Lengthening device and lengthening method of girder of shore container crane

Through the extension device of the beam of the shore container crane, using technologies such as mobile tracks and process support, the use of large-scale equipment is reduced, the construction period and cost are reduced, and the safety and efficiency of extended operations are improved, and the equipment in the existing technology is solved Highly demanding issues.

CN110407087BActive Publication Date: 2024-12-17SHANGHAI ZHENHUA HEAVY IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910788151.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-26
Publication Date
2024-12-17
Estimated Expiration
2039-08-26

AI Technical Summary

Technical Problem

The existing shore bridge extension plan has high requirements for lifting equipment and site, and the construction period and cost are also high, making it difficult to meet the loading and unloading needs of large container transport ships.

Method used

A lengthening device for the beam of the shore container crane is designed, including the extended carriage workpiece, bracket trolley, craft brace, jack, removable casing railing handrail and stop plate. The moving track and cutting line are provided on the beam. The process support on the side reduces the use of large equipment, and moves the front section of the beam through hand-pulling hoists and pulling ears to avoid high-altitude operations and individual lifting extended sections.

Benefits of technology

The shore bridge does not need to be displaced, reduces the use of large-scale equipment, reduces the construction period and cost, and prevents the contraction or outward deformation of the end of the beam, improving the safety and efficiency of extended operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110407087B_ABST
    Figure CN110407087B_ABST
Patent Text Reader

Abstract

The present invention provides a device for lengthening a girder of a shore container crane, wherein the girder includes a rear section and a front section of the girder, and the lengthening device includes: a lengthening trolley tooling, which is arranged below the rear section and the front section of the girder during lengthening operation, and includes a wheel set, a frame, a construction platform, and a moving track arranged on the construction platform; a first bracket trolley, which is arranged on the moving track, and is used to carry the lengthened section of the girder and guide the lengthened section of the girder to move along a first direction; a second bracket trolley, which is arranged on the moving track, and is used to carry the front section of the girder and guide the front section of the girder to move along a second direction perpendicular to the first direction in a first plane. The present invention also provides a method for lengthening a girder of a shore container crane, which can reduce the use of large equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a crane beam, and in particular to a lengthening device and a lengthening method for a shore container crane beam. Background Art

[0002] With the increase in the size of container transport ships, the outreach of existing quay cranes at many terminals can no longer meet their loading and unloading needs. The commonly used implementation plans for lengthening the front beam include: 1. Using a floating crane to lift the front beam to the ground for lengthening; 2. Pulling the quay crane to the back, using large lifting equipment (truck crane or crawler crane, etc.) to lift the front beam down, lengthen it and then reset it. Both solutions have high requirements for lifting equipment and site, and the construction period and cost are also high. Summary of the invention

[0003] The problem solved by the present invention is how to reduce the use of large equipment. The present invention provides a lengthening device and a lengthening method for a shore container crane beam, which can reduce the use of large equipment.

[0004] In order to solve the above problems, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, the beam comprising a beam rear section and a beam front section, and the lengthening device comprising: an lengthening trolley tooling, which is arranged below the beam rear section and the beam front section during the lengthening operation, and comprises a wheel set, a frame, a construction platform and a movable track arranged on the construction platform; a first bracket trolley, arranged on the movable track, for carrying the beam lengthening section and guiding the beam lengthening section to move along a first direction; a second bracket trolley, arranged on the movable track, for carrying the beam front section and guiding the beam front section to move along a second direction perpendicular to the first direction within a first plane.

[0005] By adopting the above technical solution, the quay crane does not need to be moved, reducing the use of large equipment.

[0006] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, comprising: a process support installed on both sides of a cutting line.

[0007] The above technical solution can prevent the beam bodies at both ends from shrinking or expanding outward after the beam is cut.

[0008] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, wherein the process support includes a first process support and a second process support, wherein both ends of the first process support are connected to two inner side walls of the rear section of the beam, and both ends of the second process support are connected to two inner side walls of the front section of the beam.

[0009] By adopting the above technical solution, the beam is cut into a front section and a rear section along the cutting line, the two ends of the first process support are connected to the two inner walls of the rear section of the beam, and the two ends of the second process support are connected to the two inner walls of the front section of the beam, which can prevent the front section and the rear section of the beam from shrinking or expanding outward.

[0010] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, wherein the lengthened section of the beam is arranged below the second process support.

[0011] By adopting the above technical solution, after the front section of the beam equipped with the second process support is moved into place, the extended section of the beam can be directly moved along the first direction to align with the rear section of the beam, avoiding the need to separately hoist the extended section of the beam from the ground to high altitude, thereby reducing the use of large equipment.

[0012] According to another specific embodiment of the present invention, a device for extending a beam of a shore container crane disclosed in an embodiment of the present invention further includes: a jack, which is arranged below the front section of the beam and the extended section of the beam.

[0013] By adopting the above technical solution, the jacks arranged below the front section of the beam and the extended section of the beam can adjust the height of the front section of the beam and the extended section of the beam.

[0014] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, and the lengthened tooling trolley further includes: a detachable sleeve railing handrail, which is arranged on the sleeves around the frame.

[0015] By adopting the above technical solution, a detachable sleeve railing handrail is provided, which is convenient for disassembly, assembly and transportation, and further ensures the safety of the workers during the operation.

[0016] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, wherein the distance between the first process support and / or the second process support and the cutting line is 800 mm.

[0017] By adopting the above technical solution and selecting the setting position of the first process support and / or the second process support, it is possible to effectively prevent the front section and the rear section of the beam from shrinking or expanding.

[0018] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a lengthening device for a shore container crane beam, wherein the process support is a round tube.

[0019] By adopting the above technical solution, the rigidity and strength of the round tube are relatively high. The round tube can be used as a process support to effectively prevent the front section and the rear section of the beam from shrinking or expanding.

[0020] According to another specific embodiment of the present invention, a lengthening device for a shore container crane beam disclosed in an embodiment of the present invention further includes a stop plate disposed at the head of the lengthening trolley tooling.

[0021] The above technical solution can effectively prevent the second bracket trolley from disengaging when carrying the front section of the beam and guiding the front section of the beam to move to the extreme position along the second direction perpendicular to the first direction in the first plane, thereby causing safety hazards.

[0022] According to another specific embodiment of the present invention, a lengthening device for a shore container crane beam disclosed in an embodiment of the present invention also includes sleepers, which are arranged on the first bracket trolley and the second bracket trolley.

[0023] By adopting the above technical solution, sleepers and jacks are used to adjust the height of the extended section of the beam.

[0024] According to another specific embodiment of the present invention, a lengthening device for a shore container crane beam disclosed in an embodiment of the present invention further includes a pull ear and a steel wire rope arranged in a second direction for moving the front section of the beam.

[0025] By adopting the above technical solution, the front section of the beam is moved along the second direction by means of the hand winch and the pull ears.

[0026] An embodiment of the present invention also discloses a method for lengthening a beam of a shore container crane, comprising: placing a lengthening trolley tooling under the beam; cutting the beam along a cutting line to form a beam rear section and a beam front section; moving the beam front section in a second direction into place and fixing it; moving the beam lengthening section to between the beam rear section and the beam front section and aligning them with each other; connecting the beam lengthening section to the beam rear section and the beam front section.

[0027] The use of the above technical solution can reduce the use of large equipment.

[0028] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a beam of a shore container crane, which, before the step of placing a lengthening trolley tooling under the beam, comprises: assembling a frame of the lengthening trolley tooling on the ground and installing a construction platform.

[0029] By adopting the above technical solution, the frame of the extended trolley tooling is assembled on the ground and a construction platform is installed, thereby reducing the amount of high-altitude operations.

[0030] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a beam of a shore container crane, which comprises, after the steps of assembling a frame of a lengthening trolley tooling on the ground and installing a construction platform, lifting the frame, docking it in the air with a wheel group hoisted on the beam, and completing the assembly of the lengthening trolley tooling, wherein the lengthening trolley tooling comprises a wheel group, a frame, a construction platform and a movable track on the construction platform.

[0031] By adopting the above technical solution, a hand chain hoist is used to adjust the flanges of the upper and lower structures until the bolts are fully assembled, thereby completing the assembly of the extended trolley tooling.

[0032] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which includes: arranging process supports on both sides of the cutting line along a first direction before cutting the beam along a cutting line to form a rear section and a front section of the beam.

[0033] The above technical solution can prevent the beam bodies at both ends from shrinking or expanding outward after the beam is cut.

[0034] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which includes the steps of moving the front section of the beam into place along a second direction and fixing it, including: setting a pulling ear and a steel wire rope in the second direction to move the front section of the beam set on the second bracket trolley.

[0035] By adopting the above technical solution, the front section of the beam is moved along the second direction by means of the hand winch and the pull ears.

[0036] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which includes moving the front section of the beam into place along a second direction and fixing it, including: after the front section of the beam is in place, locking the hand winch and the wheels of the second bracket trolley.

[0037] The adoption of the technical solution can prevent the front section of the beam from sliding and causing safety hazards.

[0038] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which includes the steps of moving the front section of the beam into place along the second direction and fixing it, including: a stop plate is provided at the head of the lengthening trolley tooling to prevent the second bracket trolley from detaching after reaching the limit position.

[0039] The above technical solution can effectively prevent the second bracket trolley from disengaging when carrying the front section of the beam and guiding the front section of the beam to move to the extreme position along the second direction perpendicular to the first direction in the first plane, thereby causing safety hazards.

[0040] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a beam of a shore container crane, wherein the steps of moving the extended section of the beam to between the rear section of the beam and the front section of the beam and aligning them with each other include: moving the extended section of the beam disposed on a first bracket trolley along a first direction to between the rear section of the beam and the front section of the beam; moving the extended section of the beam along a third direction and aligning it with the rear section of the beam along a second direction.

[0041] By adopting the above technical solution, before moving the extended section of the beam, ensure that the extended section of the beam is slightly shorter than the rear section of the beam, and then adjust the height of the extended section of the beam in the third direction by using the jack and sleepers placed on the second bracket trolley. The extended section of the beam is based on the rear section of the beam and is first docked with the rear section of the beam. Because the rear section of the beam is more stable as a whole, the accuracy after docking is higher. Subsequently, it is necessary to fine-tune the front section of the beam. After the extended section of the beam is moved into place along the first direction, the height of the extended section of the beam in the third direction is adjusted by using the jack.

[0042] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which comprises, after the lengthening trolley tooling completes the assembly step, moving the lengthening trolley tooling to below the front section of the beam by moving the bridge crane trolley.

[0043] By adopting the above technical solution, the lengthened trolley tooling is moved to the bottom of the front section of the beam by moving the bridge crane trolley, and then the lengthened trolley tooling is fixed to make it become one with the beam.

[0044] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a beam of a shore container crane, which comprises, after the lengthening trolley tooling completes the assembly steps, hoisting a first bracket trolley, a second bracket trolley, a process support, and an extended section of the beam onto a frame, and fixing them.

[0045] By adopting the above technical solution, the first bracket trolley, the second bracket trolley, the process support and the extended section of the beam are hoisted onto the frame using a truck crane and fixed to prevent the extended trolley tooling from sliding off after moving.

[0046] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which, after the step of moving the lengthening trolley tooling to below the front section of the beam, comprises: releasing the connection between the bridge crane trolley and the lengthening trolley tooling.

[0047] By adopting the above technical solution, the connecting rod between the bridge crane trolley and the extended trolley tooling is removed, the bridge crane trolley runs to the parking space, stops and anchors, and then the trolley traction wire rope is removed.

[0048] According to another specific embodiment of the present invention, an embodiment of the present invention discloses a method for lengthening a shore container crane beam, which includes, before the step of connecting the extended beam section with the rear section and the front section of the beam, controlling the docking flatness of the port and the welding shrinkage of the splicing seam.

[0049] The adoption of the above technical solution can further prevent the beam bodies at both ends and the extended sections of the beam from shrinking or expanding. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 1 is a schematic structural diagram of a girder lengthening device for a shore container crane according to an embodiment of the present invention;

[0051] Figure 2 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 1 ;

[0052] Figure 3 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 2 ;

[0053] Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1 ;

[0054] Figure 5 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 2 ;

[0055] Figure 6 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 3 ;

[0056] Figure 7 is a flow chart of a method for lengthening a girder of a shore container crane according to an embodiment of the present invention;

[0057] Figure 8 yes Figure 1 Schematic diagram along the S1 direction;

[0058] Fig. 9 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 4 .

[0059] The above drawings include the following reference numerals:

[0060] 11 beam rear section; 12 beam front section;

[0061] 2. Extended trolley tooling; 21. Wheel set; 22. Frame; 23. Construction platform; 24. Moving track;

[0062] 31 first bracket trolley; 32 second bracket trolley;

[0063] 41 beam extension section;

[0064] 5 process support; 51 first process support; 52 second process support;

[0065] 6 jack; 7 removable casing railing handrail; L cutting line; 8 stop plate; 9 sleeper; 10 pull ear; 11 hand chain hoist;

[0066] A is the first direction; B is the second direction; C is the third direction. DETAILED DESCRIPTION

[0067] The following specific embodiments illustrate the implementation of the present invention, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Although the description of the present invention will be introduced in conjunction with the preferred embodiment, this does not mean that the features of this invention are limited to this implementation. On the contrary, the purpose of introducing the invention in conjunction with the implementation is to cover other options or modifications that may extend based on the claims of the present invention. In order to provide a deep understanding of the present invention, the following description will include many specific details. The present invention can also be implemented without using these details. In addition, in order to avoid confusion or blurring the focus of the present invention, some specific details will be omitted in the description. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.

[0068] It should be noted that in this specification, similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.

[0069] In the description of this embodiment, it should be noted that the terms "upper", "lower", "inner", "bottom", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the inventive product is usually placed when used. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0070] The terms “first”, “second”, etc. are only used for distinguishing descriptions and should not be understood as indicating or implying relative importance.

[0071] In the description of this embodiment, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this embodiment can be understood according to specific circumstances.

[0072] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0073] In the present invention, the "first plane" refers to the plane where the first direction is perpendicular to the second direction. Figure 1 As shown, in the present invention, the first plane includes a first direction A and a second direction B, wherein the second direction B can be regarded as the axial direction of the beam, and the first direction A is regarded as a direction perpendicular to the axial direction of the beam in the first plane.

[0074] The following is combined with Figure 1 The invention describes a device for extending a girder of a shore container crane according to a specific embodiment of the present invention. Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 2 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 1 . Figure 3 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 2According to the lengthening device of the girder of the shore container crane in a specific embodiment of the present invention, the girder includes a girder rear section 11 and a girder front section 12, and the lengthening device includes: a lengthening trolley tooling 2, which is arranged below the girder rear section 11 and the girder front section 12 during the lengthening operation, and includes a wheel set 21, a frame 22, a construction platform 23, and a moving track 24 arranged on the construction platform 23; a first bracket trolley 31, which is arranged on the moving track 24, and is used to carry the girder lengthening section 41 and guide the girder lengthening section 41 to move along a first direction A; a second bracket trolley 32, which is arranged on the moving track 24, and is used to carry the girder front section 12 and guide the girder front section 12 to move along a second direction B perpendicular to the first direction A in a first plane. Specifically, before the lengthening operation is performed, the lengthening trolley tooling 2 is arranged below the rear section 11 of the beam and the front section 12 of the beam, the first bracket trolley 31 carrying the lengthened section 41 of the beam is arranged on the movable rail 24, and the second bracket trolley 32 is arranged on the movable rail 24, and is used to carry the front section of the beam to move along the second direction B perpendicular to the first direction A in the first plane during the lengthening operation. In other words, the lengthening device for the beam of the shore container crane provided in the embodiment of the present invention is safe and reliable. After it is installed in place, the beam can be lengthened and modified without installing auxiliary equipment and the quay crane does not need to be shifted. The lengthening operation can be performed on the original operating track, thereby reducing the use of large equipment.

[0075] Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1 The technical solution of this embodiment is basically the same as that of the embodiment 1, except that the embodiment further includes a process support 5 installed on both sides of the cutting line L. Specifically, before cutting the beam, the process support 5 is installed on both sides of the cutting line L to prevent the beam bodies at both ends, i.e., the front section 12 and the rear section 11 of the beam, from shrinking or expanding after the beam is cut.

[0076] Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1The technical solution of this embodiment is basically the same as that of the first embodiment, except that the embodiment further includes a process support 5 including a first process support 51 and a second process support 52, the two ends of the first process support 51 are connected to the two inner side walls of the rear section 11 of the beam, and the two ends of the second process support 52 are connected to the two inner side walls of the front section 12 of the beam. Specifically, before cutting the beam, the first process support 51 and the second process support 52 are respectively installed on both sides of the cutting line L, the two ends of the first process support 51 are connected to the inner wall of the beam, and the two ends of the second process support 52 are connected to the inner wall of the beam. After the beam is cut into the front section 12 and the rear section 11 of the beam along the cutting line, the connection position of the first process support 51 can be regarded as the two ends of the first process support 51 are connected to the two inner walls of the rear section 11 of the beam, and the connection position of the second process support 52 can be regarded as the two ends of the second process support 52 are connected to the two inner walls of the front section 12 of the beam, thereby preventing the cutting ports of the front section 12 of the beam and the rear section 11 of the beam from shrinking and expanding.

[0077] Fig. 9 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 4 . The technical solution of this embodiment is basically the same as that of Example 1, and the only difference is that the embodiment further includes that the beam extension section 41 is arranged below the second process support 52. Specifically, before the lengthening operation is performed, the beam extension section 41 is arranged below the second process support 52. During the lengthening operation, after the front section 12 of the beam provided with the second process support 52 is moved into place, the beam extension section 41 can directly move along the first direction A and align with the rear section 11 of the beam. The ingenious structural design not only avoids the need to separately hoist the beam extension section 41 from the ground to a high altitude, further reducing the use of large equipment, but also improves the efficiency of the lengthening operation.

[0078] Figure 1 1 is a schematic diagram of the structure of the lengthening device of the quayside container crane beam according to an embodiment of the present invention. The technical solution of this embodiment is basically the same as that of the embodiment 1, except that the embodiment further includes a jack 6, which is arranged below the front section 12 of the beam and the rear section 11 of the beam. Specifically, the jack 6 arranged below the front section 12 of the beam and the rear section 11 of the beam can adjust the position height of the front section 12 of the beam and the rear section 11 of the beam in the third direction C.

[0079] Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 3 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 2The technical solution of this embodiment is basically the same as that of the first embodiment, except that the embodiment further includes the extension trolley tooling and also includes: a detachable sleeve railing handrail 7, which is arranged on the sleeves around the frame 22. Specifically, the detachable sleeve railing handrail 7 is provided to facilitate disassembly, assembly and transportation, and further ensure the safety of the staff during the operation.

[0080] Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1 The technical solution of this embodiment is basically the same as that of the first embodiment, except that the embodiment further includes that the distance between the first process support or / and the second process support and the cutting line is 800 mm. Specifically, the distance between the first process support 51 or / and the second process support 52 and the cutting line L is preferably 800 mm, which can effectively prevent the cutting ports of the front section 12 of the beam and the rear section 11 of the beam from shrinking and expanding.

[0081] Figure 1 It is a schematic diagram of the structure of the lengthening device of the girder of the shore container crane according to the embodiment of the present invention. The technical solution of this embodiment is basically the same as that of the embodiment 1, except that the embodiment further includes that the process support is a round tube, which has high rigidity and strength. The round tube as a process support can effectively prevent the front section and the rear section of the girder from shrinking or expanding. The description of the process support in the embodiment of the present invention is not limited to this.

[0082] Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1 The technical solution of this embodiment is basically the same as that of the first embodiment, the only difference being that the embodiment further includes a stop plate 8, which is disposed at the head of the lengthened trolley tooling 2, and can effectively prevent the second bracket trolley 32 from disengaging when carrying the front section 12 of the beam and guiding the front section 12 of the beam to move to the extreme position along the second direction B perpendicular to the first direction A in the first plane, thereby causing a safety hazard.

[0083] Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1 The technical solution of this embodiment is basically the same as that of the first embodiment, except that the embodiment further includes a sleeper 9, which is arranged on the first bracket trolley 31 and the second bracket trolley 32. Figure 4As shown, the sleeper 9 can be arranged between the jack 6 and the second bracket trolley 32, or directly between the front section 12 of the beam and the second bracket trolley 32, which can effectively adjust the height of the extended section 41 of the beam in the third direction C. The arrangement of the sleeper 9 on the first bracket trolley 31 can be the same as that on the second bracket trolley 32, or can be arranged according to Figure 6 The sleepers 9 are arranged on the first bracket trolley 31, but the present invention is not limited thereto.

[0084] Figure 5 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 2 . Figure 8 yes Figure 1 The technical solution of this embodiment is basically the same as that of the first embodiment, except that the embodiment further includes a pull ear 10 and a steel wire rope arranged in the second direction B, which are used to move the front section 12 of the beam, and the front section 12 of the beam is moved along the second direction B (reference Figure 5 Move in the second direction B).

[0085] The following is combined with Figure 7 The flowchart of the method for lengthening the girder of a shore container crane according to an embodiment of the present invention is described in detail. Figure 7 The method for lengthening the girder of a shore container crane according to a specific embodiment of the present invention comprises:

[0086] S1: Install the extended trolley tooling under the beam;

[0087] S2: cutting the beam along the cutting line to form a rear section and a front section of the beam;

[0088] S3: moving the front section of the beam in the second direction to a position and fixing it;

[0089] S4: moving the extended section of the beam to between the rear section of the beam and the front section of the beam and aligning them with each other;

[0090] S5: Connect the extended section of the beam with the rear section of the beam and the front section of the beam.

[0091] Specifically, Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1. Before the lengthening operation is performed, the lengthening trolley tooling 2 is arranged under the beam; when the lengthening operation is performed, the beam is cut along the cutting line L to form the beam rear section 11 and the beam front section 12; according to the requirements of the lengthening operation, the beam front section 12 is moved in the second direction B to be in place and fixed, and the distance that the beam front section 12 moves along the second direction B is slightly greater than the length of the beam lengthening section 41, so as to facilitate the adjustment of the position of the beam lengthening section 41 and the effective lengthening operation; the beam lengthening section 41 is moved between the beam rear section 11 and the beam front section 12 and aligned with each other; the beam lengthening section 41 is connected to the beam rear section 11 and the beam front section 12, and the connection can be welding. The lengthening method of the shore container crane beam provided in the embodiment of the present invention is safe and reliable, and there is no need to install auxiliary equipment, and the quay crane does not need to be shifted. The lengthening operation can be performed on the original operating track, which reduces the use of large equipment.

[0092] Figure 2 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 1 . Figure 3 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 2 The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes the step of assembling the frame 22 of the extended trolley tooling 2 on the ground and installing the construction platform 23 before placing the extended trolley tooling 2 under the beam. Specifically, assembling the frame 22 of the extended trolley tooling 2 on the ground and installing the construction platform 23 reduces the amount of high-altitude work and is safer.

[0093] Figure 2 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 1 . Figure 3 The structure of the extension trolley tooling of the extension device of the shore container crane beam of the embodiment of the present invention is shown in FIG. Figure 2The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes the steps of assembling the frame 22 of the extended trolley tooling 2 on the ground and installing the construction platform 23, and then includes: lifting the frame 22, docking it in the air with the wheel set 21 hoisted on the beam, and completing the assembly of the extended trolley tooling 2, wherein the extended trolley tooling 2 includes the wheel set 21, the frame 22, the construction platform 23, and the moving track 24 on the construction platform 23. Specifically, firstly, the wheel set 21 (which can be 3 sets) is hoisted to the beam above the moving track 24 by using a car crane, and then the frame 22 is hoisted by a winch to dock it in the air with the wheel set 21 on the beam, and the flanges on the frame 22 and the wheel set 21 are adjusted by a hand winch until the bolts are fully assembled, and the assembly of the extended trolley tooling 2 is completed. The assembly of the entire extended trolley tooling has less high-altitude work, higher safety, and better stability of the extended trolley tooling.

[0094] Figure 1 It is a schematic structural diagram of a lengthening device for a shore container crane beam according to an embodiment of the present invention. Figure 4 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 1 The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes the step of arranging the process support 5 along the first direction A on both sides of the cutting line L before cutting the beam along the cutting line L to form the beam rear section 11 and the beam front section 12. This can prevent the beam bodies at both ends, i.e., the beam front section 12 and the beam rear section 11, from shrinking or expanding after the beam is cut.

[0095] The technical solution of this embodiment is basically the same as that of the second embodiment, and the only difference is that the embodiment further includes a step of moving the front section 12 of the beam in the second direction B and fixing it, including: setting a pull ear and a wire rope in the second direction B, which are used to move the front section 12 of the beam arranged on the second bracket trolley 32. Specifically, the pull ear and the wire rope arranged in the second direction B are used to move the front section 12 of the beam, and the front section 12 of the beam is moved along the second direction B by the hand winch and the pull ear.

[0096] The technical solution of this embodiment is basically the same as that of Example 2, with the only difference being that the embodiment further includes the steps of moving the front section 12 of the beam into place along the second direction B and fixing it, including: after the front section 12 of the beam is in place, locking the hand winch and the wheels of the second bracket trolley 32 to prevent the front section 12 of the beam from sliding and causing safety hazards.

[0097] Figure 5 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 2The technical solution of this embodiment is basically the same as that of the second embodiment, the only difference being that the embodiment further includes a step of moving the front section 12 of the beam into place along the second direction B and fixing it, including: a stop plate 8 is provided at the head of the extended trolley tooling 2 to prevent the second bracket trolley 32 from detaching after reaching the limit position.

[0098] Figure 6 Schematic diagram of the lengthening operation of the lengthening device of the shore container crane beam according to the embodiment of the present invention Figure 3 The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes the step of moving the beam extension section 41 between the beam rear section 11 and the beam front section 12 and aligning them with each other, including: moving the beam extension section 41 disposed on the first bracket trolley 31 along the first direction A to between the beam rear section 11 and the beam front section 12; moving the beam extension section 41 along the third direction C and aligning them with the beam rear section 11 along the second direction B. Specifically, before moving the beam extension section 41, ensure that the beam extension section 41 is slightly shorter than the beam rear section, and then adjust the height of the beam extension section 41 in the third direction C by using the jack 6 and sleepers placed on the first bracket trolley 31. The beam extension section 41 is based on the beam rear section 11 and is first docked with the beam rear section 11. Because the beam rear section 11 is more stable as a whole, the accuracy after docking is higher. Subsequently, it is necessary to fine-tune the beam front section 12. After the beam extension section 41 is moved into place along the first direction, the height of the beam extension section 41 in the third direction C is adjusted by using the jack 6.

[0099] The technical solution of this embodiment is basically the same as that of Example 2, with the only difference being that the embodiment further includes, after the assembly steps of the lengthened trolley tooling 2 are completed, the following steps include: moving the lengthened trolley tooling 2 to the bottom of the front section 12 of the beam by moving the bridge crane trolley, and then fixing the lengthened trolley tooling 2 to make it one with the beam.

[0100] The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes the following steps after the elongated trolley tooling 2 completes the assembly step: hoisting the first bracket trolley 31, the second bracket trolley 32, the process support 5, and the extended beam section 41 onto the vehicle frame 22 and fixing them. Specifically, the first bracket trolley 31, the second bracket trolley 32, the process support 5, and the extended beam section 41 are hoisted onto the vehicle frame 22 using a truck crane and fixed to prevent the elongated trolley tooling from sliding off after being moved.

[0101] The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes, after the step of moving the extension trolley fixture 2 to below the front section 12 of the beam, the step of: releasing the connection between the bridge crane trolley and the extension trolley fixture 2. Specifically, the connecting rod between the bridge crane trolley and the extension trolley fixture is released, the bridge crane trolley moves to the parking position, stops and anchors, and then the trolley traction wire rope is removed.

[0102] The technical solution of this embodiment is basically the same as that of the second embodiment, except that the embodiment further includes the step of controlling the butt joint flatness and the shrinkage of the joint seam welding of the port before connecting the beam extension section 41 with the beam rear section 11 and the beam front section 12. Specifically, before connecting the beam extension section 41 with the beam rear section 11 and the beam front section 12, the connection may be welding, and a card code is used to fix the port splicing position to control the butt joint flatness and the shrinkage of the joint weld. After the staff confirms that the docking size is correct, spot welding is carried out to complete the docking of the extended section of the beam and the rear section of the beam; then the docking of the front section of the beam and the extended section of the beam is completed according to the above steps. After all the spot welding work is completed, welding is started; after welding is completed, the weld quality is checked, as well as subsequent work such as grinding and painting; the tooling parts are removed, and the connection of the wire rope and accessories is restored; the functions required for the lengthening operation are restored or extended, mainly referring to the displacement of the deceleration limit and parking limit on the beam, and the lengthening of the anti-collision system.

[0103] The present invention may include combinations of various specific embodiments described below.

[0104] According to Example 1 of the present invention, a lengthening device for a shore container crane beam is provided, the beam includes a beam rear section and a beam front section, and the beam lengthening device includes: an lengthening trolley tooling, which is arranged below the beam rear section and the beam front section during the lengthening operation, and includes a wheel set, a frame, a construction platform and a movable track arranged on the construction platform; a first bracket trolley, arranged on the movable track, used for carrying the beam lengthening section and guiding the beam lengthening section to move along a first direction; a second bracket trolley, arranged on the movable track, used for carrying the beam front section and guiding the beam front section to move along a second direction perpendicular to the first direction within a first plane.

[0105] According to Example 2 of the present invention, a device for extending a beam of a shore container crane is provided, comprising: a process support installed on both sides of a cutting line.

[0106] According to Example 3 of the present invention, a lengthening device for a shore container crane beam is provided, and the process support includes a first process support and a second process support. The two ends of the first process support are connected to the two inner side walls of the rear section of the beam, and the two ends of the second process support are connected to the two inner side walls of the front section of the beam.

[0107] According to Example 4 of the present invention, a device for extending a beam of a shore container crane is provided, and the extended section of the beam is arranged below the second process support.

[0108] According to Example 5 of the present invention, a device for extending the beam of a shore container crane is provided, which also includes: a jack, which is arranged below the front section of the beam and the extended section of the beam.

[0109] According to Example 6 of the present invention, a device for lengthening a shore container crane beam is provided, and the lengthened tooling trolley also includes: a detachable sleeve railing handrail, which is arranged on the sleeves around the frame.

[0110] According to a lengthening device for a shore container crane beam provided in Example 7 of the present invention, the distance between the first process support and / or the second process support and the cutting line is 800 mm.

[0111] According to Example 8 of the present invention, a lengthening device for a shore container crane beam is provided, and the process support is a round tube.

[0112] According to Example 9 of the present invention, a lengthening device for a shore container crane beam is provided, which also includes a stop plate, which is arranged at the head of the lengthening trolley tooling.

[0113] According to Example 10 of the present invention, a lengthening device for a shore container crane beam is provided, which also includes sleepers, which are arranged on the first bracket trolley and the second bracket trolley.

[0114] According to Example 11 of the present invention, a lengthening device for a shore container crane beam is provided, which also includes a pulling ear and a steel wire rope arranged in the second direction for moving the front section of the beam.

[0115] According to Example 12 of the present invention, a method for lengthening a shore container crane beam is provided, comprising: placing a lengthening trolley tooling under the beam; cutting the beam along a cutting line to form a beam rear section and a beam front section; moving the beam front section in a second direction into place and fixing it; moving the beam extension section to between the beam rear section and the beam front section and aligning them with each other; connecting the beam extension section to the beam rear section and the beam front section.

[0116] According to Example 13 of the present invention, a method for lengthening a shore container crane beam is provided, which includes: assembling the frame of the lengthening trolley tooling on the ground and installing a construction platform before placing the lengthening trolley tooling under the beam.

[0117] According to Example 14 of the present invention, a method for lengthening a shore container crane beam is provided, which includes, after assembling a frame of a lengthening trolley tooling on the ground and installing a construction platform, lifting the frame and docking it in the air with a wheel set hoisted on the beam to complete the assembly of the lengthening trolley tooling, wherein the lengthening trolley tooling includes a wheel set, a frame, a construction platform and a movable track on the construction platform.

[0118] According to Example 15 of the present invention, a method for lengthening a shore container crane beam is provided, which includes: arranging process supports on both sides of the cutting line along a first direction before cutting the beam along a cutting line to form a rear section and a front section of the beam.

[0119] According to Example 16 of the present invention, a method for lengthening a shore container crane beam is provided, which includes the steps of moving the front section of the beam into place along the second direction and fixing it, including: setting a pulling ear and a steel wire rope in the second direction to move the front section of the beam set on the second bracket trolley.

[0120] According to Example 17 of the present invention, a method for lengthening a shore container crane beam is provided, which includes moving the front section of the beam in a second direction into place and fixing the front section, including: after the front section of the beam is in place, locking the hand winch and the wheels of the second bracket trolley.

[0121] According to Example 18 of the present invention, a method for lengthening a shore container crane beam is provided, which includes the steps of moving the front section of the beam into place along the second direction and fixing it, including: a stop plate is provided at the head of the lengthening trolley tooling to prevent the second bracket trolley from detaching after reaching the limit position.

[0122] According to Example 19 of the present invention, a method for lengthening a shore container crane beam is provided, and the steps of moving the extended section of the beam to between the rear section of the beam and the front section of the beam and aligning them with each other include: moving the extended section of the beam arranged on the first bracket trolley along a first direction to between the rear section of the beam and the front section of the beam; moving the extended section of the beam along a third direction and aligning it with the rear section of the beam along a second direction.

[0123] According to Example 20 of the present invention, a method for lengthening a shore container crane beam is provided, which includes, after the lengthening trolley tooling completes the assembly step: moving the lengthening trolley tooling to the bottom of the front section of the beam by moving the bridge crane trolley.

[0124] According to Example 21 of the present invention, a method for lengthening a shore container crane beam is provided, which includes: hoisting a first bracket trolley, a second bracket trolley, a process support, and a beam lengthening section onto a frame and fixing them after the lengthening trolley tooling completes the assembly steps.

[0125] According to Example 22 of the present invention, a method for lengthening a shore container crane beam is provided, which includes, after the step of moving the lengthening trolley tooling to the bottom of the front section of the beam, releasing the connection between the bridge crane trolley and the lengthening trolley tooling.

[0126] According to Example 23 of the present invention, a method for lengthening a shore container crane beam is provided, which includes: controlling the docking flatness of the port and the welding shrinkage of the joint seam before connecting the extended beam section with the rear beam section and the front beam section.

[0127] Although the present invention has been illustrated and described with reference to certain preferred embodiments of the present invention, it should be understood by those skilled in the art that the above is a further detailed description of the present invention in conjunction with specific embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. Those skilled in the art may make various changes in form and details, including making several simple deductions or substitutions, without departing from the spirit and scope of the present invention.

Claims

1. A device for extending a girder of a shore container crane, wherein the girder comprises a rear girder section and a front girder section, characterized in that: The lengthening device comprises: The lengthening trolley tooling is used to be arranged below the rear section of the beam and the front section of the beam during the lengthening operation, and includes a wheel set, a frame, a construction platform and a moving track arranged on the construction platform; A first bracket trolley is disposed on the moving track and is used to carry the extended section of the beam and guide the extended section of the beam to move along a first direction; A second bracket trolley is arranged on the moving track and is used to carry the front section of the beam and guide the front section of the beam to move along a second direction perpendicular to the first direction in the first plane; A jack is provided below the front section of the beam and the extended section of the beam, and the jack provided below the front section of the beam can adjust the height of the front section of the beam in the third direction; Among them, the first bracket trolley is used to move the beam extension section arranged on the first bracket trolley to between the beam rear section and the beam front section along the first direction, and the beam extension section is moved along the third direction by the jack arranged below the beam extension section, and the beam extension section and the beam rear section are aligned with each other along the second direction; the beam extension section takes the beam rear section as a reference, first docks with the beam rear section, and then docks with the beam front section, and the third direction is perpendicular to the first plane.

2. The device for extending the girder of a shore container crane according to claim 1, characterized in that: include: The process support is installed on both sides of the cutting line of the beam.

3. The device for extending the girder of a shore container crane according to claim 2, characterized in that: The process support includes a first process support and a second process support. The two ends of the first process support are connected to the two inner side walls of the rear section of the beam, and the two ends of the second process support are connected to the two inner side walls of the front section of the beam.

4. The device for extending the girder of a shore container crane according to claim 3, characterized in that: The extended section of the beam is arranged below the second process support.

5. The device for extending the girder of a shore container crane according to claim 1, characterized in that: The extended trolley tooling also includes: a detachable sleeve railing handrail, which is arranged on the sleeves around the frame.

6. The device for extending the girder of a shore container crane according to claim 3, characterized in that: The distance between the first process support and / or the second process support and the cutting line is 800 mm.

7. The device for extending the girder of a shore container crane according to claim 3, characterized in that: The process support is a round tube.

8. The device for extending the girder of a shore container crane according to claim 1, characterized in that: It also includes a stop plate, which is arranged on the head of the lengthened trolley tooling.

9. The device for extending the girder of a shore container crane according to claim 1, characterized in that: It also includes sleepers, which are arranged on the first bracket trolley and the second bracket trolley; The sleeper arranged on the second bracket trolley is arranged between the jack below the front section of the beam and the second bracket trolley; the sleeper arranged on the first bracket trolley is arranged between the jack below the extended section of the beam and the first bracket trolley.

10. The device for extending the girder of a shore container crane according to claim 1, characterized in that: It also includes a pulling ear and a steel wire rope arranged in the second direction, which are used to move the front section of the beam.

11. A method for lengthening a girder of a shore container crane comprising the lengthening device of claim 1, characterized in that: include: Install the extended trolley tooling under the beam; Cut the beam along the cutting line to form a beam rear section and a beam front section; Move the front section of the beam along the second direction to a position and fix it; Moving the extended section of the beam disposed on the first bracket trolley along the first direction to between the rear section of the beam and the front section of the beam, and moving the extended section of the beam along the third direction, and aligning the extended section of the beam with the rear section of the beam along the second direction, the extended section of the beam first docking with the rear section of the beam with the rear section of the beam as a reference; Adjusting the height of the front section of the beam in the third direction; The extended section of the beam is connected to the front section of the beam.

12. The lengthening method according to claim 11, characterized in that: Before the step of placing the lengthened trolley tooling under the beam, the steps include: assembling the frame of the lengthened trolley tooling on the ground and installing a construction platform.

13. The lengthening method according to claim 12, characterized in that: After assembling the frame of the extended trolley tooling on the ground and installing the construction platform, the following steps include: lifting the frame and docking it in the air with the wheel set hoisted on the beam to complete the assembly of the extended trolley tooling, wherein the extended trolley tooling includes the wheel set, the frame, the construction platform and the movable track on the construction platform.

14. The lengthening method according to claim 13, characterized in that: Before the step of cutting the beam along the cutting line to form the beam rear section and the beam front section, the method includes: arranging process supports on both sides of the cutting line along a first direction.

15. The lengthening method according to claim 14, characterized in that: The steps of moving the front section of the beam into position and fixing it along the second direction include: setting a pull ear and a wire rope in the second direction to move the front section of the beam set on the second bracket trolley.

16. The lengthening method according to claim 15, characterized in that: The steps of moving the front section of the beam into position along the second direction and fixing the beam include: after the front section of the beam is in position, locking the hand chain hoist and the wheels of the second bracket trolley.

17. The lengthening method according to claim 16, characterized in that: The steps of moving the front section of the beam into place along the second direction and fixing it include: providing a stop plate at the head of the extension trolley tooling to prevent the second bracket trolley from detaching after reaching the limit position.

18. The lengthening method according to claim 17, characterized in that: After the lengthened trolley tooling completes the assembly steps, the process includes: moving the lengthened trolley tooling to below the front section of the beam by moving the bridge crane trolley.

19. The lengthening method according to claim 18, characterized in that: After the lengthened trolley tooling completes the assembly steps, the following steps include: hoisting the first bracket trolley, the second bracket trolley, the process support, and the lengthened section of the beam onto the frame and fixing them.

20. The lengthening method according to claim 18, characterized in that: After the step of moving the lengthened trolley tooling to below the front section of the beam, the method includes: releasing the connection between the bridge crane trolley and the lengthened trolley tooling.

21. The lengthening method according to claim 11, characterized in that: Before the step of connecting the extended section of the beam with the rear section of the beam and the front section of the beam, the step includes: controlling the butt joint flatness of the ports and the welding shrinkage of the joint seams.