Deformation characteristic analysis method for outlet slope of flood discharge building

By dynamically correcting slope material parameters and compensating for time delay errors, combined with seepage-stress coupling stability calculations, accurate analysis and timely early warning of slope deformation characteristics are achieved, solving the problems of insufficient analysis accuracy and untimely early warning in existing technologies.

CN121389859APending Publication Date: 2026-01-23POWER CHINA KUNMING ENG CORP LTD +2
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202511346288.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-09-19
Publication Date
2026-01-23

AI Technical Summary

Technical Problem

Existing technologies lack a comprehensive analysis of slope deformation characteristics, fail to organically combine displacement monitoring data with internal mechanical state, ignore the impact of data transmission delay error, and cannot dynamically adapt to changes in slope material parameters, making it difficult to accurately reflect the stability of slopes under complex working conditions.

Method used

By acquiring the geotechnical and hydraulic load parameters of the target slope, dynamically correcting the material constitutive parameters, and combining time-dependent deformation decomposition and time delay error compensation, perform seepage-stress coupling stability calculations, output creep displacement components, elastic displacement components, and slope stability safety factors, and construct a multi-level linkage early warning mechanism.

Benefits of technology

It enables precise analysis of slope deformation characteristics, improves the timeliness and accuracy of monitoring data, can issue early warnings in a timely manner, and provides more comprehensive decision-making basis, solving the problems of insufficient analysis accuracy and untimely early warning in existing technologies.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121389859A_ABST
    Figure CN121389859A_ABST
Patent Text Reader

Abstract

The invention provides a method for analyzing deformation characteristics of an exit slope of a flood discharge building, which comprises the following steps of: firstly, collecting geotechnical parameters, hydraulic load parameters, GNSS displacement, pore water pressure and clinometer data of the slope; then, constitutive parameters of the slope stability model are dynamically corrected, GNSS displacement is decomposed into creep and elastic displacement components, and the time delay error of pore water pressure data is compensated; thirdly, seepage-stress coupling stability calculation is conducted in combination with the compensated pore water pressure and inclinometer data, and the slope stability safety coefficient is obtained. And finally, outputting the creep displacement, the elastic displacement and the stability safety coefficient to an early warning terminal. According to the invention, the accuracy and reliability of slope stability evaluation can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of slope stability monitoring in water conservancy projects, and more particularly, to a deformation characteristic analysis method for the outlet slope of a flood discharge structure. BACKGROUND

[0002] In the construction of water conservancy projects, the stability of the outlet slope of a flood discharge structure is one of the key factors to ensure the safe operation of the project. With the continuous expansion of the scale of water conservancy projects and the increasing complexity of the operating environment, the problem of slope deformation has attracted increasing attention. In the prior art, slope deformation monitoring mainly relies on traditional displacement monitoring methods such as GNSS, inclinometers, etc. These devices can obtain real-time displacement data of the slope, but cannot directly reflect the internal mechanical state and deformation mechanism of the slope. At the same time, for the evaluation of slope stability, the static limit equilibrium method or finite element analysis is usually used, which has shortcomings in considering the dynamic deformation characteristics of the slope, and it is difficult to accurately predict the stability change of the slope under complex hydraulic loads.

[0003] In the processing of slope deformation monitoring data, the existing technology often ignores the time delay error that may be introduced in the data transmission process, which affects the timeliness and accuracy of the monitoring data. In addition, for the determination of slope material parameters, a fixed constitutive model parameter is usually used, but these parameters will change dynamically with time and environmental conditions in actual engineering, therefore, the existing parameter correction method cannot meet the accuracy requirements of slope deformation characteristic analysis.

[0004] In the implementation of the embodiments of the present application, there are at least the following problems or defects in the prior art: first, there is a lack of comprehensive analysis of the deformation characteristics of the slope, and the displacement monitoring data and the internal mechanical state are not organically combined; second, the existing technology does not fully consider the influence of data transmission time delay error on the analysis results when processing monitoring data; third, the existing slope stability evaluation method cannot dynamically adapt to the changes of slope material parameters, and it is difficult to accurately reflect the stability of the slope under complex working conditions. SUMMARY

[0005] The present application provides a deformation characteristic analysis method for the outlet slope of a flood discharge structure, comprising: obtaining the rock-soil parameters and hydraulic load parameters of the target slope as the target slope parameter set, wherein the monitoring data of the outlet slope of the flood discharge structure includes a GNSS displacement sequence, a pore water pressure sequence and an inclinometer data sequence, and the GNSS displacement sequence, the pore water pressure sequence and the inclinometer data sequence are transmitted to a central processing device through a water conservancy special network; According to the target slope parameter set, the material constitutive parameters in the slope stability calculation model are dynamically corrected to obtain a corrected constitutive parameter set; based on the corrected constitutive parameter set, the GNSS displacement sequence is time-dependent deformation decomposition, get creep displacement component and elastic displacement component; The data transmission link included in the water conservancy special network is compensated for time delay error to obtain a compensated pore water pressure sequence. Combined with the compensated pore water pressure sequence and the tiltmeter data sequence, the seepage-stress coupling stability calculation is performed to obtain the slope stability safety factor; The creep displacement component, elastic displacement component and slope stability safety factor are output as deformation characteristic analysis results to the early warning terminal.

[0006] Further, the dynamic correction of the constitutive parameters according to the target slope parameter set comprises: Analyzing the initial value of the rock mass shear modulus, the initial value of the permeability coefficient and the flood discharge water head time history curve in the target slope parameter set; Through the inversion calculation module, the GNSS displacement sequence is used as the constraint condition to iteratively optimize the rock mass shear modulus correction coefficient and the permeability coefficient correction coefficient; The initial value of the rock mass shear modulus is multiplied by the rock mass shear modulus correction coefficient to obtain the updated shear modulus; The initial value of the permeability coefficient is multiplied by the permeability coefficient correction coefficient to obtain the updated permeability coefficient; The updated shear modulus and the updated permeability coefficient constitute the corrected constitutive parameter set.

[0007] Further, the time-dependent deformation decomposition of the GNSS displacement sequence comprises: An improved Burgers creep model is used to establish a displacement-time relationship equation:

[0008] Wherein, is the total displacement at time t; is the elastic displacement component; is the creep displacement component; is the initial stress; is the instantaneous elastic modulus; is the delayed elastic modulus; is the viscous coefficient; is the viscous coefficient; t is time.

[0009] The corrected constitutive parameter set is substituted into the displacement-time relationship equation to solve the components.

[0010] Further, the time delay error compensation of the data transmission link comprises: A time stamp marking device is deployed in the water conservancy special network to record the collection time and the receiving time of the pore water pressure data; Computing transmission time delay; Reconstructing real pore water pressure value at collection time based on osmotic diffusion equation:

[0011] Wherein, is compensated pore water pressure; is original pore water pressure; is rock permeability attenuation coefficient; is transmission time delay.

[0012] Further, the seepage-stress coupling stability calculation comprises: Establishing a three-dimensional finite element model of the slope, and loading the compensated pore water pressure sequence as a boundary condition; Using the modified Mohr-Coulomb criterion to calculate the shear strength of the unit:

[0013] Wherein, is shear strength; c' is effective cohesion; is normal total stress; is compensated pore water pressure; is effective internal friction angle.

[0014] The slope stability safety factor is solved by iteration through the strength reduction method.

[0015] Further, the optimization process of the inversion calculation module comprises: Constructing a displacement residual objective function:

[0016] Wherein, is objective function; is to-be-inverted parameter vector; N is the number of observation data; is observed displacement at time t; is calculated displacement at time t; is regularization parameter; is parameter initial vector.

[0017] The Levenberg-Marquardt algorithm is used to minimize the objective function.

[0018] Further, the determination of the rock mass saturated hydraulic conductivity correction factor comprises: Three drill hole groups are arranged on a typical profile of the slope downstream of the flood discharge building, each drill hole group containing a main hole and two observation holes; A step pulse water pressure test is performed on each main hole, and an initial water pressure is applied , which is maintained , and the pressure is increased in steps to , wherein each step is maintained for ; The water pressure diffusion decay curve is recorded through the observation hole, and the unsaturated hydraulic conductivity of the rock formation is calculated:

[0019] wherein, is the unsaturated hydraulic conductivity; is the radius of the main hole; R is the influence radius; t is the time; is the change amount of the matrix suction; is the logarithmic change amount of time.

[0020] A nonlinear relationship between the flood discharge velocity and the hydraulic conductivity correction factor is established:

[0021] wherein, is the hydraulic conductivity correction factor; is the saturated hydraulic conductivity; is an empirical coefficient; is the flood discharge velocity; g is the acceleration of gravity; h is the water head; is the partial derivative of the unsaturated hydraulic conductivity with respect to the matrix suction.

[0022] According to the measured flow velocity data during the flood discharge period, the value of \alpha is dynamically updated, and the correction factor is recalibrated once an hour.

[0023] Further, the output deformation feature analysis result comprises: A multi-level linkage early warning mechanism is constructed: when >5mm and >0.2mm / d, a first-level warning is activated; when >10mm or FS<1.35, a second-level warning is activated; when >15mm and FS<1.25, a third-level warning is activated; when >25mm or FS<1.05, a fourth-level warning is activated; wherein, is the creep displacement component; is the creep displacement rate; FS is the safety factor of the slope stability; a spatiotemporal fusion analysis report is generated: the contour map of the creep displacement component in the slope elevation-time coordinate system; the phase lag correlation analysis of the flood discharge water head and the safety factor; the probability cloud map of the potential sliding surface position; The report is encrypted by the national SM9 algorithm and transmitted to the early warning terminal through the water conservancy special network; Synchronously write key parameters into the slope deformation block chain to generate an unalterable time stamp record.

[0024] Further, the three-dimensional finite element model comprises: According to the ground penetrating radar scanning data, a slope structure surface network is constructed. A strain softening constitutive model is used for the fault zone:

[0025] wherein c' is the current effective cohesion; is the residual effective cohesion; is the peak effective cohesion; is the softening coefficient; is the plastic strain.

[0026] A grid encryption area is arranged within a range of 50 meters downstream of the flood discharge outlet.

[0027] Further, the target slope parameter set comprises: Exploration profiles are arranged within a range of 50 meters downstream of the flood discharge outlet, and cross-hole seismic CT detection is implemented: source point interval , receiving point interval ; an impact source is used to excite shear waves, and the center frequency = 200 Hz; The first arrival wave travel time is used to invert the rock mass shear wave velocity distribution:

[0028] wherein, is the shear wave velocity; G is the shear modulus; is the rock mass density.

[0029] In-situ compression and shear tests are performed in the shear wave velocity anomaly area: a bidirectional hydraulic loading device is installed, and the normal stress wherein, is the normal stress; is the uniaxial compressive strength; the shear stress is applied in steps wherein, is the j-th level shear stress; is the j-1-th level shear stress; is the shear strength; According to the inflection point of the shear stress-displacement curve, the peak strength parameters of the rock mass are determined; Based on the flood discharge gate opening and closing log, a water head time history function is constructed:

[0030] wherein H(t) is the water head at time t; is the initial water head; is a flow coefficient; is a flood discharge at time t; is a cumulative flood discharge from 0 to t; is a partial derivative of water level with respect to flow.

[0031] The above-mentioned embodiments of the present application have at least the following beneficial effects: 1. By dynamically correcting the constitutive parameters of the slope material, the present application can accurately adjust the mechanical properties of the slope according to real-time monitoring data, thereby more accurately reflecting the actual deformation behavior of the slope under different working conditions, solving the problem of insufficient analysis accuracy caused by the use of fixed parameters in the prior art, and significantly improving the reliability of the slope deformation characteristic analysis.

[0032] 2. The time delay error compensation technology is used to process the pore water pressure data, effectively eliminating the errors introduced in the data transmission process, and ensuring the timeliness and accuracy of the monitoring data. This enables more accurate evaluation of the stability of the slope based on more realistic data when performing seepage-stress coupling stability calculation, thereby solving the problem of stability evaluation deviation caused by data transmission delay in the prior art.

[0033] 3. The deformation characteristic analysis results are output in combination with the creep displacement component, the elastic displacement component and the slope stability safety factor, and a multi-level linkage early warning mechanism is constructed, so that the present application can monitor the deformation state of the slope in real time and issue timely warnings. This comprehensive analysis and warning method not only improves the efficiency of slope safety management, but also provides more comprehensive decision-making basis for engineering personnel, effectively solving the problems of separation of slope deformation monitoring and stability evaluation and untimely warning in the prior art. BRIEF DESCRIPTION OF DRAWINGS

[0034] The above and other objects, features and advantages of the exemplary embodiments of the present application will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: Figure 1 The flowchart of the deformation characteristic analysis method of the outlet slope of the flood discharge structure provided by an embodiment of the present application is shown. DETAILED DESCRIPTION

[0035] The principles and spirits of the present application will be described below with reference to several exemplary embodiments. It should be understood that these embodiments are given only to enable those skilled in the art to better understand and implement the present application, and do not limit the scope of the present application in any way. On the contrary, these embodiments are provided to make the present application more thorough and complete, and to fully convey the scope of the present application to those skilled in the art.

[0036] Those skilled in the art will recognize that embodiments of the present invention can be implemented as a system, apparatus, device, method, or computer program product. Therefore, the present invention can be specifically implemented in the following forms: entirely hardware, entirely software (including firmware, resident software, microcode, etc.), or a combination of hardware and software.

[0037] It should be noted that the number of any elements in the accompanying drawings is for illustrative purposes only and not as a limitation, and any naming is for distinction only and has no limiting meaning.

[0038] The following is for reference. Figure 1 , Figure 1 This is a flowchart illustrating a method for analyzing the deformation characteristics of the outlet slope of a flood discharge structure according to an embodiment of the present invention. Figure 1 As shown, a method for analyzing the deformation characteristics of the outlet slope of a flood discharge structure includes: S1. Obtain the soil and rock parameters and hydraulic load parameters of the target slope as the target slope parameter set. The monitoring data of the outlet slope of the flood discharge structure includes GNSS displacement sequence, pore water pressure sequence and inclinometer data sequence. The GNSS displacement sequence, pore water pressure sequence and inclinometer data sequence are transmitted to the central processing device through the water conservancy network. S2. Based on the target slope parameter set, the material constitutive parameters in the slope stability calculation model are dynamically corrected to obtain the corrected constitutive parameter set. S3. Based on the modified constitutive parameter set, perform time-dependent deformation decomposition on the GNSS displacement sequence to obtain creep displacement components and elastic displacement components. S4. Perform time delay error compensation on the data transmission links included in the water conservancy private network to obtain the compensated pore water pressure sequence; S5. Combining the compensated pore water pressure sequence and the tiltmeter data sequence, perform seepage-stress coupling stability calculation to obtain the slope stability safety factor. S6. Output the creep displacement component, elastic displacement component, and slope stability safety factor as deformation characteristic analysis results to the early warning terminal.

[0039] The application provides a deformation feature analysis method for an outlet slope of a flood discharge building, aiming to accurately evaluate the stability of the slope through comprehensive monitoring data and dynamic analysis means. The geotechnical parameters and hydraulic load parameters of the target slope refer to the physical and mechanical property parameters related to the stability of the slope, including the density, elastic modulus, and permeability coefficient of the geotechnical body, and the water head height and flood discharge flow of the hydraulic load. These parameters are the basic data for slope stability analysis. The GNSS displacement sequence in the monitoring data refers to the time series data of the real-time monitoring of the displacement change of the slope surface through the global navigation satellite system (GNSS); the pore water pressure sequence refers to the time series data of the monitoring of the pore water pressure change in the slope; and the tiltmeter data sequence refers to the time series data of the measurement of the inclination angle change of the slope through the tiltmeter. These data are transmitted to the central processing device through the water conservancy special network for subsequent analysis. The water conservancy special network is a special communication network for ensuring the reliable transmission of water conservancy monitoring data.

[0040] Specifically, the target slope parameter set refers to the parameter set formed by integrating the geotechnical parameters and the hydraulic load parameters, which is used for subsequent correction of the slope stability calculation model. The geotechnical parameters include the shear modulus and permeability coefficient of the rock mass, which reflect the mechanical properties and hydraulic properties of the geotechnical body. The hydraulic load parameters include the flood discharge water head time history curve, i.e., the change curve of the water head height with time, which reflects the effect of the water pressure on the slope during the flood discharge process. In the dynamic correction of the material constitutive parameters in the slope stability calculation model, the material constitutive parameters refer to the parameters describing the mechanical behavior of the slope geotechnical material, such as the elastic modulus, cohesion, and internal friction angle. Dynamic correction refers to adjusting these parameters according to the real-time monitoring data to reflect the actual mechanical state of the slope under different working conditions. In the time-dependent deformation decomposition of the GNSS displacement sequence, time-dependent deformation decomposition refers to decomposing the displacement data into creep displacement components and elastic displacement components. Creep displacement refers to the slow deformation of the slope under long-term load, while elastic displacement refers to the recoverable deformation of the slope under load. In the time delay error compensation of the data transmission link included in the water conservancy special network, time delay error compensation refers to calculating the time delay of data transmission and correcting the monitoring data to eliminate the influence of transmission time delay on the analysis results.

[0041] Preferably, in the dynamic correction of material constitutive parameters in the slope stability calculation model, an inversion calculation module can be used. This module uses the GNSS displacement sequence as the constraint condition, and optimizes the rock shear modulus correction coefficient and the permeability coefficient correction coefficient through an iterative optimization algorithm. Specifically, by analyzing the initial values of the rock shear modulus and the initial values of the permeability coefficient in the target slope parameter set, combined with the time history curve of the flood discharge water head, the inversion calculation module is used to correct these parameters. The corrected constitutive parameter set will be used for subsequent displacement sequence decomposition and stability calculation. In the time-dependent deformation decomposition of the GNSS displacement sequence, an improved Burgers creep model can be used. This model decomposes the total displacement into an elastic displacement component and a creep displacement component by establishing a displacement-time relationship equation. In the time delay error compensation of the data transmission link, a timestamp marking device can be deployed in the water conservancy special network to record the collection time and the receiving time of the pore water pressure data, calculate the transmission delay, and reconstruct the real pore water pressure value at the collection time based on the seepage diffusion equation. In the seepage-stress coupled stability calculation, a three-dimensional finite element model of the slope can be established, the compensated pore water pressure sequence is loaded as the boundary condition, and the shear strength of the unit is calculated using the modified Mohr-Coulomb criterion, and the slope stability safety factor is iteratively solved by the strength reduction method.

[0042] In some embodiments, the dynamic correction of the constitutive parameters according to the target slope parameter set comprises: analyzing the initial values of the rock shear modulus and the initial values of the permeability coefficient in the target slope parameter set, and the time history curve of the flood discharge water head; iteratively optimizing the rock shear modulus correction coefficient and the permeability coefficient correction coefficient through an inversion calculation module with the GNSS displacement sequence as the constraint condition; multiplying the initial values of the rock shear modulus by the rock shear modulus correction coefficient to obtain the updated shear modulus; multiplying the initial values of the permeability coefficient by the permeability coefficient correction coefficient to obtain the updated permeability coefficient; the corrected constitutive parameter set is composed of the updated shear modulus and the updated permeability coefficient.

[0043] It should be noted that the method for dynamically correcting the slope material constitutive parameters in the present application is based on the initial values of the rock shear modulus and the initial values of the permeability coefficient in the target slope parameter set, and the time history curve of the flood discharge water head. Through the inversion calculation module, the rock shear modulus correction coefficient and the permeability coefficient correction coefficient are iteratively optimized with the GNSS displacement sequence as the constraint condition. This method can dynamically adjust the mechanical parameters of the slope material according to real-time monitoring data, thus more accurately reflecting the mechanical behavior of the slope under different working conditions. The inversion calculation module is a mathematical optimization-based calculation tool used to back-calculate unknown parameter values from known monitoring data to improve the accuracy and reliability of the model.

[0044] Specifically, the initial value of the rock shear modulus refers to the initial estimate of the rock shear modulus set at the beginning of the analysis, which reflects the rock's resistance to shear deformation in the initial state. The initial value of the permeability coefficient refers to the ability of the rock to allow water to flow through in the initial state, reflecting the water permeability of the rock. The time history curve of the flood discharge water head refers to the change curve of the water head height with time during the flood discharge process, which reflects the effect of water pressure on the slope during the flood discharge process. In the dynamic correction process, the rock shear modulus correction coefficient and the permeability coefficient correction coefficient are adjustment factors obtained by inversion calculation, which are used to correct the initial value to more accurately reflect the actual working conditions. The inversion calculation module uses the GNSS displacement sequence as the constraint condition, and adjusts the correction coefficient through the iterative optimization algorithm until the displacement output by the model is closest to the actual monitoring displacement. The iterative optimization here refers to the process of gradually approaching the optimal solution through multiple loop calculations.

[0045] Preferably, when performing dynamic correction, the following steps can be taken: first, extract the initial value of the rock shear modulus, the initial value of the permeability coefficient and the time history curve of the flood discharge water head from the target slope parameter set. Then, use the inversion calculation module to calculate the rock shear modulus correction coefficient and the permeability coefficient correction coefficient by using the GNSS displacement sequence as the constraint condition and through the iterative optimization algorithm. Specifically, the inversion calculation module will adjust the correction coefficient according to the difference between the GNSS displacement sequence and the model predicted displacement, so that the error between the model predicted displacement and the actual monitored displacement is minimized. Finally, the corrected shear modulus and permeability coefficient are substituted into the slope stability calculation model for subsequent analysis. This method can dynamically reflect the changes of slope material parameters, improve the accuracy and reliability of slope deformation feature analysis.

[0046] In some embodiments, the time-dependent deformation decomposition of the GNSS displacement sequence comprises: An improved Burgers creep model is used to establish a displacement-time relationship equation:

[0047] wherein, is the total displacement at time t; is the elastic displacement component; is the creep displacement component; is the initial stress; is the instantaneous elastic modulus; is the delayed elastic modulus; is the viscous coefficient; is the viscous coefficient; t is time.

[0048] Substitute the corrected set of constitutive parameters into the displacement-time relationship equation to solve the components.

[0049] It should be noted that the method of time-dependent deformation decomposition of GNSS displacement sequence in the present application is realized by using the improved Burgers creep model. This model can decompose the displacement into creep displacement component and elastic displacement component, so as to more clearly reflect the deformation characteristics of the slope at different time scales. This method helps to distinguish the short-term elastic deformation and long-term creep deformation of the slope, and provides more comprehensive data support for slope stability analysis. Among them, time-dependent deformation decomposition refers to the decomposition of displacement data according to time effect to distinguish different types of deformation behavior; the creep displacement component refers to the slow and irreversible deformation of the slope under long-term load; the elastic displacement component refers to the recoverable deformation of the slope under load.

[0050] Specifically, the improved Burgers creep model is a mathematical model for describing the creep behavior of materials, which simulates the deformation process of the slope by establishing the relationship equation between displacement and time. In this model, the total displacement is composed of elastic displacement and creep displacement. The elastic displacement is related to the initial stress and instantaneous elastic modulus, which reflects the deformation of the slope under instantaneous load; the creep displacement is related to the delayed elastic modulus, viscous coefficient and viscosity coefficient, which reflects the deformation of the slope under long-term load. These parameters can be obtained by experiment or empirical formula, or can be obtained by inversion calculation. In the present application, by substituting the modified constitutive parameter set into the model, the creep displacement component and the elastic displacement component can be solved, thereby providing more accurate data support for slope stability analysis.

[0051] Preferably, when performing time-dependent deformation decomposition, the following steps can be performed: first, according to the geotechnical parameters and hydraulic load parameters of the target slope, the values of each parameter in the improved Burgers creep model are determined, including instantaneous elastic modulus, delayed elastic modulus, viscous coefficient and viscosity coefficient, etc. These parameters can be obtained by experimental test, empirical formula or inversion calculation. Then, the modified constitutive parameter set is substituted into the displacement-time relationship equation of the improved Burgers creep model, and the total displacement, elastic displacement component and creep displacement component at each time point are calculated by numerical solution method. Specifically, the creep displacement component can be calculated by numerical integration method, and the elastic displacement component can be solved by linear equation. Finally, the decomposed creep displacement component and elastic displacement component are compared and analyzed with the original GNSS displacement sequence to verify the accuracy of the decomposition result. This method can more clearly reflect the deformation characteristics of the slope at different time scales, and provide more comprehensive data support for slope stability analysis.

[0052] In some embodiments, the time delay error compensation of the data transmission link comprises: The timestamp marking device is deployed in a water conservancy special network to record the collection time and the receiving time of the pore water pressure data; Calculate the transmission delay; Reconstruct the real pore water pressure value at the collection time based on the osmotic diffusion equation:

[0053] wherein, is the compensated pore water pressure; is the original pore water pressure; is the rock mass permeation attenuation coefficient; is the transmission delay.

[0054] It should be noted that the method for compensating the time delay error of the water conservancy special network data transmission link in the present application is based on the timestamp recording of the pore water pressure data and the osmotic diffusion equation. This method calculates the time delay of data transmission and corrects the original pore water pressure data to obtain more accurate pore water pressure values. This process can effectively eliminate the time delay error introduced in the data transmission process, ensuring the timeliness and accuracy of the monitoring data and providing reliable data support for subsequent slope stability analysis. The time delay error compensation refers to the process of correcting the error of the monitoring data due to time delay in the transmission process; the timestamp marking device is a device for recording the data collection and receiving time, which can mark the time information of the data on the data transmission link.

[0055] Specifically, the water conservancy special network refers to a special network for water conservancy monitoring data transmission, which can ensure the security and reliability of the data. The timestamp marking device is deployed in the water conservancy special network to record the collection time and the receiving time of the pore water pressure data. The difference between the two times is the transmission delay. In the osmotic diffusion equation, the original pore water pressure refers to the uncorrected monitoring data, and the compensated pore water pressure refers to the pore water pressure value after time delay error compensation. The rock mass permeation attenuation coefficient is a parameter related to the permeation characteristics of the rock mass, which reflects the degree of attenuation of the pore water pressure in the rock mass with time. This coefficient can be obtained through experiments or empirical formula. In the present application, the original pore water pressure is corrected by calculating the transmission delay and combining the osmotic diffusion equation, so as to obtain more accurate pore water pressure values.

[0056] Preferably, when performing the time delay error compensation, the following steps can be performed: first, deploying a time stamp marking device in the water conservancy network to record the collection time and the receiving time of the pore water pressure data. Then, calculate the difference between the two times to get the time delay of data transmission. Next, use the osmotic diffusion equation to correct the original pore water pressure. Specifically, according to the rock mass permeation attenuation coefficient and the transmission time delay, the compensated pore water pressure value is calculated. This process can be realized by numerical calculation method, for example, multiplying the original pore water pressure by an attenuation factor, which is determined by the rock mass permeation attenuation coefficient and the transmission time delay. Finally, the corrected pore water pressure value is used for subsequent slope stability analysis, thereby improving the accuracy of the analysis results. This method can effectively eliminate the influence of data transmission time delay on the pore water pressure monitoring data, and provide more reliable data support for slope stability evaluation.

[0057] In some embodiments, the seepage-stress coupling stability calculation comprises: A three-dimensional finite element model of the slope is established, and the compensated pore water pressure sequence is loaded as a boundary condition; The unit shear strength is calculated using the modified Mohr-Coulomb criterion:

[0058] wherein, is the shear strength; c' is the effective cohesion; is the normal total stress; is the compensated pore water pressure; is the effective internal friction angle.

[0059] The slope stability safety factor is iteratively solved by the strength reduction method.

[0060] It should be noted that the seepage-stress coupling stability calculation in the present application is based on a three-dimensional finite element model of the slope, which comprehensively considers the compensated pore water pressure sequence and the inclinometer data sequence, calculates the unit shear strength using the modified Mohr-Coulomb criterion, and iteratively solves the slope stability safety factor using the strength reduction method. This method can more accurately reflect the stability of the slope under the combined action of seepage and stress, and solves the problem of separation of seepage and stress analysis in traditional methods. Among them, the seepage-stress coupling stability calculation refers to considering the influence of seepage and stress on the stability of the slope at the same time, and improving the accuracy of stability evaluation through coupling analysis; the three-dimensional finite element model of the slope is a numerical model used to simulate the mechanical behavior of the slope, which can consider the geometry, material properties and load conditions of the slope.

[0061] Specifically, the three-dimensional finite element model of the slope is constructed by dividing the slope into multiple small elements, and the mechanical behavior of each element can be described by constitutive relations. In the model, the compensated pore water pressure sequence is loaded as a boundary condition, reflecting the distribution of pore water pressure inside the slope; the inclinometer data sequence is used to determine the slope's tilt state, providing initial or boundary conditions for the model. When calculating the shear strength of the elements, the modified Mohr-Coulomb criterion is adopted, where shear strength refers to the ability of the slope soil material to resist shear failure; effective cohesion and effective internal friction angle are parameters reflecting the material's cohesiveness and frictional characteristics; total normal stress refers to the normal stress acting on the element; and compensated pore water pressure refers to the pore water pressure value after time delay error compensation. The slope stability safety factor is solved iteratively using the strength reduction method, that is, gradually increasing the reduction coefficient until the slope reaches a critical stable state, thus obtaining the stability safety factor.

[0062] Preferably, the following steps can be taken when performing seepage-stress coupled stability calculations: First, construct a three-dimensional finite element model of the slope based on its geological conditions and monitoring data. The model should include the slope's geometry, the mechanical parameters of the soil and rock materials, and seepage boundary conditions. Then, load the compensated pore water pressure sequence as boundary conditions into the model, and initialize the model using tiltmeter data sequences. Next, calculate the shear strength of each element using the modified Mohr-Coulomb criterion. Specifically, calculate the shear strength of the element based on the total normal stress and compensated pore water pressure. Finally, iteratively solve for the slope stability safety factor using the strength reduction method. During the iteration process, gradually increase the reduction coefficient until the slope reaches a critical stability state; the reduction coefficient at this point is the slope stability safety factor. This method can more accurately reflect the slope's stability under the combined action of seepage and stress, providing a reliable basis for slope safety assessment.

[0063] In some embodiments, the optimization process of the inversion calculation module includes: Construct the objective function for displacement residuals:

[0064] in, The objective function is... Here is the vector of parameters to be inverted; N is the number of observation data. for The observed displacement at any given time; for Calculate the displacement at time t; For regularization parameters; This is the initial vector for the parameters.

[0065] The Levenberg-Marquardt algorithm is used to minimize the objective function.

[0066] It should be noted that the optimization process of the inversion calculation module in the present application is realized by constructing a displacement residual objective function and minimizing the objective function using the Levenberg-Marquardt algorithm. This method can dynamically adjust the rock mass shear modulus correction coefficient and the permeability coefficient correction coefficient according to GNSS displacement monitoring data, thereby improving the accuracy of slope stability analysis. The displacement residual objective function refers to the rationality of the model parameters by calculating the difference between the observed displacement and the calculated displacement; the Levenberg-Marquardt algorithm is a commonly used nonlinear optimization algorithm for solving minimization problems and can efficiently find the optimal parameters.

[0067] Specifically, the displacement residual objective function is constructed by comparing the difference between the observed displacement and the calculated displacement. The observed displacement refers to the slope displacement data actually measured by GNSS monitoring equipment, and the calculated displacement refers to the displacement value calculated according to the current model parameters. The objective function also includes a regularization term to prevent overfitting, wherein the regularization parameter is a coefficient used to balance data fitting and model complexity; the parameter initial vector refers to the initial value of the parameters at the beginning of the optimization algorithm. In the optimization process, the to-be-inverted parameter vector refers to the parameter set that needs to be adjusted by the optimization algorithm, such as the rock mass shear modulus correction coefficient and the permeability coefficient correction coefficient. By minimizing the objective function, the optimal parameter value can be obtained, thereby improving the fitting accuracy of the model to the observed data.

[0068] Preferably, when optimizing the inversion calculation module, the following steps can be performed: first, construct a displacement residual objective function according to the observed data and the initial model parameters. The construction of the objective function needs to consider the reliability of the observed data and the complexity of the model, and balance through the regularization parameter. Then, select a suitable initial parameter vector, which can be based on experience or pre-experimental results. Next, the Levenberg-Marquardt algorithm is used to minimize the objective function. This algorithm combines the advantages of gradient descent and Gauss-Newton methods, and can quickly converge to the optimal solution. In each iteration, the algorithm calculates the gradient and Hessian matrix of the objective function according to the current parameters, and then adjusts the parameter values to reduce the value of the objective function. Finally, when the value of the objective function no longer decreases significantly, the algorithm stops iteration and obtains the optimal parameter value. This method can dynamically adjust the slope material parameters, improve the accuracy and reliability of slope stability analysis.

[0069] In some embodiments, the determination of the rock mass saturated hydraulic conductivity correction factor comprises: Three borehole groups are arranged on the typical section of the downstream slope of the flood discharge structure, each borehole group containing a main hole and two observation holes; A stepped pulse water pressure test is performed on each main hole, and an initial water pressure is applied , lasting , the pressure is increased to , wherein , each stage lasts ; The water pressure diffusion decay curve is recorded through the observation hole, and the rock mass unsaturated hydraulic conductivity is calculated:

[0070] wherein, is the unsaturated hydraulic conductivity; is the main hole radius; R is the influence radius; t is time; is the change amount of matrix suction; is the logarithmic change amount of time.

[0071] A nonlinear relationship between the flood discharge velocity and the hydraulic conductivity correction factor is established:

[0072] wherein, is the hydraulic conductivity correction factor; is the saturated hydraulic conductivity; is an empirical coefficient; is the flood discharge velocity; g is the acceleration of gravity; h is the water head; is the partial derivative of the unsaturated hydraulic conductivity with respect to the matrix suction.

[0073] The value of \alpha is dynamically updated according to the measured flood discharge velocity data, and the correction factor is recalibrated once an hour.

[0074] It should be noted that the determination of the rock mass saturated hydraulic conductivity correction factor in the present application is achieved by arranging borehole groups on the typical section of the downstream slope of the flood discharge structure, and performing a stepped pulse water pressure test. The water pressure diffusion decay curve is recorded through the observation hole, the rock mass unsaturated hydraulic conductivity is calculated, and a nonlinear relationship between the flood discharge velocity and the hydraulic conductivity correction factor is established. This method can dynamically update the hydraulic conductivity correction factor, thereby more accurately reflecting the permeability characteristics of the rock mass under different flood discharge conditions, and providing more reliable parameter support for slope stability analysis. The hydraulic conductivity correction factor is a parameter for adjusting the saturated hydraulic conductivity of the rock mass, reflecting the change of the hydraulic conductivity of the rock mass in the unsaturated state; the stepped pulse water pressure test is a test method for determining the permeability characteristics of the rock mass by gradually increasing the water pressure and observing the water pressure diffusion.

[0075] Specifically, the typical profile refers to a representative geological profile selected on the downstream slope of the flood discharge structure, which is used to arrange a drill hole group for testing. The drill hole group includes a main hole and two observation holes, the main hole is used to apply water pressure, and the observation hole is used to record the diffusion of water pressure. In the stepped pulse water pressure test, the initial water pressure is 0.2 times the maximum water head height, and then gradually increased to a higher pressure, and each pressure level lasts for a certain period of time. The water pressure diffusion decay curve recorded by the observation hole can be used to calculate the unsaturated hydraulic conductivity of the rock mass. In the formula for calculating the unsaturated hydraulic conductivity, the main hole radius refers to half of the diameter of the main hole; the influence radius refers to the maximum range of water pressure diffusion; the change amount of matrix suction refers to the change of internal suction of the rock mass under the action of water pressure; and the logarithmic change amount of time refers to the logarithmic change of time in the process of recording water pressure diffusion. In addition, the nonlinear relationship between the flood flow rate and the hydraulic conductivity correction factor is established by an empirical formula, wherein the empirical coefficient is a coefficient obtained by summarizing a large amount of experimental data, which is used to adjust the nonlinear relationship in the formula.

[0076] Preferably, when determining the saturated hydraulic conductivity correction factor of the rock mass, the following steps can be performed: first, arrange three drill hole groups on the typical profile of the downstream slope of the flood discharge structure, each drill hole group including one main hole and two observation holes. Then, implement a stepped pulse water pressure test on each main hole, starting from an initial water pressure and gradually increasing the pressure, and record the water pressure diffusion decay curve through the observation hole. According to the recorded curve, the unsaturated hydraulic conductivity of the rock mass is calculated using the formula for calculating the unsaturated hydraulic conductivity, combined with parameters such as the main hole radius, the influence radius, the change amount of matrix suction, and the logarithmic change amount of time. Then, according to the flood flow rate and the unsaturated hydraulic conductivity, a nonlinear relationship is established by an empirical formula, and the hydraulic conductivity correction factor is determined. Finally, the hydraulic conductivity correction factor is dynamically updated according to the measured flow rate data during the flood discharge period, and the recalibration of the correction factor is performed once an hour to ensure that the correction factor can reflect the changes in the permeability characteristics of the rock mass in real time. This method can provide more accurate permeability parameters for slope stability analysis, improving the reliability of the analysis.

[0077] In some embodiments, the output deformation feature analysis result includes: A multi-level early warning mechanism is constructed: when >5mm and >0.2mm / d, a first-level early warning is activated; when >10mm or FS<1.35, a second-level early warning is activated; when >15mm and FS<1.25, a third-level early warning is activated; when >25mm or FS<1.05, a fourth-level early warning is activated; wherein, is the creep displacement component; is the creep displacement rate; FS is the slope stability safety factor; the space-time fusion analysis report includes: the contour map of the creep displacement component in the slope elevation-time coordinate system; the phase lag correlation analysis of the flood discharge water head and the safety factor; the probability cloud map of the potential sliding surface position; The report is encrypted by the national SM9 algorithm and transmitted to the early warning terminal through the water conservancy special network. Synchronously write key parameters into the slope deformation blockchain to generate an unalterable time stamp record.

[0078] It should be noted that the output deformation feature analysis result in the present application involves steps such as constructing a multi-level linkage early warning mechanism, generating a space-time fusion analysis report, encrypting the report by a specific algorithm and transmitting it to the early warning terminal. In addition, it also includes writing key parameters into the slope deformation blockchain to generate an unalterable time stamp record. These steps are designed to ensure the timeliness, accuracy and security of the slope deformation feature analysis result, and at the same time provide reliable data support for subsequent analysis and decision-making. Among them, the multi-level linkage early warning mechanism refers to setting multiple early warning levels according to different deformation characteristics and safety factors, and triggering corresponding early warning measures as soon as the conditions of a certain level are met; the space-time fusion analysis report is an analysis report that comprehensively considers time and space factors, which can more comprehensively display the slope deformation characteristics; the national SM9 algorithm is an encryption algorithm used to ensure the security of the report during transmission; the slope deformation blockchain is a distributed ledger technology used to record key parameters of slope deformation, ensuring the authenticity and unalterability of data.

[0079] Specifically, the multi-level cascading early warning mechanism triggers different levels of early warning by setting different thresholds for creep displacement components and creep displacement rates, as well as the threshold for the safety factor of slope stability. For example, when the creep displacement component exceeds a certain value and the creep displacement rate exceeds another threshold, a first-level early warning is triggered; when the safety factor of slope stability is lower than a certain critical value, a higher-level early warning is triggered. These thresholds can be adjusted according to the specific conditions and safety requirements of the slope. The spatiotemporal fusion analysis report includes contour maps of creep displacement components in the slope elevation-time coordinate system, showing the changes of slope deformation over time and space; phase-lag correlation analysis of flood discharge water head and safety factor, revealing the relationship between hydraulic load and slope stability; probability cloud map of potential sliding surface position, predicting the area where the slope may slide. These analysis results can provide intuitive decision-making basis for engineers. The SM9 algorithm is an encryption algorithm based on elliptic curve cryptography, which is used to encrypt the spatiotemporal fusion analysis report to ensure its confidentiality and integrity during transmission. The slope deformation blockchain records key parameters of slope deformation, including creep displacement components, elastic displacement components, and safety factors of slope stability, using distributed ledger technology to generate tamper-proof timestamp records, providing a reliable data foundation for slope deformation monitoring and analysis.

[0080] Preferably, when outputting the deformation feature analysis result, the following steps can be taken: First, construct a multi-level cascading early warning mechanism according to the set thresholds. For example, when the creep displacement component exceeds 5 mm and the creep displacement rate exceeds 0.2 mm / day, a first-level early warning is triggered; when the safety factor of slope stability is lower than 1.35, a higher-level early warning is triggered. These thresholds can be adjusted according to the specific geological conditions and safety requirements of the slope. Next, generate a spatiotemporal fusion analysis report. Specifically, use GIS technology and data analysis tools to draw contour maps of creep displacement components in the slope elevation-time coordinate system, showing the spatiotemporal distribution of slope deformation; use correlation analysis software to analyze the phase-lag relationship between flood discharge water head and slope stability safety factor; use probability statistical methods to generate a probability cloud map of potential sliding surface position, predicting the area where the slope may slide. Then, use the SM9 algorithm to encrypt the spatiotemporal fusion analysis report to ensure its security and confidentiality during transmission. Finally, write the key parameters into the slope deformation blockchain to generate tamper-proof timestamp records, providing reliable data support for subsequent analysis and decision-making. These steps can ensure the timeliness, accuracy and security of the slope deformation feature analysis result, providing strong support for slope safety management.

[0081] In some embodiments, the establishment of the three-dimensional finite element model comprises: constructing a slope structure surface network according to ground penetrating radar scanning data; The strain softening constitutive model is adopted for the fault zone:

[0082] where c' is the current effective cohesion; is the residual effective cohesion; is the peak effective cohesion; is the softening coefficient; is the plastic strain.

[0083] A grid refinement zone is set within 50 meters downstream of the spillway outlet.

[0084] It should be noted that the establishment of the three-dimensional finite element model in the present application is based on the construction of a slope structural surface network from geological radar scanning data, and the strain softening constitutive model is adopted for the fault zone. At the same time, a grid refinement zone is set within 50 meters downstream of the spillway outlet to improve the accuracy and reliability of the model. This method can more accurately simulate the mechanical behavior of the slope, especially when considering the complex mechanical properties of the internal structural surfaces and fault zones of the slope. The geological radar scanning data refers to the internal structural information of the slope obtained by geological radar technology, which is used to construct the slope structural surface network; the strain softening constitutive model is a model that describes the gradual softening behavior of materials after reaching the peak strength, which is suitable for simulating the mechanical properties of weak surfaces such as fault zones; the grid refinement zone refers to the refinement of specific areas in the model to improve the calculation accuracy of the model in key areas.

[0085] Specifically, the slope structural surface network refers to the distribution map of the internal structural surfaces of the slope constructed from the geological radar scanning data, which includes joints, fractures, faults, etc., and has an important influence on the stability of the slope. The strain softening constitutive model is used to describe the mechanical behavior of weak surfaces such as fault zones that gradually soften after reaching the peak strength, where the current effective cohesion refers to the cohesion of the fault zone under the current strain state; the residual effective cohesion refers to the cohesion of the fault zone after complete softening; the peak effective cohesion refers to the cohesion of the fault zone when it reaches the peak strength; the softening coefficient is a parameter that characterizes the softening rate; the plastic strain refers to the irreversible deformation of the material after reaching the elastic limit. In the model, the grid refinement zone refers to the area within 50 meters downstream of the spillway outlet where the model grid is refined to improve the calculation accuracy and reliability of the model in this key area.

[0086] Preferably, when establishing a three-dimensional finite element model, the following steps can be taken: first, use ground penetrating radar scanning technology to obtain the information of the structural plane inside the slope, including the location and distribution of joints, fractures and faults, etc. Then, according to this information, the structural plane network of the slope is constructed and imported into the finite element model. Next, for weak planes such as fault zones, a strain-softening constitutive model is used for description. Specifically, according to the material properties of the fault zone, the current effective cohesion, residual effective cohesion, peak effective cohesion, softening coefficient and plastic strain are determined and input into the model. Finally, a grid refinement area is set within 50 meters downstream of the flood discharge outlet, and the grid is refined to improve the calculation accuracy of the model in this area. This method can more accurately simulate the mechanical behavior of the slope under complex geological conditions, and provide more reliable model support for slope stability analysis.

[0087] In some embodiments, the set of target slope parameters includes: Within 50 meters downstream of the flood discharge outlet, a survey profile is laid out, and cross-hole seismic CT detection is implemented: source point interval , receiver point interval ; a shear wave is excited using an impact source, with a center frequency = 200 Hz; The rock mass shear wave velocity distribution is inverted through the first arrival wave travel time:

[0088] wherein, is the shear wave velocity; G is the shear modulus; is the density of the rock mass.

[0089] In-situ compression-shear tests are conducted in the shear wave velocity anomaly area: a bidirectional hydraulic loading device is installed, with a normal stress , wherein, is the normal stress; is the uniaxial compressive strength; the shear stress is applied in steps , wherein, is the j-th level of shear stress; is the j-1-th level of shear stress; is the shear strength; The peak strength parameters of the rock mass are determined according to the inflection point of the shear stress-displacement curve; Based on the opening and closing log of the flood discharge gate, a water head time function is constructed:

[0090] wherein H(t) is the water head at time t; is the initial water head; is the flow coefficient; is the flood discharge flow at time τ; is the cumulative flood discharge at time t; and is the partial derivative of water level with respect to discharge.

[0091] It should be noted that the method for obtaining the target slope parameter set in the present application is achieved by arranging an exploration profile within a range of 50 meters downstream of the flood discharge outlet, implementing cross-hole seismic CT detection, combining in-situ compression and shear tests, and flood discharge gate opening and closing logs. This method can integrate various technical means to obtain the rock-soil parameters and hydraulic load parameters of the slope, and provide comprehensive and accurate basic data for subsequent slope stability analysis. Among them, cross-hole seismic CT detection is a technology for obtaining internal structure information of rock-soil by the propagation characteristics of seismic waves in rock-soil medium; in-situ compression and shear test is a shear strength test method conducted on the slope site; and the flood discharge gate opening and closing log is a log recording the operation time and flow change of the flood discharge gate, which is used to construct a water head time function.

[0092] Specifically, the exploration profile refers to a profile line arranged within a range of 50 meters downstream of the flood discharge outlet for detecting the geological structure of the slope. Cross-hole seismic CT detection is to excite seismic waves at the source point and record the propagation time of the waves at the receiving point, so as to invert the shear wave velocity distribution of the rock mass. Among them, the source point spacing refers to the distance between adjacent source points, which is usually set to 2 meters; the receiving point spacing refers to the distance between adjacent receiving points, which is usually set to 1 meter. These parameters determine the resolution of the detection. The impact source is a device that excites seismic waves by impact, and the center frequency refers to the main frequency of the excited seismic waves, which is usually 200 Hz. The first arrival wave travel time inversion refers to inverting the shear wave velocity distribution of the rock mass by analyzing the time of the first arrival of the seismic wave at the receiving point. The shear wave velocity refers to the propagation speed of the seismic shear wave in the rock-soil medium, which is related to the shear modulus of the rock mass and the density of the rock mass, and the calculation of the shear wave velocity needs to be obtained by the known shear modulus and the density of the rock mass. The in-situ compression and shear test is a test conducted on the slope site, which applies normal stress and shear stress by installing a bidirectional hydraulic loading device to determine the peak strength parameters of the rock mass. The flood discharge gate opening and closing log records the operation time and flow change of the flood discharge gate, which is used to construct a water head time function, which reflects the change of water head height with time.

[0093] Preferably, in the process of obtaining the target slope parameter set, the following steps can be taken: first, set up an exploration profile within 50 meters downstream of the flood discharge outlet and implement cross-hole seismic CT detection. Specifically, set the source point interval to 2 meters, the receiving point interval to 1 meter, use an impact source to excite shear waves, and the center frequency is 200 Hz. Through the first arrival wave travel time inversion technique, the shear wave velocity distribution of the rock mass is calculated. Then, in-situ compression-shear tests are carried out in the shear wave velocity anomaly area. Install a bidirectional hydraulic loading device, apply a normal stress of 0.5 times the uniaxial compressive strength, apply shear stress in steps, and determine the peak strength parameters of the rock mass through the inflection point of the shear stress-displacement curve. Finally, based on the flood discharge gate opening and closing log, a water head time function is constructed. This function describes the change of water head height with time through the flow coefficient, cumulative flood discharge and partial derivative of water level to flow. These steps can provide comprehensive and accurate geotechnical parameters and hydraulic load parameters for slope stability analysis.

[0094] The above-mentioned various embodiments of the present application have the following beneficial effects: 1. By dynamically correcting the constitutive parameters of the slope material, the present application can accurately adjust the mechanical properties of the slope according to real-time monitoring data, thus more accurately reflecting the actual deformation behavior of the slope under different working conditions, solving the problem of insufficient analysis accuracy caused by the use of fixed parameters in the prior art, and significantly improving the reliability of slope deformation characteristic analysis.

[0095] 2. The time delay error compensation technology is used to process the pore water pressure data, effectively eliminating the errors introduced in the data transmission process, ensuring the timeliness and accuracy of the monitoring data. This enables more accurate evaluation of the stability of the slope based on more realistic data when performing seepage-stress coupling stability calculation, thus solving the problem of stability evaluation deviation caused by data transmission delay in the prior art.

[0096] 3. The deformation characteristic analysis results are output in combination with the creep displacement component, the elastic displacement component and the slope stability safety factor, and a multi-level linkage early warning mechanism is constructed, the present application can monitor the deformation state of the slope in real time and issue timely warnings. This comprehensive analysis and warning method not only improves the efficiency of slope safety management, but also provides more comprehensive decision-making basis for engineering personnel, effectively solving the problems of separation of slope deformation monitoring and stability evaluation and untimely warning in the prior art.

[0097] Further, the storage medium of the embodiments of the present application stores program instructions capable of realizing all the methods described above, wherein the program instructions can be stored in the storage medium in the form of a software product, and include a plurality of instructions to make a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor execute all or part of the steps of the methods described in the embodiments of the present application. And the aforementioned storage medium includes: a U disk, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and various media capable of storing program codes, or a computer, a server, a mobile phone, a tablet, and other terminal devices.

[0098] The above description is merely some preferred embodiments of the present application and a description of the principles of the technology used. Those skilled in the art should understand that the scope of the application involved in the embodiments of the present application is not limited to the technical solutions formed by the specific combinations of the technical features described above, and should also cover other technical solutions formed by any combinations of the technical features described above or their equivalent features without departing from the inventive concept described above. For example, the technical solutions formed by mutually replacing the above-described features and the technical features disclosed in the embodiments of the present application (but not limited to) having similar functions.

Claims

1. A method for analyzing deformation characteristics of an outlet slope of a spillway structure, comprising: obtaining geotechnical parameters and hydraulic load parameters of a target slope as a target slope parameter set, wherein the monitoring data of the outlet slope of the spillway structure comprises a GNSS displacement sequence, a pore water pressure sequence and a tiltmeter data sequence, and the GNSS displacement sequence, the pore water pressure sequence and the tiltmeter data sequence are transmitted to a central processing device through a water conservancy special network; dynamically correcting material constitutive parameters in a slope stability calculation model according to the target slope parameter set to obtain a corrected constitutive parameter set; based on the corrected constitutive parameter set, time-dependent deformation decomposition is performed on the GNSS displacement sequence to obtain a creep displacement component and an elastic displacement component; delay error compensation is performed on a data transmission link included in the water conservancy special network to obtain a compensated pore water pressure sequence; combined with the compensated pore water pressure sequence and the tiltmeter data sequence, seepage-stress coupling stability calculation is performed to obtain a slope stability safety factor; the creep displacement component, the elastic displacement component and the slope stability safety factor are output as deformation characteristic analysis results to an early warning terminal.

2. The method of claim 1, wherein, the dynamic correction of the constitutive parameters according to the target slope parameter set comprises: analyzing the initial value of the rock mass shear modulus, the initial value of the permeability coefficient and the time history curve of the spillway water head in the target slope parameter set; iteratively optimizing the rock mass shear modulus correction coefficient and the permeability coefficient correction coefficient by an inversion calculation module with the GNSS displacement sequence as a constraint condition; multiplying the initial value of the rock mass shear modulus by the rock mass shear modulus correction coefficient to obtain an updated shear modulus; multiplying the initial value of the permeability coefficient by the permeability coefficient correction coefficient to obtain an updated permeability coefficient; the corrected constitutive parameter set is composed of the updated shear modulus and the updated permeability coefficient.

3. The method of claim 1, wherein, the time-dependent deformation decomposition of the GNSS displacement sequence comprises: an improved Burgers creep model is used to establish a displacement-time relationship equation: wherein, is the total displacement at time t; is the elastic displacement component; is the creep displacement component; is the initial stress; is the instantaneous elastic modulus; is the delayed elastic modulus; is the viscous coefficient; is the viscous coefficient; t is time; the corrected constitutive parameter set is substituted into the displacement-time relationship equation to solve the components.

4. The method of claim 1, wherein, the delay error compensation of the data transmission link comprises: a time stamp marking device is deployed in the water conservancy special network to record the collection time and the receiving time of the pore water pressure data; the transmission delay is calculated; the real pore water pressure value at the collection time is reconstructed based on the seepage diffusion equation: wherein, is the original pore water pressure; is the original pore water pressure; is the rock permeability decay coefficient; is the transmission delay.

5. The method of claim 1, wherein, the seepage-stress coupling stability calculation comprises: a three-dimensional finite element model of the slope is established, and the compensated pore water pressure sequence is loaded as a boundary condition; the unit shear strength is calculated by using the modified Mohr-Coulomb criterion: wherein, is the shear strength; c' is the effective cohesion; is the normal total stress; is the compensated pore water pressure; is the effective internal friction angle; the slope stability safety factor is iteratively solved by the strength reduction method.

6. The method of claim 2, wherein, the optimization process of the inversion calculation module comprises: a displacement residual objective function is constructed: in, The objective function is... Here is the vector of parameters to be inverted; N is the number of observation data. for The observed displacement at any given time; for Calculate the displacement at time t; For regularization parameters; Use the parameter initialization vector; the Levenberg-Marquardt algorithm is used to minimize the objective function.

7. The method of claim 4, wherein, the determination of the rock mass saturated hydraulic conductivity correction factor comprises: three drill hole groups are arranged on a typical profile of the downstream slope of the spillway structure, each drill hole group containing a main hole and two observation holes; A stepwise pulse hydrostatic test is performed on each main bore, applying an initial water pressure , for a duration , stepped up to , wherein , each step is maintained for a duration ; the water pressure diffusion attenuation curve is recorded through the observation holes to calculate the rock layer unsaturated hydraulic conductivity: wherein, is the unsaturated hydraulic conductivity; is the main pore radius; R is the influence radius; t is time; is the change in matrix suction; is the change in time logarithm; A nonlinear relationship between flood discharge velocity and discharge capacity correction factor is established: wherein, is a water conductivity correction factor; is a saturated hydraulic conductivity; is an empirical coefficient; is a flood discharge velocity; g is the acceleration due to gravity; h is the water head; is the partial derivative of the unsaturated hydraulic conductivity with respect to the matric suction; According to the measured flow velocity data during the flood discharge period, the value of \alpha is dynamically updated, and the correction factor is recalibrated every hour.

8. The method of claim 1, wherein, The output deformation feature analysis result includes: A multi-level linkage early warning mechanism is constructed: when > 5 mm and > 0.2 mm / d, the first level of early warning is activated; when > 10 mm or FS < 1.35, the second level of early warning is activated; when > 15 mm and FS < 1.25, the third level of early warning is activated; when > 25 mm or FS < 1.05, the fourth level of early warning is activated; wherein, is the creep displacement component; is the creep displacement rate; FS is the safety factor of slope stability A space-time fusion analysis report is generated: the contour map of the creep displacement component in the slope elevation-time coordinate system; the phase lag correlation analysis of the flood discharge water head and the safety factor; the probability cloud map of the potential sliding surface position; The report is encrypted by the national SM9 algorithm and transmitted to the early warning terminal through the water conservancy special network; Synchronously write key parameters into the slope deformation block chain to generate tamper-proof time-stamped record storage.

9. The method of claim 5, wherein, The establishment of the three-dimensional finite element model includes: Constructing the slope structure surface network according to the ground penetrating radar scanning data; Using strain softening constitutive model for fault zone: where c' is the current effective cohesion; is the residual effective cohesion; is the peak effective cohesion; is the softening coefficient; is the plastic strain; Setting a grid encryption area within 50 meters downstream of the flood discharge outlet.

10. The method of claim 1, wherein, The target slope parameter set includes: The exploration profile is arranged within 50 m downstream of the flood discharge outlet, and the cross-hole seismic CT detection is implemented: the interval of the source points , the interval of the receiving points ; the shear wave is excited by using the impact source, the central frequency =200 Hz; Inverting the rock mass shear wave velocity distribution through the first arrival wave travel time: wherein, is the shear wave velocity; G is the shear modulus; is the rock density; In-situ compression-shear test in abnormal shear wave velocity zone: install bidirectional hydraulic loading device, normal stress wherein, is the normal stress; is the uniaxial compressive strength; stepwise application of shear stress wherein, is the jth step shear stress; is the j-1th step shear stress; is the shear strength; Determining the peak strength parameters of the rock mass according to the inflection point of the shear stress-displacement curve; Based on the flood discharge gate opening and closing log, a water head time function is constructed: where H(t) is the water head at time t; is the initial water head; is the flow coefficient; is the discharge at time t; is the cumulative discharge from time 0 to t; is the partial derivative of water level with respect to discharge.

Citation Information

Cited By

  • Osmotic pressure analysis method and equipment fusing model optimization and physical inversion, and medium

    CN121744956A

  • Hypobaric analysis methods, equipment, and media that integrate model optimization and physical inversion

    CN121744956B