Combustion boiler control system and method therefor
The combustion boiler control system addresses fluctuations in waste quality by using a mathematical model with feedforward control to stabilize evaporation levels, reducing time delays and enhancing control stability through precise heat calculations.
Patent Information
- Application Number
- JP2023059914
- Authority / Receiving Office
- JP · JP
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-04-03
- Publication Date
- 2024-10-16
AI Technical Summary
Conventional combustion control systems in waste incinerators face challenges in maintaining consistent evaporation levels due to fluctuations in waste quality, leading to time delays and instability in boiler system control, especially with long time constants, and lack proactive feedforward control mechanisms.
A combustion boiler control system that incorporates a mathematical model-based transfer function for controlling combustion and boiler sections, utilizing feedforward control to address disturbances caused by changes in heat quantity, and includes components for calculating and correcting air supply based on actual and reference heat amounts.
The system effectively reduces time delays and stabilizes evaporation by clearly defining and canceling disturbances, providing clear theoretical foundations and accurate heat calculations, ensuring stable control without interference between control sections.
Smart Images

Figure 2024147122000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a combustion control system and method for a combustion boiler, for example, an incinerator at a garbage incineration facility, a waste incinerator, a biomass power generation plant, or the like. [Background technology]
[0002] Conventionally, in municipal waste incinerators, it has been difficult to control the amount of evaporation from the waste heat boiler at a constant level because of fluctuations in the waste quality, such as the calorific value of the municipal waste that is used as fuel. In particular, in recent years, there has been a demand for stabilization of the output of waste-to-energy generation, so it is extremely important to suppress fluctuations in the amount of evaporation.
[0003] Patent Document 1 discloses that in a combustion control device that performs feedback control of an incinerator so that the amount of steam generated from a waste heat boiler follows a control target value, in addition to feedback control based on the amount of steam, the incinerator is controlled using the amount of heat contained in the combustion exhaust gas at the inlet of the waste heat boiler as a leading element. The combustion control device includes a first adjustment unit that outputs a first control amount based on the difference between the control target value and the amount of steam, and a second adjustment unit that outputs a second control amount using the amount of heat contained in the combustion exhaust gas generated in the incinerator as a leading element, and the incinerator is controlled based on the difference between the first control amount and the second control amount.
[0004] Patent Document 2 discloses a control device that includes an exhaust gas temperature measuring device for measuring the furnace outlet temperature of the exhaust gas, an exhaust gas flow rate measuring device for measuring the flow rate of the exhaust gas, and a steam volume measuring device for measuring the evaporation amount of boiler water, and further performs feedback control that changes the amount of secondary combustion air supplied in response to changes in the evaporation amount of boiler water measured by the steam volume measuring device, and precedence element control that changes the amount of secondary combustion air supplied in response to changes in the exhaust gas heat quantity predicted by changes in the exhaust gas temperature measured by the exhaust gas temperature measuring device and the exhaust gas flow rate measured by the exhaust gas flow rate measuring device. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] Patent Publication No. 2022-76570 [Patent Document 2] JP 2020-190364 A Summary of the Invention [Problem to be solved by the invention]
[0006] Patent Document 1 describes a conventional simple feedback control device (see paragraphs 0007 to 0013 and FIG. 5 of the specification). Similarly, FIG. 3 shows a typical conventional control block diagram of a combustion air control system for a waste combustion boiler. It is divided into a combustion system Gf that burns waste, and a boiler system Gb that generates steam by heat exchange with the combustion gas generated in the combustion system. These systems are connected in series as shown in Figure 3. Both the combustion system Gf and the boiler system Gb can be approximated by a first-order lag with a certain time constant. Here, the time constant Tf of the combustion system Gf is about 30 seconds to 1 minute, but the time constant Tb of the boiler system Gb is considerably longer, about 3 to 5 minutes, in a normal waste boiler. This long Tb makes it difficult to control the combustion of a waste-combustion boiler. The output C of the boiler system Gb is the actual boiler evaporation rate Gsr, but it fluctuates due to the influence of disturbance D. C is fed back (FB path) to the main adjustment section Gc1 to determine the deviation E from the set evaporation rate value Gs. If E occurs, a corrective action is always taken in Gc1, and an output signal is sent to the air volume controller (e.g., an air damper) at the position marked *, appropriately adjusting the amount of combustion air. Gc1 normally employs PID control, and performs control action according to the amount of deviation and its change over time. The set value R is normally a fixed value control that is kept constant. However, if there is a sudden change in the waste quality (considered to be a major disturbance), a control delay occurs due to the long time constant Tb of the boiler system Gb, resulting in fluctuations in Gsr.
[0007] Due to the long time constant of the boiler system, the conventional technology has the following drawbacks: (1) When there is a large change in the quality of the waste, if the combustion air volume is controlled based only on the deviation in the boiler evaporation volume, a time lag occurs and the evaporation volume fluctuates greatly. In this case, the proportional gain of the adjustment section can be strengthened to deal with the problem, but there are limitations due to the stability of the system. (2) Recently, there have been correction methods using artificial intelligence (AI) that focus on the frequency of individual phenomena thought to be related to combustion. However, there are cases where the causal relationship of each phenomenon to the amount of evaporation cannot be clearly explained, and the theoretical basis is often weak. (3) In Patent Document 1, in addition to feedback control, the incinerator is controlled by using the heat quantity of the combustion exhaust gas at the inlet of the waste heat boiler as a leading element. This is not a feedforward control. (4) In Patent Document 2, the supply amount of secondary combustion air is changed according to the change in the calorific value of the exhaust gas that is predicted due to the change in the temperature and flow rate of the exhaust gas. This is not a feedforward control.
[0008] The present disclosure provides a combustion boiler control system and method capable of detecting the amount of heat generated by a furnace due to fluctuations in the amount of heat generated, and adding proactive feedforward control to conventional feedback control to eliminate the effects of the time constant of the boiler system and improve controllability. In addition, the present disclosure provides a combustion boiler control system and method that can be applied not only to municipal waste incinerators but also to industrial waste incinerator boilers and biomass power generation facilities that use similar fuels. [Means for solving the problem]
[0009] The combustion boiler control system of the present disclosure comprises: It is preferable to perform control using a transfer function obtained by Laplace transforming a mathematical model of a dynamic system having a combustion boiler equipped with a combustion device and a boiler as a control target.
[0010] The combustion boiler control system (1) comprises: A main adjustment unit (Gc1) for controlling the combustion of the combustion unit (Gf); a disturbance adjustment unit (Gc2) for performing feedforward control based on a disturbance (D) caused by a change in heat quantity; an air amount control unit (Ad) for controlling the amount of air (containing an oxidizer) supplied to a combustion unit (Gf) based on an output from the main control unit (Gc1) and an output from the disturbance control unit (Gc2); a combustion unit (Gf) that burns fuel (e.g., garbage, waste, biomass) with the air (containing an oxidant) manipulated by the air amount manipulation unit (Ad) to generate combustion gas; The control may be performed in a controlled object having a boiler unit (Gb) that generates steam (water vapor) by heat exchange between the combustion gas sent from the combustion unit (Gf) and liquid (water).
[0011] The combustion boiler control system (1) Combustion gas composition (C g ) and gas volume (V g ) to the actual heat (Q fr An actual heat quantity calculation unit that calculates A combustion section (G f and a combustion unit input calculation unit that calculates the input value of
[0012] The combustion boiler control system (1) comprises: The target evaporation rate (G s ) and the actual steam volume of the boiler (G sr a master controller input calculation unit which calculates an input value (E) for the master controller by taking a difference between the input value (E) and the master controller input value (E); The set evaporation amount (G s ) to the standard heat quantity (Q fs A reference heat quantity calculation unit that calculates The actual heat quantity (Q fr ) to the standard heat quantity (Q fs a disturbance calculation unit that calculates the disturbance (D) by subtracting a disturbance correction signal calculation unit that calculates a disturbance correction signal (S) based on the disturbance (D); an air volume manipulation unit input calculation unit that adds the disturbance correction signal (S) and an output from the main adjustment unit to calculate an input value for the air volume manipulation unit, The combustion section input calculation section adds the disturbance (D) and the output of the air amount operation section to calculate the combustion section (G f ) input value may be calculated.
[0013] The combustion boiler control system (1) comprises: The air amount operation unit (A d Based on the input value of the air amount operation unit (A d an air amount control section (41) for controlling The combustion section (G f Based on the input value of the combustion unit (G f ), and The device may include: The above control sections may be configured by the same control device (81).
[0014] The combustion boiler control system (1) comprises: a master controller input value storage unit (12) for storing an input value (E) obtained by the master controller input calculation unit (10); a disturbance correction signal storage unit (32) for storing the disturbance correction signal (S) obtained by the disturbance correction signal calculation unit (30); The air amount operation unit (A d an air volume operation unit input value storage unit (42) for storing an input value of The combustion section (G f a combustion unit input value storage unit (52) for storing an input value of The device may include: The combustion boiler control system (1) comprises: The reference heat quantity (Q fs A reference heat quantity storage unit (212) for storing the reference heat quantity, The actual heat quantity (Q fr an actual heat quantity storage unit (222) for storing the actual heat quantity; a disturbance storage unit (202) for storing the disturbance (D) obtained by the disturbance calculation unit (20); The device may include: The above storage units may be configured from the same storage device (82), and may be local storage or cloud storage.
[0015] The combustion boiler control system (1) comprises: The input value (E) obtained by the main control input calculation unit (10) is input to the main control unit (G c1 a first transmitting unit (13) for transmitting to the The disturbance correction signal (S) obtained by the disturbance correction signal calculation unit (30) is fed to the disturbance adjustment unit (G c2 a second transmitting unit (33) for transmitting to the The air amount operation unit (A d a third transmitting unit (43) that transmits the input value of (Ad) to the air amount manipulation unit (Ad); The combustion section (G f a fourth transmitting unit (53) that transmits the input value of (Gf) to the combustion unit (Gf); The device may include: The above-mentioned transmitting units may be configured by the same communication device (83), and the communication device may be either a wireless communication means or a wired communication means, or may be configured by both means.
[0016] The combustion boiler control system (1) comprises: a main controller input value display unit (14) for displaying an input value (E) obtained by the main controller input calculation unit (10); a disturbance correction signal display unit (34) for displaying the disturbance correction signal (S) obtained by the disturbance correction signal calculation unit (30); The air amount operation unit (A d an air volume operation unit input value display unit (44) for displaying an input value of The combustion section (G f A combustion unit input value display unit (54) for displaying the input value of The device may include: The combustion boiler control system (1) comprises: The reference heat quantity (Q fs A reference heat quantity display unit (214) that displays the reference heat quantity (H2O), The actual heat quantity (Q fr an actual heat quantity display unit (224) that displays the actual heat quantity; a disturbance display unit (204) for displaying the disturbance (D) obtained by the disturbance calculation unit (20); The device may include: The above display units may be configured with the same display device (84).
[0017] The combustion boiler control system (1) comprises: The system may further include a fuel supply device control section (60) for controlling a fuel supply device using the disturbance correction signal (S) obtained by the disturbance correction signal calculation section (30). The combustion boiler control system includes: The fuel supply device may further include a transmitting unit (63) for transmitting the disturbance correction signal (S) obtained by the disturbance correction signal calculation unit (30) to a fuel supply device. Examples of the "fuel supply device" include a speed control device for a fuel supply and transport section (conveyor, crane), and a feed speed control device for a traveling stoker or a stepped stoker.
[0018] The "main control unit input calculation unit (10)", "reference heat quantity calculation unit (21)", "actual heat quantity calculation unit (22)", "disturbance calculation unit (20)", "disturbance correction signal calculation unit (30)", "air volume operation unit input calculation unit (40)", and "combustion unit input calculation unit (50)" may be configured in an information processing device, or may be configured by a program including its procedures and a processor working in cooperation with each other.
[0019] Examples of "fuel" include garbage (municipal garbage, household garbage), industrial waste, and biomass. Biomass includes waste-based biomass (livestock waste, food waste, waste paper, pulp mill effluent, sewage sludge, human waste sludge, construction wood, sawmill residues, etc.), unused biomass (rice straw, wheat straw, rice husks, forest residues, etc.), resource crops (sugar resources, starch resources, oil resources), willow, poplar, switchgrass, etc.).
[0020] Another disclosed combustion boiler control method includes: The target evaporation rate (G s ) and the boiler section (G b Actual evaporation rate (G sr ) and the difference (deviation) is calculated (feedback calculation) and the main adjustment unit (G c1 A master controller input calculation step for calculating an input value (E) of The set evaporation amount (G s ) to the standard heat quantity (Q fs A reference heat quantity calculation step for calculating The gas composition of the combustion gas (C g ) and gas volume (V g ) to the actual heat (Q fr An actual heat quantity calculation step of calculating The actual heat quantity (Q fr ) to the standard heat quantity (Q fs ) to calculate the disturbance (D); a disturbance correction signal calculation step of calculating a disturbance correction signal (S=-D) based on the disturbance (D); an air volume manipulation unit input calculation step of adding (performing a feedforward calculation) the disturbance correction signal (S) and an output (PID control signal) from the main adjustment unit (Gc1) to calculate an input value for the air volume manipulation unit (Ad); The disturbance (D) and the air amount control unit (A d ) and the output of the combustion section (G f A combustion unit input calculation step for calculating an input value of may also include
[0021] The combustion boiler control method includes: an actual calorific value calculation step of calculating an actual calorific value (Qfr) from the gas composition (Cg) and gas amount (Vg) of the combustion gas; and a combustion unit input calculation step of calculating an input value of the combustion unit based on the actual heat quantity (Qfr). The combustion boiler control method includes: a main control unit input calculation step for calculating an input value (E) of the main control unit by taking a difference between a set evaporation rate (Gs), which is a target value, and an actual evaporation rate (Gsr) of the boiler unit; A reference heat quantity calculation step of calculating a reference heat quantity (Qfs) from the set evaporation amount (Gs); a disturbance calculation step of calculating a disturbance (D) by subtracting the reference heat quantity (Qfs) from the actual heat quantity (Qfr); a disturbance correction signal calculation step of calculating a disturbance correction signal (S) based on the disturbance (D); and an air volume manipulation unit input calculation step of adding the disturbance correction signal (S) and an output from the main adjustment unit to calculate an input value for the air volume manipulation unit, In the combustion section input calculation step, the disturbance (D) and an output of the air amount manipulation section may be added together to calculate an input value for the combustion section. The combustion boiler control method includes: The air amount operation unit (A d Based on the input value of the air amount operation unit (A d An air amount control step of controlling the air amount control unit; The combustion part (G f Based on the input value of the combustion unit (G f ) may be included in the combustion unit control step. The combustion boiler control method includes: The method may include a fuel supply device control step of controlling a fuel supply device with the disturbance correction signal (S) obtained in the disturbance correction signal calculation step. The combustion boiler control method includes: The method may include a transmitting step of transmitting the disturbance correction signal (S) obtained in the disturbance correction signal calculation step to a fuel supply device. The combustion boiler control method includes: a first transmission step of transmitting the input value (E) obtained in the master controller input calculation step to the master controller (Gc1); a second transmission step of transmitting the disturbance correction signal (S) obtained in the disturbance correction signal calculation step to the disturbance adjustment unit (Gc2); The air amount operation unit (A d The input value of the air amount operation unit (A d a third sending step of sending the The combustion part (G f ) input value to the combustion section (G f ) a fourth transmitting step.
[0022] A combustion boiler control program disclosed in another aspect is a program for implementing the above-mentioned combustion boiler control method by at least one processor or information processing device. The steps of the program may be all executed within the same device, or each step may be executed by distributed processing or parallel processing on one or more devices, and the devices may be on-premise or in the cloud. Another disclosed computer-readable recording medium having computer instructions stored thereon is a computer-readable recording medium that, when the computer instructions are executed by a processor, realizes the steps of the combustion boiler control program.
[0023] Each element of the "combustion boiler control system" may be composed of an information processing device (e.g., a computer, a server) having a memory, a processor, and a software program, a dedicated circuit, firmware, or the like. The "information processing device" may be composed of, for example, one or more of a general-purpose computer, an on-premise server, a cloud server, an edge computer, etc.
[0024] (Action and effect) (1) By clearly defining the disturbance of the combustion section, it is possible to cancel the disturbance by continuously calculating it. This enables control that takes time delay into account. In addition, the theoretical concept is clear in light of the control system. (2) The disturbance is not the combustion heat amount itself, but the amount of change from the reference heat amount determined by the set evaporation amount, so the physical image is clear. (3) The control unit is the main control unit (G c1 ) and disturbance adjustment section (G c2 ) which are parallel systems, there is no mutual interference and good control results can be obtained. (4) The amount of heat of combustion is calculated based on the composition of the combustion gas and is not dependent on the gas temperature. Therefore, it is not affected by the uncertainty of the gas temperature. (5) The calculation of the heat of combustion is based on the Dulong formula, which uses combustible hydrogen, which allows a clear understanding of the amount of hydrogen combusted, and a heat correction coefficient is applied, so there is little error in the calculation. (6) The disturbance (change in the amount of heat of combustion) obtained by the present invention can be used as a standard not only for the air volume control system but also for the waste feed rate control system. [Brief description of the drawings]
[0025] [Figure 1] FIG. 2 is a diagram showing a control model of the combustion boiler control system according to the first embodiment. [Figure 2A] 1 is a diagram showing a functional configuration of a combustion boiler control system according to a first embodiment. [Figure 2B] FIG. 11 is a diagram showing a functional configuration of a combustion boiler control system according to another embodiment. [Diagram 3] FIG. 1 is a diagram showing a control model of a conventional combustion boiler control system. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0026] Several embodiments of the present invention will be described below. The embodiments described below are merely examples of the present invention. The present invention is not limited to the following embodiments, and includes various modified forms that are implemented within the scope of the present invention. Note that not all of the configurations described below are necessarily essential configurations of the present invention.
[0027] FIG. 1 shows a control model of the combustion boiler control system 1. Main adjustment section G c1controls the combustion of the combustion unit Gf. This is a control model that performs PID control by inputting an input value E (deviation E) described later.
[0028] Disturbance adjustment section G c2 is a control model that performs feedforward control based on disturbance D due to changes in heat quantity. Combustion section G f is the air volume control unit A d This is a control model that burns fuel and generates combustion gases using the amount of air controlled by the controller. The boiler section Gb is a control model that generates steam (water vapor) by heat exchange between the combustion gas sent from the combustion section Gf and water. Boiler Section G b The output C from the actual evaporation amount G sr Main Control Unit G c1 If there is a deviation E (=input value E), the main control unit G c1 It is done by.
[0029] FIG. 2A shows the functional configuration of the combustion boiler control system 1. The main control input calculation unit 10 calculates the set evaporation amount G, which is the target value (R) of the boiler unit. s and Boiler Section G b Actual evaporation rate G sr The difference (deviation) between the two is taken (feedback calculation) and the main control unit G c1 Calculate the input value E.
[0030] The reference heat quantity calculation unit 21 calculates the reference heat quantity Q from the set evaporation quantity Gs. fs Calculate the standard heat quantity Q fs is the boiler outlet steam specific enthalpy h s , specific enthalpy of feed water at the inlet h w , and boiler efficiency η b It can be calculated from η b is a constant value.
number
[0031] The actual calorific value calculation unit 22 calculates the gas composition Cg and the gas volume V g Actual heat quantity Q fr Calculate the following.
[0032] In this embodiment, the combustion heat amount Q based on the boiler evaporation amount and the amount of garbage input from the garbage input hopper is f Since no boiler G is used, b The feature of this method is that there is no time delay due to the waste disposal or the dead time from the garbage disposal to the start of combustion. In addition, since the Qf is not calculated based on the gas temperature, there is no risk of errors due to fluctuations in gas temperature. g , wet gas volume V g , dry gas volume V d , using air volume A, actual heat quantity Q fr (= Combustion heat Q f ) can be calculated instantly and accurately without delay from the end of combustion. Dry gas volume V d For general municipal waste, if the air volume is A, it can be approximated by the following formula. Alternatively, V can be calculated by using the coefficient calculated using the air ratio m instead of the coefficient 0.98. d may be calculated more accurately.
number
number
number
number
number
number
[0033] The disturbance calculation unit 20 calculates the actual heat quantity Q fr From the standard heat quantity Q fs The disturbance D is calculated by subtracting
[0034] The air volume operation input calculation unit 40 receives the disturbance correction signal S and the main adjustment unit G c1 The output (PID control signal) from is added (feedforward calculation) to calculate the input value E2 of the air volume control unit Ad.
[0035] The combustion section input calculation section 50 is a control section for calculating the amount of air flow from the external disturbance D and the air flow rate control section A. d Output A dout Add (feed forward calculation) and f Calculate the input value E3 of the combustion section G f The output F of the boiler section G b This is the input value.
[0036] In FIG. 2A, the combustion boiler control system 1 includes a control device 81. The control device 81 receives the air amount operation unit A obtained by the air amount operation unit input calculation unit 40. d Based on the input value of air volume control unit A d The air amount control unit 41 controls the amount of air in the combustion unit G obtained by the combustion unit input calculation unit 50. fBased on the input value of the combustion section G f and a combustion section control section 51 for controlling the combustion section.
[0037] 2A, the combustion boiler control system 1 includes a storage device 82. The storage device 82 includes a main control unit input value storage unit 12 that stores the input value E obtained by the main control unit input calculation unit 10 in association with the calculation time, a disturbance correction signal storage unit 32 that stores the disturbance correction signal S obtained by the disturbance correction signal calculation unit 30 in association with the calculation time, and an air volume operation unit A in association with the air volume operation unit input calculation unit 40. d The input value of the air volume operation unit is stored in the air volume operation unit input value storage unit 42 in association with the calculation time, and the input value of the combustion unit G obtained by the combustion unit input calculation unit 50 is stored in the air volume operation unit input value storage unit 42 in association with the calculation time. f The storage device 82 stores the input value of the reference heat quantity Q obtained by the reference heat quantity calculation unit 21 in correspondence with the calculation time. fs The actual heat quantity Q obtained by the actual heat quantity calculation unit 22 is stored in the reference heat quantity storage unit 212 in association with the calculation time. fr in association with the calculation time, and a disturbance storage unit 202 in which the disturbance D obtained by the disturbance calculation unit 20 is stored in association with the calculation time.
[0038] 2A, the combustion boiler control system 1 includes a display device 84. The display device 84 displays a main control unit input value display unit 14 that displays an input value E obtained by the main control unit input calculation unit 10, a disturbance correction signal display unit 34 that displays a disturbance correction signal S obtained by the disturbance correction signal calculation unit 30, and the air volume operation unit A that displays the air volume operation unit A that is obtained by the air volume operation unit input calculation unit 40. d The air volume operation input value display unit 44 displays the input value of the air volume operation unit G obtained by the combustion unit input calculation unit 50. f The display device 84 is provided with a combustion unit input value display unit 54 that displays the input value of the reference heat quantity Q obtained by the reference heat quantity calculation unit 21. fs and the actual calorie amount Q obtained by the actual calorie amount calculation unit 22. fr and a disturbance display unit 204 that displays the disturbance D obtained by the disturbance calculation unit 20.
[0039] (Composition / effect) The control model in Figure 2A is the main control unit G c1 Setting value R (Set evaporation amount G s ) is kept constant. Boiler section G b Output C (actual evaporation amount G sr ) to the main control unit G c1 The feedback (FB) is sent to the inlet of the valve, and the deviation E is calculated by [RC]. If deviation E occurs, the main control unit G c1 Corrective action is performed by PID control, and air volume control section A d Air volume control unit A d The amount of air operated in the combustion section G f It is used to burn waste, generating combustion gas and producing combustion heat F. The combustion heat F is the boiler part G b The actual evaporation amount is output C by heat exchange at the main control unit G as described above. c1 , and the above-mentioned correction operation is repeated. Combustion section G f The input fuel (e.g., municipal solid waste) frequently changes its waste quality, such as its calorific value. For this reason, even if the amount of combustion air is constant, the combustion section G f The combustion heat F of the output of the boiler section G b The output C of the control system will also change, causing disturbances in the control system. In this embodiment, the signal of the disturbance D in FIG. 2A is f and feedforward control is performed. S=-(Q fs -Q fr The signal from this signal is also output to the waste supply system (stoker feed rate control system). It can be used as a reference signal for the supply system.
[0040] (Another embodiment) 2B shows the functional configuration of a combustion boiler control system 1B according to another embodiment. The combustion boiler control system 1B includes a communication device 83 instead of the control device 81. The communication device 83 includes a first transmission unit 13 that transmits the input value E obtained by the main control unit input calculation unit 10 to the main control unit Gc1, a second transmission unit 33 that transmits the disturbance correction signal S obtained by the disturbance correction signal calculation unit 30 to the disturbance control unit Gc2, a third transmission unit 43 that transmits the input value of the air volume operation unit Ad obtained by the air volume operation unit input calculation unit 40 to the air volume operation unit Ad, and a fourth transmission unit 53 that transmits the input value of the combustion unit Gf obtained by the combustion unit input calculation unit 50 to the combustion unit Gf. Each part is controlled based on the transmitted data.
[0041] (method) The combustion boiler control method includes: The target evaporation rate (G s ) and the boiler section (G b Actual evaporation rate (G sr ) and the difference (deviation) is calculated (feedback calculation) and the main adjustment unit (G c1 A master controller input calculation step for calculating an input value (E) of The set evaporation amount (G s ) to the standard heat quantity (Q fs A reference heat quantity calculation step for calculating The gas composition of the combustion gas (C g ) and gas volume (V g ) to the actual heat (Q fr An actual heat quantity calculation step of calculating The actual heat quantity (Q fr ) to the standard heat quantity (Q fs ) to calculate the disturbance (D); a disturbance correction signal calculation step of calculating a disturbance correction signal (S=-D) based on the disturbance (D); an air volume manipulation unit input calculation step of adding (performing a feedforward calculation) the disturbance correction signal (S) and an output (PID control signal) from the main adjustment unit (Gc1) to calculate an input value for the air volume manipulation unit (Ad); The disturbance (D) and the air amount control unit (A d) and the output of the combustion section (G f A combustion unit input calculation step for calculating an input value of The air amount operation unit (A d Based on the input value of the air amount operation unit (A d An air amount control step of controlling the air amount control unit; The combustion section (G f Based on the input value of the combustion unit (G f A combustion unit control step of controlling Includes.
[0042] (program) The combustion boiler control program is executed by at least one processor or information processing device. The target evaporation rate (G s ) and the boiler section (G b Actual evaporation rate (G sr ) and the difference (deviation) is calculated (feedback calculation) and the main adjustment unit (G c1 A master controller input calculation step for calculating an input value (E) of The set evaporation amount (G s ) to the standard heat quantity (Q fs A reference heat quantity calculation step for calculating The gas composition of the combustion gas (C g ) and gas volume (V g ) to the actual heat (Q fr An actual heat quantity calculation step of calculating The actual heat quantity (Q fr ) to the standard heat quantity (Q fs ) to calculate the disturbance (D); a disturbance correction signal calculation step of calculating a disturbance correction signal (S=-D) based on the disturbance (D); an air volume manipulation unit input calculation step of adding (performing a feedforward calculation) the disturbance correction signal (S) and an output (PID control signal) from the main adjustment unit (Gc1) to calculate an input value for the air volume manipulation unit (Ad); The disturbance (D) and the air amount control unit (A d ) and the output of the combustion section (G f A combustion unit input calculation step for calculating an input value of The air amount operation unit (A d Based on the input value of the air amount operation unit (A d An air amount control step of controlling the air amount control unit; The combustion section (G f Based on the input value of the combustion unit (G f A combustion unit control step of controlling This is a program that achieves the above. [Explanation of symbols]
[0043] 1 Combustion boiler control system 1B Combustion boiler control system 10. Main control unit input calculation unit 20 Disturbance calculation section 21 Reference calorie calculation section 22 Actual heat amount calculation unit 30 Disturbance correction signal calculation section 40 Air volume operation unit input calculation unit 50 Combustion section input calculation section
Claims
1. Combustion gas composition (C g ) and gas volume (V g ) to the actual heat quantity (Q fr An actual heat amount calculation unit that calculates A combustion section (G f A combustion input calculation unit that calculates the input value of A combustion boiler control system comprising:
2. The target evaporation amount (G s ) and the actual steam volume of the boiler (G sr a master controller input calculation unit which calculates an input value (E) for the master controller by taking a difference between the input value (E) and the master controller input value (E); The set evaporation amount (G s ) to the standard heat quantity (Q fs A reference heat quantity calculation unit that calculates The actual heat amount (Q fr ) to the reference heat quantity (Q fs a disturbance calculation unit for calculating a disturbance (D) by subtracting a disturbance correction signal calculation unit that calculates a disturbance correction signal (S) based on the disturbance (D); an air volume manipulation unit input calculation unit that adds the disturbance correction signal (S) and an output from the main adjustment unit to calculate an input value for the air volume manipulation unit, The combustion section input calculation section adds the disturbance (D) and the output of the air amount operation section to calculate the combustion section (G f ) input value, The combustion boiler control system according to claim 1 .
3. an air volume manipulation unit control unit that controls the air volume manipulation unit based on an input value of the air volume manipulation unit obtained by the air volume manipulation unit input calculation unit; a combustion unit control unit that controls the combustion unit based on the input value of the combustion unit obtained by the combustion unit input calculation unit; Equipped with The combustion boiler control system according to claim 2 .
4. a fuel supply device control unit that controls a fuel supply device using the disturbance correction signal (S) obtained by the disturbance correction signal calculation unit; The combustion boiler control system according to claim 2 .
5. Combustion gas composition (C g ) and gas volume (V g ) to the actual heat quantity (Q fr an actual heat quantity calculation step of calculating The actual heat amount (Q fr A combustion unit input calculation step of calculating an input value of the combustion unit based on the input value of the combustion unit. Combustion boiler control method.
6. The target evaporation amount (G s ) and the actual steam volume of the boiler (G sr a master controller input calculation step of calculating a difference between the input value (E) and the master controller input value (E); The set evaporation amount (G s ) to the standard heat quantity (Q fs A reference heat quantity calculation step for calculating a reference heat quantity; The actual heat amount (Q fr ) to the reference heat quantity (Q fs a disturbance calculation step of calculating a disturbance (D) by subtracting a disturbance correction signal calculation step of calculating a disturbance correction signal (S) based on the disturbance (D); an air volume control unit input calculation step of adding the disturbance correction signal (S) and an output from the main adjustment unit to calculate an input value for the air volume control unit, In the combustion unit input calculation step, the disturbance (D) and the output of the air amount control unit are added to calculate an input value of the combustion unit. The combustion boiler control method according to claim 5.
7. an air volume operation unit control step of controlling the air volume operation unit based on the input value of the air volume operation unit obtained in the air volume operation unit input calculation step; a combustion unit control step of controlling the combustion unit based on the input value of the combustion unit obtained by the combustion unit input calculation unit; Including, The combustion boiler control method according to claim 6.
8. a fuel supply device control step of controlling a fuel supply device using the disturbance correction signal (S) obtained in the disturbance correction signal calculation step; The combustion boiler control method according to claim 6.
9. A combustion boiler control program A program for implementing the combustion boiler control method according to any one of claims 5 to 8 by at least one processor or information processing device.
Citation Information
Patent Citations
Dust quality estimating method in incinerator
JP1980160219A
Combustion control system of refuse incinerator having no boiler facility
JP2002267134A
Combustion control device for refuse incineration treatment facility and combustion control method
JP2022076570A
System control device and control method
JP2022076571A
Combustion control method and refuse incinerator power generating facility