Fabricated container base structure

By using a prefabricated container base structure and adopting a modular splicing and positioning design, the construction limitations of traditional welded bases are solved, enabling rapid installation and improved stability, and adapting to various construction environments.

CN224797688UActive Publication Date: 2026-09-25MIANYANG KUAIZHU CONTAINER CO LTD
1 Cites 0 Cited by

Patent Information

Application Number
CN202522367452.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-07
Publication Date
2026-09-25
Estimated Expiration
2035-11-07

AI Technical Summary

Technical Problem

Existing container base structures rely on on-site welding, which limits the construction environment and time, making it impossible to construct in areas where hot work is prohibited, and also results in low installation efficiency.

Method used

It adopts a prefabricated structure, utilizing the combination of columns, bottom ring beams, through holes, threaded holes and bolts to achieve modular splicing. Combined with the design of positioning strips and positioning grooves, it can achieve rapid positioning and locking, avoiding welding and is suitable for construction where welding is not possible.

Benefits of technology

It shortens the construction cycle from the traditional 3-5 days to 4-8 hours, adapts to various environments, improves installation efficiency and stability, and is suitable for remote areas lacking heavy equipment.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The utility model discloses an assembly type container base structure, including stand and bottom ring beam, bottom ring beam is provided with two groups, the one side and one end of stand all are provided with two groups through -hole, two groups bottom ring beam near stand one side set up two groups of thread hole, four groups the inside of through -hole is equipped with the bolt of adaptation with thread hole, the both sides of through -hole near the one side and one end of stand are provided with the positioning strip, the utility model discloses through the intercoordination between stand, bottom ring beam, through -hole, thread hole and bolt, make with base frame disassembly into splicable unit module, complete anticorrosive treatment and pre -assembly debugging in factory, only need to splice module and tighten bolt on the spot, and single group base construction period can be shortened to 4-8 hours from traditional 3-5 days, change traditional on -the -spot welding node for standardization bolt connection spare, do not need to use electricity when assembling, solve the construction problem of the area without welding condition.
Need to check novelty before this filing date? Find Prior Art