Attached type lifting scaffold guide rail fixing suite

By designing an attached lifting scaffold guide rail fixing kit, and using guide seat heightening components and bolt lock connections, the problem of unstable guide rail fixing in large-span frame structures was solved, thereby improving the stability of the guide rail and construction efficiency.

CN224016753UActive Publication Date: 2026-03-20CHINA CONSTR SECOND ENG BUREAU LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520439879.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-13
Publication Date
2026-03-20
Estimated Expiration
2035-03-13

AI Technical Summary

Technical Problem

In large-span frame structures and cantilever structures, the fixed position of the attached lifting scaffold guide rail is unstable, and the attachment interval of the guide rail cannot meet the construction requirements, resulting in the instability or overloading of the scaffold, affecting structural safety and incurring high maintenance costs.

Method used

Design an attached lifting scaffold guide rail fixing kit, including guide seat heightening component, round tube cantilever beam and bolt lock. It adopts a right-angled trapezoidal cage structure and is connected by bolt lock to enhance structural stability and overall strength. It is suitable for different types of buildings.

Benefits of technology

It improves the stability and construction safety of the guide rail, simplifies the construction process, reduces maintenance costs and material waste, and enhances construction efficiency and cost-effectiveness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224016753U_ABST
    Figure CN224016753U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, and aims to solve the technical problems that in a large-span frame structure and a cantilever structure, the fixed position of a guide rail of an attached lifting scaffold is unstable, the attachment interval of the guide rail cannot meet the construction requirement, and the follow-up maintenance cost is high. The utility model discloses an attached type lifting scaffold guide rail fixing suite which is provided with a guide seat heightening piece, a round pipe outrigger and a bolt lock, the guide seat heightening piece is of a right trapezoid cage-shaped structure and comprises a top frame and a bottom frame, and a bearing steel plate is welded to the top frame. And the top frame and the bottom frame are fixedly connected through a vertical square pipe, a first inclined steel pipe and a second inclined steel pipe. The attached type lifting scaffold guide rail can be fixed on the inner side structure of the suspension structure, the external member is fixed through bolts, the relative position is adjustable, the extension length of the round pipe cantilever beam is adjusted, the concrete pre-burying construction procedure is reduced, meanwhile, mounting and dismounting are convenient, repeated turnover use can be achieved, and the subsequent maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building engineering especially relates to a fixed kit of guide rail of attached lifting scaffold. BACKGROUND

[0002] With the rapid development of high-rise and super high-rise buildings, the design types of building shapes are also more and more, in order to ensure the engineering construction quality, most of the projects will select aluminum alloy formwork system to cooperate with attached lifting scaffold for construction, but many cantilever structures and line structures and other structures bring great construction difficulty to the fixation of guide rail of attached lifting scaffold.

[0003] In actual construction, the fixed position of the guide rail of the traditional attached lifting scaffold is usually the vertical components such as shear walls and structural columns. However, in the positions of large-span frame structures and cantilever structures such as balconies, the adjacent spacing of vertical vertical components is large, and the attachment interval of the guide rail cannot meet the specification and construction requirements. If the guide rail is attached to the outer cantilever beam, the guide rail interval may not meet the specification, which may cause the instability or overload of the scaffold body, and the stability of the scaffold cannot be guaranteed, and there is a probability of affecting the safety of the structure, and the subsequent maintenance cost is high. SUMMARY

[0004] The utility model aims at providing a fixed kit of guide rail of attached lifting scaffold to solve the technical problems of unstable fixed position of guide rail of attached lifting scaffold, unable to meet the construction requirements of attachment interval of guide rail and high subsequent maintenance cost in large-span frame structures and cantilever structures.

[0005] To achieve the above-mentioned purpose, the utility model provides a fixed kit of guide rail of attached lifting scaffold, which is provided with a guide seat heightening piece, a round pipe cantilever beam and a bolt lock. The guide seat heightening piece is in the form of a right trapezoidal cage structure, including a top frame and a bottom frame. A supporting steel plate is welded on the top frame, and the top frame and the bottom frame are fixedly connected through a vertical square tube, a first inclined steel tube and a second inclined steel tube. The first inclined steel tube is fixedly connected to the side, and the second inclined steel tube is fixedly connected to the diagonal.

[0006] Further, the bottom frame includes four bottom square tubes connected at the head and tail, and the top frame includes four top square tubes connected at the head and tail.

[0007] Further, a first reinforcing steel plate is welded at the connection of the bottom square tube, the first inclined steel tube and the second inclined steel tube, for preventing stress concentration at the node.

[0008] Further, the round pipe cantilever beam includes four horizontal round pipes and a vertical round pipe. The vertical round pipe is connected between the horizontally arranged horizontal round pipes, and a connecting steel plate is welded between the front and rear arranged horizontal round pipes, forming a rectangular cage structure. A second reinforcing steel plate is welded between the connections of the horizontal round pipes and the vertical round pipe.

[0009] Further, the two ends of the round pipe cantilever beam are provided with end plates, and one end thereof extends upwardly with an end connecting plate, two round holes are arranged in the end connecting plate for connecting with the scaffold through bolt lock.

[0010] Further, the bolt lock comprises a bolt, a pressing plate and a nut.

[0011] Further, the inner side of the pressing plate is sleeved with a channel steel.

[0012] The attached lifting scaffold guide rail fixing kit has the following advantages:

[0013] The right-angled trapezoidal cage structure of the guide seat heightening piece can effectively disperse the vertical load and lateral bending moment transmitted by the scaffold, improves the stability of the fixed position, and avoids the risk of relying on the outer cantilever beam; meanwhile, the connection between the vertical square tube between the top frame and the bottom frame, the first inclined steel tube and the second inclined steel tube enhances the overall strength and stability of the structure, and ensures the stable attachment of the guide rail in construction. The attached lifting scaffold guide rail can be fixed and attached on the inside structure of the suspension structure, the kit is fixed by bolts, the relative position is adjustable, the extension length of the round pipe cantilever beam is adjusted, the concrete pre-buried construction process is reduced, the installation and removal are convenient, the kit can be used repeatedly for many times, and the subsequent maintenance cost is reduced. BRIEF DESCRIPTION OF DRAWINGS

[0014] Figure 1 The vertical plane view of the guide seat heightening piece is provided;

[0015] Figure 2 The vertical plane view of the guide seat heightening piece is provided;

[0016] Figure 3 The vertical plane view of the round pipe cantilever beam is provided;

[0017] Figure 4 The vertical plane view of the round pipe cantilever beam is provided;

[0018] Figure 5 The right end structure view of the round pipe cantilever beam is provided;

[0019] Figure 6 The bolt lock structure is provided; Figure 1 ;

[0020] Figure 7 The bolt lock structure is provided; Figure 2 ;

[0021] Figure 8 The application mode one schematic view is provided;

[0022] Figure 9 The application mode two schematic view is provided;

[0023] Figure 10 A schematic diagram illustrating the third application method provided by this utility model.

[0024] In the diagram: 10. Guide seat heightening component; 20. Round tube cantilever beam; 30. Bolt lock; 11. Supporting steel plate; 12. Top square tube; 13. Bottom square tube; 14. Vertical square tube; 15. First inclined steel pipe; 16. Second inclined steel pipe; 17. First reinforcing steel plate; 21. Horizontal round tube; 22. Vertical round tube; 23. Second reinforcing steel plate; 24. Horizontal connecting steel plate; 25. End connecting plate; 26. Round hole; 31. Nut; 32. Bolt; 33. Pressure plate; 34. Channel steel; 1. Floor slab; 2. Wall; 3. Scaffolding. Detailed Implementation

[0025] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain this utility model and are not intended to limit this utility model.

[0026] See Figures 1 to 7 This utility model provides an attached lifting scaffold guide rail fixing kit, including a guide seat heightening component 10 and a round tube cantilever beam 20 fixedly connected to the guide seat heightening component 10. The guide seat heightening component 10 is fixedly connected to the round tube cantilever beam 20 by bolt lock 30.

[0027] The bolt-lock connection simplifies the construction process, reduces concrete pre-embedding steps, and enables rapid installation while ensuring the stability of the guide rails. This kit is suitable for various building types, especially high-rise and super high-rise buildings, providing a flexible and reliable solution. It is easy to install and disassemble, and its multiple uses reduce material waste and subsequent maintenance costs, optimize construction efficiency, lower labor and material costs, and improve overall cost-effectiveness.

[0028] See Figure 1 and Figure 2 The guide support heightening component 10 has a right-angled trapezoidal cage structure, forming a stable trapezoidal force system to distribute the vertical load and lateral bending moment transmitted by the scaffolding. The guide support heightening component 10 includes a top frame and a bottom frame. The size of the top frame is smaller than that of the bottom frame. A supporting steel plate 11 is welded on the top frame. A vertical square tube 14 and a first inclined steel tube 15 located at the side are connected between the top frame and the bottom frame. A second inclined steel tube 16 located inside the top frame is connected diagonally. A first reinforcing steel plate 17 is also welded at the connection between the bottom square tube 13, the first inclined steel tube 15 and the second inclined steel tube 16 to prevent stress concentration at the joint.

[0029] The base frame consists of four interconnected bottom square tubes 13, forming a stable foundation that fits snugly against the building structure. The top frame consists of four interconnected top square tubes 12. The design of reinforcing steel plates and diagonal steel tubes enhances the overall structural strength, improves the stability of the large-span frame structure and cantilever structure, and reduces safety risks.

[0030] In one embodiment, the top square tube 12 has a length of 420 mm, the bottom square tube 13 has a length of 600 mm, the supporting steel plate 11 has a thickness of 5 mm, and the vertical square tube 14 has a height of 600-900 mm; the diameter of the square tube is 30 x 30 mm, and the wall thickness is 3 mm.

[0031] See Figures 3 to 5 The circular tube cantilever beam 20 includes four horizontal circular tubes 21, forming a rectangular cage structure. Vertical circular tubes 22 are connected between the horizontal circular tubes 21 arranged vertically. Connecting steel plates 24 are welded between the horizontal circular tubes 21 arranged front and back. A second reinforcing steel plate 23 is welded between the connection points of the horizontal circular tubes 21 and the vertical circular tubes 22. The welded connection forms a stable frame and improves the lateral stiffness. Both ends of the circular tube cantilever beam 20 are provided with sealing plates, and an end connecting plate 25 extends upward from one end. Two circular holes 26 are provided in the end connecting plate 25.

[0032] Each circular hole 26 is connected to the scaffolding 3 by a bolt lock 30.

[0033] In one embodiment, the length of the circular tube cantilever beam 20 is 1500 mm.

[0034] See Figure 6 and Figure 7 The bolt lock 30 includes a bolt 32, a pressure plate 33 is fitted onto the bolt 32, and a nut 31 is provided on the outer side of the pressure plate 33, forming an adjustable rigid connection. Depending on actual needs, a channel steel 34 is fitted on the inner side of the pressure plate 33.

[0035] In one embodiment, the pressure plate 33 is preferably a thick steel plate with a thickness of 100 mm, the nut 31 is of specification M2, and the bolt 32 is of specification M30.

[0036] Figure 8 The first application method is shown. The bottom of the guide seat heightening component 10 is fixedly connected to the floor slab 1 by bolt lock 30. The bolt lock 30 is formed by bolt 32 penetrating the floor slab 1. A pressure plate 33 is provided on the bottom side of the floor slab 1, and the outside of the pressure plate 33 is locked with a nut 31. A channel steel 34 is provided at the other end of the bolt 32. The pressure plate 33 is provided on the upper part of the channel steel 34, and the pressure plate 33 is locked on the top of the pressure plate 33 with a nut 31.

[0037] The upper part of the guide seat extension 10 is fixedly connected to the circular tube cantilever beam 20 by bolts 30. Here, the bolts 30 consist of bolts 32 passing through the top frame of the circular tube cantilever beam 20 and the guide seat extension 10. A pressure plate 33 and a nut 31 are installed on the lower side of the top frame, and a pressure plate 33 and a nut 31 are installed on the upper side of the circular tube cantilever beam 20. Tightening the nut 31 achieves the fixed connection between the circular tube cantilever beam 20 and the guide seat extension 10. Channel steel 34 is not required for the bolts 30 here. The right end of the circular tube cantilever beam 20 is then connected to the scaffolding 3.

[0038] Figure 9 The second application method is shown, in which the bottom of the guide seat heightening member 10 is fixedly connected to the outside of the wall 2 by bolt lock 30, and the top of the guide seat heightening member 10 is connected to the scaffold 3.

[0039] Figure 10 The third application method is shown. The bottom of the guide seat heightening component 10 is fixedly connected to the outside of the wall 2 by bolt lock 30. The back of the guide seat heightening component 10 is fixedly connected to the round tube cantilever beam 20 by bolt lock 30. The right end of the round tube cantilever beam 20 is then connected to the scaffold 3.

[0040] The attached lifting scaffold guide rail fixing kit provided by this utility model has the following advantages:

[0041] The bolt-locking connection method effectively reduces the number of concrete pre-embedding construction steps and simplifies the construction process. The fixed connection between the kit and the internal structure allows for quick installation and ensures the stability of the guide rail.

[0042] The reinforcing steel plates and multiple diagonal steel pipes in the design enhance the overall structural strength of the scaffolding system, making it particularly suitable for large-span frame structures and cantilevered structures such as balconies. Compared to traditional methods, this technical solution significantly improves the stability of the scaffolding system and reduces safety risks caused by structural instability.

[0043] It is applicable to construction projects of different types and scales, especially for complex structures in high-rise and super high-rise buildings, providing a more flexible and reliable solution.

[0044] The mounting kit is easy to install and remove, and can be reused multiple times, reducing equipment and material waste on the construction site, improving work efficiency, and reducing subsequent maintenance costs.

[0045] By using fixed components, scaffold instability caused by the use of cantilever beams can be avoided, thereby reducing structural safety hazards. Its stability not only ensures construction safety but also guarantees the quality of the entire project.

[0046] The design of this mounting kit eliminates the need for extensive special pre-embedding and complex component construction during installation, thus reducing labor and material costs. Its reusability also significantly improves the cost-effectiveness of the equipment investment.

[0047] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. An attached lifting scaffold guide rail fixing kit, characterized in that, The system is equipped with a guide seat heightening component (10), a round tube cantilever beam (20), and a bolt lock (30). The guide seat heightening component (10) is a right-angled trapezoidal cage structure, including a top frame and a bottom frame. A supporting steel plate (11) is welded on the top frame, and the top frame and the bottom frame are fixedly connected by a vertical square tube (14), a first inclined steel pipe (15), and a second inclined steel pipe (16). The first inclined steel pipe (15) is fixedly connected to the side, and the second inclined steel pipe (16) is fixedly connected to the diagonal.

2. The attached lifting scaffold guide rail fixing kit according to claim 1, characterized in that, The base frame includes four bottom square tubes (13) connected end to end, and the top frame includes four top square tubes (12) connected end to end.

3. The attached lifting scaffold guide rail fixing kit according to claim 2, characterized in that, A first reinforcing steel plate (17) is welded at the connection between the bottom square tube (13), the first oblique steel tube (15), and the second oblique steel tube (16) to prevent stress concentration at the joint.

4. The attached lifting scaffold guide rail fixing kit according to claim 1, characterized in that, The circular tube cantilever beam (20) includes four horizontal circular tubes (21) and vertical circular tubes (22). The vertical circular tubes (22) are connected to the horizontal circular tubes (21) arranged vertically and vertically. The horizontal circular tubes (21) arranged front and rear are connected by connecting steel plates (24) to form a rectangular cage structure. A second reinforcing steel plate (23) is welded between the connection points of the horizontal circular tubes (21) and the vertical circular tubes (22).

5. The attached lifting scaffold guide rail fixing kit according to claim 4, characterized in that, The round tube cantilever beam (20) has sealing plates at both ends, and one end extends upward with an end connecting plate (25). The end connecting plate (25) has two round holes (26) for connecting to the scaffold (3) by bolt lock (30).

6. The attached lifting scaffold guide rail fixing kit according to claim 1, characterized in that, The bolt lock (30) includes a bolt (32), a pressure plate (33), and a nut (31).

7. The attached lifting scaffold guide rail fixing kit according to claim 6, characterized in that, The inner side of the pressure plate (33) is fitted with a channel steel (34).