A device to prevent trampling on slab reinforcement
Patent Information
- Application Number
- CN202521820528.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-08-26
- Publication Date
- 2026-08-11
- Estimated Expiration
- 2035-08-26
AI Technical Summary
[0003]为解决上述技术问题,本实用新型提供一种板面钢筋防踩踏装置,有效的解决了板面钢筋易踩踏变形且不利于采用工程推车运输施工工具或者施工材料的技术问题,克服了现有技术的不足
[0016]本实用新型具有的优点和积极效果是:由于采用上述技术方案,踏板能够根据踩踏区域的大小自由拼装,设置在板面钢筋的上方,方便施工人员行走,对板面钢筋进行防护,避免了板面钢筋的踩踏变形,保证了楼板的浇筑质量。通过设置伸缩的支撑杆,可调节踏板的支撑高度,适用于不同工况。通过设置轨道,方便推动工程推车,更有利于施工工具和施工材料的运输。通过设置放置板,用于施工工具和施工材料的临时存放,避免小型器件掉落至底板上,不易进行清理,进一步保证了楼板的浇筑质量。
Smart Images

Figure CN224621146U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of building engineering technology, and in particular relates to a device for preventing trampling on steel bars on slabs. Background Technology
[0002] During the construction of floor slabs in building construction, after the steel reinforcement bars on the slab surface are tied, construction workers can easily walk on the steel reinforcement bars, which can easily cause the steel reinforcement bars to deform underfoot, affecting the pouring quality of the floor slab. In addition, it is impossible to use engineering carts to transport construction tools or materials on the steel reinforcement bars. Utility Model Content
[0003] To solve the above-mentioned technical problems, this utility model provides a device to prevent the reinforcement bars on slabs from being stepped on, which effectively solves the technical problems that the reinforcement bars on slabs are easily deformed by stepping on them and are not conducive to the use of engineering trolleys to transport construction tools or construction materials, thus overcoming the shortcomings of the prior art.
[0004] The technical solution adopted in this utility model is: a device for preventing trampling on steel reinforcement bars on slabs, comprising...
[0005] The treadmill is installed above the reinforcing steel bars on the slab.
[0006] A support rod is installed on the bottom plate below the reinforcing bars of the slab, and the top of the support rod is provided with the pedal. The support rod is configured as a telescopic structure.
[0007] The track is set on the pedal.
[0008] Furthermore, the pedal includes multiple separate pedals, which are spliced together.
[0009] Furthermore, the split pedal includes a parallel steel frame with a steel mesh between the steel frames, and the track is arranged along the steel frame.
[0010] Furthermore, one end of the steel frame is provided with a groove, and the other end is provided with a pin, the groove being adapted to the pin.
[0011] Furthermore, the support rod includes an upper connecting rod and a lower support rod, the upper connecting rod being sleeved inside the lower support rod and movable along the lower support rod.
[0012] Furthermore, the bottom of the upper connecting rod is provided with an external thread, and the top of the lower support rod is provided with an internal thread, wherein the external thread is adapted to the internal thread.
[0013] Furthermore, the upper connecting rod is provided with multiple positioning holes, and the lower support rod is provided with positioning pins, which are detachably connected to the positioning holes.
[0014] Furthermore, the track is equipped with a placement plate for placing construction tools or construction materials.
[0015] Furthermore, the placement plate is L-shaped and engages with the track.
[0016] The advantages and positive effects of this utility model are as follows: Due to the adoption of the above technical solution, the treadmill can be freely assembled according to the size of the stepping area and placed above the reinforcing steel bars on the slab, facilitating worker movement, protecting the reinforcing steel bars from deformation caused by stepping, and ensuring the quality of the slab pouring. The support height of the treadmill can be adjusted by setting telescopic support rods, making it suitable for different working conditions. The track facilitates the pushing of engineering trolleys, which is more conducive to the transportation of construction tools and materials. The placement plate provides temporary storage for construction tools and materials, preventing small components from falling onto the base plate and being difficult to clean, further ensuring the quality of the slab pouring. Attached Figure Description
[0017] The above and other objects, features, and advantages of this utility model will become more apparent from the more detailed description of the embodiments thereof in conjunction with the accompanying drawings. The drawings are provided to further illustrate the embodiments of this utility model and form part of the specification. They are used together with the embodiments of this utility model to explain the utility model and do not constitute a limitation thereof. In the drawings, the same reference numerals generally represent the same parts or steps.
[0018] Figure 1 This is a side view of a slab reinforcement anti-trampling device according to an embodiment of the present invention.
[0019] Figure 2 This is a top view of a slab reinforcement anti-trampling device according to an embodiment of this utility model.
[0020] Figure 3 This is a schematic diagram of the support rod connection of a slab reinforcement anti-trampling device according to Embodiment 2 of this utility model.
[0021] Figure 4 This is a diagram showing the placement of a plate clamp for an anti-trampling device for steel reinforcement bars in a slab, according to an embodiment of this utility model.
[0022] In the picture:
[0023] 1. Split pedals 2. Steel frame 3. Steel mesh
[0024] 4. Track; 5. Groove; 6. Pin
[0025] 7. Upper connecting rod; 8. Lower support rod; 9. Positioning hole
[0026] 10. Positioning pin; 11. Support unit; 12. Placement plate
[0027] 13. Bending section 14. Engineering trolley 15. Base plate
[0028] 16. Slab reinforcement Detailed Implementation
[0029] This utility model provides a device to prevent the reinforcement bars on a slab from being stepped on. The embodiments of this utility model will be described below with reference to the accompanying drawings.
[0030] In the description of the embodiments of this utility model, it should be understood that the terms "top," "bottom," etc., indicating the orientation or positional relationship are based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. In the description of this utility model, it should be noted that unless otherwise expressly specified and limited, the terms "set" and "connected" should be interpreted broadly. For example, it can refer to a fixed connection, a detachable connection, or an integral connection; it can refer to a direct connection or an indirect connection through an intermediate medium; it can refer to the internal communication of two elements. Those skilled in the art can understand the specific meaning of the above terms in this utility model through specific circumstances.
[0031] like Figure 1 and Figure 2 As shown in the figure, an embodiment of this utility model provides a device to prevent trampling on slab reinforcement bars, including a footboard, a support rod, and a track 4. The footboard is mounted above the slab reinforcement bars 16, and the support rod is mounted on the base plate 15 below the slab reinforcement bars 16. The footboard is fixedly connected to the top of the support rod to support the footboard. For ease of installation, the support rod is designed as a telescopic structure to adjust the support height of the footboard. To facilitate the transportation of construction tools and materials using a trolley 14 on the footboard, a track 4 is fixed on the footboard, allowing construction workers to push the trolley 14 along the track 4.
[0032] Preferably, the pedal includes multiple separate pedals 1, which are spliced together. By separating the pedals, the multiple separate pedals 1 can be arbitrarily spliced according to the size of the stepping area, and dividing the pedal into multiple separate pedals 1 makes it easier to move and store.
[0033] Specifically, the split pedal 1 includes parallel steel frames 2, with steel mesh 3 fixedly connected between the steel frames 2. The steel frames 2 ensure the rigidity of the pedal and prevent deformation from foot pressure. Each split pedal 1 includes two parallel steel frames 2, with a track 4 running along the steel frames 2 and fixedly connected to them, located on the inner side of the steel frames 2. A support rod is fixed to the bottom of the steel frames 2.
[0034] Specifically, one end of the steel frame 2 has a groove 5, and the other end is fixed with a pin 6. The groove 5 and the pin 6 are compatible. Between adjacent split pedals 1, the pin 6 of one split pedal 1 can be inserted into the groove 5 of the adjacent split pedal 1 to realize the splicing of the split pedals 1.
[0035] Specifically, the support rod includes an upper connecting rod 7 and a lower support rod 8. The upper connecting rod 7 is sleeved inside the lower support rod 8 and can move along the lower support rod 8. By adjusting the relative position of the upper connecting rod 7 and the lower support rod 8, the length of the entire support rod can be adjusted.
[0036] In some embodiments, such as Figure 2 As shown, the upper connecting rod 7 is a solid circular rod with external threads at the bottom, and the lower support rod 8 is a circular tube with internal threads at the top, with the external and internal threads matching each other. By turning the lower support rod 8, the relative positions of the upper connecting rod 7 and the lower support rod 8 can be adjusted, thereby adjusting the length of the entire support rod.
[0037] In some embodiments, such as Figure 3 As shown, the upper connecting rod 7 is a circular tube with multiple positioning holes 9. These positioning holes 9 are evenly spaced along the length of the upper connecting rod 7. The lower support rod 8 is also a circular tube with positioning pins 10. Specifically, the positioning pins 10 are positioning bolts, horizontally inserted into the lower support rod 8 and threadedly connected to it. The positioning pins 10 can connect to positioning holes 9 at different heights, adjusting the relative position of the upper connecting rod 7 and the lower support rod 8 to achieve adjustment of the entire support rod length.
[0038] Preferably, the bottom of the lower support rod 8 is provided with a horizontal support part 11, which makes the support more stable.
[0039] Preferably, the track 4 is provided with a placement plate 12 for placing construction tools or construction materials. In order to prevent construction tools and materials from having nowhere to be placed during the construction process, such as small parts such as bolts and shims that are easy to fall onto the base plate 15 and are difficult to clean, thus affecting the pouring quality of the floor slab, a placement plate 12 is provided on the track 4 to place construction tools or construction materials.
[0040] Specifically, such as Figure 4 As shown, the placement plate 12 is L-shaped and engages with the track 4. The placement plate 12 is made of plastic, with the long side of the L-shape used to place construction tools and materials, and the short side of the L-shape having a bend 13 that engages with the track 4.
[0041] A construction method for using a slab reinforcement anti-trampling device as described above includes the following steps:
[0042] S1. Assemble the split pedal 1;
[0043] The steel mesh 3 is fixedly connected between the parallel steel frames 2. The upper connecting rod 7 is fixed to the bottom of the steel frame 2, and the lower support rod 8 is installed on the upper connecting rod 7. The track 4 is fixed to the steel frame 2.
[0044] S2. Adjust the height of the support rod;
[0045] Tighten the lower support rod 8 or use the positioning pin 10 to connect the positioning holes 9 at different heights, and adjust the relative position of the upper connecting rod 7 and the lower support rod 8 according to the height of the steel reinforcement 16 on the slab surface, so as to adjust the length of the entire support rod.
[0046] S3, Split pedal 1;
[0047] The support rod is placed on the base plate 15 below the steel reinforcement 16 on the plate surface, and multiple split pedals 1 are spliced together and placed above the steel reinforcement 16 on the plate surface. The adjacent spliced split pedals 1 are connected by grooves 5 and pins 6.
[0048] S4. Push the engineering trolley 14 to move along track 4;
[0049] Construction workers push the engineering trolley 14 along the track 4 to transport construction tools and materials. At the construction site, the placement plate 12 is engaged with the track 4 to hold the construction tools and materials. After construction is completed, the placement plate 12 can be removed from the track 4 and transported together with the construction tools and materials using the engineering trolley 14 to a designated storage point for safekeeping.
[0050] Example 1: A device to prevent trampling on slab reinforcement bars, comprising a footboard, a support rod, and a track 4. The footboard is mounted above the slab reinforcement bars 16 and is composed of multiple separate footboards 1. Each separate footboard 1 includes two parallel steel frames 2, with a steel mesh 3 welded and fixed between the steel frames 2. The track 4 is arranged along the steel frames 2, welded and fixed to the steel frames 2, and is located on the inner side of the steel frames 2. One end of the steel frame 2 has a groove 5, and the other end is fixed with a pin 6, the groove 5 and the pin 6 being compatible. The support rod is fixed to the bottom of the steel frame 2 and includes an upper connecting rod 7 and a lower support rod 8. The top of the upper connecting rod 7 is welded and fixed to the bottom of the steel frame 2. The upper connecting rod 7 is a solid circular rod with external threads at the bottom, and the lower support rod 8 is a circular tube with internal threads at the top, the external threads being compatible with the internal threads. A horizontal support part 11 is welded to the bottom of the lower support rod 8. The track 4 is provided with a placement plate 12, which is an L-shaped plastic plate. The long side of the L-shape is used to place construction tools and construction materials, and the short side of the L-shape is provided with a bending part 13 to engage with the track 4.
[0051] Example 2: A device to prevent trampling on slab reinforcement bars, comprising a footboard, a support rod, and a track 4. The footboard is mounted above the slab reinforcement bars 16 and is composed of multiple separate footboards 1. Each separate footboard 1 includes two parallel steel frames 2, with a steel mesh 3 welded and fixed between the steel frames 2. The track 4 is set along the steel frames 2, welded and fixed to the steel frames 2, and is located on the inner side of the steel frames 2. One end of the steel frame 2 has a groove 5, and the other end is fixed with a pin 6, the groove 5 and the pin 6 being compatible. The support rod is fixed to the bottom of the steel frame 2 and includes an upper connecting rod 7 and a lower support rod 8. The top of the upper connecting rod 7 is welded and fixed to the bottom of the steel frame 2. The upper connecting rod 7 is a circular tube with multiple positioning holes 9, which are evenly spaced along the length of the upper connecting rod 7. The lower support rod 8 is a circular tube with positioning pins 10, which are positioning bolts, horizontally passing through the lower support rod 8 and threadedly connected to the lower support rod 8. The positioning bolts can be connected to the positioning holes 9 at different heights. A horizontal support part 11 is welded to the bottom of the lower support rod 8. A placement plate 12 is provided on the track 4. The placement plate 12 is an L-shaped plastic plate. The long side of the L-shape is used to place construction tools and construction materials, and the short side of the L-shape has a bend 13 that engages with the track 4.
[0052] The advantages and positive effects of this utility model are:
[0053] 1. The treadmill can be freely assembled according to the size of the stepping area and set above the slab reinforcement. It facilitates the movement of construction workers, protects the slab reinforcement from deformation caused by stepping, and ensures the quality of the floor slab pouring.
[0054] 2. The support height of the pedal can be adjusted by setting a telescopic support rod, making it suitable for different working conditions.
[0055] 3. By setting up tracks, it is easier to push the engineering trolley, which is more conducive to the transportation of construction tools and materials.
[0056] 4. By setting up a placement board for temporary storage of construction tools and materials, small components are prevented from falling onto the base plate and being difficult to clean, thus further ensuring the quality of the floor slab pouring.
[0057] The embodiments of this disclosure have been described in detail above with reference to the accompanying drawings. It should be noted that implementations not illustrated or described in the drawings or the main text of the specification are forms known to those skilled in the art and have not been described in detail. Furthermore, the definitions of the various components described above are not limited to the specific structures, shapes, or methods mentioned in the embodiments, and those skilled in the art can easily modify or substitute them.
[0058] The embodiments of this utility model have been described in detail above, but the content described is only a preferred embodiment of this utility model and should not be considered as limiting the scope of implementation of this utility model. All equivalent changes and improvements made in accordance with the claims of this utility model should still fall within the patent coverage of this utility model.
Claims
1. A device for preventing trampling on reinforcing steel bars in slabs, characterized in that: include, The treadmill is installed above the reinforcing steel bars on the slab. A support rod is installed on the bottom plate below the reinforcing bars of the slab, and the top of the support rod is provided with the pedal. The support rod is configured as a telescopic structure. The track is set on the pedal.
2. The anti-trampling device for steel reinforcement bars on a slab according to claim 1, characterized in that: The pedal includes multiple separate pedals, which are spliced together.
3. The anti-trampling device for steel reinforcement bars on a slab according to claim 2, characterized in that: The split pedal includes a parallel steel frame with a steel mesh between the steel frames, and the track is arranged along the steel frame.
4. The anti-trampling device for steel reinforcement bars on a slab according to claim 3, characterized in that: One end of the steel frame is provided with a groove, and the other end is provided with a pin, the groove being adapted to the pin.
5. A device for preventing trampling on reinforcing bars on slabs according to any one of claims 1-4, characterized in that: The support rod includes an upper connecting rod and a lower support rod. The upper connecting rod is sleeved inside the lower support rod and can move along the lower support rod.
6. The anti-trampling device for steel reinforcement bars on a slab according to claim 5, characterized in that: The bottom of the upper connecting rod is provided with an external thread, and the top of the lower support rod is provided with an internal thread, wherein the external thread is adapted to the internal thread.
7. The anti-trampling device for steel reinforcement bars on a slab according to claim 5, characterized in that: The upper connecting rod is provided with multiple positioning holes, and the lower support rod is provided with positioning pins, which are detachably connected to the positioning holes.
8. A device for preventing trampling on reinforcing bars on slabs according to any one of claims 1-4 and 6-7, characterized in that: The track is equipped with a placement plate for placing construction tools or construction materials.
9. A device for preventing trampling on reinforcing bars on a slab according to claim 8, characterized in that: The placement plate is L-shaped and engages with the track.