Reinforced waterproof board trolley
Patent Information
- Application Number
- CN202521979082.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-15
- Publication Date
- 2026-09-15
- Estimated Expiration
- 2035-09-15
AI Technical Summary
[0023] Compared with the prior art, this utility model provides a steel reinforcement waterproof board trolley, which has the following beneficial effects:
Smart Images

Figure CN224755749U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of tunnel construction machinery technology, specifically to a steel reinforcement and waterproofing trolley for steel reinforcement binding and waterproofing trolley laying operations in tunnel secondary lining construction. Background Technology
[0002] Traditional steel reinforcement waterproofing board trolleys have the following disadvantages and deficiencies:
[0003] (1) The steel bar trolley, waterproof membrane laying trolley and lining trolley are moved multiple times for positioning, resulting in separation of processes and low efficiency;
[0004] (2) Manually tying steel bars and hanging waterproof boards on the arch top involves a lot of high-altitude work and high safety risks.
[0005] (3) Multiple positioning in different processes can easily lead to cumulative errors, resulting in poor positioning accuracy;
[0006] (4) Mutual interference between workspaces;
[0007] (5) High intensity of manual labor;
[0008] (6) The quality of waterproof membrane installation is not easy to guarantee, and it is prone to wrinkles and damage.
[0009] (7) High equipment investment and high cost. Utility Model Content
[0010] (a) Technical problems to be solved
[0011] To address the shortcomings of existing technologies, this utility model provides a steel reinforcement waterproofing trolley, which significantly improves the efficiency of tunnel lining construction, reduces process changeover time, greatly reduces the risks of high-altitude operations and enhances construction safety, reduces manual labor input and labor intensity, realizes streamlined and integrated operations for steel reinforcement binding and waterproofing trolley laying, and reduces the overall equipment investment cost.
[0012] (II) Technical Solution
[0013] To achieve the above objectives, this utility model provides the following technical solution: a steel reinforcement waterproof membrane trolley, comprising a trolley movable within a tunnel, wherein the trolley is equipped with a waterproof membrane laying structure and a steel reinforcement binding platform, the waterproof membrane laying structure comprising an upper frame longitudinal moving trolley movable longitudinally along the trolley, an annular waterproof membrane laying trolley movable circularly on the upper frame longitudinal moving trolley, the annular waterproof membrane laying trolley being equipped with a waterproof membrane roll lifting device, an automatic waterproof membrane unfolding and guiding mechanism, and an arch auxiliary support device, the steel reinforcement binding platform comprising a multi-layer platform and a ladder disposed between the multi-layer platforms, and also comprising a hanging plate small platform disposed on the upper frame longitudinal moving trolley.
[0014] Preferably, the top of the trolley is fixedly installed with two sets of longitudinal beams, each equipped with a trolley track, which allow the longitudinal moving trolley to move longitudinally. One end of the two sets of longitudinal beams is fixedly connected by a track crossbeam, and a track brace is fixedly connected between the track crossbeam and the trolley. The longitudinal moving trolley is fixedly installed with an annular track that allows the annular waterproof membrane laying trolley to slide annularly.
[0015] Preferably, the longitudinal trolley for mounting is equipped with guide wheels that slide and cooperate with the trolley guide.
[0016] Preferably, the trolley also includes a gantry system, a walking system, a support system, a main control box, and an electrical control cabinet.
[0017] Preferably, the gantry system includes a bottom longitudinal beam, gantry columns, gantry crossbeams, gantry diagonal braces, duct support, longitudinal connecting frame, and longitudinal diagonal braces.
[0018] Preferably, the support system includes a lifting cylinder fixedly installed at the bottom of the trolley, with a support leg fixedly installed at the bottom output end of the lifting cylinder, and also includes a hydraulic pump station fixedly installed at the bottom of the trolley.
[0019] Preferably, the walking system further includes guide devices disposed on both sides of the bottom of the trolley.
[0020] Preferably, guardrails are installed at each level of the climbing frame and at each platform.
[0021] Preferably, the multi-layer platform is configured as a three-layer platform, consisting of a first-layer platform, a second-layer platform, and a third-layer platform, and is equipped with a first-layer ladder, a second-layer ladder, and a third-layer ladder. The bottom of the first-layer ladder is fixedly installed with a temporary reinforcing support between it and the trolley.
[0022] (III) Beneficial Effects
[0023] Compared with the prior art, this utility model provides a steel reinforcement waterproof board trolley, which has the following beneficial effects:
[0024] This rebar waterproofing membrane trolley, adhering to the core R&D philosophy of improvement through innovation, integrates the spirit of continuous improvement into the entire product design process. Based on this philosophy, it has successfully and independently developed a rebar waterproofing membrane trolley with significant technological advantages, which significantly improves tunnel lining construction efficiency, reduces process changeover time, greatly reduces the risks of high-altitude operations and improves construction safety, reduces manual input and labor intensity, realizes streamlined and integrated operation of rebar binding and waterproofing membrane laying, and reduces the overall equipment investment cost. This equipment is mainly used for laying waterproofing membrane and installing rebar in tunnel lining. It not only greatly optimizes the traditional manual operation process and significantly improves construction efficiency and operational safety, but also effectively ensures the laying quality of the waterproofing layer and the installation accuracy of the rebar skeleton in tunnel lining. It is a key tool for improving the standardization and mechanization level of railway single-track tunnel construction. Attached Figure Description
[0025] Figure 1 This is a schematic diagram of the front structure of this utility model;
[0026] Figure 2 This is a side view of the structure of this utility model.
[0027] The attached diagram is labeled as follows: 1. Longitudinal moving trolley for mounting; 2. Circular waterproof membrane laying trolley; 3. Waterproof membrane roll lifting device; 4. Hanging platform; 5. Longitudinal beam; 6. Guide wheel; 7. Walking system; 8. Electrical control cabinet; 9. Air duct support; 10. Circular track; 11. Lifting cylinder; 12. Hydraulic pump station; 13. Guiding device; 14. Guardrail; 15. First floor platform; 16. Second floor platform; 17. Third floor platform; 18. First floor ladder; 19. Second floor ladder; 20. Third floor ladder; 21. Temporary reinforcement support; 22. Waterproof membrane roll. Detailed Implementation
[0028] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0029] Example:
[0030] Please see Figure 1-2A rebar waterproofing membrane trolley includes a trolley that can move within a tunnel. The trolley is equipped with a waterproofing membrane laying structure and a rebar tying platform. The waterproofing membrane laying structure includes an upper frame longitudinal moving trolley 1 that can move longitudinally along the trolley. An annular waterproofing membrane laying trolley 2 that can move in a circle is provided on the upper frame longitudinal moving trolley 1. The annular waterproofing membrane laying trolley 2 is equipped with a waterproofing membrane roll lifting device 3, an automatic waterproofing membrane unfolding and guiding mechanism, and an arch auxiliary support device. The rebar tying platform includes a multi-layer platform and ladders set between the multi-layer platforms, as well as a hanging plate small platform 4 set on the upper frame longitudinal moving trolley.
[0031] Specifically, the top of the trolley is fixedly installed with two sets of longitudinal beams 5, each equipped with a trolley track, which allow the longitudinal moving trolley 1 to move longitudinally. One end of the two sets of longitudinal beams is fixedly connected by a track crossbeam, and a track brace is fixedly connected between the track crossbeam and the trolley. The longitudinal moving trolley 1 is fixedly installed with an annular track 10, which allows the annular waterproof membrane laying trolley 2 to slide annularly.
[0032] Specifically, the longitudinal trolley 1 is equipped with guide wheels 6 that slide and cooperate with the trolley guide.
[0033] Specifically, the trolley also includes a gantry system, a walking system 7, a support system, a main control box, and an electrical control cabinet 8.
[0034] Specifically, the gantry system includes a bottom longitudinal beam, gantry uprights, gantry crossbeams, gantry diagonal braces, duct support 9, longitudinal connecting frame, and longitudinal diagonal braces.
[0035] Specifically, the support system includes a lifting cylinder 11 fixedly installed at the bottom of the trolley, with a support leg fixedly installed at the bottom output end of the lifting cylinder, and a hydraulic pump station 12 fixedly installed at the bottom of the trolley.
[0036] Specifically, the walking system also includes guide devices 13 installed on both sides of the bottom of the trolley.
[0037] Specifically, guardrails 14 are installed at each level of the climbing frame and each platform.
[0038] Specifically, the multi-layer platform is configured as three layers, namely a first-layer platform 15, a second-layer platform 16, and a third-layer platform 17, and is equipped with a first-layer ladder 18, a second-layer ladder 19, and a third-layer ladder 20. A temporary reinforcing support 21 is fixedly installed between the bottom of the first-layer ladder 18 and the trolley.
[0039] Construction Process: The trolley travels along a multi-functional waterproof fabric and rebar trolley, which consists of various intelligent operating systems. The trolley is equipped with an automatic walking system and a walking guide device, enabling it to safely and accurately reach the construction position along the tunnel's longitudinal direction. Upon arrival, the trolley first checks whether the initial tunnel support excavation in that area meets the requirements, facilitating efficient subsequent construction work. Hydraulic outriggers are then used to adjust the trolley's height, ensuring better contact with the tunnel surface. A waterproof membrane feeding system suspends 22 rolls of waterproof membrane in a single operation, eliminating the need for manual handling and secondary winding. This facilitates manual welding of the waterproof fabric, significantly reducing labor intensity, improving work efficiency, and enhancing the waterproof fabric laying effect. The waterproof fabric laying is controlled via an electrical control box or remote control, and the waterproof fabric is pressed and fixed. Operators can easily complete the work by standing on a side operating platform. This process is part of the current construction... During the process, the laying of the waterproof tarpaulin is strictly following the prescribed sequence. Once the current 12-meter-long waterproof tarpaulin segment is fully laid and passes the necessary quality inspection, the next critical process can be smoothly initiated: the laying of the reinforcing steel. In the reinforcing steel laying stage, this machine features a specially designed, stable, and spacious multi-functional operating platform, providing a revolutionary change for the reinforcing steel binding operation. Operators can stand safely and comfortably on the platform to accurately position, efficiently bind, and weld the reinforcing steel mesh. Compared to traditional scaffolding and high-altitude climbing operations, this platform design completely eliminates the risk of falls from heights, significantly improving operational safety. More importantly, it significantly optimizes the workflow, moving away from high-risk and inefficient operations, overcoming manual limitations, and driving tunnel construction towards automation, standardization, and a future of intelligent construction through innovative equipment.
[0040] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of this application, and are not intended to limit them. Although this application has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that modifications can still be made to the technical solutions described in the foregoing embodiments, or equivalent substitutions can be made to some or all of the technical features therein. Such modifications or substitutions do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of this application.
Claims
1. A steel reinforcement waterproofing trolley, comprising a trolley movable within a tunnel, characterized in that: The trolley is equipped with a waterproof membrane laying structure and a rebar binding platform. The waterproof membrane laying structure includes an upper frame longitudinal trolley (1) that can move longitudinally along the trolley. The upper frame longitudinal trolley (1) is equipped with a ring-shaped waterproof membrane laying trolley (2) that can move in a circular motion. The ring-shaped waterproof membrane laying trolley (2) is equipped with a waterproof membrane roll lifting device (3), an automatic waterproof membrane unfolding and guiding mechanism, and an arch auxiliary support device. The rebar binding platform includes a multi-layer platform and a ladder set between the multi-layer platforms, as well as a hanging plate small platform (4) set on the upper frame longitudinal trolley.
2. The steel reinforcement waterproofing trolley according to claim 1, characterized in that: The top of the trolley is fixedly installed with two sets of longitudinal beams (5) that are equipped with trolley tracks, which allow the longitudinal moving trolley (1) to move longitudinally. One end of the two sets of longitudinal beams is fixedly connected by a track crossbeam, and a track brace is fixedly connected between the track crossbeam and the trolley. The longitudinal moving trolley (1) is fixedly installed with an annular track (10) that allows the annular waterproof board laying trolley (2) to slide annularly.
3. The steel reinforcement waterproofing trolley according to claim 2, characterized in that: The upper longitudinal trolley (1) is equipped with guide wheels (6) that slide and cooperate with the trolley guide.
4. The steel reinforcement waterproofing trolley according to claim 3, characterized in that: The trolley also includes a gantry system, a walking system (7), a support system, a main control box, and an electrical control cabinet (8).
5. The steel reinforcement waterproofing trolley according to claim 4, characterized in that: The gantry system includes a bottom longitudinal beam, gantry columns, gantry crossbeams, gantry diagonal braces, duct support (9), longitudinal connecting frame, and longitudinal diagonal braces.
6. The steel reinforcement waterproofing trolley according to claim 5, characterized in that: The support system includes a lifting cylinder (11) fixedly installed at the bottom of the trolley, with a support leg fixedly installed at the bottom output end of the lifting cylinder, and also includes a hydraulic pump station (12) fixedly installed at the bottom of the trolley.
7. The steel reinforcement waterproofing trolley according to claim 6, characterized in that: The walking system also includes guide devices (13) located on both sides of the bottom of the trolley.
8. The steel reinforcement waterproofing trolley according to claim 7, characterized in that: Each level of the climbing frame and each platform is equipped with guardrails (14).
9. The steel reinforcement waterproofing trolley according to claim 8, characterized in that: The multi-layer platform is configured as three layers, namely a first-layer platform (15), a second-layer platform (16) and a third-layer platform (17), and is equipped with a first-layer ladder (18), a second-layer ladder (19) and a third-layer ladder (20). A temporary reinforcing support (21) is fixedly installed between the bottom of the first-layer ladder (18) and the trolley.