Automatic garbage transfer control method and system based on multi-mechanism cooperative scheduling
By using an automatic unloading control method that dynamically allocates unloading ports and monitors them in real time, the problems of low efficiency and poor accuracy of manual unloading in waste transfer stations have been solved, achieving efficient waste treatment and equipment protection.
Patent Information
- Application Number
- CN202511411870.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-29
- Publication Date
- 2026-01-16
- Estimated Expiration
- 2045-09-29
AI Technical Summary
The existing manual feeding control mode in waste transfer stations suffers from low operating efficiency, poor weight control accuracy, and abnormal equipment wear and tear. This is due to the high reliance on human experience, slow multi-stage collaborative response, and lack of compensation capabilities for abnormal operating conditions.
By acquiring the load data of garbage transport vehicles, the spatial distribution information of unloading pits, and the information of unloading ports, the positioning parameters of unloading ports and the unloading window period of vehicles are dynamically allocated. Combined with the real-time monitoring of the three-dimensional contour data of the unloading pit by a laser scanning device, a dynamic volume model is established to realize automatic unloading control. When an anomaly is detected, a multi-level control command sequence is triggered for adjustment and compensation.
It significantly improves waste processing throughput, precisely controls the amount of material fed, reduces equipment wear and tear, and avoids equipment impact loads caused by manual intervention.
Smart Images

Figure CN121348994A_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of garbage transfer operation, and in particular to a garbage automatic transfer control method and system based on multi-agency collaborative scheduling. BACKGROUND
[0002] In the existing garbage transfer station, the unloading mode of the garbage compressor relies on manual operation to unload and manually load the vehicle. The weight of the garbage is measured by manual observation and a weighing sensor system matched with the garbage compressor, to control the amount of unloading in a single time. This is repeated to achieve the desired preset weight of the garbage.
[0003] In the manual mode, to ensure that the weight of each vehicle reaches the weight control range, first, the unloading control needs to be controlled by multiple links, relying on the operation experience of the unloading operator and the assistance of the unloading commander. In the last quantity control stage, if the pit garbage is too high, the appropriate weight garbage truck needs to be waited for unloading to the unloading port to control the packing weight within a reasonable range. In this traditional way, although it can meet certain production needs, it relies on manual judgment. If the operator is not concentrated, it will cause abnormal weight of unloading, thereby affecting production efficiency, and even affecting the service life of the equipment. SUMMARY
[0004] (I) Technical problems to be solved
[0005] In view of the above-mentioned shortcomings and deficiencies of the prior art, the present application provides a garbage automatic transfer control method and system based on multi-agency collaborative scheduling, which solves the technical defects of low operation efficiency, poor weight control accuracy and abnormal equipment wear and tear in the existing garbage transfer station manual unloading control mode, which is caused by the technical problems of high dependence on manual experience, multi-link collaborative response lag and lack of abnormal working condition compensation capability.
[0006] (II) Technical solutions
[0007] In order to achieve the above-mentioned purposes, the main technical solutions adopted by the present application include:
[0008] In the first aspect, the present application provides a garbage automatic transfer control method based on multi-agency collaborative scheduling, comprising:
[0009] According to the obtained load data of the garbage transport vehicle, the spatial distribution information of the unloading pit, the space occupation information and the unloading port information, the unloading port positioning parameters of the unloading pit, the vehicle unloading window period and the vehicle operation time beat are dynamically allocated to guide the corresponding vehicle unloading;
[0010] The material retained in the unloading port is transported to the operation area of the unloading mechanism by the pushing mechanism, so as to unload the material in the unloading mechanism to the unloading pit;
[0011] Collect the motion parameters and load data of the discharging mechanism, and determine the matching state of the discharging mechanism and the vehicle operation time beat;
[0012] Real-time monitoring of the three-dimensional profile data inside the unloading pit before and after discharging by a laser scanning device, establishing a dynamic volume model based on the three-dimensional profile data and motion parameters, and real-time calculation of the single discharging amount combined with the preset material density parameters;
[0013] When it is detected that the single discharging amount exceeds the preset tolerance range or the beat is out of synchronization, a multi-stage control instruction sequence is triggered to adjust the variable speed gradient of the discharging mechanism, intervene in compensation by the pushing mechanism, and adjust the redistribution of the unloading port.
[0014] Optionally, according to the obtained load data of the garbage transport vehicle, spatial distribution information, space occupation information and unloading port information of the unloading pit, the unloading port positioning parameters of the unloading pit, the vehicle unloading window period and the vehicle operation time beat are dynamically allocated to guide the corresponding vehicle unloading, including:
[0015] Real-time acquisition of the load data of the garbage transport vehicle, the spatial distribution information, the space occupation information and the unloading port information of the unloading pit;
[0016] According to the load data of the garbage transport vehicle, the spatial distribution information and the space occupation information of the unloading pit, the path distance, the load matching degree and the anti-collision allowance of each unloading pit and the current vehicle are calculated, the space adaptation degree is generated by weighted scoring, the unloading pit with a space adaptation degree higher than a set threshold is screened, and the unloading port corresponding to the unloading pit is regarded as a candidate unloading port;
[0017] Based on the pre-trained dynamic programming algorithm model, the available time window of each candidate unloading port is recursively solved from the terminal time to the initial time with the goal of maximizing the continuous utilization rate, and the available time window includes the starting time stamp, the duration and the efficiency weight coefficient;
[0018] A conflict resolution tree model is constructed, the candidate unloading port and the available time window are combined as a decision node, the node weight is quantified by the product of the space adaptation degree and the efficiency weight coefficient, after traversing the conflict resolution tree model and pruning the branches with a weight value lower than a critical value layer by layer, the global optimal solution containing the optimal unloading port and time window combination is output;
[0019] The duration of the time window in the global optimal solution is split into a plurality of basic time slices based on the vehicle operation time beat as a reference unit, wherein each vehicle operation time beat corresponds to the reference time consumption of the standard action sequence of the feeding positioning, unloading execution and displacement avoidance of the vehicle at the unloading port;
[0020] The optimal unloading port and time window combination, the vehicle operation time beat and the corresponding basic time slice are encoded into a structured instruction stream and pushed to the corresponding vehicle.
[0021] Optionally, the motion parameters and load data of the discharging mechanism are collected, and the matching state of the discharging mechanism and the vehicle operation time beat is determined, including:
[0022] The running speed is collected through the rotational speed sensor installed on the driving shaft of the discharging mechanism;
[0023] The time markers of the completion of the feeding positioning, the start and end of the unloading execution, and the triggering of the shifting avoidance action in the vehicle operation time beat are extracted, and a three-stage time sequence reference of the vehicle operation time beat is established;
[0024] The periodic arrival time of the material receiving section of the discharging mechanism is determined based on the running speed of the discharging mechanism, the periodic arrival time of the material receiving section of the discharging mechanism is compared with the three-stage time sequence reference, the overlapping duration of the period of the start and end of the unloading execution and the transportation window of the material receiving section is calculated, and the matching state of the discharging mechanism operation time beat and the vehicle operation time beat is determined by combining the monitoring of the accumulation thickness and distribution form of the material on the surface of the discharging mechanism, wherein the discharging mechanism operation time beat is the periodic transportation window time span of the material receiving section.
[0025] Optionally, the three-dimensional profile data inside the unloading pit before and after discharging is monitored in real time through the laser scanning device, a dynamic volume model is established based on the three-dimensional profile data and the motion parameters, and the single discharging amount is calculated in real time by combining the preset material density parameters, including:
[0026] The three-dimensional profile data inside the unloading pit before and after discharging is collected in real time through the laser scanning device, the height distribution of the garbage accumulation surface at the start and end stages of discharging is extracted, and the average height value of the garbage accumulation surface is generated based on the multi-point height sampling;
[0027] According to the preset trapezoidal structure parameters and the average height value of the unloading pit, the garbage flow cross-sectional area is constructed;
[0028] The running speed of the discharging mechanism and the single discharging duration are obtained synchronously, the material displacement distance is obtained by multiplying the running speed of the discharging mechanism and the single discharging duration, and the real-time volume change is calculated by combining the garbage flow cross-sectional area to obtain the dynamic volume model;
[0029] The corresponding garbage material density parameters are called from the historical database, the dynamic volume model is associated and mapped with the garbage material density parameters, and the single discharging weight is output.
[0030] Optionally, when it is detected that the single discharging amount exceeds the preset tolerance range or the beat is out of synchronization, a multi-stage control instruction sequence is triggered to perform speed gradient adjustment of the discharging mechanism, intervention compensation of the pushing mechanism, and redistribution adjustment of the unloading port, including:
[0031] When it is detected that the single discharging amount exceeds the preset tolerance range or the matching state is out of synchronization, a multi-stage control instruction sequence is triggered to perform the following steps:
[0032] According to the deviation direction and absolute value of the beat matching, the deviation is divided into multiple regulation levels, wherein the positive deviation represents over-limit discharging amount, and the negative deviation represents insufficient supply;
[0033] When the single discharging amount exceeds the preset threshold, the running speed is gradually increased according to the positive deviation level, and the speed increment of each level is 5%-15% of the running speed of the discharging mechanism;
[0034] When the material supply is insufficient, the negative deviation is triggered, and the running speed of the discharging mechanism is gradually reduced according to the regulation level, and the reduction amplitude of each level does not exceed the maximum allowed deceleration threshold;
[0035] Based on the accumulation height and residence time of the material in the working area of the discharging mechanism, the push mechanism is started to push the material in a targeted manner, and continuous pushing or intermittent pulse pushing compensation is performed on the local residence area;
[0036] According to the obtained accumulation thickness of the material on the surface of the discharging mechanism, when it is identified that the local accumulation thickness exceeds the safety threshold, the vehicle access permission of the corresponding unloading port is temporarily locked, and the audible and light warning is activated to guide the vehicle to shift to the unloading port which is not occupied and has the optimal path accessibility among the candidate unloading ports;
[0037] The speed gradient adjustment amount of the chain plate machine, the intervention frequency of the push mechanism, and the unloading port distribution information are synchronously associated, and the material flow oscillation in the regulation process is inhibited through closed-loop feedback;
[0038] The discharging amount fluctuation value after correction and the beat matching state are monitored within a preset time window, and if it does not recover to the tolerance range or the beat synchronization, an iterative multi-stage control instruction sequence is triggered.
[0039] Optionally, the beat out of synchronization refers to a work timing misalignment state triggered by at least one of the following conditions:
[0040] The overlap duration of the vehicle unloading execution period and the discharging mechanism receiving segment transportation window is lower than the preset overlap threshold;
[0041] The accumulation thickness of the material on the surface of the discharging mechanism exceeds the morphological safety threshold, and the distribution form indicates that the unloading execution action is not completed within the receiving segment transportation window;
[0042] The deviation of the total time consumption from the reference time consumption from the completion of the vehicle feeding positioning to the triggering of the displacement avoidance action exceeds the preset vehicle beat tolerance range;
[0043] An unplanned interruption occurs in the periodic arrival time sequence of the discharging mechanism receiving segment, resulting in the inability to form continuous matching with the vehicle work time beat.
[0044] Optionally, it also includes:
[0045] When the cumulative material discharge reaches the target value, the waste material compression and baling operation program is automatically triggered, and the vehicle access permission of the corresponding unloading port area is locked simultaneously.
[0046] After the packaging operation is completed, the cumulative material feeding counter is reset, and the packaging threshold for the next cycle is dynamically updated based on the compressed material volume.
[0047] The data generated by the single feeding quantity, cycle time matching status, multi-level control instruction sequence, and instruction execution process calculated in the current cycle are integrated as a reference scheme for the next work cycle.
[0048] Secondly, embodiments of the present invention provide an automatic waste transfer control system based on multi-mechanism collaborative scheduling, comprising:
[0049] The unloading mechanism includes a chain conveyor for transporting unloaded materials to the unloading pit, wherein the unloading section of the chain conveyor extends into the unloading pit to form a continuous unloading channel.
[0050] The pushing mechanism is located in the transfer corridor between the unloading port and the receiving section, and is used to push the garbage to the working area of the chain conveyor.
[0051] A laser scanning device is installed at the feed inlet of the chain conveyor.
[0052] Gravity meter, installed in the area where garbage trucks enter the site;
[0053] In addition, a control platform is connected to the pressing mechanism, the unloading mechanism, the laser scanning device, and the gravity meter, respectively, for executing the method described above.
[0054] Optionally, the control platform includes: a main control unit and a chain conveyor control unit, a pusher control unit, and a laser scanner control unit connected to the main controller.
[0055] Optionally, the chain conveyor control unit includes: a chain conveyor drive subunit connected to the chain conveyor and the main control unit respectively, and a motion feedback subunit connected to the chain conveyor and the main control unit respectively;
[0056] The control unit of the pusher includes: a pusher mechanism drive subunit connected to the pusher mechanism and the main control unit respectively;
[0057] The laser scanning control unit includes a scanning control subunit that is connected to the laser scanning device and the main control unit, respectively.
[0058] (III) Beneficial Effects
[0059] The beneficial effects of this invention are as follows: The automatic unloading control method provided by this invention significantly improves the operational efficiency of the waste transfer system through multi-dimensional technological collaboration. First, based on a dynamic unloading port allocation strategy using multi-source data such as vehicle load and pit space occupancy, it can autonomously generate optimal unloading window periods and operation cycle parameters, effectively eliminating decision delays and vehicle waiting time wastage common in manual collaborative scheduling. This improves the cycle connection accuracy of continuous unloading operations to the inherent response limit of the equipment, significantly increasing the waste throughput per unit time. Second, through a real-time dynamic modeling mechanism that integrates laser scanning three-dimensional contour data and material density parameters, it can accurately calculate the volume and weight of a single unloading operation. Simultaneously, combined with feedback compensation of the unloading mechanism's motion parameters, it achieves closed-loop control of quality errors, avoiding measurement inaccuracies caused by human experience-based judgment bias. Furthermore, when unloading volume exceeds tolerance or cycle synchronization is detected, it autonomously triggers multi-level collaborative control commands. Through a combination of gradient speed adjustment, push-pressure compensation intervention, and unloading port reallocation strategies, it not only achieves adaptive repair of abnormal operating conditions but also avoids equipment impact loads caused by traditional manual intervention, significantly reducing the risk of mechanical wear. Attached Figure Description
[0060] Figure 1 This is a schematic diagram of the overall process of the method proposed in the embodiments of the present invention;
[0061] Figure 2 This is a schematic diagram of the specific process of step S1 of the method proposed in the embodiment of the present invention;
[0062] Figure 3 This is a schematic diagram of the specific process of step S3 of the method proposed in the embodiment of the present invention;
[0063] Figure 4 This is a schematic diagram of the specific process of step S4 of the method proposed in the embodiment of the present invention;
[0064] Figure 5 A schematic diagram of a trapezoidal cross-section of waste according to the method proposed in this embodiment of the invention;
[0065] Figure 6 This is a schematic diagram of the specific process of step S5 of the method proposed in the embodiment of the present invention;
[0066] Figure 7 This is a schematic diagram of the system composition proposed in an embodiment of the present invention. Detailed Implementation
[0067] To better explain and facilitate understanding of the present invention, the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.
[0068] like Figure 1As shown in the embodiment of the present invention, an automatic waste transfer control method based on multi-mechanism collaborative scheduling includes: dynamically allocating the unloading port positioning parameters, vehicle unloading window period, and vehicle operation time rhythm of the unloading pit according to the acquired load data of waste transport vehicles, spatial distribution information of unloading pits, space occupancy information, and unloading port information, so as to guide the corresponding vehicles to unload; directionally transporting the material retained at the unloading port to the working area of the feeding mechanism through a pushing mechanism, so that the feeding mechanism can feed the material into the unloading pit; collecting the motion parameters and load data of the feeding mechanism, and judging the matching status of the feeding mechanism and the vehicle operation time rhythm; monitoring the three-dimensional contour data inside the unloading pit before and after feeding in real time through a laser scanning device, establishing a dynamic volume model based on the three-dimensional contour data and motion parameters, and calculating the single feeding amount in real time in combination with the preset material density parameters; when it is detected that the single feeding amount exceeds the preset tolerance range or the rhythm is out of sync, triggering a multi-level control command sequence to perform speed gradient adjustment of the feeding mechanism, intervention compensation of the pushing mechanism, and reallocation adjustment of the unloading port.
[0069] The automatic unloading control method provided by this invention significantly improves the operational efficiency of waste transfer systems through multi-dimensional technological collaboration. First, a dynamic unloading port allocation strategy based on multi-source data such as vehicle load and pit space occupancy can autonomously generate optimal unloading window periods and operational cycle parameters. This effectively eliminates decision-making delays and vehicle waiting time wastage common in manual collaborative scheduling, raising the cycle connection accuracy of continuous unloading operations to the inherent response limit of the equipment and significantly increasing the waste throughput per unit time. Second, through a real-time dynamic modeling mechanism that integrates laser scanning 3D contour data and material density parameters, the volume and weight of a single unloading operation can be accurately calculated. Simultaneously, combined with feedback compensation of the unloading mechanism's motion parameters, closed-loop control of quality errors is achieved, avoiding measurement inaccuracies caused by human experience-based judgment biases. Furthermore, when unloading volume exceeds tolerance or cycle synchronization is detected, multi-level collaborative control commands are autonomously triggered. Through a combination of gradient speed regulation, push-pressure compensation intervention, and unloading port reallocation strategies, not only is adaptive repair of abnormal operating conditions achieved, but also the impact load on equipment caused by traditional manual intervention is avoided, significantly reducing the risk of mechanical wear.
[0070] To better understand the above technical solutions, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the drawings, it should be understood that the present invention can be implemented in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that the present invention can be understood more clearly and thoroughly, and that the scope of the present invention can be fully conveyed to those skilled in the art.
[0071] Specifically, the present invention provides an automatic waste transfer control method based on multi-agency collaborative scheduling, which includes:
[0072] S1. Based on the obtained load data of garbage transport vehicles, spatial distribution information of unloading pits, space occupancy information and unloading port information, dynamically allocate the unloading port positioning parameters of unloading pits, vehicle unloading window period and vehicle operation time rhythm to guide the corresponding vehicles to unload.
[0073] Furthermore, such as Figure 2 As shown, step S1 includes:
[0074] S11. Real-time acquisition of load data of garbage transport vehicles, spatial distribution information of unloading pits, space occupancy information and unloading port information.
[0075] S12. Based on the load data of the garbage transport vehicle, the spatial distribution information and space occupancy information of the unloading pit, calculate the path distance, load matching degree and anti-collision margin between each unloading pit and the current vehicle. Generate spatial adaptability through weighted scoring, filter unloading pits with spatial adaptability higher than a set threshold, and regard the unloading port corresponding to the filtered unloading pit as a candidate unloading port. Among them, the path distance is: the shortest feasible path length from the current position of the vehicle to the target unloading pit; the load matching degree is: vehicle load / (1 - real-time space occupancy information of the unloading pit), normalized to the [0,1] interval to represent unloading feasibility, 1 = perfect match; the anti-collision margin is: the theoretical minimum distance between adjacent unloading pits that can be safely operated, determined by the combined pit operation area space and vehicle size.
[0076] S13. Based on a pre-trained dynamic programming algorithm model, with the goal of maximizing continuous utilization, the available time window of each candidate unloading port is solved recursively from the terminal time to the initial time. The available time window includes the start timestamp, duration and efficiency weight coefficient.
[0077] In one embodiment, the dynamic programming algorithm model employs a pre-trained spatiotemporal feature fusion network. A bidirectional gated recursive unit (BiGRU) extracts the periodic variation of material accumulation at the unloading port, outputting a temporal feature vector representing long-term and short-term load trends. A lightweight convolutional layer (Depthwise CNN) is used to extract local features from sensor signals at the unloading port (such as photoelectric switch pulse sequence encoding the vehicle unloading time distribution, infrared sensors capturing the spatial distribution of material accumulation, and current waveform analysis of the pushing mechanism to determine the pushing operation intensity). This generates a spatial feature tensor reflecting dynamic transportation behavior. A graph attention network (GAT) is then used to analyze the path dependency of material transport between unloading ports, generating node embedding vectors.
[0078] The temporal feature vector, spatial feature tensor, and node embedding vector are dimensionally aligned and feature-concatenated to form a dedicated state descriptor for waste transportation scheduling. Based on this descriptor, the following inverse recursive decision-making is performed: First, starting from the preset end time of the operation cycle, an initial state value function is generated based on the full load rate constraint of the terminal unloading port. Second, for each candidate unloading port, the global utilization gain from the current time to the previous time is calculated based on the start timestamp, duration, and efficiency weight coefficient of its time window (the efficiency weight coefficient reflects the efficiency weight coefficient of the real-time operation efficiency of the unloading port, which is adaptively adjusted by comprehensively considering the periodic change trend of material accumulation and the intensity characteristics of the pushing operation). Then, through iterative updates of the value function, the path that maximizes continuous utilization is selected, and the activation sequence and time window occupancy mark of each unloading port are recorded simultaneously.
[0079] This invention innovatively embeds a pre-trained network into a reverse recursive framework to achieve online self-learning generation of weight coefficients. This deep integration of data-driven and operations research optimization can capture nonlinear relationships under complex working conditions while strictly adhering to the temporal constraints of the work process, ultimately achieving a dual improvement in global scheduling robustness and resource utilization efficiency.
[0080] S14. Construct a conflict resolution tree model, using candidate unloading ports and available time windows as decision nodes. Node weights are quantified by the product of spatial fitness and efficiency weight coefficients. After traversing the conflict resolution tree model and pruning branches with weight values below the critical value layer by layer, the global optimal solution containing the optimal unloading port and time window combination is output. In this step, a tree-like decision model is constructed based on the permutations and combinations of candidate unloading ports and their available time windows. Each node represents a feasible pairing scheme of "unloading port-time window," and the priority of the node is quantified by the joint contribution value of spatial fitness and efficiency weights. By traversing the decision tree layer by layer, inefficient paths with contribution values below a preset safety threshold are dynamically eliminated, and finally, the unloading port and time window combination with the highest global contribution value is retained as the optimal scheduling scheme.
[0081] S15. The duration of the time window in the global optimal solution is divided into several basic time slices based on the vehicle operation time cycle. Each vehicle operation time cycle corresponds to the baseline time consumption of the standard action sequence of the vehicle at the unloading port, including feeding positioning, unloading execution, and shifting and avoiding obstacles.
[0082] S16. Encode the optimal unloading port and time window combination, vehicle operation time cycle and corresponding basic time slice into a structured instruction stream and push it to the target vehicle in real time.
[0083] S2. The material retained at the discharge port is transported to the working area of the unloading mechanism by the pushing mechanism, so that the unloading mechanism can unload the material into the discharge pit.
[0084] S3. Collect motion parameters and load data of the unloading mechanism, and determine the matching status of the unloading mechanism and the vehicle's operating time rhythm.
[0085] Furthermore, such as Figure 3 As shown, step S3 includes:
[0086] S31. The running speed is collected by a speed sensor installed on the drive shaft of the unloading mechanism.
[0087] S32. Extract the time markers for the completion of feeding and positioning, the start and end of unloading, and the triggering of shifting and avoiding actions in the vehicle operation time cycle, and establish a three-stage time sequence reference for the vehicle operation time cycle.
[0088] S33. Based on the operating speed of the unloading mechanism, determine the periodic arrival time of the receiving section of the unloading mechanism. Compare the periodic arrival time of the receiving section of the unloading mechanism with the three-stage time series benchmark, calculate the overlap duration between the start and end time of unloading execution and the transportation window of the receiving section, and combine the monitoring of the accumulation thickness and distribution pattern of the material on the surface of the unloading mechanism to determine the matching status between the unloading mechanism's operating time rhythm and the vehicle's operating time rhythm. The unloading mechanism's operating time rhythm is the time span of the periodic transportation window of the receiving section.
[0089] S4. Real-time monitoring of the three-dimensional contour data inside the unloading pit before and after material feeding using a laser scanning device. A dynamic volume model is established based on the three-dimensional contour data and motion parameters. The amount of material fed in a single operation is calculated in real time in combination with the preset material density parameters.
[0090] Furthermore, such as Figure 4 As shown, step S4 includes:
[0091] S41. The three-dimensional contour data of the unloading pit before and after unloading is collected in real time by a laser scanning device. The height distribution of the garbage accumulation surface at the beginning and end of the unloading stage is extracted, and the average height value of the garbage accumulation surface is generated based on multi-point height sampling.
[0092] S42. Based on the preset trapezoidal structure parameters and average height of the unloading pit, construct the cross-sectional area of the waste flow.
[0093] S43. Simultaneously acquire the operating speed of the feeding mechanism and the duration of a single feeding, multiply the operating speed of the feeding mechanism by the duration of a single feeding to obtain the material pushing distance, and combine it with the cross-sectional area of the waste flow to calculate the real-time volume change to obtain a dynamic volume model.
[0094] S44. Retrieve the corresponding waste material density parameters from the historical database, associate and map the dynamic volume model with the waste material density parameters, and output the weight of a single feeding.
[0095] In one specific embodiment, a laser scanning device is used to acquire the real-time height curve of the waste during waste feeding. Within a single feeding cycle, features are extracted from the height curve from the starting end to the ending end. Multiple height points are taken on the real-time height curve to calculate the average height value, which is used as the height information for a single feeding operation. Preferably, reference is made to... Figure 5 Alternatively, the definite integral of the real-time height curve can be used as the height information for a single feeding, thus yielding:
[0096]
[0097] In the formula, f(x) is the real-time height curve, d is half the difference between the upper and lower bases of the isosceles trapezoid, h is the height of the isosceles trapezoid. Since the shape of the unloading pit is fixed, d and h are both detectable parameters; x1 and x2 are the first and second ends of the garbage accumulation formed by unloading.
[0098] Based on the height of a single discharge, the bottom width of the unloading pit, and the base angle of its trapezoidal structure, the cross-sectional area of the waste flow is calculated. Wherein, the cross-sectional area S... t For: S t =L b ·A(h)+A(h) 2 ·cotθ, where L b Let A(h) be the bottom width of the unloading pit, and θ be the base angle of the trapezoidal structure.
[0099] The operating speed of the feeding mechanism and the duration of a single feeding cycle are obtained. The material pushing distance is calculated, and the volume of a single feeding cycle is obtained by combining this with the trapezoidal cross-sectional area of the waste. The volume of a single feeding cycle, V, is: V = v·t·S t In the formula, v is the running speed of the feeding mechanism, and t is the running time of the feeding mechanism.
[0100] Based on the pre-retrieved average waste density value and single-discharge volume, the single-discharge weight is calculated. The single-discharge weight M is: M = ρ·V, where ρ is the average waste density value, and the range of values obtained through data analysis of multiple discharges is 0.65-0.9 g / cm3.
[0101] Finally, if the volume or weight of a single feeding exceeds the preset range, the feeding mechanism will stop the current feeding operation. If neither the volume nor the weight of a single feeding exceeds the preset range, the feeding operation will be repeated multiple times until the total weight of the fed waste is met, at which point the feeding mechanism will stop feeding.
[0102] S5. When the single feeding amount exceeds the preset tolerance range or the cycle time is out of sync, a multi-level control command sequence is triggered to adjust the speed gradient of the feeding mechanism, compensate for the intervention of the pushing mechanism, and redistribute the unloading port.
[0103] It is important to emphasize that cycle time desynchronization refers to a state of misalignment in job timing triggered by at least one of the following conditions:
[0104] (1) The duration of overlap between the vehicle unloading execution period and the material receiving section transportation window of the unloading mechanism is less than the preset overlap threshold. For example, unloading only covers 30% of the material receiving window, which is lower than the preset minimum overlap threshold requirement of 50%.
[0105] (2) The thickness of the material accumulation on the surface of the feeding mechanism exceeds the morphological safety threshold, and the distribution pattern indicates that the unloading action was not completed within the material receiving section transportation window, such as detecting sudden thickness changes or edge accumulation.
[0106] (3) The total time from the completion of the vehicle's feeding and positioning to the triggering of the displacement and avoidance action deviates from the baseline time and exceeds the preset vehicle cycle tolerance range. For example, the baseline time is 10 seconds, the actual time is 15 seconds, and the upper limit of the tolerance is ±2 seconds.
[0107] (4) Unplanned interruptions (such as equipment jamming) occur in the periodic arrival time sequence of the material receiving section of the unloading mechanism, resulting in a failure to continuously match the vehicle operation time rhythm.
[0108] Furthermore, such as Figure 6 As shown, step S5 includes:
[0109] S51. When the single feeding quantity is detected to exceed the preset tolerance range or the matching status is out of sync, a multi-level control command sequence is triggered to perform the following steps:
[0110] S52. Based on the direction and absolute value of the deviation in the cycle time matching, the deviation is divided into multiple control levels, where a positive deviation indicates that the material feed exceeds the limit, and a negative deviation indicates that the supply is insufficient.
[0111] S53. When the amount of material fed in a single operation exceeds the preset threshold, the operating speed is increased step by step according to the positive deviation level, with each level of speed increase being 5%-15% of the operating speed of the feeding mechanism; when the material supply is insufficient, a negative deviation is triggered, and the operating speed of the feeding mechanism is reduced step by step according to the control level, with each level of reduction not exceeding the maximum allowable deceleration threshold.
[0112] S54. Based on the accumulation height and retention time of the material in the working area of the feeding mechanism, start the directional pushing operation of the pushing mechanism to compensate for the local retention area with continuous pushing or intermittent pulse pushing.
[0113] S55. Based on the obtained material accumulation thickness on the surface of the unloading mechanism, when the local accumulation thickness exceeds the safety threshold, temporarily lock the vehicle access permission of the corresponding unloading port, and activate the audible and visual warning to guide the vehicle to the unoccupied unloading port with the best path accessibility among the candidate unloading ports.
[0114] S56, synchronously correlates the speed gradient adjustment amount of the chain conveyor, the intervention frequency of the pushing mechanism and the distribution information of the unloading port, and suppresses the material flow oscillation during the adjustment process through closed-loop feedback.
[0115] S57. Monitor the fluctuation value of the corrected feed rate and the cycle time matching status within the preset time window. If it is not restored to the tolerance range or the cycle time is synchronized, trigger an iterative multi-level control instruction sequence.
[0116] In addition, after step S5, the following steps are also included: when the cumulative material feeding reaches the target value, the waste material compression and baling operation program is automatically triggered, and the vehicle access permission of the corresponding unloading port area is simultaneously locked; after the baling operation is completed, the cumulative material feeding counter is reset, and the baling threshold for the next cycle is dynamically updated according to the volume of the compressed material (e.g., the volume is reduced by 30% after compression); the single material feeding volume, cycle time matching status, and multi-level control command sequence and command execution process data calculated in the current cycle are integrated as a reference scheme for the next operation cycle.
[0117] like Figure 7 As shown, this embodiment of the invention also provides an automatic waste transfer control system based on multi-mechanism collaborative scheduling, including: a feeding mechanism, comprising a chain conveyor for transporting waste to the unloading pit, the unloading section of the chain conveyor extending to the unloading pit to form a continuous feeding channel; a pushing mechanism, disposed in the transfer corridor between the unloading port and the receiving section, for pushing waste to the working area of the chain conveyor; a laser scanning device, disposed at the unloading port of the chain conveyor, preferably a single-line laser scanner, characterized by linear scanning to obtain a real-time curve of the waste height at the unloading port, and due to its single-line nature, the laser scanning efficiency is high; a gravity meter, disposed in the waste transport vehicle entry area; and a control platform, respectively connected to the pushing mechanism, the feeding mechanism, the laser scanning device and the gravity meter, for executing the method described above; wherein, the unloading pit has a truncated pyramidal structure that is wider at the top and narrower at the bottom, optimizing the natural sliding and storage efficiency of materials.
[0118] Furthermore, the control platform includes: a main control unit and a chain conveyor control unit, a pusher control unit, and a laser scanner control unit connected to the main controller. The chain conveyor control unit includes: a chain conveyor drive subunit connected to the chain conveyor and the main control unit, and a motion feedback subunit connected to the chain conveyor and the main control unit, respectively; the pusher control unit includes: a pusher mechanism drive subunit connected to the pusher mechanism and the main control unit, respectively; the laser scanner control unit includes: a scan control subunit connected to the laser scanner and the main control unit, respectively.
[0119] Since the systems / devices described in the above embodiments of the present invention are systems / devices used to implement the methods of the above embodiments of the present invention, those skilled in the art can understand the specific structure and modifications of the systems / devices based on the methods described in the above embodiments of the present invention, and therefore will not be repeated here. All systems / devices used in the methods of the above embodiments of the present invention fall within the scope of protection of the present invention.
[0120] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0121] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, as well as combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions.
[0122] It should be noted that any reference numerals placed between parentheses in the claims should not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claims. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The invention can be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In claims that enumerate several means, several of these means may be embodied by the same hardware. The use of the terms first, second, third, etc., is merely for convenience of expression and does not indicate any order. These terms can be understood as part of the component names.
[0123] Furthermore, it should be noted that in the description of this specification, the terms "one embodiment," "some embodiments," "embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of the present invention. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples. Furthermore, without contradiction, those skilled in the art can combine and integrate the different embodiments or examples described in this specification, as well as the features of different embodiments or examples.
[0124] Although preferred embodiments of the invention have been described, those skilled in the art, upon learning the basic inventive concept, can make other changes and modifications to these embodiments. Therefore, the claims should be interpreted to include both the preferred embodiments and all changes and modifications falling within the scope of the invention.
[0125] Obviously, those skilled in the art can make various modifications and variations to this invention without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this invention and their equivalents, then this invention should also include these modifications and variations.
Claims
1. An automatic waste transfer control method based on multi-agency collaborative scheduling, characterized in that, The method comprises the following steps: According to the obtained load data of the garbage transport vehicle, the spatial distribution information of the unloading pit, the spatial occupation information and the unloading port information, the unloading port positioning parameters of the unloading pit, the vehicle unloading window period and the vehicle operation time beat are dynamically allocated to guide the corresponding vehicle to unload; Through the pushing mechanism, the material accumulated at the unloading port is transported to the working area of the discharging mechanism for discharging into the unloading pit by the discharging mechanism; The motion parameters and load data of the discharging mechanism are collected, and the matching state of the discharging mechanism and the vehicle operation time beat is judged; The three-dimensional profile data inside the unloading pit before and after discharging is monitored in real time by the laser scanning device, a dynamic volume model is established based on the three-dimensional profile data and the motion parameters, and the single discharging amount is calculated in real time combined with the preset material density parameters; When it is detected that the single discharging amount exceeds the preset tolerance range or the beat is out of synchronization, a multi-stage control instruction sequence is triggered to perform speed gradient adjustment of the discharging mechanism, intervention compensation of the pushing mechanism and redistribution adjustment of the unloading port.
2. The garbage automatic transfer control method based on multi-agency cooperative scheduling according to claim 1, characterized in that, According to the obtained load data of the garbage transport vehicle, the spatial distribution information of the unloading pit, the spatial occupation information and the unloading port information, the unloading port positioning parameters of the unloading pit, the vehicle unloading window period and the vehicle operation time beat are dynamically allocated to guide the corresponding vehicle to unload including: Real-time acquisition of the load data of the garbage transport vehicle, the spatial distribution information of the unloading pit, the spatial occupation information and the unloading port information; According to the load data of the garbage transport vehicle, the spatial distribution information of the unloading pit and the spatial occupation information, the path distance, the load matching degree and the anti-collision allowance of each unloading pit and the current vehicle are calculated, the spatial adaptation degree is generated by weighted scoring, the unloading pit with a spatial adaptation degree higher than a set threshold is screened, and the unloading port corresponding to the unloading pit is regarded as a candidate unloading port; Based on the pre-trained dynamic programming algorithm model, the available time window of each candidate unloading port is recursively solved from the terminal time to the initial time with the goal of maximizing the continuous utilization rate, and the available time window includes the starting time stamp, the duration and the efficiency weight coefficient; A conflict resolution tree model is constructed, the candidate unloading port and the available time window are combined as a decision node, the node weight is quantified by the product of the spatial adaptation degree and the efficiency weight coefficient, after traversing the conflict resolution tree model and pruning the branches with a weight value lower than a critical value layer by layer, the global optimal solution containing the optimal unloading port and time window combination is outputted; The duration of the time window in the global optimal solution is split into several basic time slices based on the vehicle operation time beat as the reference unit, wherein each vehicle operation time beat corresponds to the reference time consumption of the standard action sequence of the feeding positioning, unloading execution and displacement avoidance of the vehicle at the unloading port; The optimal unloading port and time window combination, the vehicle operation time beat and the corresponding basic time slice are encoded into a structured instruction stream and pushed to the corresponding vehicle. 3.The automatic waste transfer control method based on multi-agency collaborative scheduling according to claim 2, wherein, The motion parameters and load data of the discharging mechanism are collected, and the matching state of the discharging mechanism and the vehicle operation time beat is judged including: The running speed is collected through the speed sensor installed on the driving shaft of the discharging mechanism; Extract the time markers of the feeding positioning completion, unloading execution start and end, and shift avoidance action triggering in the vehicle operation time beat, and establish a three-stage timing reference of the vehicle operation time beat; Determine the periodic arrival time of the material receiving section of the unloading mechanism based on the operating speed of the unloading mechanism, compare the periodic arrival time of the material receiving section of the unloading mechanism with the three-stage timing reference, calculate the overlap duration of the unloading execution start and end with the material receiving section transport window, and determine the matching state of the unloading mechanism operation time beat and the vehicle operation time beat by monitoring the accumulation thickness and distribution form of the material on the surface of the unloading mechanism, wherein the unloading mechanism operation time beat is the periodic transport window time span of the material receiving section. 4.The automatic waste transfer control method based on multi-agency collaborative scheduling according to claim 1, wherein, Real-time monitoring of the three-dimensional profile data inside the unloading pit before and after unloading by laser scanning device, establishing a dynamic volume model based on three-dimensional profile data and motion parameters, and real-time calculation of single unloading volume including: Real-time acquisition of three-dimensional profile data inside the unloading pit before and after unloading by laser scanning device, extraction of garbage accumulation surface height distribution at the unloading start and end stages, and generation of average height value of garbage accumulation surface based on multi-point height sampling; According to the preset trapezoidal structure parameters and average height value of the unloading pit, the garbage flow cross-sectional area is constructed; Synchronously obtain the running speed of the unloading mechanism and the duration of single unloading, multiply the running speed of the unloading mechanism by the duration of single unloading to get the material displacement distance, and calculate the real-time volume change based on the garbage flow cross-sectional area to get the dynamic volume model; Call the corresponding garbage material density parameters from the historical database, associate and map the dynamic volume model with the garbage material density parameters, and output the single unloading weight. 5.The automatic waste transfer control method based on multi-agency collaborative scheduling according to claim 2, wherein, When it is detected that the single unloading volume exceeds the preset tolerance range or the beat is out of synchronization, a multi-level control instruction sequence is triggered to perform unloading mechanism variable gradient adjustment, push mechanism intervention compensation, and unloading port redistribution adjustment including: When it is detected that the single unloading volume exceeds the preset tolerance range or the matching state is out of synchronization, a multi-level control instruction sequence is triggered to perform the following steps: According to the deviation direction and absolute value of the beat matching, the deviation is divided into multiple control levels, wherein positive deviation represents over-limit unloading volume and negative deviation represents insufficient supply; When the single unloading volume exceeds the preset threshold, the running speed is gradually increased according to the positive deviation level, and the speed increment of each level is 5%-15% of the running speed of the unloading mechanism; When the material supply is insufficient, the negative deviation is triggered, and the running speed of the unloading mechanism is gradually reduced according to the control level, and the reduction amplitude of each level does not exceed the maximum allowed deceleration threshold; Based on the accumulation height and retention time of the accumulated material in the operating area of the unloading mechanism, the push mechanism is started for directional pushing operation, and continuous pushing or intermittent pulse pushing compensation is performed on the local retention area; According to the accumulation thickness of the material on the surface of the unloading mechanism, when the local accumulation thickness is identified to exceed the safety threshold, the vehicle access permission of the corresponding unloading port is temporarily locked, and the audible and visual warning is activated to guide the vehicle to shift to the unloading port that is not occupied and has the optimal path accessibility among the candidate unloading ports. Synchronous association of the chain plate machine speed gradient adjustment amount, the push mechanism intervention frequency and the unloading port distribution information, through closed loop feedback to suppress the material flow oscillation in the adjustment process; Monitoring the fluctuation value of the unloading amount and the beat matching state in the preset time window, if it is not restored to the tolerance range or the beat synchronization, the iterative multi-level control instruction sequence is triggered. 6.The automatic waste transfer control method based on multi-agency collaborative scheduling according to claim 5, wherein, Beat desynchronization refers to the work timing dislocation state triggered by at least one of the following conditions: The overlap duration of the vehicle unloading execution period and the unloading mechanism receiving segment transport window is lower than the preset overlap threshold; The accumulation thickness of the material on the surface of the unloading mechanism exceeds the form safety threshold, and the distribution form indicates that the unloading execution action is not completed in the receiving segment transport window; The deviation of the total time consumed from the reference time consumed from the completion of the vehicle feeding positioning to the triggering of the displacement avoidance action exceeds the preset vehicle beat tolerance range; Non-planned interruption occurs in the periodic arrival time sequence of the receiving segment of the unloading mechanism, resulting in the inability to form continuous matching with the vehicle work time beat.
7. The multi-agency collaborative dispatch-based automatic waste transfer control method according to any one of claims 1-6, wherein, Also includes: When the cumulative unloading amount reaches the target value, the garbage material compression and packaging work program is automatically triggered, and the vehicle access permission of the corresponding unloading port area is synchronously locked; Reset the cumulative unloading amount counter after the packaging work is completed, and dynamically update the packaging threshold of the next period according to the volume of the compressed material; Integrate the single unloading amount calculated in the current period, the beat matching state, the multi-level control instruction sequence and the data generated in the instruction execution process as the reference scheme for the next work period.
8. An automatic garbage transfer control system based on multi-agency cooperative scheduling, characterized by, It includes: The unloading mechanism includes a chain plate machine for transporting unloading to the unloading pit, and the unloading segment of the chain plate machine extends to the unloading pit to form a continuous unloading channel; The push mechanism is arranged in the transfer corridor between the unloading port and the receiving segment, and is used for pushing the garbage to the working area of the chain plate machine; The laser scanning device is arranged at the unloading port of the chain plate machine; The gravimetric meter is arranged in the approach area of the garbage transport vehicle; And the control platform is connected with the push mechanism, the unloading mechanism, the laser scanning device and the gravimetric meter respectively, and is used for executing the method as claimed in any one of claims 1-7. 9.The multi-agency collaborative dispatching based automatic waste transfer control system of claim 8, wherein, The control platform includes a main control unit, a chain plate machine control unit, a push mechanism control unit and a laser scanner control unit connected with the main control unit.
10. The garbage automatic transfer control system based on multi-mechanism cooperative scheduling according to claim 9, wherein The chain plate machine control unit includes a chain plate machine drive sub-unit connected with the chain plate machine and the main control unit respectively, and a motion feedback sub-unit connected with the chain plate machine and the main control unit respectively; The push mechanism control unit includes a push mechanism drive sub-unit connected with the push mechanism and the main control unit respectively; The laser scanning control unit includes a scanning control sub-unit connected with the laser scanning device and the main control unit respectively.
Citation Information
Patent Citations
Real-time cooperative scheduling control method and system for garbage power plant
CN115963787A
Automatic control method of intelligent garbage crane
CN120039776A
Fine sorting and regenerating system for construction waste brick-concrete materials
CN120276550A
Garbage management system and garbage management method
JP2021120597A
Cited By
Autonomous unloading method and device, electronic equipment and storage medium
CN121974061A