A mechanically integrated pier operation protection platform and an operation method thereof

Through the multi-layer keel system and driving mechanism of the mechanically integrated column pier operation protection platform, the problems of frequent erection and safety hazards in traditional construction are solved, and efficient, flexible operation and safety protection are achieved during the column pier pouring process, reducing construction costs. Cost and time.

CN110616643BInactive Publication Date: 2024-10-08CHINA CONSTR SEVENTH ENG DIVISION CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911007220.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-10-22
Publication Date
2024-10-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

Traditional column pier construction requires frequent erection and disassembly of protective frames, resulting in low construction efficiency, time-consuming work, and potential safety hazards. It is also difficult to move quickly to adapt to different pouring sequences and times.

Method used

A mechanically integrated column pier operation protection platform is designed, which adopts a multi-layer keel system and a driving mechanism. The opening and closing of the interface is realized through a telescopic keel mechanism and a driving motor. It can be adjusted and moved quickly according to the width of the column pier, simplifying erection. and disassembly process.

Benefits of technology

It achieves flexible operation and safety protection during the column pier pouring process, reduces labor costs and time, has a wide range of applications, can save materials and has certain environmental protection effects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110616643B_ABST
    Figure CN110616643B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of construction engineering technology, and specifically discloses a mechanically integrated pier operation and protection platform and an operation method thereof, the platform comprising a frame body, the frame body being a steel structure consisting of a driving mechanism, at least two layers of keel systems, and a plurality of vertical poles supporting each layer of the keel system; the keel system comprising a first telescopic keel mechanism and a second telescopic keel mechanism arranged horizontally and symmetrically on the left and right, the driving mechanism being used to simultaneously drive the first telescopic keel mechanism and the second telescopic keel mechanism of each layer to rotate in opposite directions around the height direction of the frame body, so that the docking interface of each layer is opened or closed. Compared with the traditional operation and protection frame, the pier operation and protection platform of the present invention does not need to set up an operation and protection frame for each pier separately, and is easy to install and disassemble, saving the labor cost and time of setting up the operation and protection frame. In addition, the pier operation and protection platform of the present invention can play a protective role during the pier construction process, effectively avoiding safety hazards.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and in particular to a mechanically integrated column pier operation protection platform and an operation method thereof. Background Art

[0002] In the traditional construction and transportation engineering construction in my country, each pier needs to be set up with an operating frame during the pier construction. The usual construction sequence is: first set up the pier formwork system, that is, set up stirrups, formwork, vertical ribs, column hoops, tension bolts, diagonal braces, fasteners and anchors, and finally pour concrete. Therefore, before pouring concrete for the pier, a special construction operating frame must be set up to construct and protect the pier to meet the requirements of the pier concrete pouring construction.

[0003] Since the protective operating frame has a short service life and a fast turnover rate, it takes a lot of manpower and material resources to set up the frame, which greatly affects the construction efficiency. Moreover, for the construction of multiple piers, this method is labor-intensive, time-consuming, and material-intensive, and there are certain safety hazards. Therefore, there is an urgent need for a mechanically integrated operating protection platform that can be quickly moved as a whole according to the pouring sequence and pouring time during the construction process to meet the pouring work of the piers. Summary of the invention

[0004] In view of this, one of the purposes of the present invention is to overcome the defects in the prior art and provide a mechanically integrated pier operation protection platform.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0006] A mechanically integrated pier operation and protection platform comprises a frame body, wherein the frame body is a steel structure consisting of a driving mechanism, at least two layers of keel systems, and a plurality of vertical poles supporting each layer of the keel system; the keel system comprises a first telescopic keel mechanism and a second telescopic keel mechanism which are horizontally symmetrically arranged on the left and right sides.

[0007] The first telescopic keel mechanism adopts a C-shaped structure, including a first telescopic square steel component I, a first telescopic square steel component II and a first connecting rail connected in sequence, and the first telescopic square steel component I is provided with a first sector gear;

[0008] The second telescopic keel mechanism adopts a C-shaped structure, including a second telescopic square steel component I, a second telescopic square steel component II and a second connecting rail connected in sequence, and the second telescopic square steel component I is provided with a second sector gear;

[0009] The first telescopic square steel component I and the second telescopic square steel component I are arranged opposite to each other and have a first gap, and the first connecting rail and the second connecting rail are arranged opposite to each other and have a second gap; the C-shaped opening of the first telescopic keel mechanism and the C-shaped opening of the second telescopic keel mechanism are arranged opposite to each other to form a docking interface for enclosing the column pier;

[0010] The driving mechanism is arranged in the first gap of each layer, and the driving mechanism is respectively engaged with the first sector gear and the second sector gear of each layer; the driving mechanism is used to simultaneously drive the first telescopic keel mechanism and the second telescopic keel mechanism of each layer to rotate in opposite directions around the height direction of the frame body, so as to open or close the docking port of each layer.

[0011] Further, the first telescopic square steel component I comprises a first small square steel tube I and two first large square steel tubes I, the two ends of the first small square steel tube I respectively extend into the first large square steel tubes I on both sides, and the first small square steel tube I is respectively slidably connected to the inner cavities of the two first large square steel tubes I;

[0012] The first telescopic square steel component II includes a first small square steel tube II and two first large square steel tubes II. The two ends of the first small square steel tube II extend into the first large square steel tubes II on both sides respectively. The first small square steel tube II is slidably connected to the inner cavities of the two first large square steel tubes II respectively.

[0013] Furthermore, the first sector gear is arranged on the upper tube wall edge of the first large square steel tube I close to the second telescopic square steel component I, the end of another first large square steel tube I away from the first small square steel tube I is vertically connected to the end of one of the first large square steel tubes II, and the end of another first large square steel tube II away from the first small square steel tube II is vertically connected to the end of the first connecting rail.

[0014] Further, the upper and lower tube walls of the first small square steel tube I are correspondingly provided with a plurality of pairs of first mounting holes I, and the plurality of pairs of first mounting holes I are arranged at a certain interval along the length direction of the first small square steel tube I; the upper and lower tube walls of the two first large square steel tubes I are correspondingly provided with a plurality of pairs of first latch holes I, and the plurality of pairs of first latch holes I are arranged at a certain interval along the length direction of the first large square steel tube I; the first small square steel tube I is fixedly connected with the two first large square steel tubes I by bolts penetrating a pair of first latch holes I and a pair of first mounting holes I;

[0015] The upper and lower tube walls of the first small square steel tube II are correspondingly provided with multiple pairs of first mounting holes II, and the multiple pairs of the first mounting holes II are arranged at a certain interval along the length direction of the first small square steel tube II; the upper and lower tube walls of the two first large square steel tubes II are correspondingly provided with multiple pairs of first pin holes II, and the multiple pairs of the first pin holes II are arranged at a certain interval along the length direction of the first large square steel tube II; the first small square steel tube II is fixedly connected to the two first large square steel tubes II by bolts through a pair of first pin holes II and a pair of first mounting holes II.

[0016] Furthermore, the structure and connection relationship of the second telescopic keel mechanism are the same as the structure and connection relationship of the first telescopic keel mechanism.

[0017] Furthermore, the first connecting rail and the second connecting rail both adopt a U-shaped groove structure, the first connecting rail comprises a first notch, a plurality of first latch holes III are arranged in the first notch, and the plurality of first latch holes III are arranged at intervals along the length direction of the first connecting rail at a certain interval;

[0018] The second connecting rail comprises a second notch; a plurality of second pin holes III are arranged in the second notch, and the plurality of second pin holes III are arranged at intervals along the length direction of the second connecting rail at a certain interval;

[0019] The pier operation protection platform also includes a guide rail connecting plate, the guide rail connection can be conformably embedded in the first slot and the second slot, a plurality of guide rail mounting holes are arranged on the guide rail connecting plate, and the plurality of guide rail mounting holes are arranged at intervals along the length direction of the guide rail connecting plate at a certain interval;

[0020] The first connecting rail and the second connecting rail are fixedly connected by bolts passing through a corresponding guide rail mounting hole and a first latch hole III, and a guide rail mounting hole and a second latch hole III respectively.

[0021] Further, the driving mechanism includes a first transmission shaft, a second transmission shaft and a driving motor, the first transmission shaft and the second transmission shaft are arranged in parallel along the height direction of the frame body, and the first transmission shaft and the second transmission shaft are both located in the first gap, and the output shaft of the driving motor is connected to the bottom end of the second transmission shaft;

[0022] A plurality of first transmission gears are arranged at intervals on the first transmission shaft, and the plurality of first transmission gears are respectively meshed with the first sector gears corresponding to each layer; a plurality of second transmission gears are arranged at intervals on the second transmission shaft, and the plurality of second transmission gears are respectively meshed with each corresponding first transmission gear, and the plurality of second transmission gears are respectively meshed with the second sector gears corresponding to each layer.

[0023] Further, a first support plate I is provided on the end surface of the first large square steel tube I close to the first transmission shaft, the first transmission shaft penetrates the first support plate I of each layer, and the first transmission shaft is rotatably connected to the first support plate I of each layer; a second support plate I is provided on the end surface of the second telescopic square steel component I close to the second transmission shaft, the second transmission shaft penetrates the second support plate I of each layer, and the second transmission shaft is rotatably connected to the second support plate I of each layer;

[0024] A first support plate II is provided on the end surface of the first large square steel tube I located at the bottom layer close to the first transmission shaft, and the first support plate II is rotatably connected to the bottom end of the first transmission shaft;

[0025] A second support plate II is arranged on the end surface of the second telescopic square steel component I located at the bottom layer close to the second transmission shaft. The bottom end of the second transmission shaft passes through the second support plate II and is connected to the output shaft of the driving motor arranged at the bottom of the second support plate II.

[0026] Furthermore, universal wheels with foot brakes are installed at the bottom of the vertical poles.

[0027] The second object of the present invention is to provide an operation method of a pier operation protection platform, comprising the following steps:

[0028] (1) Open the pier operation protection platform: remove the bolts and guide rail connection plates in each layer of the keel system respectively, adjust each first telescopic square steel component I, first telescopic square steel component II, second telescopic square steel component I and second telescopic square steel component II to the maximum extension state, and then fix the bolts respectively;

[0029] The driving motor is started, and the driving motor drives the first telescopic keel mechanism and the second telescopic keel mechanism of each layer to rotate, so that the docking interface is opened;

[0030] (2) Wrapping the pier: Move the pier operation protection platform in step (1) to the pier so that the pier is located in the opened docking interface, start the drive motor again, and the drive motor drives the first telescopic keel mechanism and the second telescopic keel mechanism to rotate so that the docking interface is closed; adjust the length of the first telescopic keel mechanism and the second telescopic keel mechanism of each layer according to the width of the pier to be cast, so that the docking interface of the entire pier operation protection platform wraps the pier template;

[0031] (3) Formwork support: Install the construction operation platform on the top of the pier operation protection platform to support the formwork;

[0032] (4) pouring concrete: pouring concrete into the formwork in step (3);

[0033] (5) Moving the pier operation protection platform: After the concrete strength requirement is reached, repeat step (1) and move the pier operation protection platform through the opened docking port 35.

[0034] The beneficial effects of the present invention are:

[0035] (1) The mechanically integrated pier operation and protection platform of the present invention adopts a multi-layer keel system with a docking interface in the middle. The system can be telescopically adjusted according to the width of piers of different specifications. Driven by a driving motor, the multi-layer keel body can simultaneously open or close the docking interface to meet the packaging requirements. Compared with the traditional pier operation and protection frame, the pier operation and protection platform of the present invention does not need to set up an operation and protection frame for each pier separately. The mechanically integrated pier operation and protection platform of the present invention can be moved quickly as a whole according to the number, specifications and casting speed of the piers, and can complete the pier casting work more flexibly. It is easy to install and disassemble, and saves the labor cost and time of setting up the operation and protection frame.

[0036] (2) The mechanically integrated pier operation and protection platform of the present invention has a wide range of applications and can save the number of steel pipes for erecting the pier operation and protection frame, thereby saving material costs. At the same time, the pier operation and protection platform can be reused according to the size of the pier, thereby having a certain environmental protection effect. In addition, the pier operation and protection platform of the present invention can play a protective role during the pier construction process, effectively avoiding safety hazards. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.

[0038] Figure 1 It is a structural schematic diagram of a mechanically integrated pier operation protection platform of the present invention;

[0039] Figure 2 is a structural schematic diagram of a first telescopic keel mechanism and a second telescopic keel mechanism;

[0040] Figure 3 It is a structural schematic diagram of the cooperation between one layer of keel system and driving mechanism;

[0041] Figure 4 It is a structural schematic diagram of the coordination between the driving mechanism and the multi-layer keel system.

[0042] Reference numerals:

[0043] 1-frame body, 2-driving mechanism, 21a-first transmission shaft, 21b-second transmission shaft, 211-first transmission gear, 212-second transmission gear, 22-driving motor, 23a-first support plate I, 23b-second support plate I, 24a-first support plate II, 24b-second support plate II, 3-keel system, 31-first telescopic keel mechanism, 311-first telescopic square steel component I, 311a-first small square steel pipe I, 311b-first large square steel pipe I, 3111-first mounting hole I, 3112-first pin hole I, 312-first telescopic square steel component II, 312a- The first small square steel tube II, 312b-the first large square steel tube II, 3121-the first mounting hole II, 3122-the first latch hole II, 313-the first connecting rail, 3131-the first latch hole III, 32-the second telescopic keel mechanism, 321-the second telescopic square steel component I, 322-the second telescopic square steel component II, 323-the second connecting rail, 3231-the second latch hole III, 33-the first gap, 34-the second gap, 35-the docking port, 360-the guide rail connecting plate, 3601-the guide rail mounting hole, 37-the bolt, 4-the vertical pole, 51-the first sector gear, 52-the second sector gear, 6-the universal wheel. DETAILED DESCRIPTION

[0044] The present invention is further described in detail below in conjunction with the embodiments.

[0045] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0046] In the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, it is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as limitations on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0047] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", etc. should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0048] See also Figure 1 , a mechanically integrated column pier operation protection platform provided by the present invention, the platform includes a frame body 1, the frame body 1 is a steel structure composed of a driving mechanism 2, at least two layers of keel systems 3 and a plurality of uprights 4 supporting each layer of the keel system 3; the keel system 3 includes a first telescopic keel mechanism 31 and a second telescopic keel mechanism 32 arranged horizontally and symmetrically on the left and right, the first telescopic keel mechanism 31 adopts a C-shaped structure, including a first telescopic square steel component I311, a first telescopic square steel component II312 and a first connecting rail 313 connected in sequence, and a first sector gear 51 is arranged on the first telescopic square steel component I311 The second telescopic keel mechanism 32 adopts a C-shaped structure, including a second telescopic square steel component Ⅰ321, a second telescopic square steel component Ⅱ322 and a second connecting rail 323 connected in sequence, and the second telescopic square steel component Ⅰ321 is provided with a second sector gear 52; the first telescopic square steel component Ⅰ311 and the second telescopic square steel component Ⅰ321 are arranged opposite to each other and have a first gap 33, and the first connecting rail 313 and the second connecting rail 323 are arranged opposite to each other and have a second gap 34; the C-shaped opening of the first telescopic keel mechanism 31 and the C-shaped opening of the second telescopic keel mechanism 32 are arranged opposite to each other to form a docking interface 35 for enclosing the column pier;

[0049] The driving mechanism 2 is arranged in the first gap 33 of each layer, and the driving mechanism 2 is respectively engaged with the first sector gear 51 and the second sector gear 52 of each layer; the driving mechanism 2 is used to simultaneously drive the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 of each layer to rotate in opposite directions around the height direction of the frame body 1, so that the docking port 35 of each layer is opened or closed.

[0050] In this embodiment, the frame body 1 is composed of a driving mechanism 2, at least two layers of keel systems 3 and a plurality of uprights 4 for supporting the keel systems 3. The keel system 3 refers to a steel structure composed of two first telescopic keel mechanisms 31 and second telescopic keel mechanisms 32 which are symmetrical and have the same size. The C-shaped opening of the first telescopic keel mechanism 31 is arranged opposite to the C-shaped opening of the second telescopic keel mechanism 32 (the first telescopic square steel component I311 is arranged opposite to the second telescopic square steel component I321, and the first connecting rail 313 is arranged opposite to the second connecting rail 323), so that the middle part of the keel system 3 of each layer forms a docking port 35 for enclosing the column pier, and the docking port 35 is used to wrap the column pier.

[0051] Since the structure and connection relationship of the first telescopic keel mechanism 31 are the same as the structure and connection relationship of the second telescopic keel mechanism 32 , the structure and connection relationship of the first telescopic keel mechanism 31 will be described in detail below.

[0052] In this embodiment, the first telescopic square steel component I311 and the first telescopic square steel component II312 are both telescopic structures, while the first connecting rail 313 is a fixed structure. When adjusting the length of the first telescopic keel mechanism 31, only the first telescopic square steel component I311 and the first telescopic square steel component II312 can be telescoped (length adjustment of the first telescopic square steel component I311 and the first telescopic square steel component II312), and the adjustment method of the first connecting rail 313 will be described below.

[0053] There is a gap between the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32, that is, the end surface of the first telescopic square steel component Ⅰ311 and the end surface of the second telescopic square steel component Ⅰ321 have a first gap 33, and the end surface of the first connecting rail 313 and the end surface of the second connecting rail 323 have a second gap 34. The driving mechanism 2 is arranged in the first gap 33 of each layer of the keel system 3, and the driving mechanism 2 is respectively engaged with the first sector gear 51 arranged on the first telescopic square steel component Ⅰ311 and the second sector gear 52 arranged on the second telescopic square steel component Ⅰ321 of each layer, and the driving mechanism 2 can simultaneously drive the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 of each layer to rotate in opposite directions around the height direction of the frame body 1, so that the C-shaped opening of the first telescopic keel mechanism 31 and the C-shaped opening of the second telescopic keel mechanism 32 of each layer are opened or closed at the same time to surround and wrap the column pier.

[0054] The pier operation and protection platform of the present invention adopts a multi-layer keel system 3 with a docking port 35 in the middle. The system can be telescopically adjusted according to the width of piers of different specifications. It is driven by a drive motor 22 so that the multi-layer keel system 3 can simultaneously open or close the docking port 35, thereby meeting the packaging requirements. Compared with the traditional pier operation and protection frame, the pier operation and protection platform of the present invention does not need to set up an operation and protection frame for each pier separately. The mechanically integrated pier operation and protection platform of the present invention can be moved quickly as a whole according to the number, specifications and casting speed of the piers, and can complete the pier casting work more flexibly. It is easy to install and disassemble, and saves the labor cost and time of setting up the operation and protection frame.

[0055] In this embodiment, the first telescopic square steel component I311 includes a first small square steel tube I311a and two first large square steel tubes I311b, the two ends of the first small square steel tube I311a respectively extend into the first large square steel tubes I311b on both sides, and the first small square steel tube I311a is respectively slidably connected to the inner cavities of the two first large square steel tubes I311b; the first telescopic square steel component II312 includes a first small square steel tube II312a and two first large square steel tubes II312b, the two ends of the first small square steel tube II312a respectively extend into the first large square steel tubes II312b on both sides, and the first small square steel tube II312a is respectively slidably connected to the inner cavities of the two first large square steel tubes II312b.

[0056] Specifically, taking the first telescopic square steel component I311 as an example, the outer dimensions of the first small square steel tube I311a match the inner dimensions of the first large square steel tube I311b, so that the two ends of the first small square steel tube I311a can slide into the inner cavities of the two first large square steel tubes I311b on both sides thereof, thereby enabling the first telescopic square steel component I311 to be telescopically adjusted. The connection and adjustment methods of the first telescopic square steel component II312, the second telescopic square steel component I321 and the second telescopic square steel component II322 with the above-mentioned first telescopic square steel component I311 are the same as those of the first telescopic square steel component I311, and will not be repeated here.

[0057] Specifically, see Figure 2 and Figure 3 The first sector gear 51 is arranged on the upper tube wall edge of the first large square steel tube Ⅰ311b close to the second telescopic square steel component Ⅰ321, the end of another first large square steel tube Ⅰ311b away from the first small square steel tube Ⅰ311a is vertically connected to the end of one of the first large square steel tubes Ⅱ312b, and the end of another first large square steel tube Ⅱ312b away from the first small square steel tube Ⅱ312a is vertically connected to the end of the first connecting rail 313.

[0058] In this embodiment, the upper and lower tube walls of the first small square steel tube Ⅰ311a are correspondingly provided with a plurality of pairs of first mounting holes Ⅰ3111, and the plurality of pairs of first mounting holes Ⅰ3111 are arranged at a certain interval along the length direction of the first small square steel tube Ⅰ311a; the upper and lower tube walls of the two first large square steel tubes Ⅰ311b are correspondingly provided with a plurality of pairs of first latch holes Ⅰ3112, and the plurality of pairs of first latch holes Ⅰ3112 are arranged at a certain interval along the length direction of the first large square steel tube Ⅰ311b; the first small square steel tube Ⅰ311a is fixedly connected with the two first large square steel tubes Ⅰ311b by bolts 37 respectively penetrating a pair of first latch holes Ⅰ3112 and a pair of first mounting holes Ⅰ3111;

[0059] The upper and lower tube walls of the first small square steel tube Ⅱ312a are correspondingly provided with a plurality of pairs of first mounting holes Ⅱ3121, and the plurality of pairs of first mounting holes Ⅱ3121 are arranged at a certain interval along the length direction of the first small square steel tube Ⅱ312a; the upper and lower tube walls of the two first large square steel tubes Ⅱ312b are correspondingly provided with a plurality of pairs of first pin holes Ⅱ3122, and the plurality of pairs of first pin holes Ⅱ3122 are arranged at a certain interval along the length direction of the first large square steel tube Ⅱ312b; the first small square steel tube Ⅱ312a is fixedly connected with the two first large square steel tubes Ⅱ312b by bolts 37 through a pair of first pin holes Ⅱ3122 and a pair of first mounting holes Ⅱ3121.

[0060] Taking the first telescopic square steel component Ⅰ311 as an example, the term "bolt 37 penetration" means that the bolt 37 (including the bolt 37 head and the stud) is passed through the first mounting hole Ⅰ3111 or the first pin hole Ⅰ3112 on the first small square steel tube Ⅰ311a or the two first large square steel tubes Ⅰ311b, and after passing through the first pin hole Ⅰ3112 or the first mounting hole Ⅰ3111, it cooperates with the nut to achieve the connection and tightening between the components.

[0061] The "pair" in the "pair of first pin holes I3112" and "pair of first mounting holes I3111" mentioned in this embodiment means that the first mounting holes I3111 are located on the upper and lower walls of the first small square steel tube I311a, and the first pin holes I3112 are located on the upper and lower walls of the first large square steel tube I311b, and the sizes are matched, so that a bolt 37 can pass through. For example, the first mounting holes I3111 corresponding to the upper and lower walls of the first small square steel tube I311a constitute a pair of first mounting holes I3111. When the first small square steel tube Ⅰ311a and the first large square steel tube Ⅰ311b are connected and fixed by the bolts 37, the bolts 37 pass through one of the pair of first pin holes Ⅰ3112, one of the pair of first mounting holes Ⅰ3111, the other of the pair of first mounting holes Ⅰ3111 and the other of the pair of first pin holes Ⅰ3112 in sequence, and then the matching nut is tightened on the bolt 37 to complete the fixed connection between the first small square steel tube Ⅰ311a and the first large square steel tube Ⅰ311b.

[0062] In this embodiment, the first connecting rail 313 and the second connecting rail 323 both adopt a U-shaped groove structure. The first connecting rail 313 includes a first notch, and a plurality of first latch holes III3131 are arranged in the first notch. The plurality of first latch holes III3131 are arranged at intervals along the length direction of the first connecting rail 313 at a certain interval; the second connecting rail 323 includes a second notch; a plurality of second latch holes III3231 are arranged in the second notch, and the plurality of second latch holes III3231 are arranged at intervals along the length direction of the second connecting rail 323 at a certain interval;

[0063] The pier operation protection platform also includes a guide rail connecting plate 360, which can be conformably embedded in the first slot and the second slot. A plurality of guide rail mounting holes 3601 are provided on the guide rail connecting plate 360, and the plurality of guide rail mounting holes 3601 are arranged at a certain interval along the length direction of the guide rail connecting plate 360; the first connecting rail 313 and the second connecting rail 323 are fixedly connected by bolts 37 that pass through a corresponding guide rail mounting hole 3601 and a first pin hole III3131, and a guide rail mounting hole 3601 and a second pin hole III3231, respectively.

[0064] There is a second gap 34 between the first connecting rail 313 and the second connecting rail 323, so that the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 can be opened or closed, and then the entire pier operation protection platform can complete the opening or closing action. After the docking interface 35 surrounds the pier, the lengths of the first telescopic square steel component I311, the first telescopic square steel component II312, the second telescopic square steel component I321 and the second telescopic square steel component II322 are first adjusted according to the size of the pier and fixed by bolts 37. In order to make the entire pier operation protection platform tightly wrap around the pier, there is a second gap 34 between the first connecting rail 313 and the second connecting rail 323. Therefore, a guide rail connecting plate 360 ​​is also required to connect and fix the first connecting rail 313 and the second connecting rail 323 to meet the wrapping and integrity of the pier operation protection platform.

[0065] Specifically, the guide rail connecting plate 360 ​​can be conformably embedded in the first notch and the second notch, and the guide rail mounting holes 3601 are respectively opposite to the first latch hole III3131 and the second latch hole III3231, and the sizes are matched, so that a bolt 37 can pass through each. When the first connecting rail 313 and the second connecting rail 323 are connected and fixed by the bolts 37, the two bolts 37 pass through the corresponding one guide rail mounting hole 3601 and one first latch hole III3131, one guide rail mounting hole 3601 and one second latch hole III3231, and then the matching nuts are tightened on the bolts 37 to complete the guide rail connecting plate 360 ​​connecting and fixing the first connecting rail 313 and the second connecting rail 323 respectively.

[0066] In this embodiment, the driving mechanism 2 includes a first transmission shaft 21a, a second transmission shaft 21b and a driving motor 22. The first transmission shaft 21a and the second transmission shaft 21b are arranged in parallel along the height direction of the frame body 1, and the first transmission shaft 21a and the second transmission shaft 21b are both located in the first gap 33. The output shaft of the driving motor 22 is connected to the bottom end of the second transmission shaft 21b.

[0067] A plurality of first transmission gears 211 are arranged at intervals on the first transmission shaft 21a, and the plurality of first transmission gears 211 are respectively meshed with the first sector gears 51 corresponding to each layer; a plurality of second transmission gears 212 are arranged at intervals on the second transmission shaft 21b, and the plurality of second transmission gears 212 are respectively meshed with each corresponding first transmission gear 211, and the plurality of second transmission gears 212 are respectively meshed with the second sector gears 52 corresponding to each layer.

[0068] In this embodiment, the first sector gear 51 and the second sector gear 52, the plurality of first transmission gears 211 and the plurality of second transmission gears 212 are of the same shape, specification and size, so that the rotation speed of the first telescopic keel mechanism 31 and the corresponding second telescopic keel mechanism 32 of each layer is the same, thereby facilitating the control of the column pier operation protection platform. The outer diameter of the first transmission shaft 21a and the second transmission shaft 21b are also the same, except that the length of the second transmission shaft 21b is longer than that of the first transmission shaft 21a, so that the second transmission shaft 21b is connected to the drive motor 22, thereby providing driving force for the opening or closing of the entire column pier operation protection platform.

[0069] In this embodiment, a first support plate I23a is provided on the end surface of the first large square steel tube I311b close to the first transmission shaft 21a, the first transmission shaft 21a penetrates the first support plate I23a of each layer, and the first transmission shaft 21a is rotatably connected to the first support plate I23a of each layer; a second support plate I23b is provided on the end surface of the second telescopic square steel component I321 close to the second transmission shaft 21b, the second transmission shaft 21b penetrates the second support plate I23b of each layer, and the second transmission shaft 21b is rotatably connected to the second support plate I23b of each layer;

[0070] A first support plate II24a is arranged on the end face of the first large square steel tube I311b located at the bottom layer close to the first transmission shaft 21a, and the first support plate II24a is rotatably connected to the bottom end of the first transmission shaft 21a; a second support plate II24b is arranged on the end face of the second telescopic square steel component I321 located at the bottom layer close to the second transmission shaft 21b, and the bottom end of the second transmission shaft 21b passes through the second support plate II24b and is connected to the output shaft of the driving motor 22 arranged at the bottom of the second support plate II24b.

[0071] The first support plate I23a and the second support plate I23b of each layer can provide support for the first transmission shaft 21a and the second transmission shaft 21b respectively, so that the first transmission shaft 21a and the second transmission shaft 21b do not deflect when rotating, thereby ensuring the stability of the driving mechanism 2. In addition, a first support plate II24a is arranged on the first large square steel tube I311b of the bottom layer, and a second support plate II24b is arranged on the second telescopic square steel component I321 of the bottom layer. The first support plate II24a and the second support plate II24b are respectively used to support the weight of the first transmission shaft 21a and multiple first transmission gears 211, and the second transmission shaft 21b and multiple second transmission gears 212. In addition, the driving motor 22 is arranged at the bottom of the second support plate II24b and connected to the second transmission shaft 21b. The driving motor 22 drives the second transmission shaft 21b to rotate, and the second transmission gear 212 of each layer drives the first transmission gear 211 and the second sector gear 52 on its left side to rotate respectively. The above-mentioned first transmission gear 211 further drives the first sector gear 51 to rotate, thereby simultaneously driving the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 of each layer to rotate in opposite directions around the height direction of the frame body 1, so that the docking interface 35 of each layer is opened or closed.

[0072] In order to facilitate the movement of the pier operation protection platform, in this embodiment, universal wheels 6 with foot brakes are installed at the bottom of the vertical poles 4.

[0073] The present invention also discloses an operation method of a pier operation protection platform, comprising the following steps:

[0074] (1) Open the pier operation protection platform: take out the bolts 37 and the guide rail connecting plate 360 ​​in each layer of the keel system 3 respectively, adjust each of the first telescopic square steel component I 311, the first telescopic square steel component II 312, the second telescopic square steel component I 321 and the second telescopic square steel component II 322 to the maximum extension state, and then fix the bolts 37 respectively;

[0075] The driving motor 22 is started, and the driving motor 22 drives the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 of each layer to rotate, so that the docking port 35 is opened;

[0076] (2) Wrapping the pier: Move the pier operation protection platform in step (1) to the pier so that the pier is located in the opened docking port 35, start the drive motor 22 again, and the drive motor 22 drives the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 to rotate, so that the docking port 35 is closed; adjust the length of the first telescopic keel mechanism 31 and the second telescopic keel mechanism 32 of each layer according to the width of the pier to be cast, so that the docking port 35 of the entire pier operation protection platform wraps the pier formwork;

[0077] (3) Formwork support: Install a construction operation platform (not shown) on top of the pier operation protection platform to support the formwork;

[0078] (4) pouring concrete: pouring concrete into the formwork in step (3);

[0079] (5) Moving the pier operation protection platform: After the concrete strength requirement is reached, repeat step (1) and move the pier operation protection platform through the opened docking port 35.

[0080] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A mechanically integrated pier operation and protection platform, characterized in that: The invention comprises a frame body, wherein the frame body is a steel structure composed of a driving mechanism, at least two layers of keel systems and a plurality of vertical poles supporting each layer of the keel system; the keel system comprises a first telescopic keel mechanism and a second telescopic keel mechanism which are horizontally symmetrically arranged on the left and right sides. The first telescopic keel mechanism adopts a C-shaped structure, including a first telescopic square steel component I, a first telescopic square steel component II and a first connecting rail connected in sequence, and the first telescopic square steel component I is provided with a first sector gear; The second telescopic keel mechanism adopts a C-shaped structure, including a second telescopic square steel component I, a second telescopic square steel component II and a second connecting rail connected in sequence, and the second telescopic square steel component I is provided with a second sector gear; The first telescopic square steel component I and the second telescopic square steel component I are arranged opposite to each other and have a first gap, and the first connecting rail and the second connecting rail are arranged opposite to each other and have a second gap; the C-shaped opening of the first telescopic keel mechanism and the C-shaped opening of the second telescopic keel mechanism are arranged opposite to each other to form a docking interface for enclosing the column pier; The first telescopic square steel component I comprises a first small square steel tube I and two first large square steel tubes I, the two ends of the first small square steel tube I respectively extend into the first large square steel tubes I on both sides, and the first small square steel tube I is respectively slidably connected to the inner cavities of the two first large square steel tubes I; The first telescopic square steel component II comprises a first small square steel tube II and two first large square steel tubes II, the two ends of the first small square steel tube II respectively extend into the first large square steel tubes II on both sides, and the first small square steel tube II is respectively slidably connected to the inner cavities of the two first large square steel tubes II; The first sector gear is arranged on the upper tube wall edge of the first large square steel tube I close to the second telescopic square steel component I, the end of another first large square steel tube I away from the first small square steel tube I is vertically connected to the end of one of the first large square steel tubes II, and the end of another first large square steel tube II away from the first small square steel tube II is vertically connected to the end of the first connecting rail; The upper and lower tube walls of the first small square steel tube I are correspondingly provided with a plurality of pairs of first mounting holes I, and the plurality of pairs of the first mounting holes I are arranged at a certain interval along the length direction of the first small square steel tube I; the upper and lower tube walls of the two first large square steel tubes I are correspondingly provided with a plurality of pairs of first latch holes I, and the plurality of pairs of the first latch holes I are arranged at a certain interval along the length direction of the first large square steel tube I; the first small square steel tube I is fixedly connected to the two first large square steel tubes I by bolts penetrating a pair of first latch holes I and a pair of first mounting holes I; The upper and lower tube walls of the first small square steel tube II are correspondingly provided with a plurality of pairs of first mounting holes II, and the plurality of pairs of the first mounting holes II are arranged at a certain interval along the length direction of the first small square steel tube II; the upper and lower tube walls of the two first large square steel tubes II are correspondingly provided with a plurality of pairs of first latch holes II, and the plurality of pairs of the first latch holes II are arranged at a certain interval along the length direction of the first large square steel tube II; the first small square steel tube II is fixedly connected with the two first large square steel tubes II by bolts penetrating a pair of first latch holes II and a pair of first mounting holes II; The driving mechanism is arranged in the first gap of each layer, and the driving mechanism is respectively engaged with the first sector gear and the second sector gear of each layer; the driving mechanism is used to simultaneously drive the first telescopic keel mechanism and the second telescopic keel mechanism of each layer to rotate in opposite directions around the height direction of the frame body, so as to open or close the docking port of each layer; The structure and connection relationship of the second telescopic keel mechanism are the same as the structure and connection relationship of the first telescopic keel mechanism; Universal wheels with foot brakes are installed at the bottoms of the uprights.

2. The pier operation protection platform according to claim 1, characterized in that: The first connecting rail and the second connecting rail both adopt a U-shaped groove structure, the first connecting rail comprises a first notch, a plurality of first latch holes III are arranged in the first notch, and the plurality of first latch holes III are arranged at intervals along the length direction of the first connecting rail at a certain interval; The second connecting rail comprises a second notch; a plurality of second pin holes III are arranged in the second notch, and the plurality of second pin holes III are arranged at intervals along the length direction of the second connecting rail at a certain interval; It also includes a guide rail connecting plate, the guide rail connecting plate can be conformably embedded in the first slot and the second slot, a plurality of guide rail mounting holes are arranged on the guide rail connecting plate, and the plurality of guide rail mounting holes are arranged at intervals along the length direction of the guide rail connecting plate at a certain interval; The first connecting rail and the second connecting rail are fixedly connected by bolts passing through a corresponding guide rail mounting hole and a first latch hole III, and a guide rail mounting hole and a second latch hole III respectively.

3. The pier operation protection platform according to claim 2, characterized in that: The driving mechanism comprises a first transmission shaft, a second transmission shaft and a driving motor, the first transmission shaft and the second transmission shaft are arranged in parallel along the height direction of the frame body, and the first transmission shaft and the second transmission shaft are both located in the first gap, and the output shaft of the driving motor is connected to the bottom end of the second transmission shaft; A plurality of first transmission gears are arranged at intervals on the first transmission shaft, and the plurality of first transmission gears are respectively meshed with the first sector gears corresponding to each layer; a plurality of second transmission gears are arranged at intervals on the second transmission shaft, and the plurality of second transmission gears are respectively meshed with each corresponding first transmission gear, and the plurality of second transmission gears are respectively meshed with the second sector gears corresponding to each layer.

4. The pier operation protection platform according to claim 3 is characterized by: A first support plate I is provided on the end surface of the first large square steel tube I close to the first transmission shaft, the first transmission shaft penetrates the first support plate I of each layer, and the first transmission shaft is rotatably connected to the first support plate I of each layer; A second support plate I is arranged on the end surface of the second telescopic square steel component I close to the second transmission shaft, the second transmission shaft penetrates the second support plate I of each layer, and the second transmission shaft is rotatably connected to the second support plate I of each layer; A first support plate II is provided on the end surface of the first large square steel tube I located at the bottom layer close to the first transmission shaft, and the first support plate II is rotatably connected to the bottom end of the first transmission shaft; A second support plate II is arranged on the end surface of the second telescopic square steel component I located at the bottom layer close to the second transmission shaft. The bottom end of the second transmission shaft passes through the second support plate II and is connected to the output shaft of the driving motor arranged at the bottom of the second support plate II.

5. An operating method for a pier operating protection platform according to any one of claims 2, 3 and 4, characterized in that: The following steps are involved: (1) Open the pier operation protection platform: remove the bolts and guide rail connection plates in each layer of the keel system respectively, adjust each first telescopic square steel component I, first telescopic square steel component II, second telescopic square steel component I and second telescopic square steel component II to the maximum extension state, and then fix the bolts respectively; The driving motor is started, and the driving motor drives the first telescopic keel mechanism and the second telescopic keel mechanism of each layer to rotate, so that the docking interface is opened; (2) Wrapping the pier: Move the pier operation protection platform in step (1) to the pier so that the pier is located in the opened docking interface, start the drive motor again, and the drive motor drives the first telescopic keel mechanism and the second telescopic keel mechanism to rotate so that the docking interface is closed; adjust the length of the first telescopic keel mechanism and the second telescopic keel mechanism of each layer according to the width of the pier to be cast, so that the docking interface of the entire pier operation protection platform wraps the pier template; (3) Formwork support: Install the construction operation platform on the top of the pier operation protection platform to support the formwork; (4) pouring concrete: pouring concrete into the formwork in step (3); (5) Moving the pier operation protection platform: After the concrete strength requirement is reached, repeat step (1) and move the pier operation protection platform through the opened docking port (35).