Metallurgical coke forming production equipment and systems

By designing metallurgical coke molding production equipment, we have realized the automatic transportation and crushing, mixing and pressing of raw materials after drying, solving the problems of low output and low yield of metallurgical coke briquettes in the existing technology, and improving production. efficiency and finished product quality.

CN108504375BActive Publication Date: 2024-10-25QINGDAO HUAMEI ENERGY & TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201810563445.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-06-01
Publication Date
2024-10-25
Estimated Expiration
2038-06-01

AI Technical Summary

Technical Problem

The existing production scale of metallurgical coke briquettes is small and the output is low. It relies on manual operation, which is time-consuming and labor-intensive and has a low yield. Moreover, the raw materials are easy to stick after being crushed after drying, resulting in uneven mixing.

Method used

A metallurgical coke powder forming production equipment is designed, including a raw material dryer, a pulverizer, a mixing mechanism and a finished material drying box. After the raw materials are dried in a hot air furnace, they are automatically transported to crushing, mixing and pressing, and the finished briquettes are Then dry it to realize automatic assembly line operation, and dry the raw materials before crushing to avoid adhesion.

Benefits of technology

It improves the output and finished product rate of metallurgical coking coal briquettes, saves manpower, realizes an efficient and automated production process, ensures uniform mixing of raw materials and adhesive agents, and improves the quality of finished coal briquettes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN108504375B_ABST
    Figure CN108504375B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of coke forming, and discloses a metallurgical coke forming production equipment and system. The metallurgical coke forming production equipment comprises a raw material dryer, a first feed assembly, a crusher, a second feed assembly, a mixing and sticking mechanism, a third feed assembly, a finished product pressing mechanism, a fourth feed assembly, and a finished product drying box, which are arranged in sequence; the raw material dryer is connected to a raw material hot air furnace; and the finished product drying box is connected to a finished product hot air furnace. The metallurgical coke forming production equipment and system of the present invention have high production efficiency, large output, and high yield rate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coke forming, and in particular to a metallurgical coke powder forming production equipment and system. Background Art

[0002] Metallurgical coke is a general term for blast furnace coke, foundry coke, ferroalloy coke and coke for non-ferrous metal smelting. Since more than 90% of metallurgical coke is used for blast furnace ironmaking, blast furnace coke is often also called metallurgical coke.

[0003] Metallurgical coke is mainly used in blast furnace ironmaking and blast furnace smelting of non-ferrous metals such as copper, lead, zinc, titanium, antimony, and mercury, and acts as a reducing agent, exothermic agent, and material column skeleton. The use of coke instead of charcoal in blast furnace ironmaking has laid the foundation for the large-scale development of modern blast furnaces and is a major milestone in the history of metallurgy. In order to achieve better technical and economic indicators for blast furnace operation, metallurgical coke must have appropriate chemical and physical properties, including thermal properties during the smelting process. In addition to being used in large quantities for ironmaking and non-ferrous metal smelting, metallurgical coke is also used in casting, chemical industry, calcium carbide, and ferroalloys, and its quality requirements are different.

[0004] Coal briquette is a coal product with a certain shape and strength formed by processing one or more kinds of coal powder with a certain proportion of binder or desulfurizer under a certain pressure. Metallurgical coke briquette is a product with a certain shape and strength made by processing metallurgical coke under the action of binder or desulfurizer. Coal briquette has the advantages of high combustion efficiency, less energy waste and less environmental pollution. Coal briquette has been listed as a kind of clean coal.

[0005] In order to adapt to the environment and production requirements, metallurgical coke is mostly used in industrial production in the form of shaped coal. With the improvement of environmental protection requirements and the development of the metallurgical industry, the demand for metallurgical coke shaped coal is increasing. However, the existing production scale of metallurgical coke shaped coal is generally small, the output is low, and it relies heavily on manual material transportation, which is time-consuming and labor-intensive. At the same time, the raw materials of existing metallurgical coke shaped coal are generally dried after crushing during production. In this way, when the raw materials are crushed, they are prone to adhesion due to the high humidity of the raw materials, resulting in uneven mixing of some raw materials and the mixed binder when the raw materials are mixed with the mixed binder in the later stage, resulting in the final shaped coal The finished product rate is not very high, so there is an urgent need for a metallurgical coke shaped coal production equipment with high output and high finished product rate. Summary of the invention

[0006] The object of the present invention is to provide a metallurgical coke powder forming production equipment to solve the technical problems existing in the prior art of low output of existing metallurgical coke briquettes, time-consuming and labor-intensive manual labor and low yield of finished products.

[0007] The present invention also aims to provide a metallurgical coke powder forming production system to solve the technical problems in the prior art of low output, time-consuming and labor-intensive manual labor and low yield of existing metallurgical coke powder forming.

[0008] Based on the above first purpose, the present invention provides a metallurgical coke powder forming production equipment, including a raw material dryer, a first feeding component, a crusher, a second feeding component, a mixing and sticking mechanism, a third feeding component, a finished product pressing mechanism, a fourth feeding component and a finished product drying box arranged in sequence;

[0009] The raw material drying machine is connected to a raw material hot air furnace;

[0010] The finished material drying box is connected with a finished material hot air furnace.

[0011] Furthermore, a first spark catcher is provided in the raw material hot blast furnace, and the hot air generated by the raw material hot blast furnace enters the raw material dryer from the air outlet of the raw material hot blast furnace after passing through the first spark catcher.

[0012] Furthermore, a second spark catcher is provided in the finished material hot blast furnace, and the hot air generated by the finished material hot blast furnace passes through the second spark catcher and enters the finished material drying box from the air outlet of the finished material hot blast furnace.

[0013] Furthermore, the hot air outlet of the raw material dryer is provided with a first exhaust duct, a first bag dust collector, a second exhaust duct, an induced draft fan and a chimney which are connected in sequence.

[0014] Furthermore, the air outlet of the finished material dryer is connected to a second bag dust collector.

[0015] Furthermore, the raw material dryer comprises a long strip box, one end of which is provided with a feed port and an air inlet; the other end of which is provided with a discharge port and an air outlet, and the discharge port of the raw material dryer is provided close to the first feeding assembly;

[0016] The bottom surface of the raw material dryer is inclined toward the first feeding assembly.

[0017] Furthermore, the first feeding assembly, the second feeding assembly, the third feeding assembly and the fourth feeding assembly all include a belt and a pulley for driving the belt to move;

[0018] The belt of the first feeding assembly is arranged obliquely toward the raw material dryer;

[0019] The belt of the second feeding assembly is tilted and arranged facing the pulverizer;

[0020] The belt of the third feeding assembly is arranged obliquely toward the mixing and sticking mechanism;

[0021] The belt of the fourth feeding assembly is arranged to be inclined toward the finished product pressing mechanism.

[0022] Furthermore, the mixing and sticking mechanism comprises a first-stage mixing and sticking machine, a second-stage mixing and sticking machine and a third-stage mixing and sticking machine which are arranged in sequence, and a mixing and sticking feeding component is respectively arranged between the mixing and sticking machines at each stage;

[0023] The finished material drying box includes a plurality of drying boxes which are arranged in parallel and connected in sequence.

[0024] Furthermore, the raw material dryer is also connected to a feed assembly;

[0025] A discharging assembly is arranged along the discharging direction of the discharging port of the finished material drying box corresponding to the finished material drying box.

[0026] Based on the above second purpose, the present invention also provides a metallurgical coke forming production system, including the metallurgical coke forming production equipment as described in any of the above items and an intelligent control component for controlling the operation of each component of the metallurgical coke forming production equipment.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] The metallurgical coke forming production equipment provided by the present invention comprises a raw material dryer, a first feed assembly, a pulverizer, a second feed assembly, a mixing and sticking mechanism, a third feed assembly, a finished product pressing mechanism, a fourth feed assembly and a finished product drying box which are arranged in sequence; the raw material dryer is connected to a raw material hot air furnace; the finished product drying box is connected to a finished product hot air furnace.

[0029] The raw material dryer of the metallurgical coke forming production equipment of the present invention dries the raw material through the hot air introduced into the raw material hot blast furnace, the dried raw material automatically enters the first feeding component and is transported to the pulverizer by the first feeding component for pulverization, the pulverized raw material falls on the second feeding component and is transported to the mixing and sticking mechanism by the second feeding component, the raw material is combined with the binder in the mixing and sticking mechanism and then falls on the third feeding component and is transported to the finished product pressing mechanism by the third feeding component, the finished product pressing mechanism presses the raw material into shaped coal, the shaped coal falls into the fourth feeding component and is transported to the finished product drying box by the fourth feeding component for finished product drying. Among them, the finished product drying box dries the finished coal shaped by the hot air introduced into the finished product hot blast furnace. The metallurgical coke forming production equipment of the present invention realizes the automatic assembly line operation of metallurgical coke forming production, which not only saves manpower but also has high production efficiency and large output; at the same time, the metallurgical coke forming production equipment of the present invention dries the raw materials before crushing, and the dried raw materials are more uniform and less likely to stick together when crushed. In this way, when the mixing mechanism performs mixing, the raw materials can be mixed with the mixing agent more uniformly, thereby improving the finished product rate of the pressed coal shapes.

[0030] The metallurgical coke forming production system provided by the present invention comprises the metallurgical coke forming production equipment as described above and an intelligent control component for controlling the operation of various components of the metallurgical coke forming production equipment.

[0031] Compared with the prior art, the metallurgical coke forming production system of the present invention has the same advantages as the metallurgical coke forming production equipment provided by the present invention; at the same time, the metallurgical coke forming production system of the present invention adopts intelligent control components to control the actions of various components of the production equipment, thereby improving the intelligence level of the system and making the production equipment run more smoothly. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 It is a schematic diagram of a metallurgical coke forming production equipment according to an embodiment of the present invention;

[0034] Figure 2 It is a schematic diagram of the assembly of a raw material hot blast furnace, a raw material dryer and a pulverizer of a metallurgical coke forming production equipment according to an embodiment of the present invention;

[0035] Figure 3 It is a schematic diagram of the arrangement of a mixing and sticking machine and a second conveying assembly of a metallurgical coke powder forming production equipment according to an embodiment of the present invention;

[0036] Figure 4 It is a schematic diagram of the arrangement of the finished product pressing mechanism and the third conveying assembly of the metallurgical coke powder forming production equipment according to an embodiment of the present invention;

[0037] Figure 5 It is a schematic diagram of a briquetting machine, a finished product drying box, and a discharging assembly of a metallurgical coke forming production equipment according to an embodiment of the present invention.

[0038] Icons: 1-raw material dryer; 11-first bag filter; 12-induced draft fan; 13-chimney; 14-first exhaust duct; 15-second exhaust duct; 2-crusher; 3-mixing mechanism; 31-first mixer; 32-second mixer; 33-third mixer; 4-finished product pressing mechanism; 41-ball press; 42-common feeding device; 5-finished product drying box; 51-finished product drying box outlet; 61-first feeding assembly; 62-second feeding assembly; 63-third feeding assembly; 64-fourth feeding assembly; 65-horizontal feeding assembly; 66-mixing feeding assembly; 67-feeding assembly; 68-discharging assembly; 7-raw material hot air furnace; 71-first spark catcher; 8-finished product hot air furnace; 81-second spark catcher; 9-guide elbow. DETAILED DESCRIPTION

[0039] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0040] In the description of the present invention, it should be noted that, if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, if the terms "first", "second", "third" appear, they are only used for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0041] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0042] Embodiment 1

[0043] See also Figures 1 to 5As shown, this embodiment provides a metallurgical coke forming production equipment, including a raw material dryer 1, a first feeding assembly 61, a crusher 2, a second feeding assembly 62, a mixing and sticking mechanism 3, a third feeding assembly 63, a finished product pressing mechanism 4, a fourth feeding assembly 64 and a finished product drying box 5. The raw material dryer 1 is connected to a raw material hot air furnace 7; the finished product drying box 5 is connected to a finished product hot air furnace 8.

[0044] The finished product pressing mechanism 4 of this embodiment can be composed of several existing conventional ball presses 41, and a common feeding device 42 is arranged above the feed ports of several conventional ball presses 41. The raw material hot air furnace 7 and the finished product hot air furnace 8 can be hot air furnaces for clean raw materials; the mixing mechanism 3 includes a first-stage mixing machine 31, a second-stage mixing machine 32 and a third-stage mixing machine 33 arranged in sequence, and a mixing and feeding assembly 66 is respectively arranged between each stage of the mixing machines; the finished product drying box includes 12 sequentially arranged side by side and connected.

[0045] The raw material dryer 1 of the metallurgical coke forming production equipment of this embodiment dries the raw material through the hot air introduced by the raw material hot blast furnace 7. The dried raw material automatically enters the first feeding component 61 and is transported to the pulverizer 2 by the first feeding component 61 for pulverization. The pulverized raw material falls on the second feeding component 62 and is transported to the mixing and sticking mechanism 3 by the second feeding component 62. The raw material is combined with the binder and mixed in the mixing and sticking mechanism 3, and then falls on the third feeding component 63 and is transported to the finished product pressing mechanism 4 by the third feeding component 63. The finished product pressing mechanism 4 presses the raw material into shaped coal. The shaped coal falls into the fourth feeding component 64 and is transported to the finished product drying box 5 by the fourth feeding component 64 for finished product drying. Among them, the finished product drying box 5 dries the finished coal shaped by the hot air introduced by the finished product hot blast furnace 8.

[0046] The metallurgical coke forming production equipment of the present embodiment realizes the automatic assembly line operation of metallurgical coke forming production, which not only saves manpower but also has high production efficiency and large output; at the same time, the metallurgical coke forming production equipment of the present embodiment dries the raw materials before crushing, and the dried raw materials are more uniform and less likely to stick together when crushed. In this way, when the mixing mechanism 3 performs mixing, the raw materials can be mixed with the mixing agent more evenly, thereby improving the yield of the pressed coal shapes.

[0047] As a preferred embodiment, the raw material dryer 1 includes a long rectangular box body, one end of which is provided with a feed port and an air inlet; the other end of the box body is provided with a discharge port and an air outlet; the discharge port of the raw material dryer 1 is arranged close to the first feeding component 61, and the bottom surface of the raw material dryer 1 is inclined toward the first feeding component 61.

[0048] The raw material dryer 1 of the metallurgical coke forming production equipment of this embodiment can feed the feed port through the feed component 67, and the feed component 67 includes a belt, a pulley for driving the belt to move, a driving motor, and a feed hopper arranged on the feed port. The feed end of the belt of the feed component 67 feeds into the feed hopper; an auxiliary feed scraper is arranged in the feed hopper, and an adjustable baffle for adjusting the feed speed is arranged below the feed scraper. Among them, the adjustable baffle adjusts the feed speed by adjusting the opening of the adjustable baffle and the inner wall of the feed hopper. The feed component 67 of this embodiment can also control the running speed of the belt by controlling the output power of the motor of the feed component 67, thereby controlling the feed speed.

[0049] It can be understood that the feed port of the metallurgical coke forming production equipment in this embodiment is the initial source of raw materials, and the speed of feeding should match the action of the subsequent workstations. This embodiment adopts a feed assembly 67 with adjustable feed speed for feeding, and the feed speed is controlled by a motor and an adjustable baffle. In this way, the feed speed can be reasonably and selectively adjusted according to actual working conditions and needs to ensure the normal operation of components on other subsequent workstations.

[0050] At the same time, the bottom of the box of the raw material dryer 1 of the metallurgical coke forming production equipment of this embodiment is inclined toward the first feeding assembly 61, and the raw materials in the raw material dryer 1 can automatically fall into the first feeding assembly 61 along the bottom of the box under the action of gravity. Among them, the length of the box of the raw material dryer 1 and the inclination angle of the bottom of the box are reasonably selected according to the drying requirements of the raw materials. When the drying temperature and drying requirements are small, the longer the box length is, the larger the inclination angle is; the smaller the box length is, the smaller the inclination angle is.

[0051] The raw material hot blast furnace 7 of the metallurgical coke forming production equipment of this embodiment is provided with a first spark catcher 71, and the hot blast generated by the raw material hot blast furnace 7 enters the raw material dryer 1 from the outlet of the raw material hot blast furnace 7 after passing through the first spark catcher 71. The hot blast outlet of the raw material dryer 1 is provided with a first bag dust collector 11, a second exhaust duct 15, an induced draft fan 12 and a chimney 13 connected in sequence; the hot blast outlet of the raw material dryer 1 is connected to the lower part of the first bag dust collector 11 through the first exhaust duct 14, the air outlet of the first bag dust collector 11 is arranged at the upper part, the air inlet of the second exhaust duct 15 is connected and communicated with the air outlet of the first bag dust collector, the air outlet of the second exhaust duct 15 is connected to the air inlet of the induced draft fan 12, the air inlet of the induced draft fan 12 is connected to the air inlet of the chimney 13, and the air inlet of the chimney 13 is arranged at the lower part of the chimney 13.

[0052] The hot air process flow of raw material drying in the production line is: the raw material hot air furnace 7 of clean fuel generates hot air that enters the first spark catcher 71 in the furnace, and the hot air that eliminates sparks is sent to the raw material dryer 1 from the outlet of the raw material hot air furnace 7. After the hot air dries the raw material, it enters the inlet of the first bag dust collector 11 through the hot air outlet of the raw material dryer 1. The dust-containing flue gas is removed by the first bag dust collector 11 and enters the air inlet of the induced draft fan 12, and is sent to the air inlet of the chimney 13 by the induced draft fan 12. Finally, the clean flue gas is discharged into the atmosphere from the chimney 13.

[0053] It can be understood that the hot air outlet of the raw material dryer 1 is connected to the lower part of the first bag-type dust collector 11, so that the dust-containing flue gas enters the first bag-type dust collector 11 from the lower part and then is dust-removed, and the dust removal effect is good; the first bag-type dust collector 11 is connected to the induced draft fan 12 and the raw material dryer 1 through the first exhaust duct 14 and the second exhaust duct respectively, so that the hot air entering the bag-type dust collector is cooled once in the first exhaust duct 14, and the hot air is led from a high position to a low position and then discharged through the chimney 13, which can reduce the temperature of the hot air when it is discharged at the outlet of the chimney 13.

[0054] The finished material hot air furnace 8 is provided with a second spark catcher 81, and the hot air generated by the finished material hot air furnace 8 enters the finished material drying box 5 from the air outlet of the finished material hot air furnace 8 after passing through the second spark catcher 81. The air outlet of the finished material drying box is connected to a second bag dust collector.

[0055] The hot air process flow of finished product drying on the production line is: the hot air generated by the hot air furnace 8 of the finished product enters the entrance of the second spark catcher 81 in the furnace, the hot air that eliminates the sparks is led to the entrance of the finished product drying box through the entrance of the connecting pipe of the finished product drying box 5, and the hot air after drying the finished product is dedusted by the second bag dust collector and then discharged into the atmosphere.

[0056] It can be understood that after the sparks in the hot air of the raw material hot air furnace 7 and the finished material hot air furnace 8 are captured by the spark catcher, the sparks in the flue gas disappear, thereby eliminating the risk of sparks in the hot air igniting the raw materials in the raw material dryer 1 and the finished materials inside the finished material drying box 5.

[0057] The first feeding assembly 61, the second feeding assembly 62, the third feeding assembly 63, the fourth feeding assembly 64 and the mixing feeding assembly 66 of the metallurgical coke forming production equipment of the present embodiment respectively include belts, pulleys for driving the belts to move and motors; the belt of the first feeding assembly 61 is tilted towards the raw material dryer 1; the belt of the second feeding assembly 62 is tilted towards the crusher 2; the belt of the third feeding assembly 63 is tilted towards the mixing mechanism 3; the belt of the fourth feeding assembly 64 is tilted towards the finished product pressing mechanism 4; the belt of the mixing feeding assembly 66 is tilted towards the upstream mixing machine.

[0058] It can be understood that the belts of the first feed assembly 61, the second feed assembly 62, the third feed assembly 63, the fourth feed assembly 64 and the mixed-viscosity feed assembly 66 are all arranged to be inclined toward the previous workstation, that is, the feeding position of the belt of each feed assembly is lower and the discharging position is higher; the purpose of this arrangement is to facilitate the discharging of components from the previous workstation to which each feed assembly is connected and the feeding of components from each feed assembly to the subsequent workstation to which it is connected.

[0059] Preferably, the end of the belt of the second feed component 62 is also provided with a horizontal feed component 65 for transporting the material horizontally to the first-stage mixer, and the horizontal feed component 65 also includes a belt, a driving wheel and a motor; the ends of the belts corresponding to the first feed component 61, the second feed component 62, the third feed component 63, the fourth feed component 64 and the mixed feed component 66 are respectively provided with guide bends 9 for guiding the feed; the guide bends 9 are bent as a whole.

[0060] Each of the finished product drying boxes 5 of the metallurgical coke forming production equipment of this embodiment is provided with a finished product drying box discharge port 51, and the metallurgical coke forming production equipment of this embodiment further includes a discharge assembly 68. The discharge assembly 68 is a pulley, and the belt of the discharge assembly 68 is arranged below the finished product drying box discharge port 51 of each finished product drying box 5.

[0061] The process flow of the metallurgical coke forming production equipment of this embodiment is: the raw material in the raw material dryer 1 is dried by hot air and flows out from the raw material outlet of the raw material dryer 1, the dried raw material is sent to the entrance of the raw material crusher 2 via the belt of the first feeding component 61, the raw material is crushed by the crusher 2 and flows out from the outlet of the crusher 2, the crushed raw material is sent to the belt entrance of the horizontal feeding component 65 by the belt of the second feeding component 62, and is transported to the entrance of the first-stage mixer 31 via the belt of the horizontal feeding component 65, the raw material is mixed by the first-stage mixer 31 and flows out from the outlet of the first-stage mixer 31, the outflowing raw material is transported to the entrance of the second-stage mixer 32 by the belt of the mixing and sticking feeding component 66 between the first-stage mixer 31 and the second-stage mixer 32, and the raw material is transported to the entrance of the second-stage mixer 32 via the belt of the second feeding component 66. After mixing in the mixer 32, the raw materials flow out from the outlet of the secondary mixer 32. The outflowing raw materials are conveyed to the entrance of the tertiary mixer 33 by the belt of the mixing and feeding assembly 66 between the secondary mixer 32 and the tertiary mixer 33. After mixing in the tertiary mixer 33, the raw materials flow out from the outlet of the tertiary mixer 33. The outflowing raw materials are conveyed to the entrance of the finished product pressing mechanism by the belt of the third feeding assembly 63. After the raw materials pass through the finished product pressing mechanism, finished coal balls are produced and flow out from the outlet of the finished product pressing mechanism. The outflowing finished coal balls are conveyed to the entrance of the finished product drying box 5 by the belt of the fourth feeding assembly 64. The finished materials are dried inside the drying line in the finished material drying box and then flow out through the discharge port 51 of the finished material drying box, and then conveyed to the storage device by the belt of the discharge assembly 68.

[0062] It should be noted that the mixing mechanism 3 is not limited to the form of a three-stage mixing machine, and it can be reasonably selected and set according to needs, so that the raw materials and the mixing agent can be mixed evenly. Generally, the faster the feeding speed, the more mixing machines are needed. The number of finished material drying boxes 5 is also not limited to 12 given in the embodiment, and it is also reasonably selected according to the number required. Under the condition of a certain drying efficiency, the faster the feeding speed of the raw materials, the more finished material drying boxes are needed.

[0063] In summary, the metallurgical coke forming production equipment of this embodiment has the advantages of high output and high yield rate, and is suitable for the production of large-scale metallurgical coke forming.

[0064] Embodiment 2

[0065] This embodiment provides a metallurgical coke forming production system, including the metallurgical coke forming production equipment as described in the first embodiment and an intelligent control component for controlling the operation of various components of the metallurgical coke forming production equipment.

[0066] The intelligent control component is a PLC controller, which is respectively connected to the motors of the feed component 67, the first feed component 61, the second feed component 62, the third feed component 63, the fourth feed component 64, each mixed feed component 66, the horizontal feed component 65, and the discharge component 68, so as to control the conveying speed of each feed component; at the same time, the PLC controller is also connected to the air volume control equipment of the raw material hot air furnace 7 and the finished product hot air furnace 8 to control the air outlet speed of the raw material hot air furnace 7 and the finished product hot air furnace 8.

[0067] The metallurgical coke forming production system of this embodiment has the same advantages as the metallurgical coke forming production equipment provided by the present invention compared with the prior art; at the same time, the metallurgical coke forming production system of this embodiment adopts intelligent control components to control the actions of various components of the production equipment, thereby improving the intelligence level of the system and making the production equipment run more smoothly.

[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A metallurgical coke forming production equipment, characterized in that: It includes a raw material dryer, a first feeding component, a crusher, a second feeding component, a mixing and sticking mechanism, a third feeding component, a finished product pressing mechanism, a fourth feeding component, a finished product drying box and a PLC controller which are arranged in sequence; the raw material dryer is connected to a raw material hot air furnace; the finished product drying box is connected to a finished product hot air furnace; The raw material dryer comprises a long strip box, one end of which is provided with a feed port and an air inlet; the other end of which is provided with a discharge port and an air outlet, and the discharge port of the raw material dryer is provided close to the first feeding assembly; The bottom surface of the raw material dryer is inclined toward the first feeding assembly; the raw material dryer is also connected to a feeding assembly; A discharging assembly is provided along the discharging direction of the finished material drying box corresponding to the discharging port of the finished material drying box; The feeding assembly comprises a belt, a pulley for driving the belt, a driving motor and a feeding hopper arranged on the feeding port, and the feeding end of the feeding assembly belt feeds into the feeding hopper; an auxiliary feeding scraper is arranged in the feeding hopper and an adjustable baffle for adjusting the feeding speed is arranged below the feeding scraper; The adjustable baffle plate adjusts the feeding speed by adjusting the opening between the adjustable baffle plate and the inner wall of the feeding hopper; The feeding assembly controls the running speed of the belt by controlling the output power of the motor of the feeding assembly, thereby controlling the feeding speed; The PLC controller is connected to the air volume control devices of the raw material hot blast furnace and the finished material hot blast furnace, and is used to control the air outlet speed of the raw material hot blast furnace and the finished material hot blast furnace.

2. The metallurgical coke forming production equipment according to claim 1, characterized in that: A first spark catcher is arranged in the raw material hot blast furnace, and the hot air generated by the raw material hot blast furnace enters the raw material dryer from the air outlet of the raw material hot blast furnace after passing through the first spark catcher.

3. The metallurgical coke powder forming production equipment according to claim 1, characterized in that: A second spark catcher is arranged in the finished material hot blast furnace, and the hot air generated by the finished material hot blast furnace enters the finished material drying box from the air outlet of the finished material hot blast furnace after passing through the second spark catcher.

4. The metallurgical coke powder forming production equipment according to claim 1 or 2, characterized in that: The hot air outlet of the raw material dryer is provided with a first exhaust duct, a first bag dust collector, a second exhaust duct, an induced draft fan and a chimney which are connected in sequence.

5. The metallurgical coke powder forming production equipment according to claim 1 or 3, characterized in that: The air outlet of the finished material dryer is connected to a second bag dust collector.

6. The metallurgical coke forming production equipment according to any one of claims 1 to 3, characterized in that: The first feeding assembly, the second feeding assembly, the third feeding assembly and the fourth feeding assembly all include a belt and a pulley for driving the belt to move; The belt of the first feeding assembly is tilted toward the raw material dryer; the belt of the second feeding assembly is tilted toward the pulverizer; the belt of the third feeding assembly is tilted toward the mixing mechanism; The belt of the fourth feeding assembly is arranged to be inclined toward the finished product pressing mechanism.

7. The metallurgical coke forming production equipment according to any one of claims 1 to 3, characterized in that: The mixing and sticking mechanism comprises a first-stage mixing and sticking machine, a second-stage mixing and sticking machine and a third-stage mixing and sticking machine which are arranged in sequence, and a mixing and sticking feeding component is respectively arranged between the mixing and sticking machines at each stage; The finished material drying box includes a plurality of drying boxes which are arranged in parallel and connected in sequence.

8. A metallurgical coke powder forming production system, characterized by: It comprises the metallurgical coke forming production equipment as described in any one of claims 1 to 7 above and an intelligent control component for controlling the operation of each component of the metallurgical coke forming production equipment.