Scrapped electric energy meter destruction device, destruction system and destruction method
By designing the system of the electric energy meter attribute reading unit, control unit and image acquisition unit, combined with the transmission unit and program-controlled drilling device, the problem of low processing efficiency and pollution of used electric energy meters has been solved, and efficient and environmentally friendly electric energy meter destruction processing has been achieved. Improved resource reuse rate.
Patent Information
- Application Number
- CN201810737103.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-07-06
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2038-07-06
AI Technical Summary
Existing technology cannot effectively handle waste electric energy meters, resulting in resource waste and environmental pollution. Traditional recycling methods are inefficient and cannot achieve efficient reuse of materials.
A device and system including an electric energy meter attribute reading unit, a control unit that pre-stores the scrapped electric energy meter destruction list, an image acquisition unit and a scrapped electric energy meter destruction execution unit are designed. Scientific implementation is achieved through the transmission unit, positioning unit and program-controlled drilling device. , Efficient energy meter destruction processing to ensure the reuse of materials.
It improves production efficiency, reduces resource waste, avoids dust and waste liquid pollution, and achieves scientific and practical destruction of electric energy meters with low production cost and high resource reuse rate.
Smart Images

Figure CN108704927B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of waste electric meter processing, and in particular to a device, a system and a method for destroying waste electric energy meters. Background Art
[0002] In order to ensure the accuracy and fairness of electricity metering and promote the intelligent development of power detection, power metering instruments need to be continuously upgraded and scrapped within the specified service life. DL / T448-2016 "Technical Management Regulations for Electric Energy Metering Devices" clearly stipulates in 7.4.4 Scrapping and Elimination - Basic Requirements for Technical Management of Scrapping and Elimination of Electric Energy Metering Instruments: The following electric energy metering instruments should be eliminated or scrapped: 1) Electric energy metering instruments that do not meet the requirements of 8.5a), 8.5c), and 8.5d) after inspection and verification. 2) Electric energy metering instruments that cannot meet the use and management requirements in terms of function or performance. 3) Electric energy metering instruments that are explicitly prohibited from use by the state or superiors. In addition, it is stipulated that electric energy metering instruments that have been approved for scrapping should be destroyed in a timely manner to prevent them from returning to the market. Clause 11.8 Scrapping and Elimination Information requires: Record the entire process of application, technical appraisal, review and approval, and processing of scrapping and elimination of electric energy metering instruments, and it should be consistent with the time of destruction or preservation.
[0003] This brings about the problem of recycling and processing a large number of waste electricity meters. The scrapped electricity meters that are uniformly recycled need to be registered and completely destroyed to prevent them from re-entering the market, causing chaos in the electricity market order and electricity metering management; or the electricity meters that do not meet the scrap requirements are scrapped for the purpose of resale, resulting in waste of resources. At present, the methods for recycling and processing waste electricity meters mostly use traditional extensive recycling methods such as crushing, rolling, and high-temperature melting. Not only can they not efficiently realize the recycling of materials, resulting in waste of resources, but the processing process is prone to secondary pollution such as dust, waste liquid, and waste materials. Once many toxic components are not treated or treated improperly, they will cause serious pollution to the soil, groundwater and air.
[0004] In order to solve the above problems, people have been seeking an ideal technical solution. Summary of the invention
[0005] The purpose of the present invention is to address the deficiencies of the prior art and thus provide a device, system and method for destroying scrapped electric energy meters which have scientific design, strong practicality, high production efficiency, low production cost and high resource recycling rate.
[0006] In order to achieve the above-mentioned object, the technical solution adopted by the present invention is: a scrapped electric energy meter destruction device, including an electric energy meter attribute reading unit, a control unit for pre-storing a scrapped electric energy meter destruction list, a first image acquisition unit, a second image acquisition unit and a scrapped electric energy meter destruction execution unit;
[0007] The electric energy meter attribute reading unit is connected to the control unit and is used to read the attribute information of the scrapped electric energy meter and transmit it to the control unit;
[0008] The first image acquisition unit is connected to the control unit and is used to acquire image information of the scrapped electric energy meter before it is destroyed, and transmit it to the control unit for storage;
[0009] The control unit is connected to the scrapped electric energy meter destruction execution unit, and drives the scrapped electric energy meter destruction execution unit to destroy the scrapped electric energy meter according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list;
[0010] The second image acquisition unit is connected to the control unit, and is used to acquire image information of the scrapped electric energy meter after it is destroyed, and transmit it to the control unit for storage.
[0011] A scrapped electric energy meter destruction system includes a transmission unit, a positioning unit, an electric energy meter attribute reading unit, a control unit for pre-storing a scrapped electric energy meter destruction list, a first image acquisition unit, a second image acquisition unit and a scrapped electric energy meter destruction execution unit;
[0012] The transmission unit is used to transmit the scrapped electric energy meter to a predetermined position, wherein the predetermined position includes a first predetermined position, a second predetermined position and a third predetermined position;
[0013] The positioning unit is connected to the control unit and is used to detect whether a scrapped electric energy meter is placed at the first predetermined position, the second predetermined position or the third predetermined position;
[0014] The electric energy meter attribute reading unit is connected to the control unit, reads the attribute information of the scrapped electric energy meter located at the first predetermined position, and transmits the attribute information to the control unit;
[0015] The control unit is connected to the scrapped electric energy meter destruction execution unit, and drives the scrapped electric energy meter destruction execution unit to destroy the scrapped electric energy meter located at the second predetermined position according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list;
[0016] The first image acquisition unit is connected to the control unit, and acquires image information of the scrapped electric energy meter before it is destroyed and transmits it to the control unit for storage;
[0017] The second image acquisition unit is connected to the control unit, collects image information of the scrapped electric energy meter located at the third predetermined position after it is destroyed, and transmits it to the control unit for storage.
[0018] Based on the above, the positioning unit includes positioning sensors respectively arranged at the first predetermined position, the second predetermined position and the third predetermined position.
[0019] Based on the above, the electric energy meter attribute reading unit is a code scanning device.
[0020] Based on the above, the first image acquisition unit and the second image acquisition unit are both image collectors.
[0021] Based on the above, the scrapped electricity meter destruction execution unit is an electricity meter destruction execution device, including an installation box, a clamping device arranged in the installation box for clamping the scrapped electricity meter, and a programmable drilling device arranged on the upper end surface of the installation box corresponding to the clamping device.
[0022] Based on the above, the conveying unit includes a supporting platform provided with a conveyor belt, a programmable motor for driving the conveyor belt, and a controller for controlling the start or shut down of the programmable motor. The electric energy meter attribute reading unit, the first image acquisition unit, the scrapped electric energy meter destruction execution unit and the second image acquisition unit are sequentially arranged on the supporting platform along the conveying direction of the conveyor belt.
[0023] Based on the above, the present invention also includes a marketing system server, and the control unit is provided with an external communication interface unit. The marketing system server is connected to the control unit through the external communication interface unit, sends the scrapped electricity meter destruction list to the control unit, and receives the attribute information uploaded by the control unit, the electricity meter image information before destruction, and the electricity meter image information after destruction.
[0024] A method for destroying the above-mentioned scrapped electric energy meter destruction system comprises the following steps:
[0025] Step 1, the positioning unit detects whether there is a scrapped electric energy meter placed at the first predetermined position, if yes, the transmission unit stops the transmission action and goes to step 2; otherwise, the transmission unit continues the transmission;
[0026] Step 2, when a scrapped electric energy meter is placed at the first predetermined position, the electric energy meter attribute reading unit reads attribute information of the scrapped electric energy meter and transmits it to the control unit;
[0027] Step 3, the control unit determines whether the scrapped electric energy meter can be destroyed according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list, and the first image acquisition unit acquires the electric energy meter image information before the scrapped electric energy meter is destroyed and transmits it to the control unit for storage;
[0028] Step 4, the positioning unit detects whether a scrapped electric energy meter is placed at the second predetermined position. If yes, the transmission unit stops the transmission action and goes to step 5; otherwise, the transmission unit continues the transmission;
[0029] Step 5, when a scrapped electric energy meter is placed at the second predetermined position, the scrapped electric energy meter destruction execution unit destroys the scrapped electric energy meter according to the judgment result of the control unit;
[0030] Step 6, the positioning unit detects whether a scrapped electric energy meter is placed at the third predetermined position, if yes, the transmission unit stops the transmission action and goes to step 7; otherwise, the transmission unit continues the transmission;
[0031] Step 7: the second image acquisition unit acquires the electric energy meter information after the scrapped electric energy meter is destroyed and transmits it to the control unit for storage.
[0032] Based on the above, the scrapped electricity meter destruction execution unit is an electricity meter destruction execution device, including an installation box, a clamping device arranged in the installation box for clamping the scrapped electricity meter, and a programmable drilling device arranged on the upper end surface of the installation box corresponding to the clamping device; in the step 5, when the positioning unit detects that a scrapped electricity meter is placed at the second predetermined position, the clamping device clamps and fixes the scrapped electricity meter, and after the control unit drives the programmable drilling device to destroy the scrapped electricity meter, the clamping device releases the scrapped electricity meter.
[0033] The present invention has outstanding substantive features and significant progress compared to the prior art, specifically:
[0034] 1) The present invention provides a device, system and method for destroying scrapped electric energy meters, which realizes the traditional manual process of scrapping electric energy meters or extensive processing of electric energy meters, greatly improves production efficiency and facilitates material recycling;
[0035] 2) At the same time, since the destruction of scrapped electric energy meters is carried out in the installation box, the problem of secondary pollution such as dust, waste liquid, and waste materials caused by the treatment process is effectively solved; in addition, the electric energy meter destruction execution device uses a programmable drilling device for drilling and destruction, and the shell, electronic circuit board, mechanical structure and other components of the scrapped electric energy meter can be recycled and reused, avoiding the waste of resources caused by traditional extensive treatment, facilitating the recycling of materials, and reducing the waste of raw materials;
[0036] 3) The first image acquisition unit and the second image acquisition unit respectively record the image information of the scrapped electric energy meter before and after the destruction process, and upload it to the control unit for recording and storage. The whole process is recorded for easy query;
[0037] In summary, the present invention has the advantages of scientific design, strong practicability, high production efficiency, low production cost and high resource recycling rate. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] Figure 1 The present invention is a block diagram of the working principle of the device for destroying scrapped electric energy meters.
[0039] Figure 2 The present invention is a block diagram of the working principle of the scrapped electric energy meter destruction system.
[0040] Figure 3 It is a structural schematic diagram of the scrapped electric energy meter destruction system of the present invention.
[0041] Figure 4 It is a flow chart of a destruction method of a scrapped electric energy meter destruction system.
[0042] Figure 5 It is the overall workflow diagram of the present invention.
[0043] Figure 6 It is the overall working block diagram of the present invention.
[0044] In the figure: 1. Computer; 2. Placement area for scrapped electric energy meters to be destroyed; 3. Controller; 4. Programmable motor; 5. Start, stop and emergency stop buttons; 6. Support platform; 7. Conveyor belt; 8. First positioning sensor; 9. Wireless scanner; 10. First industrial camera; 11. Installation box; 12. Second positioning sensor; 13. Clamping device; 14. Programmable drilling device; 15. Waste collection box; 16. Third positioning sensor; 17. Second industrial camera; 18. Placement area for scrapped electric energy meters after destruction. DETAILED DESCRIPTION
[0045] The technical solution of the present invention is further described in detail below through specific implementation methods.
[0046] Example 1
[0047] As attached Figure 1 As shown, a device for destroying a scrapped electric energy meter comprises an electric energy meter attribute reading unit, a control unit for pre-storing a scrapped electric energy meter destruction list, a first image acquisition unit, a second image acquisition unit and a scrapped electric energy meter destruction execution unit;
[0048] The electric energy meter attribute reading unit is connected to the control unit and is used to read the attribute information of the scrapped electric energy meter and transmit it to the control unit;
[0049] The first image acquisition unit is connected to the control unit and is used to acquire image information of the scrapped electric energy meter before it is destroyed, and transmit it to the control unit for storage;
[0050] The control unit is connected to the scrapped electric energy meter destruction execution unit, and drives the scrapped electric energy meter destruction execution unit to destroy the scrapped electric energy meter according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list;
[0051] The second image acquisition unit is connected to the control unit, and is used to acquire image information of the scrapped electric energy meter after it is destroyed, and transmit it to the control unit for storage.
[0052] Example 2
[0053] As attached Figure 2 -Attached Figure 6 As shown, a scrapped electric energy meter destruction system includes a transmission unit, a positioning unit, an electric energy meter attribute reading unit, a control unit for pre-storing a scrapped electric energy meter destruction list, a first image acquisition unit, a second image acquisition unit and a scrapped electric energy meter destruction execution unit;
[0054] The transmission unit is used to transmit the scrapped electric energy meter to a predetermined position, wherein the predetermined position includes a first predetermined position, a second predetermined position and a third predetermined position;
[0055] The positioning unit is connected to the control unit and is used to detect whether a scrapped electric energy meter is placed at the first predetermined position, the second predetermined position or the third predetermined position;
[0056] The electric energy meter attribute reading unit is connected to the control unit, reads the attribute information of the scrapped electric energy meter located at the first predetermined position, and transmits the attribute information to the control unit;
[0057] The control unit is connected to the scrapped electric energy meter destruction execution unit, and drives the scrapped electric energy meter destruction execution unit to destroy the scrapped electric energy meter located at the second predetermined position according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list;
[0058] The first image acquisition unit is connected to the control unit, and acquires image information of the scrapped electric energy meter before it is destroyed and transmits it to the control unit for storage;
[0059] The second image acquisition unit is connected to the control unit, collects image information of the scrapped electric energy meter located at the third predetermined position after it is destroyed, and transmits it to the control unit for storage.
[0060] This embodiment provides a specific implementation of a positioning unit, and the positioning unit includes positioning sensors respectively arranged at the first predetermined position, the second predetermined position, and the third predetermined position. The first predetermined position is provided with a first positioning sensor 8 for detecting whether a scrapped electric energy meter is placed at the first predetermined position; the second predetermined position is provided with a second positioning sensor 12 for detecting whether a scrapped electric energy meter is placed at the second predetermined position; the third predetermined position is provided with a third positioning sensor 16 for detecting whether a scrapped electric energy meter is placed at the third predetermined position. The first positioning sensor 8, the second positioning sensor 12, and the third positioning sensor 16 are position detection sensors.
[0061] This embodiment provides a specific implementation of an electric energy meter attribute reading unit, which is a barcode scanning device for reading the attribute information of a scrapped electric energy meter placed at a first predetermined position and transmitting it to the control unit. The barcode scanning device uses a wireless scanner 9, which reads the attribute information of the scrapped electric energy meter and communicates with the control unit. The attribute information is barcode information, which is an identification code of the scrapped electric energy meter and is unique.
[0062] Specifically, the control unit adopts a computer 1 or an STM32 series single-chip microcomputer, and the consistency of the attribute information with the pre-stored scrapped electricity meter destruction list refers to the barcode information of the scrapped electricity meter collected in real time by the wireless scanner 9, which is the same as a certain barcode information in the pre-stored scrapped electricity meter destruction list, and the barcode consistency comparison does not require creative labor for technical personnel in this field and belongs to the prior art; the computer 1 or the STM32 series single-chip microcomputer outputs high and low levels to the scrapped electricity meter destruction execution unit to drive the scrapped electricity meter destruction execution unit to destroy the scrapped electricity meter located at the second predetermined position.
[0063] This embodiment provides a specific implementation of a first image acquisition unit and a second image acquisition unit. The first image acquisition unit and the second image acquisition unit are both image collectors. The image collectors use industrial cameras. A first industrial camera 10 is installed on one side of the scrapped electric energy meter destruction execution unit, and a second industrial camera 17 is installed on the other side. The image information of the scrapped electric energy meter is recorded before and after the destruction process, and uploaded to the control unit for recording and storage; the whole process is recorded for easy query.
[0064] Specifically, the first image acquisition unit and the second image acquisition unit also upload the acquired image information of the scrapped electric energy meter to the background server, and store it in one-to-one correspondence with the barcode information of the scrapped electric energy meter for later traceability and verification.
[0065] This embodiment provides a specific implementation of a scrapped electric energy meter destruction execution unit, which is an electric energy meter destruction execution device, including an installation box 11, a clamping device 13 arranged in the installation box 11 for clamping the scrapped electric energy meter, and a program-controlled drilling device 14 arranged on the upper end surface of the installation box 11 corresponding to the clamping device 13. The second positioning sensor 12 transmits the detected positioning information to the control unit, and the control unit controls the conveying unit to stop the conveying action. After the scrapped electric energy meter is fixed by the electric energy meter clamping device 13, the control unit drives the program-controlled drilling device 14 to destroy the scrapped electric energy meter. The clamping device 13 includes a telescopic cylinder arranged on both sides of the conveyor belt 7, and a pressure plate arranged at the telescopic end of the telescopic cylinder. The program-controlled drilling device 14 uses an electric drill, and the control unit controls the power on and off of the electric drill.
[0066] In order to prevent the scrapped materials from splashing and dust pollution during the destruction process, the destruction of the scrapped electric energy meter is carried out in an installation box 11, and a program-controlled drilling device 14 is used for drilling and destruction.
[0067] This embodiment provides a specific implementation of a conveying unit, the conveying unit includes a support platform 6 provided with a conveyor belt 7, a programmable motor 4 for driving the conveyor belt 7, and a controller 3 for controlling the start or shut down of the programmable motor 4, the electric energy meter attribute reading unit, the first image acquisition unit, the scrapped electric energy meter destruction execution unit and the second image acquisition unit are sequentially arranged on the support platform 6 along the conveying direction of the conveyor belt 7. The support platform 6 is also equipped with a start, stop and emergency stop button 5 for manually controlling the start, stop and emergency stop of the conveyor belt 7. After the destruction of the scrapped electric energy meter is completed, the transmission unit continues the transmission action, and a waste collection box 15 is arranged between the scrapped electric energy meter placement area 18 and the conveyor belt 7, so that the waste and debris generated during the destruction process can automatically fall back to the waste collection box 15, and the destroyed scrapped electric energy meter is manually placed or automatically falls back to the destroyed scrapped electric energy meter placement area 18 set at the outlet of the conveyor belt 7.
[0068] The present invention also includes a marketing system server. The control unit is provided with an external communication interface unit. The marketing system server is connected to the control unit through the external communication interface unit, sends the scrapped electricity meter destruction list to the control unit, and receives the attribute information uploaded by the control unit, the electricity meter image information before destruction, and the electricity meter image information after destruction.
[0069] In order to further improve the accuracy of the destruction of scrapped electric energy meters, the present invention also includes a warning device connected to the control unit, which is used to issue an alarm message according to the judgment result of the control unit. The warning device uses a buzzer. Before the destruction process, the attribute information obtained by the electric energy meter attribute reading unit is used to determine whether the scrapped electric energy meter can be destroyed. If an electric energy meter that does not meet the scrap standard is taken by mistake, the control unit will also identify it in time and issue an alarm message to prompt the staff through the warning device.
[0070] The flowchart of the destruction method of the scrapped electric energy meter destruction system is as follows Figure 4 As shown, a method for destroying a scrapped electric energy meter comprises the following steps:
[0071] Step 1, the positioning unit detects whether there is a scrapped electric energy meter placed at the first predetermined position, if yes, the transmission unit stops the transmission action and goes to step 2; otherwise, the transmission unit continues the transmission;
[0072] Step 2, when a scrapped electric energy meter is placed at the first predetermined position, the electric energy meter attribute reading unit reads attribute information of the scrapped electric energy meter and transmits it to the control unit;
[0073] Step 3, the control unit determines whether the scrapped electric energy meter can be destroyed according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list, and the first image acquisition unit acquires the electric energy meter image information before the scrapped electric energy meter is destroyed and transmits it to the control unit for storage;
[0074] Step 4, the positioning unit detects whether a scrapped electric energy meter is placed at the second predetermined position. If yes, the transmission unit stops the transmission action and goes to step 5; otherwise, the transmission unit continues the transmission;
[0075] Step 5, when a scrapped electric energy meter is placed at the second predetermined position, the scrapped electric energy meter destruction execution unit destroys the scrapped electric energy meter according to the judgment result of the control unit;
[0076] Step 6, the positioning unit detects whether a scrapped electric energy meter is placed at the third predetermined position, if yes, the transmission unit stops the transmission action and goes to step 7; otherwise, the transmission unit continues the transmission;
[0077] Step 7: the second image acquisition unit acquires image information of the scrapped electric energy meter after it is destroyed and transmits it to the control unit for storage.
[0078] Specifically, the step 5 specifically includes:
[0079] Step 5.1, when the positioning unit detects that a scrapped electric energy meter is placed at the second predetermined position, the clamping device 13 clamps and fixes the scrapped electric energy meter;
[0080] Step 5.2, when the scrapped electric energy meter is fixed, the clamping device 13 uploads the fixing completion information to the control unit;
[0081] Step 5.3, the control unit drives the program-controlled drilling device 14 to destroy the scrapped electric energy meter;
[0082] Step 5.4, when the destruction process is completed, the clamping device 13 releases the scrapped electric energy meter.
[0083] As attached Figure 5 and attached Figure 6 As shown, the overall working process of the present invention is: manually dismantle the scrapped electric energy meters determined to be destroyed and put them into the warehouse, and enter them into the marketing system server. The marketing system server and the control unit send the scrapped electric energy meter destruction list to the control unit. The scrapped electric energy meters are taken out of the warehouse and placed in the scrapped electric energy meter placement area 2 to be destroyed. The scrapped electric energy meter destruction system is started, and the scrapped electric energy meters to be destroyed are set to the entrance of the conveyor belt 7 in turn by a mechanical arm or manually, and the scrapped electric energy meters are destroyed. The scrapped electric energy meters after the destruction process are packed and put into the warehouse.
[0084] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.
Claims
1. A system for destroying scrapped electric energy meters, characterized in that: It includes a transmission unit, a positioning unit, an electric energy meter attribute reading unit, a control unit for pre-storing a list of scrapped electric energy meters for destruction, a first image acquisition unit, a second image acquisition unit and a scrapped electric energy meter destruction execution unit; The conveying unit includes a supporting platform provided with a conveyor belt, a programmable motor for driving the conveyor belt, and a controller for controlling the start or shut down of the programmable motor, and the electric energy meter attribute reading unit, the first image acquisition unit, the scrapped electric energy meter destruction execution unit and the second image acquisition unit are sequentially arranged on the supporting platform along the conveying direction of the conveyor belt; The scrapped electric energy meter destruction execution unit is an electric energy meter destruction execution device, including an installation box, a clamping device arranged in the installation box for clamping the scrapped electric energy meter, and a program-controlled drilling device arranged on the upper end surface of the installation box corresponding to the clamping device, the clamping device includes a telescopic cylinder arranged on both sides of the conveyor belt, and a pressure plate arranged at the telescopic end of the telescopic cylinder; the control unit controls the conveying unit to stop the conveying action, fixes the scrapped electric energy meter through the electric energy meter clamping device, and then drives the program-controlled drilling device to destroy the scrapped electric energy meter; The transmission unit is used to transmit the scrapped electric energy meter to a predetermined position, wherein the predetermined position includes a first predetermined position, a second predetermined position and a third predetermined position which are arranged in sequence; The positioning unit is connected to the control unit and is used to detect whether a scrapped electric energy meter is placed at the first predetermined position, the second predetermined position or the third predetermined position; The electric energy meter attribute reading unit is connected to the control unit, reads the attribute information of the scrapped electric energy meter located at the first predetermined position, and transmits the attribute information to the control unit; The control unit is connected to the scrapped electric energy meter destruction execution unit, and drives the scrapped electric energy meter destruction execution unit to destroy the scrapped electric energy meter located at the second predetermined position according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list; The first image acquisition unit is connected to the control unit, and acquires image information of the scrapped electric energy meter before it is destroyed and transmits it to the control unit for storage; The second image acquisition unit is connected to the control unit, collects image information of the scrapped electric energy meter located at the third predetermined position after it is destroyed, and transmits it to the control unit for storage.
2. The scrapped electric energy meter destruction system according to claim 1 is characterized in that: The positioning unit includes positioning sensors respectively arranged at the first predetermined position, the second predetermined position and the third predetermined position.
3. The scrapped electric energy meter destruction system according to claim 1 or 2, characterized in that: The electric energy meter attribute reading unit is a code scanning device.
4. The scrapped electric energy meter destruction system according to claim 1 or 2, characterized in that: The first image acquisition unit and the second image acquisition unit are both image collectors.
5. The scrapped electric energy meter destruction system according to claim 1 or 2, characterized in that: It also includes a marketing system server. The control unit is provided with an external communication interface unit. The marketing system server is connected to the control unit through the external communication interface unit, sends the scrapped electricity meter destruction list to the control unit, and receives the attribute information uploaded by the control unit, the electricity meter image information before destruction, and the electricity meter image information after destruction.
6. A method for destroying the scrapped electric energy meter destruction system according to claim 1, characterized in that: The following steps are involved: Step 1, the positioning unit detects whether there is a scrapped electric energy meter placed at the first predetermined position, if yes, the transmission unit stops the transmission action and goes to step 2; otherwise, the transmission unit continues the transmission; Step 2, when a scrapped electric energy meter is placed at the first predetermined position, the electric energy meter attribute reading unit reads attribute information of the scrapped electric energy meter and transmits it to the control unit; Step 3, the control unit determines whether the scrapped electric energy meter can be destroyed according to the consistency between the attribute information and the pre-stored scrapped electric energy meter destruction list, and the first image acquisition unit acquires the electric energy meter image information before the scrapped electric energy meter is destroyed and transmits it to the control unit for storage; Step 4, the positioning unit detects whether a scrapped electric energy meter is placed at the second predetermined position. If yes, the transmission unit stops the transmission action and goes to step 5; otherwise, the transmission unit continues the transmission; Step 5, when a scrapped electric energy meter is placed at the second predetermined position, the scrapped electric energy meter destruction execution unit destroys the scrapped electric energy meter according to the judgment result of the control unit; Step 6, the positioning unit detects whether a scrapped electric energy meter is placed at the third predetermined position, and if so, the transmission unit stops the transmission action and goes to step 7; Otherwise, the transmission unit continues to transmit; Step 7: the second image acquisition unit acquires the electric energy meter information after the scrapped electric energy meter is destroyed and transmits it to the control unit for storage.
7. The destruction method according to claim 6, characterized in that: The scrapped electric energy meter destruction execution unit is an electric energy meter destruction execution device, including an installation box, a clamping device arranged in the installation box for clamping the scrapped electric energy meter, and a programmable drilling device arranged on the upper end surface of the installation box corresponding to the clamping device; in the step 5, when the positioning unit detects that a scrapped electric energy meter is placed at the second predetermined position, the clamping device clamps and fixes the scrapped electric energy meter, and after the control unit drives the programmable drilling device to destroy the scrapped electric energy meter, the clamping device releases the scrapped electric energy meter.
Citation Information
Patent Citations
Die destroying method
CN105618456A
Tool special for scrapping disposition of electric energy meters
CN107321757A
Scrap electric energy meter and destroy device, destruction system
CN208628099U