Prestressed anchor cable structure and prestressed anchor cable one-time grouting construction method

By arranging spacer steel pipes and fastening rings in the prestressed anchor cable structure, combined with the jet grouting method, the problems of poor sealing and multiple grouting refills of the existing grouting device are solved, and grouting and anchor cables can be completed in one go. Improved strength, saving time and materials.

CN110453695BActive Publication Date: 2024-10-25CHINA MCC20 GRP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910748791.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-08-14
Publication Date
2024-10-25
Estimated Expiration
2039-08-14

AI Technical Summary

Technical Problem

The existing prestressed anchor cable grouting device has poor sealing performance, resulting in a long grouting process and unstable quality. It often requires repeated grouting, prolonging the construction period and increasing project costs.

Method used

A prestressed anchor cable structure is designed, including anchor cable holes, anchor cables and grouting pipes. The anchor cable is composed of multiple steel strands. Steel pipes are arranged side by side in the anchoring section. The steel strands are set along the outer wall of the steel pipe. The fixing ring is fastened to avoid entanglement; the grouting pipe is independent of the anchor cable, rotates and lifts for grouting, and uses the rotary jet grouting method.

Benefits of technology

The grouting is completed in one go, which improves the strength of the anchor cable body, saves time, reduces material consumption, avoids damage to the grouting pipe and shrinkage of the grout, and solves the problem of insufficient grouting in one go in the existing technology.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110453695B_ABST
    Figure CN110453695B_ABST
Patent Text Reader

Abstract

The present invention provides a prestressed anchor cable structure and a prestressed anchor cable one-time grouting construction method. The structure comprises: an anchor cable hole set in a soil layer; wherein an anchor cable and a grouting pipe spaced apart from the anchor cable are set inside the anchor cable hole, and the tail of the anchor cable extends out of the anchor cable hole; the anchor cable is a wire bundle composed of a plurality of steel strands; a plurality of steel pipes spaced apart and arranged side by side are set in the interval of the anchoring section, and each steel pipe is coaxially arranged, and each steel strand is arranged along the outer wall of the steel pipe to isolate each steel strand, and a first fastening ring is arranged on the outer periphery of the steel strand to fasten the steel strand to the steel pipe; each steel strand between any two steel pipes is individually bundled and the outer periphery is fastened by a second fastening ring. The grouting pipe and the anchor cable of the present invention exist independently of each other, so that the anchor cable is buried in the slurry during subsequent grouting, thereby avoiding damage to the grouting pipe and the problem that the slurry shrinks due to the grouting pipe being buried in the slurry, thus requiring additional grouting.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of civil engineering, and in particular to a prestressed anchor cable structure and a one-time grouting construction method for the prestressed anchor cable. Background Art

[0002] In general, high slopes in areas with complex geological conditions are often supported by the method of "prestressed anchor cable + lattice beam" to ensure the stability of high slopes on the roadbed. After installation, prestressed anchor cables need to be grouted through pre-buried grouting pipes. Grouting uses cement mortar, and the construction mix ratio is determined after test comparison. The actual grouting volume is generally greater than the theoretical grouting volume, or the anchor exhaust hole is no longer exhausted and the slurry overflows from the hole as the standard for the end of grouting. If it is not fully filled at one time or settlement occurs after grouting, additional grouting is required until it is full.

[0003] The existing grouting device generally uses pre-buried PPR pipes for grouting, which has a simple structure, poor sealing, and is prone to failure during use. During grouting, the slurry is pumped into the grouting pipe through a grouting pump, and the slurry is pushed to the orifice by the pressure at the bottom of the pipe to complete the grouting. The grouting process is long and the grouting quality is greatly affected by the grouting pipe, which causes the cement slurry to shrink. Therefore, a secondary grouting pipe is generally pre-buried for supplementary grouting, which makes it difficult to construct as expected, prolongs the construction period, and increases the project cost. Summary of the invention

[0004] In view of this, the present invention proposes a prestressed anchor cable structure and a prestressed anchor cable one-time grouting construction method, aiming to solve the problem that the existing grouting device requires multiple groutings, resulting in a long construction period and high costs.

[0005] On the one hand, the present invention proposes a prestressed anchor cable structure, which includes: an anchor cable hole arranged in a soil layer; wherein an anchor cable and a grouting pipe arranged at intervals from the anchor cable are arranged inside the anchor cable hole, and the tail of the anchor cable extends out of the anchor cable hole; the anchor cable is a harness composed of a plurality of steel strands, and the anchor cable is divided into an exposed section, a free section arranged in the anchor cable hole and an anchoring section from the tail to the front end; a plurality of steel pipes are arranged at intervals and side by side in the anchoring section, the steel pipes are coaxially arranged, and the steel strands are arranged along the outer wall of the steel pipe to isolate the steel strands, and a first fastening ring is arranged on the outer periphery of the steel strand for fastening the steel strand to the steel pipe; the steel strands between any two of the steel pipes are individually bundled and the outer periphery is fastened by a second fastening ring.

[0006] Furthermore, in the above-mentioned prestressed anchor cable structure, a plurality of brackets are arranged on each of the steel pipes along its circumference to support the steel pipe so that the steel pipe is coaxially aligned with the anchor cable hole.

[0007] Furthermore, in the above-mentioned prestressed anchor cable structure, there are multiple brackets and each of the brackets is distributed in a scattered manner on the periphery of the steel pipe.

[0008] Furthermore, the above-mentioned prestressed anchor cable structure is provided with a plurality of centering brackets spaced apart and arranged side by side along the axial direction of the anchor cable hole within the interval of the free section, so as to fix the steel strand and the grouting pipe.

[0009] Furthermore, in the above-mentioned prestressed anchor cable structure, the centering bracket is provided with a plurality of through holes corresponding to the steel strands one by one, for clamping the steel strands to stretch out the wire bundle composed of the steel strands; the outer wall of the centering bracket is provided with a notch for clamping the grouting pipe.

[0010] Furthermore, the above-mentioned prestressed anchor cable structure is arranged in parallel between the plurality of steel strands arranged on the outer periphery of the steel pipe within the interval of the anchoring section and / or the free section.

[0011] On the other hand, the present invention also proposes a one-time grouting construction method for prestressed anchor cables, the method comprising the following steps: preparing an anchor cable of a prestressed anchor cable structure as described in any one of claims 1 to 7, and drilling a hole at a preset position of the soil layer to form an anchor cable hole, and sweeping and cleaning the hole after the hole is formed; lowering the anchor cable and the grouting pipe of the prestressed anchor cable structure into the anchor cable hole; grouting into the anchor cable hole through the grouting pipe, and rotating and lifting the grouting pipe during grouting, and grouting is performed while lifting the grouting pipe, so that grouting is performed into the anchor cable hole through the grouting pipe during the process of pulling out the grouting pipe.

[0012] Furthermore, in the above-mentioned one-time grouting construction method for prestressed anchor cables, the grouting pipe is a rotary jet column structure, and before the grouting pipe is lowered into the anchor cable hole, a nozzle is installed at the front end of the grouting pipe so that the grouting pipe adopts the rotary jet grouting method for grouting during the grouting process.

[0013] Furthermore, in the above-mentioned one-time grouting construction method for prestressed anchor cables, in the step of lowering the grouting pipe, the grouting pipe follows the lowest point of the hole wall of the anchor cable hole to the bottom of the anchor cable hole, and the front end of the grouting pipe extends to the bottom of the anchor cable hole.

[0014] The prestressed anchor cable structure and the one-time grouting construction method of the prestressed anchor cable provided by the present invention are characterized by arranging a plurality of steel pipes spaced apart and arranged side by side in the interval of the anchoring section, wherein the steel pipes are coaxially arranged, and the steel strands are arranged along the outer wall of the steel pipe, and the steel strands arranged on the outer wall of the steel pipe are arranged in parallel and isolated from each other to avoid the steel strands from being entangled and thus affecting their strength. At the same time, after each steel strand is wound on the steel pipe, it is fastened by a first fastening ring on all sides to ensure that the steel strand is fastened to the outer wall of the steel pipe; and, in the interval of the anchoring section, there is no position where the steel pipe does not exist, and the inner circumferences of the steel strands are in contact with each other, and the outer circumferences are sleeved with a second fastening ring to achieve the fastening and connection between the steel strands, thereby avoiding the entanglement between the steel strands and making the inner circumferences of the steel strands contact and tightly combine into a bundle, that is, In other words, the steel strands in the present application are fastened by the steel pipe, the first fastening ring and the second fastening ring to achieve stability during lowering and avoid entanglement of the steel strands; at the same time, the interval between the grouting pipe and the anchor cable can avoid contact and connection between the grouting pipe and the anchor cable, that is, the grouting pipe and the anchor cable exist independently of each other, which is convenient for the anchor cable to be buried in the slurry during subsequent grouting, and the grouting pipe is lifted and rotated while grouting, that is, the grouting pipe is pulled out while grouting, thereby avoiding damage to the grouting pipe and the grouting pipe being buried in the slurry, causing the slurry to shrink and require additional grouting. Grouting can be completed in one time and the strength of the anchor cable body is improved, so as to effectively solve the problem of secondary grouting caused by insufficient grouting in one time in the prior art. At the same time, since only one grouting is required, time is saved and the construction progress is accelerated. No scheduling pipe is required and the grouting pipe is recyclable, saving materials.

[0015] Furthermore, the grouting pipe can be a rotary jet column structure, and a nozzle is provided at the front end thereof extending into the anchor hole. The nozzle can also be a rotary jet drill, which is used to adopt a high-pressure rotary jet grouting method to spray the slurry in the grouting pipe into the anchor hole. That is, the end of the grouting pipe arranged outside the anchor hole is connected to a high-pressure grouting pump, and the front end of the grouting pipe is connected to a rotary jet drill, so as to adopt the rotary jet grouting method for grouting. In particular, the rotary jet grouting method has a wide grouting range and high pressure, which accelerates the grouting speed, greatly improves its grouting effect, and can achieve better economic and social benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0017] Figure 1 A schematic structural diagram of a prestressed anchor cable structure provided by an embodiment of the present invention;

[0018] Figure 2 for Figure 1Cross-section at AA in the middle;

[0019] Figure 3 for Figure 1 Cross-section at the middle BB;

[0020] Figure 4 for Figure 1 Cross-section at CC;

[0021] Figure 5 A flowchart of the one-time grouting construction of prestressed anchor cables provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0022] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0023] Structural embodiment:

[0024] See also Figures 1 to 4 , which shows the preferred structure of the prestressed anchor cable structure provided by the embodiment of the present invention. As shown in the figure, the structure includes: an anchor cable hole 1, an anchor cable 2 and a grouting pipe 3; wherein,

[0025] An anchor hole 1 is provided in the soil layer for burying the anchor 2 and containing slurry of the grouting pipe 3 to realize the burying of the anchor 2. Specifically, the hole can be drilled by pneumatic down-the-hole hammer drilling or pneumatic impact rotary drilling technology.

[0026] An anchor cable 2 is arranged in the anchor cable hole 1 to form an anchor body to reinforce the surrounding rock and improve the bearing capacity of the surrounding rock; and the tail of the anchor cable 2 (such as Figure 1 The upper left end of the anchor cable 2 is shown in the figure) extending from the anchor cable hole 1, that is, the anchor cable 2 is partially arranged inside the anchor cable hole 1, the tail of the anchor cable 2 is located outside the anchor cable hole 1, and the front end of the anchor cable 2 (as shown in the figure) is extended from the anchor cable hole 1. Figure 1 The lower right end as shown in the figure is located in the anchor hole 1 and at the bottom of the anchor hole 1, so that the anchor 2 is partially buried in the anchor hole 1. The anchor body can be formed by the slurry sprayed by the jet drilling machine, that is, cement slurry. In this embodiment, in order to ensure the stability and strength of the anchor body, preferably, the anchor body is formed by the slurry sprayed by the drill rod of the jet ordinary high-pressure jet pile drilling machine. The grouting pipe 3 can be a jet column structure, and its front end (such as Figure 1The lower right section shown in the figure is provided with a nozzle (not shown in the figure), and the nozzle can also be a rotary jet drilling rig, which is used to adopt the high-pressure rotary jet grouting method to spray the slurry in the grouting pipe 3 into the anchor hole 1, that is, the end of the grouting pipe 3 arranged outside the anchor hole 1 is connected with a high-pressure grouting pump, and the front end of the grouting pipe 3 is connected with a rotary jet drilling rig, so as to adopt the rotary jet grouting method for grouting. In particular, the rotary jet grouting method has a wide grouting range and high pressure, which speeds up the grouting speed and greatly improves its grouting effect.

[0027] A grouting pipe 3 is also provided in the anchor hole 1 for grouting the anchor hole 1. Moreover, the grouting pipe 3 and the anchor cable 2 are arranged side by side and at intervals, that is, there is no contact and mutual connection relationship between the two. Specifically, the grouting pipe 3 is partially arranged inside the anchor hole 1, so that the anchor cable 2 is partially buried in the anchor hole 1, and the grouting pump and other equipment are connected through the grouting pipe 3 arranged outside the anchor hole 1 to achieve grouting. In order to facilitate the lowering of the anchor cable 2, that is, lowering it into the anchor hole 1, preferably, a guide cap 21 is provided at the front end of the anchor cable 2 to guide the lowering of the anchor cable 2. Among them, the grouting pipe 3 can be arranged along the inner hole wall of the anchor hole 1 to avoid contact and connection between the grouting pipe 3 and the anchor cable 2, that is, the grouting pipe 3 and the anchor cable 2 exist independently of each other, which is convenient for the anchor cable 2 to be buried in the slurry during subsequent grouting, and the grouting pipe 3 is lifted and rotated while grouting, that is, the grouting pipe 3 is pulled out while grouting, thereby avoiding damage to the grouting pipe 3 and the problem of slurry shrinkage caused by the grouting pipe 3 being buried in the slurry, resulting in the need for additional grouting, so that grouting can be completed in one time and the strength of the anchor cable body is improved.

[0028] The anchor cable 2 is a wire harness composed of multiple steel strands 22, and the anchor cable 2 extends from the tail to the front end (such as Figure 1 The anchor cable 2 is divided into an exposed section 23, a free section 24 and an anchoring section 25 from the tail to the front. The free section 24 and the anchoring section 25 are arranged in the anchor cable hole 1, that is, buried in the interior of the anchor body. The anchor cable 2 is a wire harness composed of multiple steel strands 22. In this embodiment, four strands are used as an example for description. Of course, other numbers are also possible. This embodiment does not impose any limitation on it.

[0029] A plurality of steel pipes 4 are arranged side by side at intervals within the anchoring section 25. The steel pipes 4 are coaxially arranged, and the steel strands 22 are arranged along the outer wall of the steel pipe 4 to isolate the steel strands 22. A first fastening ring 5 is arranged on the outer periphery of the steel strand 22 to fasten the steel strand 22 to the outer wall of the steel pipe 4. Specifically, Figure 2As shown, in the interval of the anchoring section 25, a plurality of steel pipes 4 are arranged coaxially and discontinuously between the plurality of steel strands 22, and each steel strand 22 is arranged along the outer wall of the steel pipe 4, and the steel strands 22 arranged on the outer wall of the steel pipe 4 are arranged in parallel and isolated from each other to avoid the steel strands 22 from being entangled and affecting their strength. At the same time, after each steel strand 22 is wound on the steel pipe 4, it is fastened by the first fastening ring 5 around it to ensure that the steel strand 22 is fastened to the outer wall of the steel pipe 4. After the anchor cable 2 is lowered, each steel pipe 4 is coaxially arranged with the anchor cable hole 1, so that the wire bundle composed of the steel strands 22 arranged outside the steel pipe 4 is coaxially arranged with the anchor cable hole 1, that is, coaxially aligned, and the steel strands 22 are grouted around to fix the steel strands 22 through the solidified slurry, thereby ensuring the stability of the steel strands 22, thereby further improving the bearing capacity of the surrounding rock. Among them, the first fastening ring 5 is an annular structure, and its inner wall is tightly attached to the outer circumference of each steel strand 22, so that the inner circumference of each steel strand 22 is locked to the steel pipe 4. In order to ensure the stability of the fixation of the steel pipe 4, preferably, a plurality of support frames 7 are arranged on each steel pipe 4 along its circumference to support the steel pipe 4, so that the steel pipe 4 is coaxially aligned with the anchor hole 1 when it is lowered into the anchor hole 1, thereby ensuring that the wire bundle composed of each steel strand 22 is coaxially arranged with the anchor hole 1, i.e. coaxially aligned. Further preferably, there can be multiple support frames 7, and they are scatteredly distributed along the circumference of the steel pipe 4 on the outer circumference of the steel pipe 4, thereby further ensuring the coaxial alignment of the steel pipe 4.

[0030] Each steel strand 22 between any two steel pipes 4 is bundled separately and the outer periphery is fastened by a second fastening ring 6. Figure 3 As shown, there is no position of the steel pipe 4 within the anchoring section 25, and the inner circumferences of the steel strands 22 are in contact with each other, and the outer circumferences are sleeved with a second fastening ring 6 to achieve fastening and connection between the steel strands 22, thereby avoiding entanglement between the steel strands 22, that is, avoiding the steel strands 22 from being entangled. The second fastening ring 6 is an annular structure, and its inner wall is tightly attached to the outer circumference of each steel strand 22, so that the inner circumferences of each steel strand 22 are in contact and tightly assembled into a bundle.

[0031] A plurality of centering brackets 8 are arranged side by side and spaced axially along the anchor hole 1 in the free section 24 to fix the steel strand 22 and the grouting pipe 3. Specifically, Figure 4As shown, a plurality of centering brackets 8 for spreading out the wire bundle composed of the steel strands 22 are arranged at intervals within the interval of the free section 24, and can also be used to fix the grouting pipe 3. Among them, the centering bracket 8 can be a circular sheet structure, and a plurality of through holes 81 corresponding to the steel strands 22 are arranged on the centering bracket 8, which are used to clamp the steel strands 22 to spread out the wire bundle composed of the steel strands 22; each through hole 81 can be evenly distributed along the circumference of the centering bracket 8. A notch 82 is arranged at the edge of the centering bracket 8, and the grouting pipe 3 is clamped at the notch 81 of the centering bracket 8 to avoid the inclination of the grouting pipe 3. The steel strands 22 within the interval of the free section 24 are parallel to each other to avoid entanglement between the steel strands 22 and the grouting pipe 3. The setting of the centering bracket 8 can prevent the steel strands 22 constituting the anchor cable 2 from being entangled, so that the anchor cable 2 can maintain its shape during the installation process.

[0032] In summary, the prestressed anchor cable structure provided in the present embodiment is provided with a plurality of spaced and side-by-side steel pipes 4 in the interval of the anchoring section 25, the steel pipes 4 are coaxially arranged, and the steel strands 22 are arranged along the outer wall of the steel pipe 4, and the steel strands 22 arranged on the outer wall of the steel pipe 4 are arranged in parallel and isolated from each other to avoid the steel strands 22 from being entangled and affecting their strength. At the same time, after each steel strand 22 is wound on the steel pipe 4, it is fastened by a first fastening ring 5 on all sides to ensure that the steel strand 22 is fastened to the outer wall of the steel pipe 4; and, in the position where there is no steel pipe 4 in the interval of the anchoring section 25, the inner circumferences of the steel strands 22 are in contact with each other, and the outer circumferences are sleeved with a second fastening ring 6 to achieve the fastening and connection between the steel strands 22, thereby avoiding the entanglement between the steel strands 22 and making the inner circumferences of the steel strands 22 contact and tightly combine into a bundle. That is, the steel strand 22 in the present application is fastened by the steel pipe 4, the first fastening ring 5 and the second fastening ring 6 to achieve stability during lowering and avoid the steel strand 22 from being entangled; at the same time, the interval between the grouting pipe 3 and the anchor cable 2 can avoid contact and connection between the grouting pipe 3 and the anchor cable 2, that is, the grouting pipe 3 and the anchor cable 2 exist independently of each other, which is convenient for the anchor cable 2 to be buried in the slurry during subsequent grouting, and the grouting pipe 3 is lifted and rotated while grouting, that is, the grouting pipe 3 is pulled out while grouting, thereby avoiding damage to the grouting pipe 3 and the grouting pipe 3 being buried in the slurry, causing the slurry to shrink and require additional grouting. Grouting can be completed in one time and the strength of the anchor cable body is improved, so as to effectively solve the problem of secondary grouting caused by insufficient grouting in the prior art. At the same time, since only one grouting is required, time is saved and the construction progress is accelerated. No scheduling pipe is required and the grouting pipe is recyclable, saving materials.

[0033] Furthermore, the grouting pipe 3 can be a rotary jet column structure, and a nozzle is provided at the front end thereof extending into the anchor hole 1. The nozzle can also be a rotary jet drill, which is used to adopt a high-pressure rotary jet grouting method to spray the slurry in the grouting pipe 3 into the anchor hole 1, that is, the end of the grouting pipe 3 arranged outside the anchor hole 1 is connected to a high-pressure grouting pump, and the front end of the grouting pipe 3 is connected to a rotary jet drill, so as to adopt the rotary jet grouting method for grouting. In particular, the rotary jet grouting method has a wide grouting range and high pressure, which speeds up the grouting speed, greatly improves its grouting effect, and can achieve better economic and social benefits.

[0034] Method Example:

[0035] See also Figure 5 , which is a preferred structure of the one-time grouting construction method for the prestressed anchor cable structure provided by the embodiment of the present invention. As shown in the figure, the method comprises the following steps:

[0036] Step S1, preparing an anchor cable of a prestressed anchor cable structure according to any one of claims 1 to 7, drilling holes at preset positions of the soil layer to form anchor cable holes, and sweeping and cleaning the holes after the holes are formed.

[0037] Specifically, first, the anchor cable 2 is made of steel strands 22, that is, a cutting machine is used to cut the steel strands 22 to obtain a plurality of steel strands 22 of a pre-designed length. Electric arc or acetylene flame cutting should not be used, and outdoor work should be avoided during thunderstorms; and bundled, that is, Figures 1 to 4 As shown, the anchor cable 2 is divided into an exposed section 23, a free section 24 and an anchoring section 25 from the tail to the front end. During the manufacturing process, the steel strands 22 constituting the anchor cable 2 are assembled into a wire harness, and then a plurality of centering brackets 8 are arranged side by side and spaced axially along the anchor cable hole 1 in the interval of the free section 24, and the steel strands 22 are clamped through the through holes 81 on the centering brackets 8, and the steel strands 24 in the interval of the free section 24 are parallel to each other; then, a plurality of centering brackets 8 are arranged in the interval of the anchoring section 25. There are steel pipes 4 spaced apart and arranged side by side, each steel pipe 4 is coaxially arranged, each steel strand 22 is arranged along the outer wall of the steel pipe 4 to isolate each steel strand 22, and a first fastening ring 5 is arranged on the outer periphery of the steel strand 22 to fasten the steel strand 22 to the outer wall of the steel pipe 4. At the same time, each steel strand 22 between any two steel pipes 4 is individually bundled and the outer periphery is fastened by a second fastening ring 6, and the steel strands 24 in the anchoring section 25 are parallel to each other. Then, the anchor cable is drilled, that is, a pneumatic down-the-hole hammer drilling or pneumatic impact rotary drilling process is used to drill to form an anchor cable hole 1. After the hole is formed, a hole sweeping should be carried out to eliminate misalignment and loose gravel in the hole; compressed air should be used for cleaning after the hole is completed. Among them, there is no sequence between the production of the anchor cable 2 and the drilling of the anchor cable, and they can also be carried out simultaneously.

[0038] Step S2, lowering the anchor cable and the grouting pipe of the prestressed anchor cable structure into the anchor cable hole.

[0039] Specifically, first, check the anchor hole 1 until the anchor hole 1 is qualified, and after the anchor hole is qualified, the grouting pipe 3 and the anchor cable 2 should be installed in time to reduce the bare hole time; then, after the anchor hole 1 is formed, the grouting pipe 3 is placed into the anchor hole 1 along the lowest point of the inner hole wall of the anchor hole 1, and the grouting pipe 3 needs to go deep into the bottom of the hole of the grouting pipe 3, and when the grouting pipe 3 is lowered, it is in the interval of the free section 24, and the grouting pipe 3 is stuck in the notch of the centering bracket 8, and is not in contact with the anchor cable 2; finally, after the grouting pipe 3 is placed, the anchor cable 2 is installed, and after the anchor cable 2 is installed, the grouting pipe 3 is assembled and connected with the grouting pump and other equipment. Before the grouting pipe 3 is lowered, the front end thereof is pre-installed with a rear nozzle or a rotary jet drilling rig.

[0040] Step S3, grouting is performed into the anchor cable hole through the grouting pipe, and the grouting pipe is rotated and lifted during grouting, and grouting is performed while the grouting pipe is lifted, so that grouting is performed into the anchor cable hole through the grouting pipe during the process of pulling out the grouting pipe.

[0041] Specifically, after the front end of the grouting pipe 3 and the nozzle or the rotary jet drilling machine reach the target depth, the nozzle or the rotary jet drilling machine performs grouting into the anchor hole 1 through the grouting pipe 3, and during the grouting, the grouting pipe 3 is rotated and lifted, and grouting is performed while the grouting pipe 3 is lifted, so that grouting is performed into the anchor hole 1 through the grouting pipe 3 during the process of withdrawing the grouting pipe 3. When the grouting is completed, the grouting pipe 3 is withdrawn from the anchor hole 1, and the anchor 2 can be tensioned and locked after the cement slurry in the anchor hole 1 reaches a predetermined strength. Among them, during the grouting, the grouting is completed by rotating and lifting the nozzle or the rotary jet drilling machine in the anchor hole 1, and when the anchoring section 25 is grouted, the nozzle or the rotary jet drilling machine is lifted and rotated at least once, and the free section 24 is grouted and formed once to complete the grouting operation.

[0042] In summary, the one-time grouting construction method of the prestressed anchor structure provided in this embodiment utilizes the above-mentioned prestressed anchor structure for grouting construction. Since the above-mentioned prestressed anchor structure has the above-mentioned effects, the one-time grouting construction method of the prestressed anchor structure using the above-mentioned prestressed anchor structure for grouting construction also has the above-mentioned effects.

[0043] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A one-time grouting construction method for prestressed anchor cable, characterized in that: The steps include: Preparing anchor cables of prestressed anchor cable structures, drilling holes at preset locations of soil layers to form anchor cable holes, and sweeping and cleaning the holes after drilling; Lowering the anchor cable and the grouting pipe of the prestressed anchor cable structure into the anchor cable hole; Grouting is performed into the anchor cable hole through the grouting pipe, and the grouting pipe is rotated and lifted during grouting, and grouting is performed while the grouting pipe is lifted, so that grouting is performed into the anchor cable hole through the grouting pipe during the process of withdrawing the grouting pipe; The prestressed anchor cable structure comprises: an anchor cable hole (1) arranged in a soil layer; wherein: An anchor cable (2) and a grouting pipe (3) spaced apart from the anchor cable (2) are arranged inside the anchor cable hole (1); The anchor cable (2) is a wire harness composed of a plurality of steel strands (22), and the anchor cable (2) is divided into an exposed section (23), a free section (24) arranged in the anchor cable hole (1), and an anchoring section (25) from the tail to the front. A plurality of spaced steel pipes (4) are arranged within the anchoring section (25), the steel pipes (4) are coaxially arranged, and the steel strands (22) are arranged along the outer wall of the steel pipe (4) so ​​that the steel strands (22) are isolated from each other, and a first fastening ring (5) is arranged on the outer periphery of the steel strand (22) for fastening the steel strand (22) to the steel pipe (4); Each steel strand (22) between any two of the steel pipes (4) is bundled individually and the outer periphery is fastened by a second fastening ring (6).

2. The one-time grouting construction method for prestressed anchor cable according to claim 1 is characterized in that: The grouting pipe is a rotary jet column structure, and before the grouting pipe is lowered into the anchor cable hole, a nozzle is installed at the front end of the grouting pipe so that the grouting pipe adopts the rotary jet grouting method for grouting during the grouting process.

3. The one-time grouting construction method for prestressed anchor cable according to claim 1 or 2, characterized in that: In the step of lowering the grouting pipe, the grouting pipe is lowered into the anchor hole along the lowest point of the hole wall of the anchor hole, and the front end of the grouting pipe extends to the bottom of the anchor hole.

4. The one-time grouting construction method for prestressed anchor cable according to claim 1 is characterized in that: A plurality of support frames (7) are arranged on each of the steel pipes (4) along its circumference, for supporting the steel pipe (4) so ​​that the steel pipe (4) and the anchor cable hole (1) are coaxially aligned.

5. The one-time grouting construction method for prestressed anchor cable according to claim 4 is characterized in that: There are a plurality of support frames (7), and each of the support frames (7) is distributed in a scattered manner on the periphery of the steel pipe (4).

6. The one-time grouting construction method for prestressed anchor cable according to claim 1 is characterized in that: A plurality of centering brackets (8) are arranged in parallel and spaced axially along the anchor cable hole (1) within the free section (24) to fix the steel strand (22) and the grouting pipe (3).

7. The one-time grouting construction method for prestressed anchor cable according to claim 6 is characterized in that: The centering bracket (8) is provided with a plurality of through holes (81) arranged in one-to-one correspondence with the steel strands (22) for clamping the steel strands (22) so as to spread out a wire harness formed by the steel strands (22); The outer wall of the centering bracket (8) is provided with a notch (82) for clamping the grouting pipe (3).

8. The one-time grouting construction method for prestressed anchor cable according to claim 1 is characterized in that: A plurality of the steel strands (22) are arranged parallel to each other within the anchoring section (25) and / or the free section (24).

9. The one-time grouting construction method for prestressed anchor cable according to claim 1, characterized in that: The grouting pipe (3) is a rotary jet column structure, and a nozzle is provided at the front end thereof extending into the anchor cable hole (1) for spraying the slurry in the grouting pipe (3) into the anchor cable hole (1) using a rotary jet grouting method.