A Method for Reducing Handover Delay in Satellite Communication System
A satellite communication system and time delay technology, applied in the field of satellite communication, can solve problems such as large beam coverage, limited on-board resources, extended signal transmission time, etc., to achieve the effect of reducing time delay and reducing ping-pong effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2018-08-14
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of satellite communication, and relates to a method for reducing the switching time delay of a satellite communication system, in particular to a method for switching midpoint beams of the same gateway station of a geosynchronous orbit satellite. Background technique
[0002] With the rapid development of highways and high-speed railways, and the popularity of aircraft, the current mobile terminals have the characteristics of wide distribution, fast moving speed, and strong regularity of moving paths. However, it is difficult for the current wireless mobile communication system to meet the relevant performance requirements. Therefore, Using the mobile satellite communication system to provide communication services for high-speed mobile terminals has the advantages of large beam coverage, fast construction speed, saving ground resources, and easy broadcasting and multiple access communications. Mobile satell...
Examples
Embodiment Construction
[0032] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0033] figure 1 It is a switching flow chart in the present invention, as shown in the figure, the method of the present invention includes the following steps: Step 1: Obtain the switching location area; Step 2: Plan the navigation path; Step 3: Determine the mobile terminal speed vector; Step 4: Switch judgment.
[0034] like image 3 Shown is a schematic diagram of the composition of the GMR-1 system. The system consists of geosynchronous orbit satellites, satellite control centers, a series of gateway stations and a large number of user terminals. A gateway station includes one or more gateway transceiver subsystems, one or more gateway station controllers, and multiple mobile switching centers. A gateway station controls one or several beams. When the user moves to the edge of the beam, if the current beam cannot meet the communica...