Method for rapidly generating change report of steel structure BIM model in Tekla
By automatically comparing model data files before and after changes in Tekla, generating change reports and writing them to the drawing database, the problem of complex and time-consuming manual processing in existing technologies is solved, enabling the rapid and accurate generation of change reports and improving processing efficiency and accuracy.
Patent Information
- Application Number
- CN202511491097.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-18
- Publication Date
- 2026-02-06
AI Technical Summary
When processing BIM model changes in Tekla, existing technologies rely on manual operation, which makes the content statistics process complex, time-consuming, and prone to errors, making it difficult to quickly generate accurate change reports.
This paper provides a method for quickly generating change reports for steel structure BIM models in Tekla. By connecting to the model database in Tekla, the method automatically compares the model data files before and after the change, generates a change report, and automatically writes the results into the drawing database. Only manual verification and confirmation are required.
It enables rapid generation of change reports, reduces manual workload, improves the efficiency and accuracy of change processing, reduces the error rate of manual operation, and shortens the change processing time from 2.5 hours to 1 hour.
Smart Images

Figure CN121479860A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of steel structure detailed design technology, specifically a method for rapidly generating change reports for steel structure BIM models in Tekla. Background Technology
[0002] In building construction, the BIM model for detailed steel structure design serves as the foundation and basis for guiding the entire construction phase of a steel structure project. Changes are inevitable in detailed design work, and these changes often have far-reaching consequences. Change handling is a major pain point in detailed design work. Manually processing and compiling change information is complex and tedious, and compiling the change results into drawings is time-consuming and prone to omissions or errors. The typical change handling time is twice or more than the normal modeling and drawing process. For example, if the normal modeling and drawing process takes 2 hours, manually processing the changed model takes 1 hour, compiling the change results takes 1 hour, and writing the change results into drawings takes 0.5 hours, for a total change process of 2.5 hours.
[0003] Tekla automatically generates steel structure details and various reports after a 3D model is created. Since the drawings and reports are based on the model, and the operator can easily identify errors in the connections between components within the 3D model, it ensures the accuracy of component connections in the detailed design of the steel structure. Simultaneously, the various reports and interface files (CNC cutting files) automatically generated by Xsteel can serve (or be used directly on the equipment) throughout the entire project. Tekla Structures' functions include full integration of 3D solid structural models and structural analysis, 3D steel structure detail design, 3D reinforced concrete design, project management, automatic shop drawing, and an automatic BOM generation system.
[0004] Patent document CN118071922A discloses a method for detailed design of steel structures based on Tekla, including: Step S1, providing steel structure design drawings; Step S2, using Tekla Structures software to perform detailed design based on the steel structure design drawings, generating detailed construction drawings of the steel structure through three-dimensional modeling; Step S3, if structural changes occur, modifying the three-dimensional model of the steel structure in conjunction with the changed structural design drawings, updating the steel structure design drawings after the three-dimensional model is modified, issuing a construction detail change notice and updating the drawings; Step S4, reviewing and providing feedback on the detailed construction drawings of the steel structure.
[0005] Patent document CN110059424A discloses a method for extracting processing information of steel structure modules based on Tekla software, including: constructing a three-dimensional model of a large steel structure based on Tekla software; copying a pre-configured Template file into the model folder of Tekla software; generating a drawing list, including at least a component list, a parts list, and a bolt relationship table, sequentially using the Template file in Tekla software based on Excel formulas and VBA language; converting the generated report file to .xls format; overwriting the folder where the automatic report program is located with the converted .xls file; opening the MarkList in the automatic report and entering the content into the project table, which must include at least project information and date.
[0006] When Tekla's BIM model undergoes changes, the process of compiling the content is complex and still relies on manual verification. It is time-consuming to compile the changes into drawings, and data statistics are prone to omissions or errors.
[0007] Therefore, providing a method for rapidly generating change reports for steel structure BIM models in Tekla is a problem worthy of research. Summary of the Invention
[0008] To address the challenges of complex content statistics, time-consuming data compilation into drawings, and data omissions or errors during traditional manual processing of Tekla BIM model changes, this invention provides a method for rapidly generating change reports for steel structure BIM models in Tekla.
[0009] The objective of this invention is achieved as follows: a method for rapidly generating change reports for steel structure BIM models in Tekla, comprising the following steps: Step 1) Open the detailed BIM model in Tekla; Step 2) Open the software provided in this method; Step 3) Connect to the model database and select the parts involved in the change in the model; Step 4) Use the software to output the model data file before the change; Step 5) After the change processing is complete, select the changed part; Step 6) Output the modified model data file using the software; Step 7) Use the software provided in this method to process the data files output twice and generate a change report; Step 8) The software will automatically write the changes into the corresponding drawing database; Step 9) Manually review the change report generated by the software, confirm the final change report, and the change processing work is completed.
[0010] The method for quickly generating change reports for steel structure BIM models in Tekla includes the following steps: Step 1) Open the BIM model change processing device and open the BIM model before the change; Step 2) Select the parts and components involved in the upcoming changes in the BIM model; Step 3) In the BIM model change processing device, select the output model information function module, set the file output path, and run the device; Step 4) The device iterates through the selected BIM model, analyzes the model's geometric information, number, material, weight and other key attributes, and exports the model data file 1. Step 5) Open the modified BIM model; Select the parts and components affected by the changes in the BIM model; Step 6) In the opened BIM model change processing device, select the output model information function module, set the file output path, and run the device again; Step 7) The device iterates through the selected BIM model, analyzes the model's geometric information, number, material, weight and other key attributes, and exports the model data file 2. Step 8) In the BIM model change processing device, set the file paths for the two exports respectively, and then select the function module to read the comparison files; Step 9) Select the Comparison Components function module in the BIM Model Change Processing Device; Step 10) Select the Comparison Parts function module in the BIM model change processing device; Step 11) Select "Output Change Information" in the BIM Model Change Processing Device. This device will perform three steps. Step 12) The operator reviews the change report generated by the software, confirms the final change report, and the change processing work is completed.
[0011] The model data file 1 is in XML format and records key information including the geometric information and material properties of the selected parts, components, and bolts before the change, for subsequent comparative analysis. The model data file 2 is in XML format and records key information including the geometric information and material properties of the selected parts, components, and bolts before the change, for subsequent comparative analysis. The device in step 8) reads the key information into the background database twice. The key information includes the geometric information and material properties of the parts, components, and bolts. In step 9), the device traverses the background database, displays the component change information in the text box area of the device, and stores it in the background database, so that users can directly see the component change information. In step 10), the device traverses the background database, displays the part change information in the text box area of the device, and stores it in the background database, so that users can directly see the part change information. The three-step operation includes: first, traversing the background database and organizing the stored part and component change information; second, converting the organized change information into Excel format and saving it in the model folder; and third, writing the organized change information into the model's drawing database.
[0012] Positive and beneficial effects: The method of this invention only requires the detailed design personnel to select the model of the scope of change before and after the change of the Tekla detailed design BIM model. The device provided by this method connects to the model database, outputs the model data before and after the change, and automatically compares the two data files to quickly and accurately generate the change result and write the result into the corresponding drawing database. The manual staff only needs to check the generated result, which reduces the workload of manual labor and improves the efficiency and accuracy of change processing. Attached Figure Description
[0013] Figure 1 This is a flowchart of the operation method of the present invention.
[0014] Figure 2 This is a diagram of the BIM model change processing device of the present invention.
[0015] Figure 3 A diagram illustrating the operation of selecting parts and components involved in upcoming changes within a BIM model and setting the model data output path in the device provided by this invention. Figure 4 A diagram illustrating the operation of selecting parts and components involved in BIM model changes and setting the model data output path in the device provided by this invention. Figure 5 This is a comparison result diagram of component changes generated in the device provided by the present invention; Figure 6 This is a comparison result diagram of part changes generated in the device provided by the present invention; Figure 7 A schematic diagram of the EXCEL file generated by the device provided by this invention for displaying the change results; Figure 8 The diagram illustrates how the device provided by this invention writes the change results into the drawing database. Detailed Implementation
[0016] To make the technical problems to be solved, the technical solutions and the beneficial effects of the present invention clearer, the technical solutions of the present invention will be further described in detail below with reference to the embodiments and accompanying drawings.
[0017] like Figure 1-8 As shown, a method for quickly generating change reports for steel structure BIM models in Tekla includes the following steps: Step 1) Open the BIM model change processing device and open the BIM model before the change; Step 2) Select the parts and components involved in the upcoming changes in the BIM model; Step 3) In the BIM model change processing device, select the output model information function module, set the file output path, and run the device; Step 4) The device iterates through the selected BIM model, analyzes the model's geometric information, number, material, weight and other key attributes, and exports the model data file 1. Step 5) Open the modified BIM model; Select the parts and components affected by the changes in the BIM model; Step 6) In the opened BIM model change processing device, select the output model information function module, set the file output path, and run the device again; Step 7) The device iterates through the selected BIM model, analyzes the model's geometric information, number, material, weight and other key attributes, and exports the model data file 2. Step 8) In the BIM model change processing device, set the file paths for the two exports respectively, and then select the function module to read the comparison files; Step 9) Select the Comparison Components function module in the BIM Model Change Processing Device; Step 10) Select the Comparison Parts function module in the BIM model change processing device; Step 11) Select "Output Change Information" in the BIM Model Change Processing Device. This device will perform three steps. Step 12) The operator reviews the change report generated by the software, confirms the final change report, and the change processing work is completed.
[0018] The model data file 1 is in XML format and records key information including the geometric information and material properties of the selected parts, components, and bolts before the change, for subsequent comparative analysis. The model data file 2 is in XML format and records key information including the geometric information and material properties of the selected parts, components, and bolts before the change, for subsequent comparative analysis. The device in step 8) reads the key information into the background database twice. The key information includes the geometric information and material properties of the parts, components, and bolts. In step 9), the device traverses the background database, displays the component change information in the text box area of the device, and stores it in the background database, so that users can directly see the component change information. In step 10), the device traverses the background database, displays the part change information in the text box area of the device, and stores it in the background database, so that users can directly see the part change information. The three-step operation includes: first, traversing the background database and organizing the stored part and component change information; second, converting the organized change information into Excel format and saving it in the model folder; and third, writing the organized change information into the model's drawing database.
[0019] The method of this invention only requires the detailed design personnel to select the model of the scope of change before and after the change in the Tekla detailed design BIM model. The device provided by this method connects to the model database, outputs the model data before and after the change, and automatically compares the two data files to quickly and accurately generate the change result and write the result into the corresponding drawing database. The manual staff only needs to check the generated result, which reduces the workload of manual labor and improves the efficiency and accuracy of change processing.
[0020] Compared with traditional change processing methods, the advantages of this invention are as follows: The device provided by this invention generates change result statistics efficiently and accurately, and writes the change results into the drawing database with precision and efficiency, reducing the intensity of manual labor; the change work that would normally take 2.5 hours to process manually can be completed in just 1 hour with the help of the program provided by this patent, thus improving the efficiency of change processing.
[0021] The device provided by this invention is simple to operate and reduces the error rate of manual change processing result statistics.
Claims
1. A method for quickly generating a change report of a steel structure BIM model in Tekla, comprising the following steps: Step 1), open the deepened BIM model of Tekla; Step 2), open the software provided by the method; Step 3), connect the model database and select the parts involved in the change in the model; Step 4), operate the software to output the model data file before the change; Step 5), after the change processing is completed, select the changed parts; Step 6), operate the software to output the model data file after the change; Step 7), operate the software provided by the method to process the two output data files and generate a change report; Step 8), operate the software to automatically write the change results into the corresponding drawing database; Step 9), manually review the change report generated by the software to confirm the final change report, and the change processing work is completed.
2. The method of claim 1, wherein the method further comprises: receiving a request to generate a change report for a steel structure BIM model in Tekla; and generating the change report for the steel structure BIM model in Tekla based on the request. comprising the following steps: Step 1), open the BIM model change processing device and open the BIM model before the change; Step 2), select the parts and components involved in the change in the BIM model; Step 3), select the output model information function module in the BIM model change processing device, set the file output path, and run the device; Step 4), the device iterates through the selected BIM model, analyzes the geometric information, number, material and weight key attributes of the model, and exports model data file 1; Step 5), open the changed BIM model; select the parts and components involved in the change in the BIM model; Step 6), select the output model information function module in the opened BIM model change processing device, set the file output path, and run the device again; Step 7), the device iterates through the selected BIM model, analyzes the geometric information, number, material and weight key attributes of the model, and exports model data file 2; Step 8), set the file paths of the two exported files in the BIM model change processing device, and then select the read and compare function module; Step 9), select the compare components function module in the BIM model change processing device; Step 10), select the compare parts function module in the BIM model change processing device; Step 11), select the output change information in the BIM model change processing device, which will perform three-step operations; Step 12), the operator reviews the change report generated by the software to confirm the final change report, and the change processing work is completed.
3. The method of claim 2, wherein the method further comprises: receiving a request to generate a change report for a steel structure BIM model in Tekla; and generating the change report for the steel structure BIM model in Tekla based on the request. The model data file 1 in step 4) is in XML format, and records key information including the geometric information and material properties of the selected parts and components before the change, for subsequent comparison and analysis.
4. The method of claim 2, wherein the method further comprises: receiving a request to generate a change report for a steel structure BIM model in Tekla; and generating the change report for the steel structure BIM model in Tekla based on the request. The model data file 2 in step 7) is in XML format, and records key information including the geometric information and material properties of the selected parts and components before the change, for subsequent comparison and analysis.
5. The method of claim 2, wherein the method further comprises: determining the type of the change; and determining the type of the change based on the type of the change. In step 8), the device reads the key information into the background database, and the key information includes the geometric information and material properties of the parts, components and bolts.
6. The method of claim 2, wherein the method further comprises: receiving a request to generate a change report for a steel structure BIM model in Tekla; and generating the change report for the steel structure BIM model in Tekla. The device in step 9 traverses the background database to display the component change information in the text box area of the device and store it in the background database, so that the user can directly see the component change information.
7. The method of claim 2, wherein the method further comprises: receiving a request to generate a change report for a steel structure BIM model in Tekla; and generating the change report for the steel structure BIM model in Tekla. The device in step 10 traverses the background database to display the part change information in the text box area of the device and store it in the background database, so that the user can directly see the part change information.
8. The method of claim 2, wherein the method further comprises: receiving a request to generate a change report for a steel structure BIM model in Tekla; and generating the change report for the steel structure BIM model in Tekla based on the request. The three-step operation includes: first step: traversing the background database, sorting the stored part and component change information; Second step: convert the sorted change information into excel format and save it under the model folder; Third step: write the sorted change information into the drawing database of the model.
Citation Information
Patent Citations
Steel structure module machining information extraction method based on TEKLA software
CN110059424A
Steel structure detail drawing deepening design method based on Tekla
CN118071922A