Bridge posture adjustment system and method
Through the bridge attitude adjustment system, the method of steel strands and continuous lifting jacks is used to solve the problems of difficult control of the overturning force and insufficient working space during the bridge attitude adjustment, and achieve stable, safe lifting and attitude adjustment of the bridge.
Patent Information
- Application Number
- CN201910364118.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-04-30
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2039-04-30
AI Technical Summary
During the bridge reconstruction process, when using jacks to adjust the posture of the bridge, the overturning force is difficult to control, the jack position is difficult to set, and it is difficult to complete the height stroke when it exceeds a single stroke. When the piers are heightened or shortened, the working space is small, and there is a large problem. Security risks.
A bridge posture adjustment system including a lifting mast, shoulder pole beam, lifting mechanism, steel strand and connecting device is adopted. Through the load-bearing and flexible connection of the steel strand, the continuous lifting jack and pushing device are used to achieve stable lifting and adjustment of the bridge.
It realizes the continuous and smooth improvement of the bridge posture, reduces the overturning force, expands the working space, improves construction safety and efficiency, and avoids the problem of insufficient single stroke of the jack.
Smart Images

Figure CN110258360B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge reconstruction, and in particular to a bridge posture adjustment system and method. Background Art
[0002] Bridge reconstruction includes the lifting and reinforcement of bridges. When reconstructing a bridge, it is necessary to lift, lower and adjust the slope of the bridge.
[0003] At present, bridge jacking, maintenance and reinforcement construction mostly adopts the construction of temporary piers or scaffolding on the pedestal, and jacking with jacks under the bridge. When the jack cannot reach the set height in a single jacking, the bridge needs to be repeatedly replaced and jacked. When jacking the bridge, the bridge will have an overturning force on the jack, which will lead to problems such as the overturning force is difficult to control, the position of the jack is difficult to set, and the height stroke is difficult to complete when it exceeds the single stroke of the jack. In addition, if the pier is raised or shortened, the working space is too small, and the safety risk is relatively large. There is also the problem that it is difficult to find the support point when the bridge pier needs to be shortened. Summary of the invention
[0004] In view of the defects existing in the prior art, the purpose of the present invention is to provide a bridge posture adjustment system and method, which can effectively solve the problems of difficult control of overturning force, difficult setting of the position of the jack and difficulty in completing the height stroke when the bridge posture is adjusted with a jack.
[0005] In order to achieve the above objectives, the technical solution adopted by the present invention is: on the one hand, the present invention provides a bridge attitude adjustment system, the bridge attitude adjustment system comprising:
[0006] A lifting gantry, comprising a first support frame and a second support frame arranged at intervals, and a load-bearing beam arranged between the tops of the first support frame and the second support frame;
[0007] A shoulder beam, which is arranged below the load-bearing beam;
[0008] Two sets of lifting mechanisms are arranged at intervals along the length direction of the load-bearing beam, and the lifting mechanisms are used to drive the shoulder pole beam to rise, fall and rotate;
[0009] Two groups of steel strands respectively connect the two groups of lifting mechanisms with the shoulder pole beam.
[0010] On the basis of the above technical solution, the shoulder beam is provided with two groups of connection devices connected with two groups of steel strands, and each group of the connection devices includes:
[0011] A hanging beam, wherein the hanging beam is fixedly connected to the steel strand;
[0012] The first spherical hinge support has one end fixedly connected to the suspension beam and the other end fixedly connected to the shoulder beam.
[0013] On the basis of the above technical solution, the hanging beam and the steel strand are fixedly connected via an anchor plate and an anchor head.
[0014] On the basis of the above technical solution, the lifting mechanism adopts a continuous lifting jack.
[0015] On the basis of the above technical solution, a second spherical hinge support is further provided between the continuous lifting jack and the load-bearing beam.
[0016] On the basis of the above technical solution, each set of continuous lifting jacks is provided with a pushing device for pushing the second spherical hinge support around it.
[0017] On the basis of the above technical solution, the pushing device comprises:
[0018] 4 reaction seats, which are evenly spaced around the second spherical hinge support;
[0019] Four horizontal jacks are arranged between the second spherical hinge support and the reaction seat, and are abutted against the second spherical hinge support and the reaction seat.
[0020] On the basis of the above technical solution, a first sensor for detecting the vertical displacement of the steel strand is provided on the second spherical hinge support, and a second sensor for detecting the horizontal displacement of the second spherical hinge support is provided on the reaction seat.
[0021] On the basis of the above technical solution, the first support frame is fixedly connected to the load-bearing beam, and the second support frame is slidably connected to the load-bearing beam.
[0022] In another aspect, the present invention provides a method for adjusting a bridge posture, the method comprising:
[0023] Installing the bridge attitude adjustment system at a set position;
[0024] The steel strand is lifted by the lifting mechanism to drive the shoulder pole beam to lift, so that the shoulder pole beam supports the bridge;
[0025] removing the connection between the bridge and the piers and lifting the bridge;
[0026] The bridge piers are processed, and the bridge is lowered or rotated according to the design requirements by the lifting mechanism, and the bridge is placed on the processed bridge piers.
[0027] Compared with the prior art, the present invention has the advantages that: when the bridge posture adjustment system is used, the first support frame and the second support frame are installed on both sides of the bridge to be adjusted, the first support frame is fixedly connected to the load-bearing beam, and the second support frame is hingedly connected to the load-bearing beam. The lifting mechanism is connected to the shoulder pole beam through the steel strand. Two sets of the bridge posture adjustment system are provided for each hole beam, and when it is a continuous bridge, the bridge posture adjustment system is added according to the corresponding holes. The steel strand is synchronously lifted by the lifting mechanism to drive the shoulder pole beam to lift, so that the shoulder pole beam supports the bridge. The connection between the bridge and the pier is removed, and the bridge is lifted. The lifting mechanism can continuously lift the bridge to be adjusted, and can lift the bridge to be adjusted to a predetermined position at one time. The original pier is processed, and the bridge is lowered or rotated according to the design requirements by the lifting mechanism, and the bridge is placed on the processed pier to complete the bridge posture adjustment construction. When adjusting the bridge posture, the bridge is loaded by the steel strand and flexibly connected, and can withstand the overturning force when the bridge is supported by the jack in a reasonable force-bearing manner, and can operate continuously, smoothly and safely. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of a bridge posture adjustment system in an embodiment of the present invention;
[0029] Figure 2 It is a right view structural schematic diagram of the bridge posture adjustment system in an embodiment of the present invention.
[0030] In the figure: 1. lifting gantry; 11. supporting frame; 111. first supporting frame; 112. second supporting frame; 12. load-bearing beam; 2. lifting mechanism; 3. shoulder beam; 31. connecting device; 311. hanging beam; 312. first spherical hinge support; 4. steel strand; 5. second spherical hinge support; 6. pushing device; 61. reaction seat; 62. horizontal jack. DETAILED DESCRIPTION
[0031] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments.
[0032] Figure 1 is a structural schematic diagram of a bridge posture adjustment system in an embodiment of the present invention, Figure 2 FIG. 1 is a right view structural diagram of a bridge posture adjustment system in an embodiment of the present invention. Figure 1 and Figure 2 As shown, an embodiment of the present invention provides a bridge posture adjustment system, the bridge posture adjustment system comprising:
[0033] A lifting gantry 1, comprising a first support frame 111 and a second support frame 112 arranged at intervals, and a load-bearing beam 12 arranged between the tops of the first support frame 111 and the second support frame 112;
[0034] A shoulder beam 3, which is disposed below the load-bearing beam 12;
[0035] Two sets of lifting mechanisms 2 are arranged at intervals along the length direction of the load-bearing beam 12, and the lifting mechanisms 2 are used to drive the shoulder pole beam 3 to rise and fall and rotate;
[0036] Two groups of steel strands 4 respectively connect the two groups of lifting mechanisms 2 with the lifting shoulder beam 3.
[0037] When the bridge posture adjustment system is used, the first support frame 111 and the second support frame 112 are installed on both sides of the bridge to be adjusted, the first support frame 111 is fixedly connected to the load-bearing beam 12, and the second support frame 112 is hingedly connected to the load-bearing beam 12. The lifting mechanism 2 is connected to the shoulder beam 3 through the steel strand. The steel strand 4 is lifted by the lifting mechanism 2 to drive the shoulder beam 3 to lift, so that the shoulder beam 3 supports the bridge. The connection between the bridge and the pier is removed, and the bridge is lifted. The lifting mechanism 2 can continuously lift the bridge to be adjusted, and can lift the bridge to be adjusted to a predetermined position at one time. The original pier is processed, and the bridge is lowered or rotated according to the design requirements by the lifting mechanism 2, and the bridge is placed on the processed pier to complete the construction of the bridge posture adjustment. During the adjustment, the bridge bears the weight through the steel strand 4 and flexibly bears the tension. Compared with the solution of supporting the bridge with a jack, the overturning force when the jack is used to support the bridge is reduced.
[0038] Preferably, the shoulder beam 3 is provided with two sets of connecting devices 31 connected with the two sets of steel strands 4, and each set of connecting devices 31 includes:
[0039] A hanging beam 311, the hanging beam 311 is fixedly connected to the steel strand 4;
[0040] One end of the first spherical hinge support 312 is fixedly connected to the suspension beam 311 , and the other end is fixedly connected to the shoulder beam 3 .
[0041] The steel strand 4 connects the connecting device 31 with the shoulder beam 3. The connecting device 31 is provided with a first spherical hinge support 312, which can adapt to the inclination of the steel strand 4 when adjusting the bridge, and further reduce the overturning force on the steel strand.
[0042] Preferably, the hanging beam 311 is fixedly connected to the steel strand 4 by an anchor plate and an anchor head. The use of an anchor plate and an anchor head for fixed connection can save time for connection construction.
[0043] Preferably, the lifting mechanism 2 uses a continuous lifting jack. The continuous lifting jack can continuously pull the steel strands to drive the shoulder beam 3 to lift, avoiding the need for continuous adjustment to achieve the designed height when the jack exceeds one stroke when the bridge is lifted on the pier.
[0044] Preferably, a second spherical hinge support 5 is further provided between the continuous lifting jack and the load-bearing beam 12. The second spherical hinge support 5 can adapt to the direction of force, tilt the continuous lifting jack according to the force mode, and reduce the overturning force on the continuous lifting jack.
[0045] Preferably, each set of continuous lifting jacks is provided with a jacking device 6 for jacking the second spherical hinge support 5. The jacking device 6 can horizontally displace the jacking continuous lifting jacks, thereby adjusting the lateral position and longitudinal position of the bridge to be adjusted.
[0046] Preferably, the pushing device 6 comprises:
[0047] Four reaction seats 61 are evenly spaced around the second spherical hinge support 5;
[0048] Four horizontal jacks 62 are disposed between the second spherical hinge support 5 and the reaction seat 61 , and are abutted against the second spherical hinge support 5 and the reaction seat 61 .
[0049] Preferably, a first sensor for detecting the vertical displacement of the steel strand 4 is provided on the second spherical hinge support 5, and a second sensor for detecting the horizontal displacement of the second spherical hinge support 5 is provided on the reaction seat 61. The first sensor monitors the vertical displacement of the steel strand 4 in real time, and the second sensor can monitor the horizontal displacement of the second spherical hinge support 5 in real time, including the horizontal displacement and longitudinal displacement of the second spherical hinge support 5. By monitoring the vertical displacement of the steel strand 4 and the horizontal displacement of the second spherical hinge support 5, the position of the bridge to be adjusted can be grasped, and then the next adjustment can be made.
[0050] Preferably, the first support frame 111 is fixedly connected to the load-bearing beam 12, and the second support frame 112 is hingedly connected to the load-bearing beam 12. The first support frame 111 is fixedly connected to the load-bearing beam 12, so that the first support frame 111 can bear the horizontal force of the load-bearing beam 12, and the second support frame 112 is hingedly connected to the load-bearing beam 12 so that the second support frame 112 can only bear the vertical force, so as to avoid the second support frame 112 needing to bear the horizontal force when the load-bearing beam 12 is subjected to wind load. In this embodiment, the first support frame 111 is provided with two support columns, and in other embodiments, the second support frame 112 may also be provided with two support columns.
[0051] In another aspect, the present invention provides a method for adjusting a bridge posture, the method comprising:
[0052] S1: Installing the bridge attitude adjustment system at a set position. The set position is generally set at both sides of the bridge pier, and the first support frame 111 and the second support frame 112 are set at both sides of the bridge to be adjusted.
[0053] Specifically, when installing the bridge posture adjustment system, first install the first support frame and the second support frame on both sides of the bridge respectively; then fix the first support frame to the load-bearing beam, and hinge the second support frame to the load-bearing beam. Then install a continuous lifting jack at the second set position of each lifting gantry; finally install a steel strand on each set of continuous lifting jacks, and connect the lifting shoulder beam to the steel strand.
[0054] S2: Use the lifting mechanism to lift the steel strands, drive the shoulder beam to lift, and make the shoulder beam support the bridge, that is, the shoulder beam bears the weight of the bridge. That is, the weight of the bridge is transferred from the original pier to the shoulder beam.
[0055] S3: Remove the connection between the bridge and the piers and lift the bridge, that is, remove the connection between the bridge and the piers and lift the bridge to a certain distance.
[0056] S4: Process the bridge piers, lower or rotate the bridge according to the design requirements through the lifting mechanism, and place the bridge on the processed piers. Processing the original bridge piers means lengthening, cutting or reinforcing the original bridge piers, and then placing the bridge on the processed piers according to the design requirements, thus completing the bridge posture adjustment construction.
[0057] In summary, when the bridge posture adjustment system and method are used, the lifting height of the bridge can be achieved at one time to reach the set height, avoiding the problem that it is difficult to lift the bridge from the bottom of the bridge using a jack and the jack needs to be constantly replaced. In addition, the present invention performs lifting operations above the bridge, the lifting operation conditions are good, and the working space under the bridge is greatly increased, which can facilitate other construction.
[0058] The present invention is not limited to the above-mentioned embodiments. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications are also considered to be within the scope of protection of the present invention. The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
Claims
1. A bridge attitude adjustment system, characterized in that: The bridge attitude adjustment system comprises: A lifting gantry (1), comprising a first support frame (111) and a second support frame (112) arranged at an interval, and a load-bearing beam (12) arranged between the tops of the first support frame (111) and the second support frame (112); A shoulder beam (3) disposed below the load-bearing beam (12); Two sets of lifting mechanisms (2) are arranged at intervals along the length direction of the load-bearing beam (12), and the lifting mechanisms (2) are used to drive the shoulder pole beam (3) to rise, fall and rotate; Two groups of steel strands (4), which respectively connect the two groups of lifting mechanisms (2) to the shoulder beam (3); The shoulder beam (3) is provided with two groups of connection devices (31) connected to the two groups of steel strands (4), and each group of the connection devices (31) comprises: A hanging beam (311), wherein the hanging beam (311) is fixedly connected to the steel strand (4); A first spherical hinge support (312), one end of which is fixedly connected to the suspension beam (311), and the other end of which is fixedly connected to the shoulder beam (3); The lifting mechanism (2) adopts a continuous lifting jack.
2. The bridge attitude adjustment system according to claim 1, characterized in that: The suspension beam (311) and the steel strand (4) are fixedly connected via an anchor plate and an anchor head.
3. The bridge attitude adjustment system according to claim 1, characterized in that: A second spherical hinge support (5) is also provided between the continuous lifting jack and the load-bearing beam (12).
4. The bridge attitude adjustment system according to claim 3, characterized in that: Each set of continuous lifting jacks is provided with a pushing device (6) around it for pushing the second spherical hinge support (5).
5. The bridge attitude adjustment system according to claim 4, characterized in that: The pushing device (6) comprises: Four reaction seats (61) are symmetrically arranged around the second spherical hinge support (5); Four horizontal jacks (62) are arranged between the second spherical hinge support (5) and the reaction seat (61), and are abutted against the second spherical hinge support (5) and the reaction seat (61).
6. The bridge attitude adjustment system according to claim 5, characterized in that: The second spherical hinge support (5) is provided with a first sensor for detecting the vertical displacement of the steel strand (4), and the reaction seat (61) is provided with a second sensor for detecting the horizontal displacement of the second spherical hinge support (5).
7. A method for adjusting the bridge attitude using the bridge attitude adjustment system according to claim 1, characterized in that: The method comprises: Installing the bridge attitude adjustment system at a set position; The steel strand is lifted by the lifting mechanism to drive the shoulder pole beam to lift, so that the shoulder pole beam supports the bridge; removing the connection between the bridge and the piers and lifting the bridge; The bridge piers are processed or remodeled, and the bridge is lowered or rotated according to the design requirements by the lifting mechanism to place the bridge on the processed bridge piers.