A waste heat central heating system with single-pipe, non-return water and long-distance heat transmission

Through a single-tube waste heat centralized heating system without return water, the river water is used to recover the waste heat of the power plant flue gas and the turbine generator is used to generate electricity, which solves the problem of high energy consumption of the return water pressure pump in the long-distance large height difference heating system. , achieving efficient utilization of heat energy and cost reduction, while improving the safety of the system.

CN110006084BActive Publication Date: 2024-10-25苏桐梅
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910297246.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-04-15
Publication Date
2024-10-25
Estimated Expiration
2039-04-15

AI Technical Summary

Technical Problem

In waste heat centralized heating systems with long distances and large height differences, the return water pressure pump consumes a lot of energy, has high operating costs, and poses safety risks. Especially when the height difference is large, a multi-stage pressurization pump station is required, resulting in electricity bills. high.

Method used

A single-tube waste heat centralized heating system without return water is used, using river water as the heat exchange medium to recover the waste heat of the power plant flue gas, setting up a pressure relief turbine generator, using the potential energy formed by the height difference to generate electricity, and reducing the water temperature through a water source heat pump. Achieve maximum utilization of heat energy.

Benefits of technology

It reduces heat transmission costs, reduces pipeline investment and operating costs, improves system safety and economy, and achieves efficient utilization of heat energy and reduction of air pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110006084B_ABST
    Figure CN110006084B_ABST
Patent Text Reader

Abstract

A waste heat centralized heating system with a single pipe and long-distance heat transmission without return water, which uses river water as the heat exchange medium, recovers the waste heat of flue gas from power plants, does not have a return water pipe and a corresponding booster pump station, and sets a pressure relief turbine generator set on the long-distance pipeline with a large height difference to generate electricity using potential energy. The final drainage is reduced to the initial temperature, solving the problem of large investment in primary pipeline engineering and high energy consumption of water pumps in the long-distance pipeline centralized heating system. Compared with the conventional heating method, one return water pipe is reduced, which reduces the investment in pipes and return water booster pumps, and a pressure relief turbine generator set is set to generate electricity, reducing the operating cost. The generated electricity can be provided to the water source heat pump at the end of the system, further reducing the cost of operating the heating system. This patent can provide a cheap heat source for centralized heating in wet and cold climate areas in the south in winter. The primary pipe network water is taken from the upstream river, and after treatment, it enters the waste heat exchanger of the power plant for heating and then transported in a single pipe. After heat exchange with secondary water at the heat exchange station in the heating area, it is discharged to the downstream river.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a waste heat centralized heating system for single-tube long-distance heat transmission without return water, belonging to the field of heating. Background Art

[0002] Conventional heating systems consist of heat sources, supply and return water circulation pipeline systems, radiators and auxiliary equipment. The waste heat centralized heating of power plants is that the primary water is heated to 110-130℃ through the steam-water heat exchanger of the thermal power plant, and the water supply pipe entering the primary pipe network through the main circulation pump converts the heat to the secondary pipe network through the thermal power station, and the 70℃ return water is sent back to the thermal power plant for reheating through the return water booster pump station to complete the circulation process. When implementing centralized heating with long-distance and large height difference heat transmission, relay stations should be set up at appropriate locations of the pipeline to ensure the pressure and flow required at the end of the pipe network. When the height difference is large, in order to reduce the deterioration of hydraulic conditions caused by high pressure in the pipe and the cost of high-pressure pipelines and water pumps, it is necessary to add single-stage or multi-stage booster pumps on the low-end supply (return) water side. At the same time, it is also necessary to consider the shutdown water hammer when the pumps at all levels fail. Therefore, the circulation and booster pumps of the long-distance and large height difference heating pipelines increase the operating cost of heating.

[0003] In recent years, some large and medium-sized cities have implemented long-distance, large-temperature-difference, and large-diameter long-distance pipeline heating projects to reduce air pollution caused by coal-fired heating boilers. The waste heat from large-scale cogeneration thermal power plants far away from the city has been introduced into the city's centralized heating network, effectively utilizing the low-grade thermal energy of the power plant, reducing the pollution emissions of winter heating boilers, and achieving energy conservation and emission reduction. However, these projects generally face some difficulties. Especially in the case of large elevation differences, it is necessary to set up multi-stage high-power booster pump stations to pressurize the return water from the heating to the power plant for continued circulation heating. The high-power pump motor consumes a lot of electricity, which increases the operating cost and becomes an economic burden on the operation and management unit.

[0004] As living conditions improve, people's requirements for comfort are also increasing. The demand for heating in southern my country, where it is hot in summer and cold in winter, is increasing. The implementation of this patented technology can provide these areas with cheap heat sources and centralized heating solutions. Especially for areas with a large amount of waste heat resources such as large power plants and steel mills, this patented technology can be used to use sufficient water sources to solve the problem of centralized heating in surrounding towns.

[0005] A city in northern my country implemented a long-distance, large temperature difference, large height difference, and large pipe diameter centralized heating project. The elevation of the heat source power plant differed by 180 meters from the elevation of the urban area where heating was provided. In order to send the return water back to the power plant, a five-level booster pump station was set up for the return water of the primary pipe network. The total head of the booster pump reached 330 meters, the total head of the circulating pump was 180 meters, and the installed capacity of the water pump was 34,000 kilowatts. The electricity bill in the heating season exceeded 100 million yuan, which became a heavy economic burden for the operation and management unit. Reducing the operating cost is imperative. Summary of the invention

[0006] The purpose of the present invention is to provide a waste heat centralized heating system for long-distance heat transmission with a single pipe and no return water, which is characterized in that river water is used as the heat exchange medium to recover the waste heat of flue gas from power plants, no return water pipeline and corresponding booster pump station are provided, a pressure relief turbine generator is provided on the long-distance pipeline, and the final drainage is reduced to the initial temperature to realize full utilization of thermal energy, thereby solving the problems of large primary pipeline engineering investment, high energy consumption of primary return water booster pump, high operating cost and many safety hazards in the long-distance pipeline centralized heating system.

[0007] In order to achieve the above object, the present invention proposes the following technical solutions:

[0008] The present invention proposes a waste heat centralized heating system with a single tube and long-distance heat transmission without return water, which is characterized in that the patented technology is implemented in situations where the height difference between the heat source power plant and the heating area is large and there is a stable water source. The water in the primary pipe network is taken from the upstream river or reservoir, and enters the power plant waste heat exchanger after sedimentation, filtration and anti-scaling treatment. After being heated by the waste heat of the power plant, it is transported in a single pipe. A hydro-turbine generator set is set at an appropriate position of the water transmission pipeline with a large height difference, and the potential energy formed by the height difference is used to generate electricity, while releasing the pressure in the pipe. In the heating area, the thermal power station exchanges heat with the secondary water of the heating pipe network, and the water temperature drops below 50°C, and then is further cooled to 10°C by a water source heat pump before being discharged into the downstream river.

[0009] The present invention proposes a waste heat centralized heating system with single-pipe non-return water long-distance heat transmission, which includes a water source system, a heat source system, a pipeline transmission system, a pressure relief power generation system, a secondary heat exchange system, and a heat pump lifting system. The operation of the waste heat centralized heating system of the present invention is achieved as follows:

[0010] The water source system is characterized in that the primary pipe network water is taken from the upstream river or reservoir, the cogeneration power plant and the heating area are in the upstream and downstream relationship of the river, the river has a stable natural water flow or the reservoir transports a certain flow of ecological water to the downstream through the river. The water source system is equipped with a sedimentation tank and a regulating tank of a certain capacity to remove the silt, suspended matter and some pollutants in the water, and plays a role in regulating the water volume. High-frequency electronic descaling and anti-scaling equipment is used to treat the primary pipe network water before entering the heat exchanger to prevent scaling in the heat exchanger.

[0011] The heat source system is characterized in that the heat source is taken from the exhaust heat of the chimney of the power plant and the exhaust heat of the steam turbine. When the aforementioned waste heat cannot meet the demand, the high-temperature exhaust air of part of the steam turbine can be used as a supplement. According to the principle of temperature matching and cascade utilization, a three-stage heat exchanger is set:

[0012] 1. Flue gas heat exchanger (steam-water heat exchange) uses low-temperature water (5-15°C, average 10°C) from the river to reduce the flue gas temperature of the power plant boiler from 60°C (the flue gas temperature after desulfurization and denitrification) to about 20°C, and the water temperature of the primary pipe network is raised to 20-30°C. At the same time, the water vapor in the flue gas is condensed and some pollutants in the flue gas are dissolved in water for removal.

[0013] 2. Exhaust gas (condensing gas) heat exchanger. The exhaust gas heat exchanger is connected in parallel with the air cooling island of the power plant. It replaces the air cooling island during the heating period. The primary pipe network water heated by the flue gas heat exchanger is further heated after passing through the exhaust gas heat exchanger.

[0014] 3. Exhaust heat exchanger: When the water temperature in the primary pipe network after passing through the exhaust gas heat exchanger does not meet the requirement, it will enter the exhaust heat exchanger to increase the temperature again until the heating demand is met and then enter the long-distance water pipeline.

[0015] The pipeline transportation system is characterized in that the pipeline transportation system adopts large-diameter steel pipes, and an insulation layer is laid outside the pipes to reduce heat loss during the transportation process. The system includes: a pressure pump, a water pipeline, and a drainage pipeline.

[0016] The booster pump is installed at the outlet of the regulating tank to ensure the flow and pressure of the water supply system and overcome the along-the-way resistance loss and local resistance loss generated by the flue gas heat exchanger, condenser heat exchanger, exhaust heat exchanger and water supply pipeline.

[0017] The drainage pipe is characterized in that the water in the primary pipe network undergoes multi-stage heat exchange, and after the temperature drops to the initial temperature, it is transported to the downstream river or storage project through the drainage pipe, and the drainage pipe does not need to be insulated.

[0018] The pressure relief turbine generator set is arranged on a water pipeline with a certain pipeline drop. The primary network water passes through the turbine generator set to generate electricity and consumes potential energy, thereby reducing the pressure of the pipeline. According to the terrain and pipeline pressure conditions, a single-stage or multi-stage turbine generator set can be arranged. Power generation through a pressure relief turbine can greatly reduce the pressure requirements on the water pipeline, reduce the thickness of the pipe wall, and reduce the project cost.

[0019] The secondary heat exchange system is characterized in that the secondary heat exchange system includes a high-temperature heat exchanger and a medium-temperature heat exchanger. The high-temperature and high-pressure secondary heating water exchanged by the high-temperature heat exchanger enters the trunk system of the urban heating network through a circulation pump and is transported to the heat exchange station of the urban heating network for circulation heat exchange. The medium-temperature and medium-pressure secondary heating water exchanged by the medium-temperature heat exchange station directly enters the end user of the urban heating network through a circulation pump for circulation heating. After the primary network water in the water delivery pipeline passes through the high-temperature heat exchanger and the medium-temperature heat exchanger, the temperature drops below 50°C and enters the heating heat pump lifting system.

[0020] The heating heat pump boosting system is characterized in that the heating heat pump boosting system includes a water source heat pump and a secondary heating pipe network. The water source heat pump is used to reduce the primary pipe network water below 50°C to the initial temperature (about 10°C) and enter the drainage pipe. The output side of the water source heat pump will increase the secondary water to about 70°C and directly enter the end user of the urban heating pipe network through a circulation pump for circulation heating.

[0021] The present invention proposes a waste heat centralized heating system with a single-pipe, non-return water and long-distance heat transmission, which has the following advantages:

[0022] 1. Recover waste heat from flue gas to achieve energy saving and emission reduction

[0023] By utilizing the low temperature characteristics of river water during the heating season, the waste heat in the flue gas of the power plant can be fully recovered. Although the exhaust gas of the coal-fired power plant has achieved ultra-low emissions through wet desulfurization, denitrification and dust removal, the water vapor content in the flue gas is very high and is in a saturated state, which still has a certain impact on the haze weather. The flue gas temperature for ultra-low emissions is reduced to about 60°C, which contains a large amount of latent heat. The use of this patented technology can reduce the flue gas to 10-20°C for emission, completely eliminating the phenomenon of white smoke, and can not only recover the latent heat of water vapor condensation in the flue gas, but also remove some pollutants to reduce pollution to the atmosphere.

[0024] 2. Realize single-pipe long-distance heat transfer without return water, greatly reducing heat transfer costs

[0025] Compared with conventional heating methods, firstly, the pressure formed by the large height difference is used as the power for water transportation, which reduces the head and power of the pipeline pressure pump station, turning the disadvantage of the large height difference into an advantage; secondly, one return pipe is reduced, reducing the pipeline investment by 50%; thirdly, the pump station investment and operating cost of the return water pressure pump are reduced.

[0026] 3. Using the potential energy generated by the large height difference, set up a hydro-generator set to release pressure and generate electricity

[0027] This patented technology sets a pressure relief turbine generator set at a certain drop position on the water pipeline, generates economic benefits through the consumption of potential energy by the turbine generator set, and reduces the pressure of the pipeline, greatly reduces the pressure requirements for the water pipeline, reduces the thickness of the pipe wall, and reduces the project cost. The electricity generated by the turbine generator set can be provided to the water source heat pump at the end of this system, further reducing the cost of operating the heating system.

[0028] 4. Use water source heat pump to reduce the primary water temperature to 10℃ and maximize the utilization of waste heat in the power plant

[0029] This patented technology uses a water source heat pump to reduce the final water temperature of the primary pipe network water to 10°C, and increases the temperature difference of the primary water from the traditional 60°C to over 100°C, thereby increasing the heat transfer capacity, significantly reducing the pipeline heat transfer cost, and improving the utilization rate of waste heat recovery in power plants.

[0030] 5. Improve the safety of long-distance heat transmission and central heating systems

[0031] By reducing one return pipe, reducing the multi-stage return booster pump station, reducing the pressure requirements of the pipeline, and reducing the chances and conditions for failures, low-cost operation is achieved, and the economy and safety of the long-distance heat transmission centralized heating system are improved.

[0032] The present invention proposes a waste heat centralized heating system with a single tube and long-distance heat transmission without return water, which is characterized in that the patented technology can be implemented for areas along the Yangtze River and south of the Yangtze River that require centralized heating in the cold and wet climate in winter. The primary network water is taken from upstream rivers, lakes or reservoirs, and enters the power plant waste heat exchanger after sedimentation, filtration and anti-scaling treatment. After being heated by the waste heat of the power plant, it is transported in a single tube, and heat is exchanged with the secondary water of the heating network at the heat exchange station in the heating area. After the water temperature drops below 30°C, it is discharged to the downstream river, lake or reservoir. This patented technology can provide a cheap heat source for centralized heating in hot summer and cold winter areas.

[0033] The present invention proposes a waste heat centralized heating system suitable for long-distance heat transmission with a single pipe and no return water in cold winter and hot summer areas, comprising a water source system, a heat source system, a pipeline transportation supply system, a heating secondary heat exchange system, and a water drainage system. The operation of the waste heat centralized heating system of the present invention is achieved as follows:

[0034] The water source system is characterized in that the primary pipe network water of the heating system is taken from the upstream river, lake or reservoir (hereinafter referred to as the river), the power plant and the heating area are in the upstream and downstream relationship of the river, the river has a stable natural water flow or the reservoir transports a certain flow of ecological water to the downstream. The water source system is equipped with a sedimentation tank and a regulating tank of a certain capacity to remove the sediment, suspended matter and some pollutants in the water, and play a role in regulating the water volume. High-frequency electronic descaling and anti-scaling equipment is used to prevent the primary pipe network water from scaling before entering the heat exchanger to prevent scaling in the heat exchanger.

[0035] The heat source system is characterized in that the heat source of the heating system is taken from the exhaust gas of the chimney of the power plant and the exhaust gas waste heat of the steam turbine. According to the principle of temperature matching and cascade utilization, a two-stage heat exchanger is set:

[0036] 1. Flue gas heat exchanger (steam-water heat exchange) uses low-temperature water (average 20°C) from the river to reduce the flue gas temperature of the power plant boiler from 60°C (the flue gas temperature after desulfurization and denitrification) to about 30°C, and the water temperature is raised to about 30°C. At the same time, the water vapor in the flue gas is condensed and some pollutants in the flue gas are dissolved in water for removal.

[0037] 2. Exhaust gas (condensing gas) heat exchanger, the exhaust gas heat exchanger is connected in parallel with the air cooling island of the power plant. During the heating period and hot water supply conditions, the primary pipe network water heated by the flue gas heat exchanger is further heated after passing through the exhaust gas heat exchanger. Considering the heat load in the southern region, the primary pipe network water temperature should not be too high.

[0038] The pipeline transportation system is characterized in that the pipeline transportation system of the heating system adopts large-diameter steel pipes. An insulation layer is laid outside the pipe to reduce heat loss during the transportation process. The system includes: a pressure pump, a water pipeline, and a drainage pipeline.

[0039] The booster pump is installed at the outlet of the regulating tank to ensure the flow and pressure of the water supply system and overcome the along-the-way resistance loss and local resistance loss generated by the flue gas heat exchanger, condenser heat exchanger, exhaust heat exchanger and water supply pipeline.

[0040] The drainage pipe is a pipe network water that undergoes multi-stage heat exchange, and after the temperature drops to the initial temperature, it is transported to the downstream river or storage project through the drainage pipe.

[0041] The secondary heat exchange system for heating is characterized in that the secondary heat exchange system of the heating system includes a high-temperature heat exchanger and a medium-temperature heat exchanger. The high-temperature and high-pressure secondary heating water exchanged by the high-temperature heat exchanger enters the trunk system of the urban heating network through a circulation pump and is transported to the heat exchange station of the urban heating network for circulating heat exchange. The medium-temperature and medium-pressure secondary heating water exchanged by the medium-temperature heat exchange station directly enters the end user of the urban heating network through a circulation pump for circulating heating. After the primary network water in the water delivery pipeline passes through the high-temperature heat exchanger and the medium-temperature heat exchanger, the temperature drops below 30°C.

[0042] The drainage pipe is characterized in that the function of the drainage pipe of the centralized heating system is to transport the primary pipe network water that has been cooled to below 30°C by the water source heat pump to the downstream river or storage project.

[0043] The present invention proposes a waste heat centralized heating system and method for long-distance heat transmission with a single pipe and no return water, which fully utilizes the waste heat of flue gas and exhaust gas from power plants. Through long-distance transmission with large pipe diameters, the heating problem south of the Yangtze River can be solved at a low cost. The system can operate all year round in river network areas with abundant water, and can supply hot water to cities during the non-heating season.

[0044] The present invention proposes a waste heat centralized heating system with single-pipe, return-free, long-distance heat transmission. The waste heat can be flue gas waste heat, exhaust steam waste heat, and exhaust gas waste heat from a cogeneration power plant. It can also utilize waste heat resources from industries such as steel mills, cement plants, kilns, and chemical plants to provide a cheap heat source for the centralized heating system.

[0045] The present invention proposes a waste heat centralized heating system with single-pipe non-return water and long-distance heat transmission. The primary pipe network water can be water from rivers, water from urban grey water systems, or qualified discharge water from urban and factory sewage treatment plants. The drainage of grey water and sewage treatment plants should be treated and disinfected as necessary. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 It is a waste heat central heating system process for large height difference single pipe non-return water long distance heat transmission

[0047] In the figure:

[0048] 1. Upstream river, 2. Sedimentation / regulation tank, 3. Booster pump, 4. High-frequency electronic anti-scaling and descaling device

[0049] 5. Power plant chimney, 6. Flue gas heat exchanger, 7. Exhaust steam heat exchanger, 8. Steam turbine,

[0050] 8-1, exhaust steam, 8-2, exhaust air, 9, exhaust air heat exchanger, 10, hydro-generator set,

[0051] 11. Long distance water pipeline, 12. High temperature heat exchanger, 13. Medium temperature heat exchanger,

[0052] 14. Water source heat pump, 15. Drainage pipe, 16. Downstream river DETAILED DESCRIPTION

[0053] This embodiment is for projects with a large height difference between the heat source power plant and the heating area and with stable water source utilization. Figure 1 Further explain the process.

[0054] The primary network water is taken from the upstream river 1 or reservoir. The cogeneration power plant and the heating area are upstream and downstream of the river. The river has a stable natural water flow or the reservoir transports a certain flow of ecological water to the downstream through the river, which can ensure that there is enough water to enter the waste heat centralized heating system for long-distance heat transmission. First, the primary network water is introduced into the sedimentation / filtration tank 2 to remove the sediment, suspended matter and some pollutants in the water, and it plays a role in water volume regulation. Then the water is transported to the heat exchanger through the booster pump 3, and a high-frequency electronic descaling and anti-scaling device 4 is installed at the outlet of the booster pump to prevent scale formation in the heat exchanger.

[0055] The heat source of the waste heat centralized heating system for long-distance heat transmission is taken from the waste heat of smoke exhaust from the power plant and the waste heat of exhaust gas from the steam turbine. When the waste heat cannot meet the demand, the high-temperature exhaust air from part of the steam turbine can be used as a supplement. According to the principle of temperature matching and cascade utilization, this system is equipped with three stages of heat exchangers:

[0056] First-stage heat exchanger: The primary network water first enters the flue gas heat exchanger 6 (steam-water heat exchange), and uses the characteristics of low-temperature water in the river (5-15℃, average 10℃) to reduce the flue gas temperature of the power plant boiler from 60℃ (the flue gas temperature after desulfurization and denitrification) to about 20℃, and the primary network water temperature rises to about 30℃. At present, most of the flue gas of coal-fired power plants has achieved ultra-low emissions through wet desulfurization, denitrification and dust removal, but due to the high water vapor content, the flue gas is in a saturated state, which still has a certain impact on haze weather. The use of this patented technology can reduce the flue gas to 20℃ for discharge, which can not only recover the heat of water vapor condensation in the flue gas, but also remove some pollutants.

[0057] Second stage heat exchanger: primary network water enters exhaust gas heat exchanger 7, the steam side of exhaust gas heat exchanger 7 is connected in parallel with the air cooling island of the power plant, and replaces the air cooling island in the heating period. The primary network water heated to 30°C by flue gas heat exchanger 6 is further heated after passing through the exhaust gas heat exchanger. For multiple generator sets in large power plants, a multi-stage series connection and cascade heating method can be adopted to make full use of the waste heat of exhaust gas to heat the heating water to above 80°C.

[0058] The third stage heat exchanger: when the temperature of the primary pipe network water after passing through the exhaust gas heat exchanger 7 still needs to be increased, it enters the exhaust gas heat exchanger 9 to increase the temperature again until the heating demand is met and enters the long-distance water pipeline.

[0059] Considering the large height difference between the heat source power plant and the heating area, the pipeline pressure at the middle and end of the water pipeline is very high. In order to reduce the water pressure of the pipeline, a hydro-generator set 10 is set at an appropriate position of the pipeline with a large height difference, and the potential energy formed by the height difference is used to generate electricity, while releasing the pressure in the pipe. In the heating area, the thermal power station exchanges heat with the secondary water of the heating network, and the water temperature is reduced to below 50°C, and then further cooled to 10°C by the water source heat pump before being discharged to the downstream river 16.

[0060] The pipeline transportation system uses large diameter steel pipes, and an insulation layer is laid outside the pipe to reduce heat loss during the transportation process. The pipeline transportation system includes: a booster pump 3, a water delivery pipeline 11, a pressure relief turbine generator set 10, and a drainage pipeline 15.

[0061] The booster pump is installed at the outlet of the regulating tank. Its function is to ensure the flow and pressure of the water supply system and overcome the along-the-way resistance loss and local resistance loss generated by the flue gas heat exchanger 6, the condensing gas heat exchanger 7, the exhaust heat exchanger 9 and the water supply pipeline 11.

[0062] The pressure relief turbine generator set 10 is arranged on a water pipeline with a certain pipeline drop. The primary network water passes through the turbine generator set 10 to generate electricity and consumes potential energy, thereby reducing the pressure of the pipeline. According to the terrain and pipeline pressure conditions, a single-stage or multi-stage turbine generator set can be arranged. Power generation through the pressure relief turbine can greatly reduce the pressure requirements for the water pipeline, reduce the thickness of the pipe wall, and reduce the project cost.

[0063] The drainage pipe is a pipe network where water undergoes multi-stage heat exchange, and after its temperature drops to the initial temperature, it is transported to the downstream river 16 or the regulation and storage project through the drainage pipe 18.

[0064] The secondary heat exchange system includes a high-temperature heat exchanger 12 and a medium-temperature heat exchanger 13. The high-temperature and high-pressure secondary heating water exchanged by the high-temperature heat exchanger 12 enters the trunk system of the urban heating network through a circulation pump and is transported to the heat exchange station of the urban heating network for circulating heat exchange. The medium-temperature and medium-pressure secondary heating water exchanged by the medium-temperature heat exchanger 13 directly enters the end user of the urban heating network through a circulation pump for circulating heating. After the primary network water in the water delivery pipeline passes through the high-temperature heat exchanger 12 and the medium-temperature heat exchanger 13, the temperature drops below 50°C and enters the heating heat pump boosting system.

[0065] The heating heat pump lifting system includes a water source heat pump 14 and a secondary heating pipe network. The water source heat pump 14 is used to reduce the primary pipe network water below 50°C to the initial temperature (about 10°C) and enter the drainage pipe. The output side of the water source heat pump 14 will raise the secondary water to about 70°C and directly enter the end user of the urban heating pipe network through a circulation pump for circulation heating.

[0066] The function of the drainage pipe 15 is to transport the primary network water cooled to the initial temperature (about 10°C) by the water source heat pump to the downstream river 16 or the regulation and storage project.

Claims

1. A waste heat centralized heating system with single-pipe, non-return water and long-distance heat transmission, characterized in that: Including water source system, heat source system, pipeline transportation system, pressure relief power generation system, secondary heat exchange system, heating heat pump lifting system and drainage pipeline; The primary network water of the water source system pipeline is taken from the upstream river or reservoir, and enters the heat source system through the sedimentation tank and the regulating tank; The heat source of the heat source system is taken from the exhaust heat of the chimney of the power plant, the exhaust heat of the steam turbine and the high-temperature exhaust of part of the steam turbine. The heat source system is equipped with a three-stage heat exchanger; The pipeline transportation system adopts large diameter steel pipes, and a heat preservation layer is laid outside the pipes; The pressure relief power generation system is a hydro-generator set installed on a water pipeline with a certain pipeline drop; The secondary heat exchange system includes a high-temperature heat exchanger and a medium-temperature heat exchanger; The heating heat pump boosting system includes a water source heat pump and a secondary heating pipe network; The primary network water of the waste heat centralized heating system with single-tube, return-free long-distance heat transmission uses river water as the heat exchange medium. After sedimentation and anti-scaling treatment, it is heated by the flue gas heat exchanger, exhaust gas heat exchanger and exhaust air heat exchanger of the power plant and enters the single-tube long-distance water transmission pipeline. No return water pipeline and corresponding booster pump station are set. A pressure relief turbine generator is set at an appropriate position of the long-distance pipeline with a large height difference. Then, the water enters the secondary heat exchange system for heat exchange, and the primary network water that has been cooled to the initial temperature by the water source heat pump is transported to the downstream river or storage project through the drainage pipe.

2. A waste heat centralized heating system with a single-pipe, non-return water and long-distance heat transfer according to claim 1, characterized in that: The water source system is provided with a sedimentation tank and a regulating tank of a certain capacity, a pressure pump is installed at the outlet of the regulating tank, and a high-frequency electronic descaling and anti-scaling device is used to perform anti-scaling treatment on the primary pipe network water before entering the heat exchanger.

3. A waste heat centralized heating system with a single-pipe, non-return water and long-distance heat transfer according to claim 1, characterized in that: The three-stage heat exchangers are: (1) flue gas heat exchanger, which uses low-temperature water from the river to reduce the flue gas temperature of the power plant boiler from 60°C to about 20°C, and the primary pipe network water temperature is raised to 20-30°C; (2) exhaust gas heat exchanger, which is connected in parallel with the air cooling island of the power plant, and the primary pipe network water heated by the flue gas heat exchanger is further heated after passing through the exhaust gas heat exchanger; (3) exhaust gas heat exchanger, when the primary pipe network water temperature after passing through the exhaust gas heat exchanger does not meet the requirements, it enters the exhaust gas heat exchanger and is heated again until it meets the heating demand and enters the long-distance water transmission pipeline.

4. A waste heat centralized heating system with a single-pipe, non-return water and long-distance heat transfer according to claim 1, characterized in that: The secondary heat exchange system includes a high-temperature heat exchanger and a medium-temperature heat exchanger; the high-temperature and high-pressure secondary heating water exchanged through the high-temperature heat exchanger enters the trunk system of the urban heating network through a circulating pump and is transported to the heat exchange station of the urban heating network for circulating heat exchange; the medium-temperature and medium-pressure secondary heating water exchanged through the medium-temperature heat exchange station directly enters the end users of the urban heating network for circulating heating through a circulating pump; the primary network water in the water supply pipeline passes through the high-temperature heat exchanger and the medium-temperature heat exchanger, and the temperature drops below 50°C and enters the heating heat pump boosting system.

5. A waste heat centralized heating system with a single-pipe, non-return water and long-distance heat transfer according to claim 1, characterized in that: The heating heat pump boosting system includes a water source heat pump and a secondary heating pipeline network. The water source heat pump is used to reduce the primary pipeline water below 50°C to the initial temperature and enter the drainage pipe. The output side of the water source heat pump will boost the secondary water to about 70°C and directly enter the end users of the urban heating pipeline network through a circulation pump for circulating heating.