A method for transporting large-scale liquefied gas storage tanks in sections for ships
By closing the large liquefied gas storage tank on the tire frame and using the SPMT unit vehicle for transportation, the problem of large equipment being unable to be closed and manufactured was solved, a more efficient and safer transportation solution was achieved, and transportation costs and working hours were reduced.
Patent Information
- Application Number
- CN201910714794.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-08-05
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2039-08-05
AI Technical Summary
The existing technology lacks a clear process plan during the transportation and installation of large equipment, resulting in inconvenient transportation. In particular, large equipment beyond the lifting range of the gantry cannot be closed and manufactured, which affects the overall transfer and manufacturing efficiency of the equipment.
Using the SPMT unit car and a special tire frame, the large liquefied gas storage tank section is closed on the tire frame, and a lifting support tooling and a displacement limiting buckle are set between the SPMT unit car and the storage tank section to achieve safety and speed. The overall transportation, and reasonable transfer routes and locations are planned within the factory area.
It improves the overall transportation efficiency of large equipment, reduces transportation costs and labor hours, ensures transportation safety and smooth production planning, and avoids transportation accidents.
Smart Images

Figure CN110356797B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bulk transport, and in particular to a bulk transport method for a large-scale liquefied gas storage tank for a ship. Background Art
[0002] Nowadays, the transportation and installation of many large equipment require SPMT unit vehicles or hydraulic rail vehicles. When transporting some heavy equipment, a complete transport plan needs to be formulated to solve various problems during transport. Depending on the equipment being transported, the entire transport process is also very different. When transporting some large equipment, it is necessary to design some tooling for transporting separately to cooperate.
[0003] There is no clear technology for the transshipment of large equipment in the industry. At present, large equipment in shipyards is generally transported by gantry cranes. In this way, the entire section must be assembled under the gantry crane, and the load-bearing requirements of the gantry crane are very high. Large equipment that exceeds the lifting range of the gantry crane cannot be assembled under the gantry crane, and cannot even be manufactured. Summary of the invention
[0004] In view of the shortcomings of the prior art, the present invention provides a method for transporting large-scale liquefied gas storage tank sections on board a ship, which solves the current problem of overall transportation of large-scale equipment and expands the business scope of the manufacturing company.
[0005] Technical Solution
[0006] To achieve the above object, the present invention provides the following technical solution: a method for transporting large-scale liquefied gas storage tank sections for ships, comprising the following steps:
[0007] (1) Arrange the tire frame of the large liquefied gas storage tank section in the liquefied gas storage tank section manufacturing area. The tire frame needs to reserve the transfer position of the SPMT unit vehicle in the overall layout and strengthen some areas;
[0008] (2) placing the large liquefied gas storage tank assembly section on the folded frame in a workshop;
[0009] (3) Assembling the SPMT unit vehicle and driving it to the designated position of the tire frame;
[0010] (4) After the SPMT unit vehicle arrives at the designated position in the tire frame, a lifting support tool is arranged between the large liquefied gas storage tank section and the SPMT unit vehicle;
[0011] (5) after the SPMT unit vehicle lifts the large liquefied gas storage tank section off the tire frame, a displacement limiting buckle is welded between the supporting tooling and the body of the large liquefied gas storage tank section;
[0012] (6) The large-scale liquefied gas storage tank section is transported to a designated location, and the large-scale liquefied gas storage tank section is seated at a pre-planned location, waiting for the turning over and closing operation;
[0013] (7) After the turning and closing is completed, the whole tank is transported from the main section closing area to the pumping test area;
[0014] (8) Transporting the entire tank from the water pumping test area to the insulation spraying area, and using the SPMT unit vehicle to turn the entire tank;
[0015] (9) Transport the entire tank from the insulation spraying area to the liquid tank shipping platform.
[0016] Preferably, the transportation system also includes the planning of the transfer route of the large-scale liquefied gas storage tank section within the factory area, and the ground undulation angle of the transfer route shall not be greater than 5°.
[0017] Preferably, the transport system uses 2 sets of the SPMT unit vehicle groups, with a total of 36 axles. The maximum load capacity of the 2 sets of the SPMT unit vehicle groups is 1,566 tons. Each set of vehicle groups has 18 axles and is composed of 1 PPU and 3 6-axis modular unit vehicles. The upper plane of the transport vehicle and the shell of the large liquefied gas storage tank are supported by 4 steel plates of the same size.
[0018] Preferably, the total weight of the large liquefied gas storage tank section shall not exceed 90% of the total carrying capacity of the SPMT unit vehicle.
[0019] Preferably, the tire frame includes a plane layout, channel steel supports, support connecting plates and a top plate, and the support top of the tire frame is leveled with a laser.
[0020] Preferably, the total weight of the large liquefied gas storage tank is greater than 600 tons.
[0021] Beneficial Effects
[0022] Compared with the prior art, the present invention provides a method for transporting large-scale liquefied gas storage tank sections on a ship, which has the following beneficial effects:
[0023] The present invention can build a larger total section within limited construction resources, improve construction efficiency, and no consumables will appear in the entire transportation process. All used tooling parts are reusable. Through the cooperation of SPMT unit vehicles, it is safer and faster than the previous transportation method, and the occurrence of transportation accidents can be prevented. From the perspective of production planning, it can reduce the time spent on transportation, reduce the working hours of labor personnel, and reduce production costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a tire frame layout diagram of the present invention;
[0025] Figure 2 It is the layout diagram of the SPMT unit vehicle of the present invention;
[0026] Figure 3 It is a schematic diagram of the structure of the SPMT unit vehicle of the present invention;
[0027] Figure 4 It is a schematic diagram of the structure of the SPMT unit vehicle of the present invention;
[0028] Figure 5 It is a transportation flow chart of the present invention. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] Embodiment 1:
[0031] This embodiment is a preferred embodiment of the present invention: Figures 1 to 5 As shown, a method for transporting large-scale liquefied gas storage tank sections for ships comprises the following steps:
[0032] (1) Arrange the tire frame of the large liquefied gas storage tank section in the liquefied gas storage tank section manufacturing area. The tire frame needs to reserve the transfer position of the SPMT unit vehicle in the overall layout and strengthen some areas;
[0033] (2) placing the large liquefied gas storage tank assembly section on the folded frame in a workshop;
[0034] (3) Assembling the SPMT unit vehicle and driving it to the designated position of the tire frame;
[0035] (4) After the SPMT unit vehicle arrives at the designated position in the tire frame, a lifting support tool is arranged between the large liquefied gas storage tank section and the SPMT unit vehicle;
[0036] (5) after the SPMT unit vehicle lifts the large liquefied gas storage tank section off the tire frame, a displacement limiting buckle is welded between the supporting tooling and the body of the large liquefied gas storage tank section;
[0037] (6) The large-scale liquefied gas storage tank section is transported to a designated location, and the large-scale liquefied gas storage tank section is seated at a pre-planned location, waiting for the turning over and closing operation;
[0038] (7) After the turning and closing is completed, the whole tank is transported from the main section closing area to the pumping test area;
[0039] (8) Transporting the entire tank from the water pumping test area to the insulation spraying area, and using the SPMT unit vehicle to turn the entire tank;
[0040] (9) Transport the entire tank from the insulation spraying area to the liquid tank shipping platform.
[0041] Preferably, the transportation system also includes the planning of the transfer route of the large-scale liquefied gas storage tank section within the factory area. The ground undulation angle of the transfer route shall not be greater than 5°. The transportation system adopts 2 sets of the SPMT unit vehicle groups, with a total of 36 axles. The maximum load capacity of the 2 sets of the SPMT unit vehicle groups is 1566 tons. Each set of vehicle groups has 18 axles and consists of 1 PPU and 3 6-axis modular unit vehicles. The upper plane of the transport vehicle and the shell of the large-scale liquefied gas storage tank are supported by 4 steel plates of the same size. The weight of the large-scale liquefied gas storage tank section shall not exceed 90% of the total load capacity of the SPMT unit vehicle. The tire frame includes a plane layout, channel steel support, support connecting plate and top plate. The support top of the tire frame is leveled with a laser. The weight of the large-scale liquefied gas storage tank section is greater than 600 tons.
[0042] Embodiment 2:
[0043] This embodiment is another preferred embodiment of the present invention: Figures 1 to 5 As shown, a method for transporting large-scale liquefied gas storage tank sections for ships is to transport large-scale liquefied gas storage tank sections manufactured in a manufacturing workshop, wherein the large-scale liquefied gas storage tank sections are larger than 600 tons, as a whole, to an external field for large-scale assembly. The present invention includes an assembly frame structure and arrangement in the large-scale liquefied gas storage tank sections, a transport jacking tooling structure, an SPMT unit vehicle arrangement, and a displacement limiting buckle. Before transshipment, the large-scale liquefied gas storage tank section is placed on the folding tire frame in the workshop. The tire frame needs to reserve the transshipment position of the SPMT unit vehicle in the overall layout, and strengthen it in some areas; the size and total amount of the large-scale liquefied gas storage tank section are calculated to configure the SPMT unit vehicle, and the weight of the large-scale liquefied gas storage tank section shall not exceed 90% of the total carrying capacity of the module vehicle; because there is a height difference between the longitudinal compartment in the large-scale liquefied gas storage tank section and the shell of the large-scale liquefied gas storage tank section, before the SPMT unit vehicle is lifted, the transshipment lifting tooling is arranged at the lifting position; after the large-scale liquefied gas storage tank section is lifted by the SPMT unit vehicle, since the contact surface between the large-scale liquefied gas storage tank section and the lifting support tooling is small and the transportation potential energy is large, it is necessary to arrange a displacement limiting buckle between the large-scale liquefied gas storage tank section and the support tooling.
[0044] Preferably, the transportation system includes a tire frame for placing the large-scale liquefied gas storage tank section, and the tire frame includes a plane layout, channel steel support, support connecting plate and top plate, and the top of the tire frame needs to be leveled with a laser instrument; the transportation system also includes a jacking support tooling, and after the SPMT unit vehicle drives to the specified position in the tire frame of the section, the jacking support tooling needs to be arranged between the large-scale liquefied gas storage tank section and the SPMT unit vehicle to ensure that the large-scale liquefied gas storage tank section can be stably landed on the SPMT unit vehicle, and the displacement limiting buckle is welded between the support tooling and the body of the large-scale liquefied gas storage tank section to prevent the section from being displaced horizontally and vertically during transportation; the transportation system also includes the planning of the transportation route of the section within the factory area, the ground undulation angle of the transportation route shall not be greater than 5°, and the section support needs to be arranged in advance according to the outer contour of the section in the large closing area to ensure that the module transport vehicle can drive out smoothly after the section is transferred to the place, and carry out the next large closing operation.
[0045] Preferably, the transport system uses 2 sets of SPMT modular unit vehicles, with a total of 36 axles. The maximum load of the 2 sets of SPMT unit vehicles is 1566 tons. Each set of vehicles has 18 axles, and is composed of 1 PPU and 3 6-axle modular unit vehicles. The upper plane of the transport vehicle and the tank shell are supported by 4 3800mm×2430mm×50mm steel plates. When performing the total section transport operation, the load rate of the transport vehicle is less than 50%.
[0046] In summary, the SPMT unit vehicle used in the present invention has many advantages over the previous oil pump lifting trolleys, such as convenient assembly, high load tonnage, no need to design saddle legs, and no need for running tracks; compared with the previous oil pump trolley barge method, the present invention has a more stable barge process and does not require parking and seat adjustment; compared with the previous tire frames, the tire frame of the present invention increases the tire frame height and construction space, and reduces the number of tire frames and material usage.
[0047] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements. Although embodiments of the present invention have been shown and described, it is understood by those of ordinary skill in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for transporting large-scale liquefied gas storage tank sections for ships, characterized in that: The following steps are involved: (1) Arrange the tire frame of the large liquefied gas storage tank section in the liquefied gas storage tank section manufacturing area. The tire frame needs to reserve the transfer position of the SPMT unit vehicle in the overall layout and be strengthened in some areas; (2) Placing the large liquefied gas storage tank assembly section in a workshop and closing the tire frame; (3) Assembling the SPMT unit vehicle and driving it to the designated position of the tire frame; (4) After the SPMT unit vehicle arrives at the designated position in the tire frame, a lifting support tool is arranged between the large liquefied gas storage tank section and the SPMT unit vehicle; (5) after the SPMT vehicle lifts the large liquefied gas storage tank section off the tire frame, welding a displacement limiting buckle between the supporting fixture and the body of the large liquefied gas storage tank section; (6) The large-scale liquefied gas storage tank section is transported to the designated location, and the large-scale liquefied gas storage tank section is seated at the pre-planned location, waiting for the turning over and closing operation; (7) After the turning and closing is completed, the whole tank is transported from the main section closing area to the pumping test area; (8) Transport the entire tank from the water pumping test area to the insulation spraying area, and use the SPMT unit vehicle to turn the entire tank; (9) Transport the entire tank from the insulation spraying area to the liquid tank shipping platform; The tire frame includes a plane layout, channel steel support, support connecting plate and top plate, and the support top of the tire frame is flattened by a laser instrument; The total weight of the large liquefied gas storage tank is greater than 600 tons.
2. A method for transporting large-scale liquefied gas storage tank sections for ships according to claim 1, characterized in that: The transportation method also includes planning of a transfer route for the large liquefied gas storage tank section within the factory area, and the ground undulation angle of the transfer route shall not be greater than 5°.
3. A method for transporting large-scale liquefied gas storage tank sections for ships according to claim 1, characterized in that: The transportation method adopts 2 sets of the SPMT unit vehicles, with a total of 36 axles. The maximum load capacity of the 2 sets of SPMT unit vehicles is 1,566 tons. Each set of vehicles has 18 axles and consists of 1 PPU and 3 6-axle modular unit vehicles. The upper plane of the transport vehicle and the shell of the large liquefied gas storage tank are supported by 4 steel plates of the same size.
4. A method for transporting large-scale liquefied gas storage tank sections for ships according to claim 1, characterized in that: The total weight of the large liquefied gas storage tank section shall not exceed 90% of the total carrying capacity of the SPMT unit vehicle.
Citation Information
Patent Citations
Large liquefied gas storage tank block transportation system for ship
CN211686997U