Intelligent equipment and method and device for controlling task plan implementation

A technology of task planning and execution control, applied in the field of communication, can solve the problem of inability to schedule the execution process of task plan, and achieve the effect of improving human-computer interaction, increasing controllability and realizing automation

CN106777009AActive Publication Date: 2017-05-31BEIJING ANYUNSHIJI TECH CO LTD
4 Cites 10 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2017-05-31

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a method and device for controlling task plan implementation. The method comprises the steps of receiving a task plan list, wherein the task plan list comprises at least one task unit, and the task unit comprises task information, the execution time which corresponds to the task information and task priority; converting all the task units into one or more task instruction packets which has the same total length according to the length of the execution time of the task units, wherein each task instruction packet has the same structure and comprises a first task time quantum, a second task time quantum and a frequency pattern, the first task time quantum and the second task time quantum are relevant to the task information, and the frequency pattern is determined according to the task priority of the task units; starting a timer, sending a task starting instruction which corresponds to the task time quantum when the system time information and the task time quantum in a certain task instruction packet are matched, and playing an audio file determined by the frequency pattern of the task instruction packet. According to the method and device for controlling the task plan implementation, random dispatching on a task is achieved, and the execution efficiency of the task plan is improved.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The present invention relates to the technical field of communications, and more particularly, to a method and device for controlling mission plan execution. Background technique

[0002] In modern society, the job competition is fierce. In order to meet the productivity of the society, work efficiency has to be improved. Among them, making a task schedule is an effective measure to keep things in order. However, after the ideal task schedule is formulated, due to the inability to supervise and control the execution of the established task schedule, once the task schedule cannot be successfully completed, users often choose to shelve the execution of the task schedule, resulting in a huge waste of resources.

[0003] The execution of mission plan has both human and machine factors, and its essence is manifested in machine factors. On the one hand, the machine needs a reasonable task scheduling plan to handle its various workloads. On the other hand, t...

Examples

Embodiment 1

[0062] The task plan execution control method in this embodiment is mainly implemented in the terminal computer, and for the detailed implementation process, please refer to figure 1 . The method comprises the steps of:

[0063] S10. Receive a task schedule, the task schedule includes at least one task unit, and the task unit includes task information, execution time and task priority corresponding to the task information;

[0064] Specifically, a user interface for editing a task schedule is displayed on the terminal interface, the task schedule includes at least one task unit, each task unit has the same structure, and includes task information, execution time and task priority of the task information , and store the edited task schedule in the terminal device.

[0065] Table 1 is an example of a task schedule, details are as follows:

[0066] serial number task information execution time task priority 1 Preview Mathematics Chapter 1 8:30~9:30 2 ...

Embodiment 2

[0096] In order to illustrate the detailed implementation process of the method for controlling task plan execution of the present invention, there is another implementation mode for this method. The method for controlling task plan execution in this embodiment is mainly implemented in the server, and the specific execution process is as follows:

[0097] S10. Receive a task schedule, the task schedule includes at least one task unit, and the task unit includes task information, execution time and task priority corresponding to the task information;

[0098] The server side receives the edited task schedule uploaded by the terminal device.

[0099] Table 4 is an example of a task schedule, details are as follows:

[0100] serial number task information execution time task priority 1 Preview Mathematics Chapter 1 8:30~9:30 2 2 do english homework 9:30~11:00 1 3 … … …

[0101] S11, converting all task units into one or more task instru...

Embodiment 3

[0130] Adapting to the above-mentioned embodiments, based on the computer modularization thinking, the present invention further provides a task plan execution control device corresponding to the above-mentioned embodiments. In order to illustrate the composition of the device detailed module of the task plan execution control of the present invention, please refer to figure 2 , at least the following modules are included in this embodiment:

[0131] A receiving module 10 , a converting module 11 , a starting module 12 , an extending module 13 , a shortening module 14 , an adjusting module 15 , and an acquisition module 16 . The following is a further description of the specific functions of each module:

[0132] The receiving module 10 is configured to receive a task schedule, the task schedule includes at least one task unit, and the task unit includes task information, execution time and task priority corresponding to the task information;

[0133]Preferably, a user inte...