Concrete stair construction method

By setting threaded sleeves and connecting bars inside the side panels of the staircase, the problem of ensuring the pouring quality of fair-faced concrete staircases was solved, achieving both stability and aesthetics in the staircase structure.

CN121429145APending Publication Date: 2026-01-30CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202511616444.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-11-06
Publication Date
2026-01-30

AI Technical Summary

Technical Problem

In existing technologies, it is difficult to guarantee the pouring quality of fair-faced concrete stairs, resulting in an unsightly stair structure.

Method used

First, pour the side slabs of the floor section and install threaded sleeves inside them. Then, insert connecting bars into the two opposite side slabs of the floor section to provide positioning and support for the subsequent pouring of the stair slabs. Use rubber plugs to fill the gaps to prevent shaking.

Benefits of technology

This improved the pouring quality and aesthetics of the staircase construction, and ensured the stability of the staircase structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121429145A_ABST
    Figure CN121429145A_ABST
Patent Text Reader

Abstract

The invention relates to a concrete stair construction method which comprises the following steps that the construction position of a building section side plate is determined in a construction area, reinforcing steel bars are bound in the construction position of the building section side plate to form reinforcing steel bar frames, the number of the reinforcing steel bar frames is two, and the two reinforcing steel bar frames are oppositely arranged; determining the position of a stair flight plate on the steel bar frame, and fixing a threaded sleeve on the steel bar frame; a side plate pouring formwork is provided, the side plate pouring formwork is arranged at the construction position of the building section side plate, and an open hole is formed in the position, corresponding to the threaded sleeve, of the side plate pouring formwork; connecting ribs are provided, and the connecting ribs are inserted into the threaded sleeves of the two steel bar frames which are oppositely arranged; concrete is poured into the side plate pouring formwork, and the side plate pouring formwork is dismantled after the concrete reaches the dismantling strength; and providing a stair plate pouring template, arranging the stair plate pouring template on the outer side of the connecting rib, and pouring concrete in the stair plate pouring template to form a stair structure.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of building construction technology, and specifically to a method for constructing concrete stairs. Background Technology

[0002] In recent years, more and more buildings in China have adopted fair-faced concrete as their finish. With increasingly sophisticated construction techniques, designers are demanding higher standards for the aesthetic appeal of fair-faced concrete. Outdoor staircases, as part of a building, are inherently complex, making it difficult to control the quality of their construction. Currently, the staircase structure and side panels are typically poured together to ensure structural stability. However, due to the complexity and size of the staircase, incomplete pouring can occur, resulting in an unsightly structure. Summary of the Invention

[0003] The purpose of this invention is to overcome the defects of the prior art and provide a concrete staircase construction method. In the construction process, the side plates of the staircase are poured first, and threaded sleeves are set in the side plates of the staircase to facilitate the subsequent installation of connecting bars. By inserting the connecting bars into the two oppositely arranged side plates of the staircase, positioning and support are provided for the subsequent pouring of the stair slab.

[0004] A concrete staircase construction method to achieve the above objectives includes the following steps:

[0005] The construction location of the side slab of the building section is determined in the construction area. Reinforcing bars are tied in the construction location of the side slab of the building section to form a reinforcing bar frame. Two reinforcing bar frames are set up and placed opposite each other.

[0006] The position of the ladder plate is determined on the steel reinforcement frame, and the threaded sleeve is fixed on the steel reinforcement frame;

[0007] A side panel casting template is provided, which is set at the construction position of the side panel of the building section. The side panel casting template has an opening corresponding to the position of the threaded sleeve.

[0008] Provide connecting bars, and insert the connecting bars into the threaded sleeves of two oppositely arranged steel bar frames;

[0009] Concrete is poured into the side plate casting formwork, and the side plate casting formwork is removed after the concrete reaches the demolition strength.

[0010] A stair slab casting template is provided, which is set on the outside of the connecting reinforcement bar, and concrete is poured into the stair slab casting template to form a stair structure.

[0011] Furthermore, when the connecting rib is inserted into the threaded sleeve, a rubber stopper is filled between the connecting rib and the threaded sleeve.

[0012] Furthermore, after the concrete inside the side plate casting template reaches the required strength for removal, the rubber stopper is removed.

[0013] Furthermore, when locating the position of the stair slab, a positioning line is provided, and the positioning line is set on the steel reinforcement frame corresponding to the position of the stair slab.

[0014] Furthermore, before setting the stair slab casting template on the outside of the connecting bar, the stair section reinforcement cage is tied to the connecting bar.

[0015] Furthermore, after the staircase structure is poured, stone is laid on the surface of the staircase structure.

[0016] Furthermore, multiple threaded sleeves are provided, and when fixing the threaded sleeves on the steel reinforcement frame, the threaded sleeves are arranged according to the on-site construction requirements.

[0017] Furthermore, the end of the threaded sleeve is provided with an anchoring bar, which is fixed to the steel reinforcement frame when the threaded sleeve is fixed.

[0018] Compared with the prior art, the present invention has the following advantages:

[0019] During construction, the side slabs of the floor section are poured first, and threaded sleeves are installed inside the side slabs to facilitate the subsequent installation of connecting bars. By inserting the connecting bars into the two opposite side slabs of the floor section, positioning and support are provided for the subsequent pouring of the stair slab. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the overall structure of a concrete staircase construction method.

[0021] Figure 2 This is a diagram illustrating the connection between the side panels and stair slabs of a concrete staircase construction method.

[0022] Figure 3 for Figure 2 A schematic diagram of the structure at point A in the middle.

[0023] Legend: 1. Side panel of the floor section; 2. Stair slab; 3. Connecting reinforcement; 4. Anchor reinforcement. Detailed Implementation

[0024] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.

[0025] See Figure 1A method for constructing a concrete staircase includes the following steps: determining the construction position of the side slab 1 of the staircase in the construction area; binding reinforcing bars to form a reinforcing bar frame within the construction position of the side slab 1; setting two reinforcing bar frames opposite to each other; determining the position of the stair slab on the reinforcing bar frame; fixing threaded sleeves on the reinforcing bar frame; providing a side slab casting template; setting the side slab casting template at the construction position of the side slab 1; the side slab casting template having openings corresponding to the positions of the threaded sleeves; providing connecting bars 3; inserting the connecting bars 3 into the threaded sleeves of the two oppositely set reinforcing bar frames; pouring concrete into the side slab casting template; removing the side slab casting template after the concrete reaches the demolition strength; providing a stair slab 2 casting template; setting the stair slab 2 casting template outside the connecting bars 3; and pouring concrete into the stair slab 2 casting template to form a staircase structure.

[0026] In this invention, a preferred embodiment is as follows: When constructing the staircase, the side panels 1 on both sides of the stair section are constructed first. The tied steel reinforcement frame is placed at the construction position of the side panel 1. The edge line of the stair section slab is positioned on the steel reinforcement frame. Then, according to the structural drawings of the stair section slab, straight threaded sleeves are embedded (standard A16 sleeves can be used; generally, the diameter of the steel reinforcement in the stair section slab is less than 16mm, and the diameter can be increased and the spacing appropriately widened in consultation with the design unit). Subsequently, the formwork for the side panels (or side beams) of the stair section is constructed. The support is installed by setting a connecting rib 3 inside the straight threaded sleeve. When setting the connecting rib 3, one end of the connecting rib 3 is inserted into the threaded sleeve on one side, and the other end is placed in the threaded sleeve on the other side and sealed with a rubber plug. When the straight threaded sleeve is embedded, measures should be taken to fix it firmly to prevent disturbance and displacement during the pouring of the floor section side plate 1. Concrete is then poured into the floor section side plate 1. After the stair section side plate reaches the demolding strength, the formwork is removed, the rubber plug in the straight threaded sleeve is unscrewed, and the subsequent stair section slab construction is carried out.

[0027] Furthermore, when the connecting rib 3 is inserted into the threaded sleeve, a rubber stopper is filled between the connecting rib 3 and the threaded sleeve. By filling the gap between the connecting rib 3 and the threaded sleeve with a rubber stopper, the connecting rib 3 is prevented from shaking during the pouring of the side slab 1 of the building section, thus avoiding any deviation in the position of the threaded sleeve.

[0028] Furthermore, after the concrete inside the side plate casting template reaches the required strength for removal, the rubber stopper is removed.

[0029] Furthermore, when positioning the stair slab, a positioning line is provided, which is set on the steel reinforcement frame corresponding to the position of the stair slab 2. This positioning line facilitates the subsequent installation of the threaded sleeve. After the threaded sleeve is installed, the positioning line can be removed to avoid affecting the next stage of construction.

[0030] Furthermore, before setting the stair slab 2 casting template on the outside of the connecting bar 3, the stair section reinforcement cage is tied to the connecting bar 3.

[0031] Furthermore, after the staircase structure is poured, stone is laid on the surface of the staircase structure.

[0032] Furthermore, multiple threaded sleeves are provided, and when fixing the threaded sleeves on the steel reinforcement frame, the threaded sleeves are arranged according to the on-site construction requirements.

[0033] Furthermore, the end of the threaded sleeve is provided with an anchoring bar 4, which is fixed to the steel reinforcement frame when the threaded sleeve is fixed.

[0034] The following describes the process of using a concrete staircase construction method according to the present invention.

[0035] When constructing the staircase, prioritize the construction of the side panels 1 on both sides of the staircase. Place the tied steel reinforcement frame at the construction position of the side panel 1, and position the edge line of the staircase slab on the steel reinforcement frame. Then, embed straight threaded sleeves according to the structural drawings of the staircase slab (standard A16 sleeves can be used; generally, the diameter of the staircase slab reinforcement is less than 16mm, and the diameter can be increased by communicating with the design unit, and the spacing can be appropriately widened at the same time). Subsequently, erect the formwork for the side panel (or side beam) of the staircase. Set the connecting bar 3 inside the straight threaded sleeve. When setting the connecting bar 3, one end of the connecting bar 3 is inserted into the threaded sleeve on one side, and the other end is placed in the threaded sleeve on the other side and sealed with a rubber plug. When embedding the straight threaded sleeve, measures should be taken to fix it firmly to prevent disturbance and displacement during the pouring of the side panel 1. Pour concrete for the side panel 1. After the side panel reaches the demolding strength, remove the formwork, unscrew the rubber plug in the straight threaded sleeve, and proceed with the subsequent construction of the staircase slab.

[0036] The present invention has been described in detail above with reference to the accompanying drawings and embodiments. Those skilled in the art can make various modifications to the present invention based on the above description. Therefore, certain details in the embodiments should not be construed as limiting the present invention, and the scope of protection of the present invention shall be defined by the appended claims.

Claims

1. A method of constructing a concrete stairway, characterized by, The method comprises the following steps: determining the construction position of the floor section side plate in the construction area, binding the steel bars to form a steel bar frame in the construction position of the floor section side plate, the steel bar frame is provided with two, and the two steel bar frames are oppositely arranged; determining the position of the ladder section plate on the steel bar frame, and fixing the threaded sleeve on the steel bar frame; providing a side plate pouring formwork, arranging the side plate pouring formwork at the construction position of the floor section side plate, and forming an opening in the side plate pouring formwork corresponding to the position of the threaded sleeve; providing a connecting bar, and inserting the connecting bar into the threaded sleeve of the oppositely arranged two steel bar frames; pouring concrete in the side plate pouring formwork, and removing the side plate pouring formwork after the concrete reaches the removal strength; providing a stair plate pouring formwork, arranging the stair plate pouring formwork outside the connecting bar, and pouring concrete in the stair plate pouring formwork to form a stair structure.

2. The method of claim 1, wherein: When the connecting bar is inserted into the threaded sleeve, rubber plugs are filled between the gap between the connecting bar and the threaded sleeve.

3. A method of constructing a concrete stairway according to claim 2, wherein: After the concrete in the side plate pouring formwork reaches the removal strength, the rubber plugs are removed.

4. The method of claim 1, wherein: When the position of the ladder section plate is positioned, a positioning line is provided, and the positioning line is arranged on the steel bar frame corresponding to the position of the stair plate.

5. The method of claim 1, wherein: Before the stair plate pouring formwork is arranged outside the connecting bar, a stair section steel bar cage is bound on the connecting bar.

6. The method of claim 1, wherein: After the stair structure is poured, stone is laid on the surface of the stair structure.

7. The method of claim 1, wherein: The threaded sleeve is provided with a plurality of threaded sleeves, and when the threaded sleeves are fixed on the steel bar frame, the threaded sleeves are arranged according to the construction requirements of the site.

8. The method of claim 1, wherein: The end of the threaded sleeve is provided with an anchoring bar, and when the threaded sleeve is fixed, the anchoring bar is fixed on the steel bar frame.