A geological drilling rig capable of monitoring core drilling conditions and a monitoring method thereof

By integrating sensors and electronic control systems on the geological drilling rig, real-time monitoring and analysis of data during the drilling core process, the problems of core replacement and detection errors are solved, and the accuracy and safety of pile foundation detection are improved.

CN110144870BActive Publication Date: 2024-11-19GUANGZHOU MUNICIPAL ENG TESTING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910519867.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-06-17
Publication Date
2024-11-19
Estimated Expiration
2039-06-17

AI Technical Summary

Technical Problem

In pile foundation inspection, the on-site drillers may conceal the quality defects of the foundation pile by stealing core samples, resulting in incorrect inspection results, which increases project safety hazards, and the existing regulatory measures are immature, making it difficult to supervise the core drilling process in real time.

Method used

Design a geological drilling rig that can monitor the working conditions of the drill core, using brackets, drive devices, hydraulic pumps, hydraulic control systems, torque speed sensors, pull pressure sensors and electronic control systems to collect and save data during the drill core process in real time, through Analyze the curve chart to determine the drill bit depth and pile length, and determine whether the driller is constructing as required.

Benefits of technology

It effectively avoids detection errors caused by drilling workers' failure to cooperate, ensures the accuracy of the inspection results, reduces project safety risks, and improves construction quality and supervision efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110144870B_ABST
    Figure CN110144870B_ABST
Patent Text Reader

Abstract

This invention discloses a method for monitoring the working conditions of a geological drilling rig. A torque-speed sensor is connected at both ends to the output shaft of a second gearbox and a core-taking mechanism, respectively. The core-taking shaft on the core-taking mechanism rotates with the torque-speed sensor. Simultaneously, each hydraulic cylinder's piston rod is connected to a tension / compression sensor. Furthermore, a pull-wire sensor is fixed to the top of the support rod, and the pull wire on the pull-wire sensor is fixed to the drill rod. In addition, this invention includes an electrical control system that can collect and save signals from each sensor in real time. This allows personnel to analyze the data collected by the electrical control system after core taking using the geological drilling rig, thereby determining whether the core-taking personnel have engaged in any substandard work, core sample replacement, or other issues related to the rock strata.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of building pile foundation quality detection, and in particular relates to a geological drilling rig capable of monitoring core drilling conditions and a monitoring method thereof. Background Art

[0002] Pile foundation is a common foundation form in industrial and civil construction projects. As a deep foundation, pile foundation has the characteristics of high bearing capacity, good stability, small and uniform settlement, stable and fast settlement, and good seismic resistance. In engineering practice, it is not uncommon for pile foundations to fail to meet requirements due to design or construction reasons, or even major accidents caused by pile foundation defects; therefore, pile foundation testing is also a principle that must be followed in pile foundation construction. In pile foundation testing, parameters such as the depth of the pile end embedded in the bearing layer, rock strength, sediment thickness, and pile body verticality are necessary data for testing; at this time, construction personnel need to use geological drilling rigs to perform core drilling tests on the above parameters; in the process of coring with geological drilling rigs, if there are serious defects in the quality of the foundation pile concrete or the pile length does not meet the design requirements and requires secondary construction or reinforcement, the construction unit may induce on-site drilling personnel to conceal the quality defects of the foundation piles by stealing core samples for economic interests, thereby burying serious hidden dangers to project safety. Under the current conditions where on-site core drilling construction supervision measures are immature and inspection personnel are unable to supervise the drillers' operations in real time, the drillers may not drill deep enough due to the difficult conditions for core drilling. This greatly increases the error rate of inspection units and technicians in result analysis, which may cause the inspection units and technicians to bear greater responsibility for misjudgment of core drilling test results. Summary of the invention

[0003] In order to overcome the deficiencies of the prior art, the present invention provides a geological drilling rig capable of monitoring core drilling conditions and a monitoring method thereof, thereby effectively avoiding detection errors caused by non-cooperation of drillers during the core drilling process.

[0004] The technical solution adopted by the present invention to solve its technical problems is: a geological drilling rig capable of monitoring core drilling conditions, comprising a bracket; a driving device is installed on the bracket, and the output shaft of the driving device is connected to a first driving wheel and a first gearbox in sequence; the first driving wheel is connected to a hydraulic pump, and the hydraulic pump is connected to a hydraulic control system fixed on the bracket through a hydraulic oil pipe; the first gearbox is connected to a second driving wheel; the second driving wheel is connected to a second gearbox; the output shaft of the second gearbox is connected to one end of a torque speed sensor, and the other end of the torque speed sensor is connected to a coring mechanism; the coring mechanism comprises a protective cover, a coring shaft, a drill rod, two or more hydraulic cylinders, and a tension and pressure sensor; The protective cover is fixed on the bracket; the hydraulic cylinders are fixed on the protective cover; the lifting and lowering of the hydraulic cylinders are controlled by a hydraulic control system, and the piston rods of the hydraulic cylinders are connected to tension and pressure sensors; the tension and pressure sensors and the coring shaft are connected through a horizontal connecting block; the coring shaft passes through the protective cover, and the torque and speed sensor drives the coring shaft to rotate; the drill rod passes through the coring shaft, and the drill rod is detachably fixed on the coring shaft; a support rod is also fixed on the bracket, and a pull wire sensor is fixed to the top of the support rod; the pull wire on the pull wire sensor is fixed to the drill rod; and an electronic control system is also included, which can collect and save signals from each sensor in real time.

[0005] As an improvement of the above solution, the electric control system includes an acquisition module and a wireless transmission module; the acquisition module can acquire signals from each sensor in real time; and the wireless transmission module can transmit the data acquired by the acquisition module to a host computer.

[0006] Furthermore, the electric control system includes a collection module and a mobile hard disk; the collection module can collect signals from each sensor in real time and save the collected signals on the mobile hard disk.

[0007] Furthermore, the first gearbox has two output ends, one of which is connected to the water pump, and the other is connected to the second driving wheel; the water pump is connected to a water inlet pipe and a water outlet pipe, and the water outlet pipe is connected to the drill pipe.

[0008] Furthermore, a drill rod loosening mechanism is provided on the coring shaft, and the drill rod loosening mechanism can control the tightness of the drill rod.

[0009] Furthermore, it also includes a hook and a winch; the winch is fixed on the bracket; a pulley is fixed on the pull-wire sensor; a rope is also tied to the hook; the rope passes around the pulley and is fixed on the winch, and the retraction and release of the rope is controlled by the winch.

[0010] Furthermore, a protective box is provided on the bracket; the second gearbox, the torque speed sensor and the electronic control system are all installed in the protective box.

[0011] Furthermore, the winch, hydraulic control system and coring mechanism are respectively fixed on various surfaces of the protection box.

[0012] Furthermore, it also includes an extension rod, which is connected to the bottom of the drill rod; a first boss is provided on the top of the extension rod; the hook is provided with a stepped groove that can simultaneously match the extension rod and the first boss; the hook is also provided with a ring that matches the first boss, and the ring can slide up and down; second bosses are provided at both upper and lower ends of the hook to prevent the ring from slipping; the hook is also provided with a lifting ring.

[0013] The monitoring method of the present invention adopts the above-mentioned geological drilling rig capable of monitoring the core drilling condition to realize monitoring according to the following steps:

[0014] Step 1, operate the geological drilling rig to complete the coring operation;

[0015] Step 2: Convert the signals collected by the acquisition card into the displacement, tension, torque and speed required by the staff;

[0016] Step 3, the displacement, pressure, torque, and speed obtained by the conversion are simulated into an initial displacement-time curve diagram, an initial pressure-time curve diagram, an initial torque-time curve diagram, and an initial speed-time curve diagram according to the time relationship; then, according to the time change, the time periods t1-t2, t3-t4, t5-t6, t7-t8, ..., t are found in sequence when the displacement on the initial displacement-time curve suddenly decreases gradually, and after decreasing, it stabilizes at the same value and remains unchanged for a period of time. x-1 ~t x , then delete the data of these time periods on the initial displacement-time curve, initial pressure-time curve, initial torque-time curve, and initial speed-time curve; finally, add the displacement of the time period t2 to t3 to the displacement of the time period t1, and then subtract the displacement of the time period t2 before the data is deleted; add the displacement of the time period t4 to t5 to the displacement of the time period t1 and t3, and then subtract the displacement of the time period t2 and t4 before the data is deleted; add the displacement of the time period t6 to t7 to the displacement of the time period t1, t3, and t5, and then subtract the displacement of the time period t2, t4, and t6 before the data is deleted; ...; and so on; then the newly obtained displacement, pressure, torque, and speed are mapped into the final displacement-time curve, the final pressure-time curve, the final torque-time curve, and the final speed-time curve according to the time relationship;

[0017] Step 4: The value obtained by subtracting the displacement a corresponding to the final moment on the final displacement-time curve from the displacement b corresponding to the initial moment is the actual coring depth h1;

[0018] Step 5: Find the initial moment t of the slope change on the final displacement-time curve a Then analyze t a At the moment, the final pressure-time curve, final torque-time curve, and final speed-time curve are at t a Whether the value at the moment has a sudden change, if at t a The pressure, torque and speed at the moment all change suddenly, and the value h2 obtained by subtracting the displacement b corresponding to the initial moment from the displacement a1 at this position is within plus or minus 5% of the designed pile length h, then it can be determined that the drill bit has passed through the concrete pile body and entered the bottom rock and soil layer, and the actual pile length of the foundation pile is h2;

[0019] Step 6: In the actual pile length range of 0 to h2, if the final pressure-time curve and the final torque-time curve are at the same time t b The values ​​on t start to decrease gradually or suddenly decrease and maintain for a period of time. Finally, at t c At that moment, it returns to the value before the change, then we determine t b ~t c The concrete pouring of the pile body in the displacement section corresponding to the time period is not dense;

[0020] Step 7: In the actual pile length range of 0 to h2, if a certain position segment h a ~h b The final pressure-time curve and the final torque-time curve change suddenly, and the value decreases to less than 20% of the value before the change, and the position segment h a ~h b If the slope of the final displacement-time curve increases, it is determined that there is a void or mud trapped at the location of the pile body;

[0021] Step 8, compare the actual coring depth h1 with the required construction depth h3. If the actual coring depth h1 is less than the required construction depth h3, it is determined that the workers did not perform the construction according to the construction requirements and the pile length does not meet the requirements; if the actual coring depth h1 is greater than or equal to the required construction depth h3, it is determined that the workers completed the construction as required.

[0022] Step 9. Finally, compare the locations of the rock layer changes, loose concrete pouring, voids and mud inclusions obtained from the analysis of steps 3 to 7 with the appearance of the core samples actually taken out to see if the defect types and locations are consistent. If they are inconsistent, it means that the drillers have replaced the core samples; if they are consistent, it means that the drillers have not replaced the core samples.

[0023] The beneficial effects of the present invention are as follows: by connecting the two ends of the torque speed sensor to the output shaft of the second gearbox and the coring mechanism respectively, and the coring shaft on the coring mechanism rotates with the rotation of the torque speed sensor, the torque and speed of the coring mechanism in the coring rotation process can be reflected by the electrical signal on the torque speed sensor; at the same time, the piston rods of each hydraulic cylinder are connected to a tension pressure sensor, so that the pressure of the coring mechanism in the coring feeding process can be reflected by the electrical signal on the tension pressure sensor; and a wire sensor is fixed to the top of the support rod, and the wire on the wire sensor is fixed on the drill rod, so that the displacement of the geological drilling rig of the present invention in the whole working process can be reflected from the signal change of the wire sensor; in addition, the present invention is also provided with an electronic control system, and the electronic control system can collect and save the signals of each sensor in real time, so that after the detection personnel use the geological drilling rig of the present invention to coring, they can analyze the data collected by the electronic control system, and then know whether the drilling personnel have cut corners, replaced core samples, and rock formation changes in the whole coring process. A series of information. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The invention is further described below with reference to the accompanying drawings and embodiments.

[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0026] Figure 2 It is a structural schematic diagram of the coring mechanism of the present invention;

[0027] Figure 3 It is a schematic diagram of the internal structure of the protection box of the present invention;

[0028] Figure 4 It is an exploded view of the assembly structure of the extension rod and the hook of the present invention;

[0029] Figure 5 It is a schematic diagram of the initial displacement-time curve of the present invention;

[0030] Figure 6 It is a schematic diagram of the final displacement-time curve of the present invention. DETAILED DESCRIPTION

[0031] In order to make the technical problems solved by the present invention, the technical solutions adopted and the technical effects achieved clearer, the technical solutions of the embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0032] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0033] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0034] like Figure 1 , Figure 2As shown, a geological drilling rig capable of monitoring the working condition of core drilling comprises a support 10; a driving device 1 is installed on the support 10, and according to the actual situation, the driving device 1 can be an electric motor, a diesel engine, a gasoline engine, etc.; preferably, in order to maximize the power of the machine and reduce the use cost, etc., in the present invention, the driving device 1 selects a diesel engine. At the same time, the output shaft of the driving device 1 is sequentially connected with a first driving wheel 2 and a first gearbox 3; the first driving wheel 2 is connected to a hydraulic pump 11, and the hydraulic pump 11 is connected to a hydraulic control system 42 fixed on the support 10 through a hydraulic oil pipe; the first gearbox 3 is connected to a second driving wheel 12; the second driving wheel 12 is connected to a second gearbox 41; specifically, according to the actual situation, the first driving wheel 2 is connected to the hydraulic pump 11 through a belt drive; the second driving wheel 12 is connected to the second gearbox 41 through a belt drive. In addition, the output shaft of the second gearbox 41 is connected to one end of the torque speed sensor 43, and the other end of the torque speed sensor 43 is connected to the coring mechanism 6; however, according to actual conditions, specifically, the second gearbox 41, the torque speed sensor 43 and the coring mechanism 6 are connected through a coupling 45; the coring mechanism 6 includes a protective cover 61, a coring shaft 64, a drill rod 67, and two or more hydraulic cylinders 62; the protective cover 61 is fixed on the bracket 10; the hydraulic cylinders 62 are all fixed on the protective cover 61; the hydraulic cylinders 62 are controlled to rise and fall through the hydraulic control system 42, and the piston rods of the hydraulic cylinders 62 are all connected with tension and pressure sensors 63 ; Each tension and pressure sensor 63 and the coring shaft 64 are connected through a horizontal connecting block 65; a bearing is provided on the horizontal connecting block 65, the core shaft 64 is fixed on the bearing, and the coring shaft 64 passes through the protective cover 61, and the torque and speed sensor 43 drives the coring shaft 64 to rotate; the drill rod 67 passes through the coring shaft 64, and the drill rod 67 is detachably fixed on the coring shaft 64; a support rod is also fixed on the bracket 10, and a wire sensor 8 is fixed on the top of the support rod; the wire on the wire sensor 8 is fixed on the drill rod 67; and an electric control system 44 is also included, and the electric control system 44 can collect and save the signals of each sensor in real time. It also includes an extension rod 672, so that when the length of the drill rod 67 is not enough, the extension rod 672 is connected to the bottom of the drill rod 67 to achieve lengthening, thereby achieving a larger drilling volume.

[0035] The present invention connects the two ends of the torque speed sensor 43 to the output shaft of the second gearbox 41 and the coring mechanism 6 respectively, and the coring shaft 64 on the coring mechanism 6 rotates with the rotation of the torque speed sensor 43, so that the torque and speed of the coring mechanism 6 in the coring rotation process can be reflected by the electrical signal on the torque speed sensor 43; at the same time, the piston rods of the hydraulic cylinders 62 are connected to the tension pressure sensor 63, so that the pressure of the coring mechanism 6 in the coring feeding process can be reflected by the electrical signal on the tension pressure sensor 63; and the top of the support rod is fixed with a wire sensor The sensor 8 is provided with a pull wire, and the pull wire on the pull wire sensor 8 is fixed on the drill rod 67, so that the displacement of the geological drilling rig of the present invention in the whole working process can be reflected from the signal change of the pull wire sensor 8; in addition, the present invention is also provided with an electric control system 44, and the electric control system 44 can collect the signals of each sensor in real time and save them, so that after the detection personnel use the geological drilling rig of the present invention to take coring, they can analyze the data collected by the electric control system 44, and then know whether the drillers have cut corners, replaced core samples and a series of information on rock formation changes in the whole coring process.

[0036] The electric control system 44 is designed to realize the data collection and storage functions; according to the actual situation, the electric control system 44 can be designed to include two modules: a collection module and a mobile hard disk. The collection module can collect signals from each sensor in real time and save the collected signals on the mobile hard disk, so that when the geological drilling rig of the present invention is used for coring, the detection personnel can copy the data collected in the mobile hard disk for analysis as needed, thereby completing the monitoring function. In addition, the electric control system 44 can also be designed to include two modules: a collection module and a wireless transmission module; the collection module can collect signals from each sensor in real time; the wireless transmission module can transmit the data collected by the collection module to the host computer; when the construction personnel use the geological drilling rig of the present invention to perform coring, the electric control system 44 can transmit the signals of each sensor to the corresponding host computer receiving the data in real time through the wireless transmission module, and then the detection personnel can further analyze the data through the host computer, thereby realizing the monitoring function; preferably, the host computer is a computer. According to actual conditions, the wireless transmission module can be: 4G communication module, ZigBee module, Bluetooth module, GPRS module, 4G thermocouple, oneNET module, TTL module, etc. Preferably, oneNET module is selected.

[0037] like Figure 1As shown, in order to prevent the geological drilling rig of the present invention from heating up the drill head and causing wear and the like due to the long working time in the coring project; the first gearbox 3 has two output ends, one of which is connected to the water pump 13, and the other is connected to the second driving wheel 12; the water pump 13 is connected to a water inlet pipe and a water outlet pipe, and the water outlet pipe is connected to the drill rod 67; so that when the geological drilling rig is working, the construction personnel can find a water tank by themselves and fill it with water, and then connect the water inlet on the water pump 13 to the water tank. When the machine is running, the water pump 13 will automatically operate and pour water from the inside of the drill rod 67, so as to achieve the effect of cooling, thereby effectively reducing the mechanical wear of the drill bit and the drill rod 67; in addition, according to actual conditions, in order to facilitate operation, the first gearbox 3 is also correspondingly provided with an operating lever, by controlling the operating lever, the working conditions of each output shaft of the first gearbox 3 can be easily controlled, so that when the construction personnel need to lengthen the drill rod 67, the water pump 13 can be easily turned off by the operating lever, and the purpose of saving water is also achieved.

[0038] like Figure 1 , Figure 4As shown, in order to improve the safety of the geological drilling rig of the present invention, when the extension rod 672 needs to be installed, the drill rod 67 clamped on the coring shaft 64 can stop rotating, thereby preventing the drill rod 67 from swinging and injuring construction workers; the coring shaft 64 is provided with a drill rod loosening mechanism 66, and the drill rod loosening mechanism 66 can control the tightness of the drill rod 67. At the same time, considering that when the extension rod 672 is being extended section by section, the construction workers may have difficulty in operation due to the excessive weight of the extension rod 672, so in order to facilitate the operation of the construction workers, the present invention also includes a hook 68 and a winch 5; the winch 5 is fixed on the bracket 10; the pulley 7 is fixed on the pull wire sensor 8; the hook 68 is also tied with a rope 9; the rope 9 passes around the pulley 7 and is fixed on the winch 5, and the retraction and release of the rope 9 is controlled by the winch 5; therefore, when it is necessary to install the extended drill rod 67 or complete the coring operation, the construction workers can use the hook 68 to pull out the extension rod 672 section by section, thereby greatly reducing the work intensity of the construction workers. In addition, in order to improve the work efficiency of the construction workers when taking out the extension rod 672; a first boss 671 is provided on the top of the extension rod 672; the hook 68 is provided with a stepped groove 684 that can simultaneously match the extension rod 672 and the first boss 671; the hook 68 is also provided with a ring 681 that matches the first boss 671, and the ring 681 can slide up and down; the upper and lower ends of the hook 68 are provided with second bosses 683 to prevent the ring 681 from slipping; the hook 68 is also provided with a lifting ring 682; the construction workers can use the winch 5 to easily remove the drill rod 67 and the extension rod 672 drilled into the pile foundation by tying the rope 9 on the lifting ring 682, then passing the rope 9 around the pulley 7, and fixing the rope 9 on the winch 5.

[0039] like Figure 1 , Figure 3 As shown, in order to make the geological drilling rig of the present invention look more integrated and more beautiful, a protective box 4 is provided on the bracket 10; the second gearbox 41, the torque speed sensor 43 and the electronic control system 44 are all installed in the protective box 4; the winch 5, the hydraulic control system 42 and the coring mechanism 6 are respectively fixed on each surface of the protective box 4.

[0040] A method for monitoring the working condition of a geological drilling rig is provided, wherein the monitoring is realized by using a geological drilling rig capable of monitoring the working condition of a core drill according to the following steps:

[0041] Step 1, operate the geological drilling rig to complete the coring operation;

[0042] Step 2: Convert the signals collected by the acquisition card into the displacement, tension, torque and speed required by the staff;

[0043] Step 3, such as Figure 5 , Figure 6 As shown, the displacement, pressure, torque and speed obtained by conversion are simulated into initial displacement-time curve diagram, initial pressure-time curve diagram, initial torque-time curve diagram and initial speed-time curve diagram according to the time relationship; then, according to the time change, the time periods t1~t2, t3~t4, t5~t6, t7~t8, ..., t5~t6, t7~t8, ..., t6~t7, t7~t8, ..., t7~t8 on the initial displacement-time curve diagram are found in sequence, where the displacement suddenly decreases gradually and stabilizes at the same value after decreasing and remains unchanged for a period of time. x-1 ~t x , then delete the data of these time periods on the initial displacement-time curve, initial pressure-time curve, initial torque-time curve, and initial speed-time curve; finally, add the displacement of the time period t2 to t3 to the displacement of the time period t1, and then subtract the displacement of the time period t2 before the data is deleted; add the displacement of the time period t4 to t5 to the displacement of the time period t1 and t3, and then subtract the displacement of the time period t2 and t4 before the data is deleted; add the displacement of the time period t6 to t7 to the displacement of the time period t1, t3, and t5, and then subtract the displacement of the time period t2, t4, and t6 before the data is deleted; ...; and so on; then the newly obtained displacement, pressure, torque, and speed are mapped into the final displacement-time curve, the final pressure-time curve, the final torque-time curve, and the final speed-time curve according to the time relationship;

[0044] Step 4: The value obtained by subtracting the displacement a corresponding to the final moment on the final displacement-time curve from the displacement b corresponding to the initial moment is the actual coring depth h1;

[0045] Step 5: Find the initial moment t of the slope change on the final displacement-time curve a Then analyze t a At the moment, the final pressure-time curve, final torque-time curve, and final speed-time curve are at t a Whether the value at the moment has a sudden change, if at t a The pressure, torque and speed at the moment all change suddenly, and the value h2 obtained by subtracting the displacement b corresponding to the initial moment from the displacement a1 at this position is within plus or minus 5% of the designed pile length h, then it can be determined that the drill bit has passed through the concrete pile body and entered the bottom rock and soil layer, and the actual pile length of the foundation pile is h2;

[0046] Step 6: In the actual pile length range of 0 to h2, if the final pressure-time curve and the final torque-time curve are at the same time t b The values ​​on t start to decrease gradually or suddenly decrease and maintain for a period of time. Finally, at tc At that moment, it returns to the value before the change, then we determine t b ~t c The concrete pouring of the pile body in the displacement section corresponding to the time period is not dense;

[0047] Step 7: In the actual pile length range of 0 to h2, if a certain position segment h a ~h b The final pressure-time curve and the final torque-time curve change suddenly, and the value decreases to less than 20% of the value before the change, and the position segment h a ~h b If the slope of the final displacement-time curve increases, it is determined that there is a void or mud trapped at the location of the pile body;

[0048] Step 8, compare the actual coring depth h1 with the required construction depth h3. If the actual coring depth h1 is less than the required construction depth h3, it is determined that the workers did not perform the construction according to the construction requirements and the pile length does not meet the requirements; if the actual coring depth h1 is greater than or equal to the required construction depth h3, it is determined that the workers completed the construction as required.

[0049] Step 9. Finally, compare the locations of the rock layer changes, loose concrete pouring, voids and mud inclusions obtained from the analysis of steps 3 to 7 with the appearance of the core samples actually taken out to see if the defect types and locations are consistent. If they are inconsistent, it means that the drillers have replaced the core samples; if they are consistent, it means that the drillers have not replaced the core samples.

[0050] The embodiments of the present invention are described in detail above in conjunction with the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge scope of ordinary technicians in the technical field without departing from the purpose of the present invention.

[0051] In the description herein, it should be understood that the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplified operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation of the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0052] In the description of this specification, the description with reference to the terms "an embodiment", "example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example.

[0053] In addition, it should be understood that although this specification is described according to implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the purpose of clarifying the device. Those skilled in the art should take the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.

[0054] The technical principle of the present invention is described above in conjunction with specific embodiments. These descriptions are only for explaining the principle of the present invention and cannot be interpreted as limiting the scope of protection of the present invention in any way. Based on the explanations herein, those skilled in the art can associate other specific implementations of the present invention without paying creative labor, and these methods will fall within the scope of protection of the present invention.

Claims

1. A geological drilling rig capable of monitoring core drilling conditions, comprising a support (10); a driving device (1) is mounted on the support (10), and an output shaft of the driving device (1) is sequentially connected to a first driving wheel (2) and a first gearbox (3); the first driving wheel (2) is connected to a hydraulic pump (11), and the hydraulic pump (11) is connected to a hydraulic control system (42) fixed on the support (10) through a hydraulic oil pipe; the first gearbox (3) is connected to a second driving wheel (12); and the second driving wheel (12) is connected to a second gearbox (41); characterized in that: The output shaft of the second gearbox (41) is connected to one end of the torque speed sensor (43), and the other end of the torque speed sensor (43) is connected to the coring mechanism (6); the coring mechanism (6) comprises a protective cover (61), a coring shaft (64), a drill rod (67), two or more hydraulic cylinders (62), and a tension and pressure sensor (63); the protective cover (61) is fixed to the bracket (10); each of the hydraulic cylinders (62) is fixed to the protective cover (61); each of the hydraulic cylinders (62) is controlled to rise and fall by a hydraulic control system (42), and the piston rod of each of the hydraulic cylinders (62) is connected to a tension and pressure sensor (63); each of the tension and pressure sensors (63) is connected to the core drilling mechanism (6); The force sensor (63) and the coring shaft (64) are both connected via a horizontal connecting block (65); the coring shaft (64) passes through the protective cover (61), and the torque speed sensor (43) drives the coring shaft (64) to rotate; the drill rod (67) passes through the coring shaft (64), and the drill rod (67) is detachably fixed to the coring shaft (64); a support rod is also fixed to the bracket (10), and a wire sensor (8) is fixed to the top of the support rod; the wire on the wire sensor (8) is fixed to the drill rod (67); and an electric control system (44) is also included, and the electric control system (44) collects signals from various sensors in real time and saves them; The electric control system (44) comprises a collection module and a wireless transmission module; the collection module collects signals from various sensors in real time; the wireless transmission module transmits the data collected by the collection module to a host computer; the first gearbox (3) has two output ends, one of which is connected to a water pump (13) and the other is connected to a second driving wheel (12); the water pump (13) is connected to a water inlet pipe and a water outlet pipe, and the water outlet pipe is connected to a drill pipe (67).

2. A geological drilling rig capable of monitoring core drilling conditions according to claim 1, characterized in that: The coring rotating shaft (64) is provided with a drill rod loosening mechanism (66), and the drill rod loosening mechanism (66) controls the tightness of the drill rod (67).

3. A geological drilling rig capable of monitoring core drilling conditions according to claim 1, characterized in that: It also includes a hook (68) and a winch (5); the winch (5) is fixed on the bracket (10); a pulley (7) is fixed on the pull-wire sensor (8); a rope (9) is also tied to the hook (68); the rope (9) passes around the pulley (7) and is fixed on the winch (5), and the retraction and extension of the rope (9) is controlled by the winch (5).

4. A geological drilling rig capable of monitoring core drilling conditions according to claim 3, characterized in that: The drill bit (67) further comprises an extension rod (672) connected to the bottom of the drill rod (67); a first boss (671) is provided at the top of the extension rod (672); a stepped groove (684) is provided on the hook (68) and can match the extension rod (672) and the first boss (671) at the same time; a sleeve (681) matching the first boss (671) is also provided on the hook (68), and the sleeve (681) can slide up and down; second bosses (683) are provided at both the upper and lower ends of the hook (68) to prevent the sleeve (681) from sliding off; and a lifting ring (682) is also provided on the hook (68).

5. A geological drilling rig capable of monitoring core drilling conditions according to claim 3, characterized in that: A protection box (4) is provided on the bracket (10); the second gearbox (41), the torque speed sensor (43) and the electronic control system (44) are all installed in the protection box (4).

6. A geological drilling rig capable of monitoring core drilling conditions according to claim 5, characterized in that: The hoist (5), the hydraulic control system (42) and the coring mechanism (6) are respectively fixed on various surfaces of the protection box (4).

7. A method for monitoring the working condition of a geological drilling rig, characterized in that: The geological drilling rig capable of monitoring the core drilling condition according to any one of claims 1 to 6 is used to implement monitoring according to the following steps: Step 1, operate the geological drilling rig to complete the coring operation; Step 2: Convert the signals collected by the acquisition card into the displacement, tension, torque and speed required by the staff; Step 3, the displacement, pressure, torque, and speed obtained by conversion are simulated into an initial displacement-time curve diagram, an initial pressure-time curve diagram, an initial torque-time curve diagram, and an initial speed-time curve diagram according to the time relationship; and then, according to the time change, the time periods t1-t2, t3-t4, t5-t6, t7-t8, ..., t8 on the initial displacement-time curve diagram are found in turn, where the displacement suddenly decreases gradually, and after decreasing, it stabilizes at the same value and remains unchanged for a period of time. x-1 ~t x , then delete the data of these time periods on the initial displacement-time curve, initial pressure-time curve, initial torque-time curve, and initial speed-time curve; finally, add the displacement of the time period t2 to t3 to the displacement of the time period t1, and then subtract the displacement of the time period t2 before the data is deleted; add the displacement of the time period t4 to t5 to the displacement of the time period t1 and t3, and then subtract the displacement of the time period t2 and t4 before the data is deleted; add the displacement of the time period t6 to t7 to the displacement of the time period t1, t3, and t5, and then subtract the displacement of the time period t2, t4, and t6 before the data is deleted; ...; and so on; then the newly obtained displacement, pressure, torque, and speed are mapped into the final displacement-time curve, the final pressure-time curve, the final torque-time curve, and the final speed-time curve according to the time relationship; Step 4: The value obtained by subtracting the displacement a corresponding to the final moment on the final displacement-time curve from the displacement b corresponding to the initial moment is the actual coring depth h1; Step 5: Find the initial moment t of the slope change on the final displacement-time curve a Then analyze t a At the moment, the final pressure-time curve, final torque-time curve, and final speed-time curve are at t a Whether the value at the moment has a sudden change, if at t a The pressure, torque and speed at the moment all change suddenly, and the value h2 obtained by subtracting the displacement b corresponding to the initial moment from the displacement a1 at this position is within plus or minus 5% of the designed pile length h, then it is determined that the drill bit has passed through the concrete pile body and entered the bottom rock and soil layer, and the actual pile length of the foundation pile is h2; Step 6: In the actual pile length range of 0 to h2, if the final pressure-time curve and the final torque-time curve are at the same time t b The values ​​on t start to decrease gradually or suddenly decrease and maintain for a period of time. Finally, at t c At that moment, it returns to the value before the change, then we determine t b ~t c The concrete pouring of the pile body in the displacement section corresponding to the time period is not dense; Step 7: In the actual pile length range of 0 to h2, if a certain position segment h a ~h b The final pressure-time curve and the final torque-time curve change suddenly, and the value decreases to less than 20% of the value before the change, and the position segment h a ~h b If the slope of the final displacement-time curve increases, it is determined that there is a void or mud trapped at the location of the pile body; Step 8, comparing the actual coring depth h1 with the required construction depth h3. If the actual coring depth h1 is less than the required construction depth h3, it is determined that the worker did not perform the construction according to the construction requirements and the pile length does not meet the requirements; if the actual coring depth h1 is greater than or equal to the required construction depth h3, it is determined that the worker completed the construction as required; Step 9. Finally, compare the rock layer changes, loose concrete pouring, voids and mud inclusions obtained from the analysis of steps 3 to 7 with the appearance of the core sample actually taken out to see if the defect types and locations are consistent. If they are inconsistent, it means that the drillers have replaced the core sample; if they are consistent, it means that the drillers have not replaced the core sample.