same time, based on the grout flow conditions, the grout flowability is ensured to be ≥260 mm in the first stage and adjusted to 190 mm in the second stage to ensure full contact between the top plate of the secondary filling zone and the filling material.

[0045] S5, Intelligent Monitoring and Closed-Loop Control

[0046] During the filling process, pressure sensors and displacement sensors are pre-embedded at different locations to monitor the filling density in real time. After filling is completed, data analysis is performed on the goaf group based on the previously constructed 3D model data. If an area without roof connection is detected, the high-pressure grouting system is immediately activated, using ultrafine cement-based grouting material with a particle size ≤20μm, and the grouting pressure is increased to 2.5MPa for local compensation filling until the ideal filling effect is achieved.

[0047] The present invention and its embodiments have been described above. This description is not restrictive, and the accompanying drawings are only one embodiment of the present invention; the actual structure is not limited thereto. In conclusion, if those skilled in the art are inspired by this description and design similar structures and embodiments without departing from the spirit of the invention, such designs should fall within the protection scope of the present invention.

Claims

1. A highly efficient filling method for a group of small goafs in underground mines, characterized in that, Includes the following steps: Step S1: 3D scanning and modeling of goaf groups: Use a laser scanner or 3D lidar to scan the target goaf group, obtain spatial morphology, volume and distribution data, construct a 3D digital model, and mark the connectivity relationship between adjacent goaf areas and the stability level of the roof. Step S2: Filling zone and drainage channel design: Based on the three-dimensional model, the goaf group is divided into a main filling zone (high connectivity area) and a secondary filling zone (isolated or low connectivity area); at least one main injection hole is pre-set at the top of the main filling zone, and drainage holes are opened at the bottom of the secondary filling zone. The drainage holes are connected to the main filling zone through pre-embedded pipes to form a gravity self-flowing filling network. Step S3: Preparation of multifunctional filling body: Prepare a filling slurry with cementitious materials, tailings and coal gangue as the main materials, add composite admixtures, control the slump of the slurry at 180-220mm, adjust the initial setting time to 2-4 hours, and the final setting strength is not less than 5MPa. Step S4: Stepped pressure adaptive filling: In the first stage, filling grout is injected into the main filling zone through the main injection hole to 70-80% of its volume, and the grout flows to the secondary filling zone by its own weight. In the second stage, the main injection hole is closed, and the remaining grout is injected in reverse through the drainage hole until the top plate of the secondary filling zone contacts the filling body; the filling pressure is dynamically controlled at 0.5–1.2 MPa, and the flow rate is ≤3 m / s; Step S5: Intelligent monitoring and closed-loop control: Sensors are pre-embedded in the filling body to monitor the filling density in real time; combined with the three-dimensional model data, if an area that is not connected to the top is detected, the high-pressure grouting system is started to perform local compensation filling.

2. The efficient filling method for a group of small goafs in underground mines according to claim 1, characterized in that, In step S2, the drainage channel is designed with a fractal topology: the main drainage pipe diameter is ≥100mm, the branch pipe diameter decreases in stages at 50mm and 30mm, and the branch angle is 30°–60° to ensure that the slurry achieves full coverage under low pump pressure conditions.

3. The efficient filling method for a group of small goafs in underground mines according to claim 1, characterized in that, The composite admixture in step S3 consists of the following parts by weight: 1–3 parts of sulfoaluminate cement quick-setting agent, 2–5 parts of ettringite-based expansion agent, 0.5–1.5 parts of polycarboxylate superplasticizer, and 0.1–0.3 parts of cellulose fiber.

4. The efficient filling method for a group of small goafs in underground mines according to claim 1, characterized in that, In the stepped filling in step S4, the grout flowability in the first stage is ≥260mm, and the grout flowability in the second stage is adjusted to 180–200mm to improve the top contact rate.

5. The efficient filling method for a group of small goafs in underground mines according to claim 1, characterized in that, In step S5, the local compensation filling uses ultrafine cement-based grouting material with a particle size ≤20μm, and the grouting pressure is increased to 2.0–3.5MPa.

Citation Information

Cited By

  • Goaf microorganism and plant synergistic soil fixation method and soil fixation device

    CN121138256A

  • Graded filling method and system for goaf after end slope mining

    CN121539345A