Suspension protection system and construction method of large diameter socket-and-spigot water supply concrete pipe
By using the military beam system and Huff knot reinforcement technology in the suspension protection of large-diameter socket water supply concrete pipes, the problem of pipeline suspension safety risks is solved, and the flexibility and safety of construction are improved. It is suitable for Complex underground engineering.
Patent Information
- Application Number
- CN201811148162.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-09-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2038-09-29
AI Technical Summary
In underground engineering, conventional pipeline relocation and suspension protection measures have strict deformation requirements and high risks at large-diameter socket water supply concrete pipes. Especially affected by the conditions of the pipeline itself and the space limitations of surrounding structures, it is difficult to meet construction requirements.
A military beam system is used for suspension protection, and Huff joints and fully enclosed concrete bearings are installed at the socket to reinforce the interface. Both ends of the pipeline are fixed with load-bearing piles to ensure the stability and safety of the pipeline.
It effectively reduces the safety risks of large-diameter socket pipe suspension, simplifies the construction process, and improves the flexibility and safety of construction. It is suitable for urban rail transit, railways, municipal underground passages and other projects, reducing investment and construction period.
Smart Images

Figure CN109296825B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of underground engineering construction, and in particular relates to a large-diameter socket-and-spigot water supply concrete pipe suspension protection system and a construction method thereof. Background Art
[0002] With the widespread application of underground projects such as urban rail transit, railways, and municipal underground passages, the complex underground environment, spatial relationships, and structural forms have put forward more stringent requirements on the construction of underground projects.
[0003] In the process of underground engineering design and construction, it is inevitable to encounter a large and complex underground pipeline structure network. For environments where large-diameter socket-type water supply concrete pipes cross underground structures, conventional pipeline relocation practices may not be implemented due to the pipeline's own conditions, the space limitations of surrounding existing structures, and the construction period budget. However, the socket-type pipeline has strict deformation requirements at the joints, and conventional suspension protection measures are very risky. For this special case, pipeline suspension protection measures that meet the actual implementation conditions should be adopted to meet the construction requirements. Summary of the invention
[0004] The purpose of the present invention is to provide a large-diameter socket-and-spigot water supply concrete pipe suspension protection system and a construction method thereof, which adopts bearing piles to fix both ends of the pipeline, uses military beams for suspension protection, and adopts half joints + fully enclosed concrete supports for reinforcement at the socket-and-spigot interface to meet the stability and safety requirements of the pipeline.
[0005] The technical solution adopted by the present invention is:
[0006] Large diameter socket water supply concrete pipe suspension protection system, characterized by:
[0007] It includes the foundation pit supporting structure on both sides of the main foundation pit and the longitudinal concrete crown beam arranged on the top, a military beam system is built between the concrete crown beams on both sides, and a hanger is arranged under the military beam system to suspend a horizontal large-diameter socket-and-spigot water supply concrete pipe, and the large-diameter socket-and-spigot water supply concrete pipe is provided with a concrete support.
[0008] The lower sides of the large-diameter socket-and-spigot water supply concrete pipe are supported by bearing piles on the outside of the main foundation pit.
[0009] Concrete connecting beams are arranged between the tops of longitudinally adjacent bearing piles.
[0010] The large-diameter bell-and-spigot water supply concrete pipe is composed of multiple sections connected in sequence by bell-and-spigot means. A half joint is installed outside the pipe bell and the outer concrete support is a fully enclosed concrete support.
[0011] The concrete support of the part other than the pipe socket on the large-diameter socket water supply concrete pipe is a semi-enclosed concrete support in the lower half.
[0012] The fully enclosed concrete bearing and the semi-enclosed concrete bearing are laterally connected to form a whole.
[0013] The concrete connecting beam on the top of the bearing pile is cast as one with the concrete support.
[0014] The construction method of the large diameter socket water supply concrete pipe suspension protection system is characterized by:
[0015] This is accomplished by the following steps:
[0016] Step 1: construct the foundation pit support structure of the main foundation pit;
[0017] Step 2: First, a small foundation pit is excavated outside the main foundation pit. Two bearing piles are set on both sides of the large-diameter socket water supply concrete pipe. They are bored piles to fix the large-diameter socket water supply concrete pipe. When excavating to the bottom of the large-diameter socket water supply concrete pipe, a temporary I-beam support is placed at the bottom of the pipe.
[0018] Step 3: Concrete connecting beams are set at the heads of the two bearing piles, and the large-diameter bell-and-spigot water supply concrete pipes within the small foundation pits on both sides are encapsulated with concrete. A half joint is first installed at the bell-and-spigot joints, and a fully encapsulated concrete support is set on the outside. A semi-encapsulated concrete support is set at the non-bell-and-spigot joints. The concrete connecting beam is cast and connected with the semi-encapsulated concrete support and the fully encapsulated concrete support to complete the fixing of both ends of the large-diameter bell-and-spigot water supply concrete pipe;
[0019] Step 4: Excavate the main foundation pit as a whole to the top of the large-diameter socket water supply concrete pipe, and verify the exact position of the socket;
[0020] Step 5: Excavate the joint part in sections, place temporary I-beam supports at the bottom of the pipe, construct half joints and fully enclosed concrete supports at the socket joints, construct military beams to hang large-diameter socket water supply concrete pipe joints, set inter-rod supports between the hangers for reinforcement, and fix the ends of the military beams on the concrete crown beams;
[0021] Step 6: Dig the remaining large diameter socket-joint water supply concrete pipes in sections, construct semi-encapsulated concrete supports, construct military beams to lift the large diameter socket-joint water supply concrete pipes, set inter-rod supports between the suspension rods for reinforcement, and fix the ends of the military beams on the concrete crown beams.
[0022] The present invention has the following advantages:
[0023] 1. The present invention mainly adopts the military beam system to suspend and protect the large-diameter socket water supply concrete pipe. The socket is the weak point of the pipeline, which is easy to deform and cause the pipeline to break. The present invention installs a half joint at the socket and uses a concrete support to encapsulate it. At the same time, bearing piles are set at both ends of the pipeline for fixing to ensure the safety of pipeline suspension. This method can be used for subsequent construction without changing the existing pipeline, solving the problem of high safety risk of suspending large-diameter socket pipelines.
[0024] 2. The construction process matches the conventional construction methods of underground projects. The construction process is simple and flexible, easy to operate, does not increase the construction period, has strong adaptability, and is safe and reliable.
[0025] 3. Compared with the conventional pipeline suspension protection, the excavation protection system mainly adds small foundation pits on both sides, military beams and concrete supports, which increases investment less. It has a wide range of application prospects in underground concrete structure projects such as urban rail transit, railways, and municipal underground passages. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural diagram of the suspension protection system of the present invention.
[0027] Figure 2 It is a large-scale drawing of pipeline suspension at the pipeline joint position of the present invention.
[0028] Figure 3 It is a large-scale drawing of pipeline suspension of a standard section of pipeline according to the present invention.
[0029] In the figure, 1- foundation pit support structure, 2- bearing piles, 3- large diameter socket water supply concrete pipe, 4- pipe socket, 5- fully encapsulated concrete bearing, 6- half section, 7- semi-encapsulated concrete bearing, 8- military beam system, 9- hanger, 10- concrete crown beam, 11- concrete connecting beam. DETAILED DESCRIPTION
[0030] The present invention is described in detail below in conjunction with specific implementation modes.
[0031] The present invention relates to a large-diameter socket water supply concrete pipe suspension protection system, which mainly includes a large-diameter pipeline military beam suspension system + socket reinforcement and encapsulation. The structure specifically includes a foundation pit support structure 1 on both sides of the main foundation pit and a longitudinal concrete crown beam 10 arranged on the top, a military beam system 8 is built between the concrete crown beams 10 on both sides, and a suspension rod 9 is arranged under the military beam system 8 to suspend a horizontal large-diameter socket water supply concrete pipe 3, and the large-diameter socket water supply concrete pipe 3 is provided with a concrete support.
[0032] The lower part of the transverse ends of the large-diameter socket water supply concrete pipe 3 is supported by the bearing piles 2 outside the main foundation pit. A concrete connecting beam 11 is arranged between the tops of the longitudinally adjacent bearing piles 2.
[0033] The large diameter socket water supply concrete pipe 3 is composed of multiple segments connected in sequence by a socket method, a half joint 6 is installed outside the pipe socket 4, and the outer concrete support is a fully encapsulated concrete support 5. The concrete support of the part other than the pipe socket 4 on the large diameter socket water supply concrete pipe 3 is a semi-encapsulated concrete support 7 in the lower half. The fully encapsulated concrete support 5 and the semi-encapsulated concrete support 7 are horizontally connected into a whole.
[0034] The concrete connecting beam 11 on the top of the bearing pile 2 is cast integrally with the concrete support.
[0035] The construction method of the above-mentioned large-diameter socket-and-spigot water supply concrete pipe suspension protection system is realized by the following steps:
[0036] Step 1: construct the foundation pit support structure 1 of the main foundation pit;
[0037] Step 2: First, a small foundation pit is excavated outside the main foundation pit, and two bearing piles 2 are set on both sides of the large-diameter socket water supply concrete pipe 3, which are bored piles, to fix the large-diameter socket water supply concrete pipe 3. When the excavation reaches the bottom of the large-diameter socket water supply concrete pipe 3, a temporary I-beam support is placed at the bottom of the pipe;
[0038] Step 3: Concrete connecting beams 11 are set at the pile heads of the two bearing piles 2, and the large-diameter socket water supply concrete pipes 3 within the small foundation pits on both sides are encapsulated with concrete. A half joint 6 is first installed at the socket 4, and a fully encapsulated concrete support 5 is set on the outside. A semi-encapsulated concrete support 7 is set at the non-socket. The concrete connecting beam 11 is cast and connected with the semi-encapsulated concrete support 7 and the fully encapsulated concrete support 5 to complete the fixing of the two ends of the large-diameter socket water supply concrete pipe 3;
[0039] Step 4: Excavate the main foundation pit as a whole to the top of the large-diameter socket water supply concrete pipe 3, and verify the accurate position of the socket 4;
[0040] Step 5: Excavate the joint part in sections, place temporary I-beam supports at the bottom of the pipe, construct 4 half joints 6 at the socket and fully enclosed concrete supports 5, construct military beams 8 to hang the large-diameter socket water supply concrete pipe 3 joints, set inter-rod supports between the suspension rods 9 for reinforcement, and fix the ends of the military beams 8 on the concrete crown beams 10;
[0041] Step six: excavate the remaining part of the large diameter socket-shaped water supply concrete pipe 3 in sections, construct semi-encapsulated concrete supports 7, construct military beams 8 to lift the large diameter socket-shaped water supply concrete pipe 3, set inter-rod supports and reinforcements between the suspension rods 9, and fix the ends of the military beams 8 on the concrete crown beams 10.
[0042] All the suspension rods 9 are arranged to be adjustable in height up and down, so that each suspension rod 9 can be easily adjusted so as to be evenly stressed.
[0043] The present invention adopts bearing piles to fix the two ends of the pipeline, military beams for suspension protection, and half joints + fully enclosed concrete supports for reinforcement at the socket joints, which meets the stability and safety requirements of the pipeline and matches the construction procedures of underground projects. The construction is simple and flexible, and the work efficiency is improved. It has a wide range of applications for underground projects.
[0044] The content of the present invention is not limited to the embodiments listed, and any equivalent changes made to the technical solution of the present invention by ordinary technicians in this field after reading the description of the present invention are covered by the claims of the present invention.
Claims
1. Construction method of large diameter socket water supply concrete pipe suspension protection system, Features: This is accomplished by the following steps: Step 1: constructing a foundation pit support structure (1) of the main foundation pit, and setting a longitudinal concrete cap beam (10) on the foundation pit support structure (1) and the top thereof; Step 2: First, a small foundation pit is excavated outside the main foundation pit, and two bearing piles (2) are arranged on both sides of the large-diameter socket-shaped water supply concrete pipe (3), which are bored piles, to fix the large-diameter socket-shaped water supply concrete pipe (3). When the excavation reaches the bottom of the large-diameter socket-shaped water supply concrete pipe (3), a temporary I-beam support is placed at the bottom of the pipe; Step 3: concrete connecting beams (11) are arranged at the pile heads of the two bearing piles (2), and the large-diameter bell-and-spigot water supply concrete pipes (3) within the small foundation pits on both sides are encapsulated with concrete. A half joint (6) is first installed at the bell-and-spigot (4), and a fully encapsulated concrete support (5) is arranged on the outside, and a semi-encapsulated concrete support (7) is arranged at the non-bell-and-spigot part. The concrete connecting beam (11) is cast and connected with the semi-encapsulated concrete support (7) and the fully encapsulated concrete support (5) to complete the fixing of both ends of the large-diameter bell-and-spigot water supply concrete pipe (3); Step 4: The main foundation pit is excavated as a whole to the top of the large-diameter socket water supply concrete pipe (3), and the accurate position of the socket (4) is verified; Step 5: Excavate the joint part in sections, lay temporary I-beam supports at the bottom of the pipe, construct half joints (6) and fully enclosed concrete supports (5) at the socket (4), construct a military beam system (8) to suspend the large-diameter socket water supply concrete pipe (3) joint, set a suspension rod (9) below the military beam system (8), set inter-rod supports and reinforcements between the suspension rods (9), and fix the end of the military beam system (8) on the concrete crown beam (10); Step 6: Excavate the remaining large-diameter socket-shaped water supply concrete pipe (3) in sections, construct semi-enclosed concrete supports (7), construct a military beam system (8) to suspend the large-diameter socket-shaped water supply concrete pipe (3), set a suspension rod (9) below the military beam system (8), set inter-rod supports and reinforcements between the suspension rods (9), and fix the end of the military beam system (8) on the concrete crown beam (10).
2. The construction method of the large-diameter socket-and-spigot water supply concrete pipe suspension protection system according to claim 1, Features: The large-diameter socket-and-spigot water supply concrete pipe suspension protection system constructed according to the method comprises a foundation pit support structure (1) on both sides of the main foundation pit and a longitudinal concrete crown beam (10) arranged on the top thereof, a military beam system (8) is built between the concrete crown beams (10) on both sides, a suspension rod (9) is arranged below the military beam system (8) to suspend a horizontal large-diameter socket-and-spigot water supply concrete pipe (3), and the large-diameter socket-and-spigot water supply concrete pipe (3) is provided with a concrete support; The lower parts of the transverse ends of the large-diameter socket-and-spigot water supply concrete pipe (3) are supported by bearing piles (2) outside the main foundation pit; A concrete connecting beam (11) is arranged between the tops of the longitudinally adjacent bearing piles (2); The concrete connecting beam (11) on the top of the bearing pile (2) is cast integrally with the concrete support.
3. The construction method of the large-diameter socket-and-spigot water supply concrete pipe suspension protection system according to claim 2, Features: The large-diameter socket-and-spigot water supply concrete pipe (3) is composed of a plurality of segments connected in sequence by a socket-and-spigot method, a half joint (6) is additionally installed outside the pipe socket-and-spigot (4), and the outer concrete support is a fully enclosed concrete support (5).
4. The construction method of the large-diameter socket-and-spigot water supply concrete pipe suspension protection system according to claim 3, Features: The concrete support of the portion other than the pipe socket (4) on the large-diameter socket water supply concrete pipe (3) is a semi-enclosed concrete support (7) of the lower half.
5. The construction method of the large-diameter socket-and-spigot water supply concrete pipe suspension protection system according to claim 4, Features: The fully encapsulated concrete support (5) and the semi-encapsulated concrete support (7) are transversely connected to form a whole.