Blast furnace radar probe system and operation method thereof

By designing an automatic execution and purge system in the blast furnace, combined with nitrogen pressure monitoring, the problems of dust intrusion and excessive temperature are solved, and a high-precision, fault-free radar scale detection system is realized, improving production efficiency and equipment reliability.

CN110408734BActive Publication Date: 2024-11-19LEIHENG CONTROL EQUIP(BEIJING) CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910725857.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-07
Publication Date
2024-11-19
Estimated Expiration
2039-08-07

AI Technical Summary

Technical Problem

Dust intrusion in the blast furnace causes damage to the conductor antenna, low measurement accuracy, traditional radar detectors are prone to dust accumulation, cannot be controlled in a fault state, and are inconvenient to maintain, which affects production.

Method used

A blast furnace radar ruler system was designed, including an automatic execution system, a wave guide system, a transmitting source, a guide antenna, a purge system and a field display control system. The four-way purge system and nitrogen pressure monitoring are used to ensure the cleanliness of the guide antenna. And the automatic protection system to prevent overheating and low pressure through temperature and gas pressure monitoring to achieve fault-free operation.

Benefits of technology

It significantly improves measurement accuracy, reduces maintenance requirements, ensures high reliability and efficient operation of the radar ruler system, avoids faults caused by dust intrusion and excessive temperature, and extends the service life of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110408734B_ABST
    Figure CN110408734B_ABST
Patent Text Reader

Abstract

A blast furnace radar probe system and its operation method, comprising an automatic execution system arranged on the top of the furnace body, a waveguide system arranged above the automatic execution system, a transmitting source arranged on the top of the waveguide system, and a broadcast guide antenna arranged at the lower end of the transmitting source, wherein the broadcast guide antenna is arranged inside the waveguide system, and a protective cover is arranged outside the transmitting source and the waveguide system, and the invention is characterized in that it also includes a purge system and a field display control system. The invention has the advantages that, with its perfect purge system, it can provide nitrogen pressure large enough to suppress the top pressure in the furnace, and the nitrogen does not produce a backflow phenomenon, so that the measurement error caused by different blast furnace top pressures can be reduced to achieve high-precision measurement, and through its field display control system, the blast furnace radar probe system can be controlled in a fault state.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of blast furnace production auxiliary devices, and in particular to a blast furnace radar probe system and an operation method thereof. Background Art

[0002] The radar probe is a special device used to measure the material level in the blast furnace during ironmaking production. It has super dust penetration ability when in use, no data delay, and the measurement accuracy in the furnace can reach 10cm. The radar probe is based on the method of using radar microwave measurement, and through the improvement of purging, cooling, waveguide and other technologies, it can accurately derive the real-time position data of the material surface.

[0003] However, blast furnaces are always in a high-pressure, high-dust state. How to protect the antenna from dust in this environment is another problem that must be solved. The designed top pressure varies according to the size of the blast furnace, and there will be errors in actual use. Therefore, in this case, the radar must have a sufficiently large nitrogen pressure to suppress the top pressure in the furnace, and the nitrogen must not produce a backflow phenomenon to ensure the measurement accuracy. And when in use, the temperature of the top of the blast furnace that the radar probe contacts is generally between 200℃-800℃. Due to the instability of temperature, the blast furnace may occasionally experience material jumping, collapse, and splashing during operation, which may cause the material to be stuck in the antenna port, or affect the radar operation due to other reasons. This requires stopping production for repairs and maintenance, which brings great inconvenience to production. Moreover, after the traditional radar probe is removed from the blast furnace, it is seriously accumulated with dust, and microwaves can no longer be transmitted and received. After the new product is installed, it cannot be used for a short time. Therefore, in the existing technology, the commonly used radar probe has problems such as being uncontrollable in a fault state, easy to accumulate dust, low measurement accuracy, data drift, and a high number of spare parts. Summary of the invention

[0004] The purpose of the present invention is to provide a blast furnace radar probe system and an operation method thereof, which can eliminate the influence of dust in the blast furnace and greatly improve the measurement accuracy of the radar probe system. At the same time, based on its good trouble-free use characteristics and zero maintenance and the advantages of being adjustable under fault conditions, it becomes an ideal measurement tool to replace the traditional radar probe.

[0005] To achieve the above-mentioned purpose, the blast furnace radar probe system and its operation method provided by the present invention include an automatic execution system arranged on the top of the furnace body, a waveguide system arranged above the automatic execution system, a transmitting source arranged on the top of the waveguide system, and a broadcast guide antenna arranged at the lower end of the transmitting source, wherein the broadcast guide antenna is arranged inside the waveguide system, and the transmitting source and the outside of the waveguide system are provided with protective covers, and are characterized in that: a purge system and an on-site display control system are also included, wherein:

[0006] The purge system is a four-way purge system, including a first branch arranged at 45° and 135° on both sides of the root of the emission source, a second branch arranged at 0° and 180° on both sides of the front end of the emission source, a third branch arranged at 0° and 180° in the horizontal direction of the side of the protective cover, a fourth branch arranged at 90° and 270° in the horizontal direction of the side of the protective cover, and a pressure detection instrument.

[0007] The field display control system includes a display system and a control system. The display system includes a pressure output transmitter and a temperature output transmitter. The functions of the pressure output transmitter and the temperature output transmitter are to convert and amplify the pressure signal on the pressure detection instrument and the temperature signal on the radar into electrical signals, transmit them to the control system, and then restore them into pressure signals and temperature signals for output. The control system includes an action switch of the electric ball valve, a gas pressure regulating controller and an alarm signal controller. The action switch of the electric ball valve can manually control the opening and closing of the electric ball valve, the gas pressure regulating controller can manually adjust the gas pressure of the purge system, and the alarm signal controller can manually open and close the sound and light alarm device. The display system and the control system are organically connected together through a field operation display cabinet, and the field operation display cabinet is also connected to the sound and light alarm device.

[0008] The waveguide system is a waveguide tube, and is installed above the automatic execution system. The automatic execution system includes an automatic execution mechanism and an automatic actuator, and the automatic execution system is installed between the protective cover and the furnace body. The automatic execution mechanism is an electric ball valve, and the automatic actuator is an automatic switch of the electric ball valve.

[0009] The transmitting source includes a transmitting system and a receiving system.

[0010] The director antenna includes a transmitting antenna and a receiving antenna. A temperature measuring element is provided at the director antenna. The temperature measuring element is a thermistor. The director antenna is horn-shaped. The distance between one end of the horn-shaped director antenna and the protective cover is 5 mm. The director antenna is a stainless steel antenna with a diameter of 75 mm, and the emission angle of the antenna is ±4°.

[0011] The purge pipeline used in the first branch of the purge system is a 1 / 8NPT pipe, the purge pipeline used in the second branch of the purge system is a 1 / 2NPT pipe, and the purge pipelines used in the third and fourth branches of the purge system are 3 / 4NPT pipes.

[0012] The operating method of the blast furnace radar probe system is characterized in that:

[0013] Step 1: Start the blast furnace radar probe system, the blast furnace radar probe system starts to operate, and the temperature monitoring system and the gas pressure monitoring system are started at the same time;

[0014] Step 2: a signal source in the blast furnace radar probe system transmits a signal;

[0015] Step 3: The pilot antenna in the blast furnace radar probe system transmits a 26 GHz electromagnetic wave signal in the form of a beam;

[0016] Step 4: the waveguide system in the blast furnace radar probe system adjusts the direction of the beam emitted by the broadcast guide antenna;

[0017] Step 5: The beam reaches the measured medium;

[0018] Step 6: The measured medium reflects the echo;

[0019] Step 7: The guide antenna in the blast furnace radar probe system receives the echo;

[0020] Step 8: The on-site display control system in the blast furnace radar probe system analyzes and calculates the interval time from the emission to the reception of the radar pulse signal, and calculates it according to the formula L=VT / 2, where L is the measured height, V is the speed of the radar wave, and T is the interval time from the emission to the reception of the radar wave. The distance from the emission source to the surface of the measured medium can be calculated, and the corresponding signal is output;

[0021] Step nine, obtaining the height of the measured medium.

[0022] In step one, in the temperature monitoring system, when the monitored temperature exceeds the maximum temperature of 800 degrees, the temperature measuring element transmits a signal, and the automatic actuator automatically operates when receiving the signal transmitted by the temperature measuring element, closing the automatic actuator to protect the blast furnace radar probe system. At the same time, the sound and light alarm device receives the signal transmitted by the temperature measuring element and emits a sound and light alarm.

[0023] In step one, in the gas pressure monitoring system, when the monitored gas pressure is lower than the minimum pressure of 0.3Mpa, or the gas flow rate is less than 30 cubic meters / hour, the gas pressure sensor transmits a signal, and the automatic actuator automatically operates when receiving the signal transmitted by the gas pressure sensor, closing the automatic actuator to protect the blast furnace radar probe system. At the same time, the sound and light alarm device receives the signal transmitted by the gas pressure sensor and emits a sound and light alarm. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 It is a schematic diagram of radar structure;

[0025] Figure 2 It is a schematic diagram of the first and second branches of the purge system;

[0026] Figure 3 It is a top view of the fourth branch of the purge system;

[0027] Figure 4 Radar probe system workflow diagram

[0028] In the figure:

[0029] 1. Automatic execution system; 2. Waveguide system; 3. Transmitter; 4. Waveguide antenna; 5. Protective cover; 6. First branch of purge system; 7. Second branch of purge system; 8. Third branch of purge system; 9. Fourth branch of purge system; 10. Automatic execution mechanism; 11. Automatic actuator. DETAILED DESCRIPTION

[0030] The present invention is further described in detail below in conjunction with the accompanying drawings.

[0031] The specific implementation methods of the present invention are as follows:

[0032] The working process of this example: The blast furnace radar probe system and its operation method include an automatic execution system arranged on the top of the furnace body and a waveguide system arranged above the automatic execution system, a transmitting source arranged on the top of the waveguide system, and a broadcast antenna arranged at the lower end of the transmitting source, wherein the broadcast antenna is arranged inside the waveguide system, and a protective cover is arranged outside the transmitting source and the waveguide system, and the transmitting source is connected to the on-site display control system, characterized in that: it also includes a purge system, wherein the purge system is a four-way purge system, including a pressure detection instrument, a first branch arranged at 45° and 135° on both sides of the root of the transmitting source, a second branch arranged at 0° and 180° on both sides of the front end of the transmitting source, a third branch arranged at 0° and 180° in the horizontal direction of the side of the protective cover, and a fourth branch arranged at 90° and 270° in the horizontal direction of the side of the protective cover. The structure of the present invention is as follows: Figure 1 shown.

[0033] The waveguide system is a waveguide tube, and it is installed above the automatic execution system. The automatic execution system includes an automatic execution mechanism and an automatic actuator, and the automatic execution system is installed on the blast furnace body. The automatic execution mechanism is an electric ball valve, and the automatic actuator is an automatic switch of the electric ball valve. When the automatic switch receives a low pressure signal from a pressure detection instrument or a high temperature signal from a temperature measuring element, the automatic switch starts and automatically closes the electric ball valve.

[0034] The field display control system includes a display system and a control system. The display system includes a pressure output transmitter and a temperature output transmitter. The functions of the pressure output transmitter and the temperature output transmitter are to convert and amplify the pressure signal on the pressure detection instrument and the temperature signal on the radar into electrical signals, transmit them to the control system, and then restore them into pressure signals and temperature signals for output. The control system includes an action switch of the electric ball valve, a gas pressure regulating controller and an alarm signal controller. The action switch of the electric ball valve can manually control the opening and closing of the electric ball valve, the gas pressure regulating controller can manually adjust the gas pressure of the purge system, and the alarm signal controller can manually open and close the sound and light alarm device. The display system and the control system are organically connected together through a field operation display cabinet, and the field operation display cabinet is also connected to the sound and light alarm device.

[0035] The items listed in Table 1 below are technical indicators of the present invention:

[0036]

[0037]

[0038] When the blast furnace radar probe system is started, the transmitting source transmits a signal, and the temperature monitoring system and the gas pressure monitoring system run simultaneously. The transmitting source includes a transmitting system and a receiving system. The stainless steel broadcast antenna with a diameter of 75 mm transmits the signal emitted by the transmitting source in the form of a beam of 26GHz electromagnetic wave signals through a transmission angle of ±4°. The waveguide adjusts the emitted beam so that it can smoothly reach the measured medium. After reaching the measured medium, the reflected echo is received by the broadcast antenna, and the received beam is converted into a signal and fed back to the transmitting source. The electronic components of the on-site display control system analyze and calculate the interval time from the transmission to the reception of the radar pulse signal, and calculate according to the formula L=VT / 2, where L is the measured height, V is the speed of the radar wave, and T is the interval time from the transmission to the reception of the radar wave, calculates the distance from the transmitting source to the surface of the measured medium, and outputs the corresponding signal.

[0039] In order to ensure that the radar probe system can work normally, the purge system is divided into four routes to provide nitrogen to the radar probe system at the same time. The first branch and the second branch of the purge system use 1 / 8NPT pipe and 1 / 2NPT pipe as purge pipes respectively. When the nitrogen flow rate and pressure are constant, the smaller the pipe diameter, the greater the pressure. Therefore, four different paths and two airflows with different pressures will be formed inside the antenna. In addition, the emission source is conical and the antenna is trumpet-shaped, so a vortex airflow is formed to spray outward, such as Figure 2As shown. This airflow can ensure that the transmission source and the inside of the antenna are free of dust. The radar is installed in a protective cover, and the gap between the protective cover and the broadcast antenna is 5mm. Because the nitrogen pressure has been reduced at the open end of the radar antenna, when it meets the top pressure in the furnace, an airflow is generated, which brings the dust to the edge of the antenna. The nitrogen pipelines of the third and fourth branches of the purge system use 3 / 4NPT pipes to increase the gas flow rate, so that a gas wall will be formed around the waveguide to keep the waveguide clean. The location of the fourth branch of the purge system is shown as follows: Figure 3 Under the action of the purge system, the cleanliness of the radar probe system can be improved, so that the measurement accuracy of the radar probe system is greatly improved.

[0040] In addition, nitrogen is used in many links during the operation of the blast furnace. When the gas pressure is lower than 0.3Mpa or the gas flow rate is not higher than 30 cubic meters per hour, the gas pressure monitoring system sends a signal, and the sound and light alarm device sends a sound and light alarm according to the signal sent back. The automatic switch on the electric ball valve automatically operates according to the signal sent by the gas pressure monitoring system to close the electric ball valve to protect the radar from damage. When the sound and light alarm is issued, the operator can turn off the sound and light alarm through the sound and light alarm controller and operate the gas pressure regulating controller to adjust the gas pressure in the radar system according to the nitrogen supply at the blast furnace site. If the adjusted pressure meets the working conditions of the radar probe system, the ball valve is opened and the radar probe system continues to operate.

[0041] Secondly, the blast furnace is prone to material jumping during operation, and the temperature may instantly rise to nearly 1,000 degrees. When the temperature is higher than the maximum temperature of 800 degrees, the temperature monitoring system will send a signal. At this time, the sound and light alarm device will also send out a sound and light alarm according to the signal transmitted, and the automatic switch on the electric ball valve will automatically operate according to the signal transmitted by the temperature monitoring system to close the electric ball valve and protect the radar from damage. When the sound and light alarm is issued, the operator can turn off the sound and light alarm through the sound and light alarm device controller, and remove the radar on the ball valve for inspection and maintenance. After confirming that the radar is intact, install the radar back on the ball valve and restart the system. If the temperature after the restart meets the working conditions of the radar probe system, the ball valve will open and the radar probe system will continue to operate.

[0042] The working process of radar probe system is as follows Figure 4 shown.

[0043] Table 2 below is the nitrogen purge test of the radar probe system:

[0044]

[0045]

[0046] Table 3 below is the material level test of the radar probe system:

[0047]

[0048] In this embodiment, the nitrogen pressure required by the system must be greater than 0.4Mpa, the instantaneous pressure must not be lower than 0.3Mpa, and the nitrogen flow rate must be greater than 30 cubic meters per hour.

[0049] The experimental results show that the radar probe system and its operation method are feasible.

[0050] The above is a detailed description of an embodiment of the invention, but the content is only a preferred embodiment of the invention and cannot be considered to limit the scope of implementation of the invention. All equivalent changes and improvements made within the scope of the application of the invention should still fall within the scope of the patent coverage of the invention.

Claims

1. A blast furnace radar probe system, comprising an automatic execution system (1) arranged on the top of a furnace body, a waveguide system (2) arranged above the automatic execution system (1), a transmitting source (3) arranged on the top of the waveguide system (2), and a broadcast guide antenna (4) arranged at the lower end of the transmitting source (3), wherein the broadcast guide antenna (4) is arranged inside the waveguide system (2), and a protective cover (5) is arranged outside the transmitting source (3) and the waveguide system (2), wherein the automatic execution system (1) comprises an automatic execution mechanism (10) and an automatic actuator (11), and the automatic execution system (1) is installed below the protective cover (5); the broadcast guide antenna (4) is also provided with a temperature measuring element; and the characteristics are as follows: It also includes a purge system and a field display control system, among which, The purge system is a four-way purge system, comprising a pressure detection instrument, a first branch (6) arranged at 45° and 135° on both sides of the root of the emission source, a second branch (7) arranged at 0° and 180° on both sides of the front end of the emission source (3), a third branch (8) arranged at 0° and 180° in the horizontal direction of the side of the protective sleeve (5), and a fourth branch (9) arranged at 90° and 270° in the horizontal direction of the side of the protective sleeve (5); The on-site display control system includes a display system and a control system. The display system includes a pressure output transmitter and a temperature output transmitter. The control system includes an action switch of the automatic execution system, an alarm signal controller, and a gas pressure controller arranged in the purge system. The display system and the control system are organically connected together through an on-site operation display cabinet. The on-site operation display cabinet is also connected with a low-pressure and high-temperature sound and light alarm device. An operating method applied to the blast furnace radar probe system, the method comprising: Step 1: Start the blast furnace radar probe system, the blast furnace radar probe system starts to operate, and the temperature monitoring system and the gas pressure monitoring system are started at the same time; Step 2: a signal source in the blast furnace radar probe system transmits a signal; Step 3: The pilot antenna in the blast furnace radar probe system transmits a 26 GHz electromagnetic wave signal in the form of a beam; Step 4: the waveguide system in the blast furnace radar probe system adjusts the direction of the beam emitted by the broadcast guide antenna; Step 5: The beam reaches the measured medium; Step 6: The measured medium reflects the echo; Step 7: The guide antenna in the blast furnace radar probe system receives the echo; Step 8, the on-site display control system in the blast furnace radar probe system performs analysis and calculation; Step nine, obtaining the height of the measured medium; In step 1, in the temperature monitoring system, when the monitored temperature exceeds the maximum temperature of 800 degrees, the temperature measuring element sends a signal, and the automatic actuator automatically operates when receiving the signal sent by the temperature measuring element, closes the automatic actuator, and protects the blast furnace radar probe system. At the same time, the sound and light alarm device receives the signal sent by the temperature measuring element and sends out a sound and light alarm; In step one, in the gas pressure monitoring system, when the monitored gas pressure is lower than the minimum pressure of 0.3MPa, or the gas flow rate is less than 30 cubic meters per hour, the gas pressure sensor transmits a signal, and the automatic actuator automatically operates when receiving the signal transmitted by the gas pressure sensor, closing the automatic actuator to protect the blast furnace radar probe system. At the same time, the sound and light alarm device receives the signal transmitted by the gas pressure sensor and emits a sound and light alarm.

2. The blast furnace radar probe system according to claim 1, wherein the automatic actuator (10) is a high-pressure sealed gate, and the automatic actuator is a gate actuator.

3. The blast furnace radar probe system according to claim 1, characterized in that: The waveguide system (2) is a waveguide tube, and is installed above the automatic execution system (1).

4. The blast furnace radar probe system according to claim 1, characterized in that: The broadcast director antenna (4) comprises a transmitting antenna and a receiving antenna, and the broadcast director antenna (4) is horn-shaped, the distance between one end of the broadcast director antenna horn and the protective sleeve (5) is 5 mm, and the temperature measuring element is a thermistor.

5. The blast furnace radar probe system according to claim 4, characterized in that: The broadcast director antenna (4) is a stainless steel antenna with a diameter of 75 mm, and its emission angle is ±4°.

6. The blast furnace radar probe system according to claim 1, characterized in that: The purge pipeline used by the first branch (6) of the purge system is a 1 / 8NPT pipe, the purge pipeline used by the second branch (7) of the purge system is a 1 / 2NPT pipe, and the purge pipelines used by the third branch (8) and the fourth branch (9) of the purge system are 3 / 4NPT pipes.