An automatic control method and device for oil and gas pipeline detection, an electronic device, and a storage medium
By constructing a multi-head attention TCN network and a factor graph model, and combining time decay and redundancy value factors, the problem of unreasonable resource allocation in the scheduling of oil and gas pipeline inspection tasks was solved, and the accuracy of inspection tasks and efficient utilization of resources were achieved.
Patent Information
- Application Number
- CN202511116519.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-11
- Publication Date
- 2026-04-17
- Estimated Expiration
- 2045-08-11
AI Technical Summary
The current scheduling of oil and gas pipeline inspection tasks does not fully consider the physical properties of the pipeline and the status of the inspection equipment, resulting in unreasonable allocation of inspection resources, equipment running out of power or overloading midway, lack of ability to respond to dynamic changes, and failure to scientifically assess scheduling risks and priorities.
By collecting physical properties of oil and gas pipelines and status parameters of detection equipment, a multi-head attention TCN network is constructed for status prediction. Probability analysis is performed using a factor graph model to calculate the time decay factor and redundancy value factor. The Hungarian algorithm is then used for task scheduling decisions to achieve real-time feedback and dynamic adjustment.
It improves the accuracy of testing tasks and the utilization rate of resources, can cope with dynamic changes, optimize task priority ranking, and ensure that the capabilities of testing equipment are matched with resources.