Simulation device and method for SF6 gas leakage fault of GIS electrical equipment
By designing GIS simulation pipelines and electrical control systems, using the mixed gases of SF6 and N2 to simulate the air leakage situation of GIS equipment, the problem that existing simulation devices cannot accurately simulate the leakage parts and leakage rates is solved, and safe and economical SF6 gas leakage fault simulation, suitable for training in GIS equipment.
Patent Information
- Application Number
- CN201911053654.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-31
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2039-10-31
AI Technical Summary
The existing SF6 gas leakage fault simulation device cannot accurately simulate the air leakage location and leakage rate of GIS equipment, and the use of pure SF6 gas poses safety risks and high costs.
A simulation device including GIS simulation pipeline, gas storage tank, gas mixing tank and electrical control system was designed to realize artificial control of air leakage through mixed gas (SF6 and N2 mixing), simulating the leakage parts and leakage of GIS equipment. The gas rate is precisely adjusted by the electrical control system.
Accurate simulation of SF6 gas leakage failures in GIS equipment is achieved, reducing costs, improving safety performance, and able to artificially control the leaking parts and leakage rates to ensure the safety and accuracy of training.
Smart Images

Figure CN110631772B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of gas leakage detection for high-voltage electrical equipment, and in particular to a GIS electrical equipment SF 6 A device and method for simulating gas leakage failure. Background Art
[0002] Infrared imaging leak detection is a very mature gas leak detection technology. 6 The leak detector has a lower detection limit and can accurately detect gas micro-leakage points in electrical equipment, so it is widely used in SF 6 Gas leak detection. Currently verifying SF 6 Infrared imaging leak detection equipment and production operation leak detection technology training, mainly using SF 6 The cylinder is used as a test device to simulate the leakage of electrical equipment by opening and closing the cylinder. There are the following problems:
[0003] 1. SF 6 There is a big difference between the appearance of steel cylinders and GIS equipment. 6 The only leaking part of the cylinder is the valve, which cannot accurately simulate the conventional leaking part of GIS electrical equipment;
[0004] 2. Due to SF 6 The gas leakage of the cylinder valve switch is large, and it is impossible to accurately simulate the gas leakage rate of conventional GIS equipment (the gas leakage rate is slower), resulting in discrepancies between the actual situation and the actual conditions on site;
[0005] 3. The gas currently used is pure SF 6 Gas is expensive, and SF 6 The density of gas is greater than that of air and it tends to gather in low-lying areas, causing suffocation to people and posing a safety hazard. Summary of the invention
[0006] The purpose of the present invention is to provide a GIS electrical equipment SF that can realize artificial control of air leakage, reduce costs and improve safety performance in view of the shortcomings of the prior art. 6 A device and method for simulating gas leakage failure.
[0007] The GIS electrical equipment SF provided by the present invention 6A simulation device for gas leakage failure comprises a base, a GIS simulation pipeline, a gas storage tank, a mixed gas tank and an electrical control system; a plurality of porcelain sleeves are welded on the GIS simulation pipeline, and leakage holes are arranged on the GIS simulation pipeline and the porcelain sleeve; each gas storage tank is arranged on the base respectively; a pressure sensor, a leakage hole and an air inlet hole are arranged on the mixed gas tank, a leakage pipe is arranged outside the leakage hole, an air inlet pipe is arranged outside the air inlet hole, the other end of the air inlet pipe is connected with the corresponding gas storage tank, and electromagnetic valves for controlling the opening and closing of the pipeline are arranged on the leakage pipe and the air inlet pipe, and the mixed gas tank is placed in the GIS simulation pipeline; the electrical control system comprises a power supply, a voltage stabilizing component, a main control processor, a control panel and a relay, the relay and the electromagnetic valve are arranged one by one, and the electrical control system controls the opening and closing of each electromagnetic valve individually through each relay.
[0008] In order to facilitate movement, a pulley is provided at the bottom of the base for movement.
[0009] In a specific embodiment, the GIS simulation pipeline is a cylindrical pipeline, three porcelain sleeve fixing seats are welded on the upper part, leakage holes are arranged at the welds, both ends are locked by cover plates, a movable door is arranged on one end cover plate, the control panel is arranged outside the movable door, and the main control processor is arranged inside the movable door.
[0010] In order to improve the simulation effect, a sealing ring is provided between the cover plate and the GIS simulation pipeline, and a small hole is provided on the sealing ring to form an air leakage hole at the threaded connection.
[0011] In a specific embodiment, the gas storage tanks are of two types, one type is SF 6 Gas tank, another type is N 2 gas tank.
[0012] The present invention also provides a GIS electrical equipment SF 6 The method for simulating a gas leakage fault comprises the following steps:
[0013] Step 1: Control all solenoid valves to be in the closed state and inject SF into a gas storage tank. 6 , another type of gas tank is filled with N 2 ;
[0014] Step 2: Open the solenoid valve on the air intake pipe and inject SF into the mixed gas tank at the same time. 6 and N 2 ; Control the air pressure in the mixed gas tank to 0.35-0.7 MPa.
[0015] Step 3: Control the solenoid valve on the leaking pipe to open, and simulate the mixed gas overflowing from the leaking hole.
[0016] Furthermore, in step 2, SF 6 The proportion is 20%-30%.
[0017] Accordingly, in step 2, confirm that SF 6 The method of content is:
[0018] a. Calculate SF 6 and N 2 Theoretical value of the power frequency breakdown voltage of the mixed gas,
[0019] a.1. Calculation of 10% SF 6 Theoretical value of mixed gas at different pressures,
[0020] a.2. Calculation of 20% SF 6 Theoretical value of mixed gas at different pressures,
[0021] a.3. Calculation of 30% SF 6 Theoretical value of mixed gas at different pressures,
[0022] a.4. Calculation of 50% SF 6 Theoretical value of mixed gas at different pressures,
[0023] a.5. Calculation of 80% SF 6 Theoretical value of mixed gas at different pressures,
[0024] a.6. Calculation of 100% SF 6 Theoretical value of mixed gas at different pressures;
[0025] b. Determine SF 6 and N 2 Test value of power frequency breakdown voltage of mixed gas,
[0026] b.1. Make a test device, which includes a sealed tank, an air-charging valve, a pressure gauge, an insulating porcelain sleeve, a discharge electrode and a conductive rod. The air-charging valve and the pressure gauge are respectively connected to the sealed tank. A pair of conductive rods are symmetrically arranged at both ends of the sealed tank. The discharge electrode is connected to the inner end of the conductive rod. The insulating porcelain sleeve is sleeved on the outer end of the conductive rod. The inner end of the conductive rod extends into the sealed tank.
[0027] b.2. Inject 10% SF 6 Mixed gas, apply power frequency voltage from 0kV, when the voltage increases to 75% of the expected breakdown voltage, start to slowly increase the voltage until the discharge electrode breaks down, then the test value of the breakdown voltage of the mixed gas at the current gas pressure can be determined.
[0028] b.3. Continue to inject 10% SF 6 Mix the gas until the pressure changes, repeat b.2 to obtain the 10% SF 6 Test value of breakdown voltage of mixed gas,
[0029] b.4. Repeat b.2 and b.3, inject 20% SF 6 Mixed gas, 30% SF 6 Mixed gas, 50% SF 6 Mixed gas, 80% SF 6 Mixed gas, 100% SF 6 The test value of breakdown voltage of mixed gas with different proportions at corresponding pressure can be obtained.
[0030] c. From the theoretical and experimental values, it can be seen that when SF 6 When the gas content ratio is 20% to 30%, the power frequency breakdown voltage of the mixed gas can reach that of pure SF 6 75% to 80% of the power frequency breakdown voltage of gas;
[0031] d. Adjust the distance between a pair of discharge electrodes, repeat steps a and b, and verify the conclusion in c.
[0032] Furthermore, in said a,
[0033] Pure SF 6 The empirical formula for the power frequency breakdown voltage of a gap with gas as the insulating medium is:
[0034] SF 6 and N 2 The formula for the power frequency breakdown voltage of the gap with mixed gas as the insulating medium is:
[0035] E af is the power frequency breakdown voltage, f is the non-uniformity coefficient, p is the absolute pressure of the gas, d is the electrode spacing (cm), x is SF 6 The proportion of mixed gas.
[0036] When the present invention is used, each solenoid valve is controlled to be in a closed state, and SF is injected into different gas storage tanks respectively. 6 and N 2 , the corresponding solenoid valve on the control pipeline is opened, and the mixed gas overflows from the leakage hole to simulate gas leakage. 6 and N 2 The mixed gas of gas is economical and practical, and can ensure the safety of personnel. And through the program, the leakage position can be manually controlled, the leakage rate can be adjusted, and the pressure of the mixed gas tank can be monitored. The color LED touch screen is used for operation and monitoring data display. The operation is intuitive and the human-machine interface is friendly. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a schematic diagram of the structure of a simulation device in a preferred embodiment of the present invention.
[0038] Figure 2 This is a control block diagram of the preferred embodiment.
[0039] Figure 3 This is a circuit schematic diagram of the main control processor in this preferred embodiment.
[0040] Figure 4 It is a schematic diagram of the structure of the test device in this preferred embodiment.
[0041] Figure serial number:
[0042] 1—base, 11—pulley;
[0043] 2—GIS simulation pipeline, 21—porcelain sleeve fixing seat, 22—cover plate, 23—movable door;
[0044] 3—gas storage tank;
[0045] 4—mixed gas tank;
[0046] 5—porcelain bushing;
[0047] 6—intake pipe;
[0048] 7—Pressure sensor;
[0049] 81—main control processor, 82—control panel;
[0050] A—test device, A1—sealed tank, A2—inflating valve, A3—insulating porcelain sleeve, A4—discharge electrode, A5—conductive rod. DETAILED DESCRIPTION
[0051] like Figure 1 As shown, the GIS electrical equipment SF disclosed in this embodiment 6 The simulation device for gas leakage failure comprises a base 1, a GIS simulation pipeline 2, a gas storage tank 3, a mixed gas tank 4 and an electrical control system.
[0052] The base 1 is a rectangular base with a cavity inside, and a pulley 11 is provided at the bottom thereof to facilitate the movement of the entire device; the GIS simulation pipeline 2 is fixedly connected to the base 1.
[0053] The structure of the GIS simulation pipeline 2 is consistent with the actual tank of the GIS electrical equipment. It is made of a 50CM diameter metal pipe. Three porcelain sleeve fixing seats 21 are welded on the upper left part of the pipeline. During welding, the welding is precisely controlled to leave a suitable size that meets the requirements of conventional SF 6The leakage holes of the inflation equipment form the leakage holes of the weld of the metal tank body; each porcelain sleeve fixing seat 21 is provided with a porcelain sleeve 5. After the porcelain sleeve is formed in the mud embryo, leakage holes are finely carved on the upper, middle and lower parts thereof (simulating leakage at the porcelain sleeve flange and porcelain sleeve cracks) and then fired; both ends are sealed with a cover plate 22 and bolted, a sealing ring is provided between the cover plate and the simulated pipeline, and a small hole is provided on the sealing ring to form a leakage hole at the threaded connection; and a movable door 23 is provided on the right end cover plate for installing relevant components of the electrical control system.
[0054] There are two gas storage tanks 3 arranged in parallel, one of which is filled with SF 6 , the other filled with N 2 The two gas storage tanks are respectively placed in the base and connected with the mixed gas tank 4 through the air inlet pipe 6.
[0055] The mixed gas tank 4 is arranged in the GIS simulation pipeline 2. The mixed gas tank is connected with eight solenoid valves, six of which are outlet valves for controlling the outlet of six leakage points, and two are inlet valves, which are connected with the inlet pipe 6 to control the SF 6 and N 2 For the intake of gas, a pressure sensor 7 is connected to the outside of the mixed gas tank 4 to monitor the gas pressure of the mixed gas tank.
[0056] The electrical control system includes a power supply, a voltage stabilizing component, a main control processor 81, a control panel 82 and a relay. The main control processor is arranged inside the movable door, and the control panel is arranged outside the movable door. The relays and the solenoid valves are arranged one by one. The electrical control system controls the opening and closing of each solenoid valve individually through each relay. The control block diagram is shown as follows. Figure 2 shown.
[0057] The main control processor uses STM32F103R8T6, which is positioned as a 32-bit ARM industrial control processor with an applicable temperature range of -40 to +85 degrees Celsius. The anti-static ability is 2000V for the human body discharge model and 400V for the device-to-device discharge model; it fully meets the requirements of industrial control levels.
[0058] The power supply uses a 12V DC power input, which is connected to the common mode suppression and filtering circuit after TVS electrostatic protection, and then connected to the DC-DC converter to step down to a 5V DC power supply.
[0059] The 5V DC power supply is stepped down and stabilized by a linear low-dropout core (LDO) to obtain a 3.3V voltage for the main control ARM processor and its peripheral digital circuit power supply.
[0060] Another path of the 5V DC power supply passes through a precision reference voltage chip to obtain a 3.3V (+ / -0.1%) precision voltage source to power the analog-to-digital converter (ADC) of the ARM chip to ensure the accuracy and stability of the data collected by the pressure sensor.
[0061] The gas pressure transmitter is powered by a 12V voltage connected in series with a magnetic bead and a parallel capacitor for filtering. The other pin of the pressure transmitter is connected in series with a precision resistor to the reference voltage ground for sampling. The sampling end is added with a TVS overvoltage protection circuit and sent to the analog acquisition pin of the ARM chip for digital sampling.
[0062] The main control ARM processor is connected to the 10-inch LCD touch screen through the RS232 serial interface. All control commands are issued through the touch screen, and all status and collected data are intuitively displayed on the LCD display.
[0063] The ARM processor outputs the control signals of each relay through the IO data buffer, and drives the relay to control the AC solenoid valve to switch through the high current driver chip. Figure 3 Shown
[0064] When using this device to simulate gas leakage faults, follow the steps below:
[0065] 1. Control all solenoid valves to be in the closed state and inject SF into a type of gas storage tank. 6 , another type of gas tank is filled with N 2 ;
[0066] 2. Open the solenoid valve on the air intake pipe and inject SF 6 and N 2 , S.F. 6 The proportion in the mixed gas is 20%-30%, and the pressure in the mixed gas tank is controlled to be 0.35-0.7 MPa, which is about the same as that of pure SF 6 1.4 times the rear air pressure;
[0067] N 2 As SF 6 The mixed gas has the following advantages: 2 Widely present in the air, easy to obtain and low cost; N 2 The liquefaction temperature is low, which can improve the liquefaction temperature of the mixed gas; N 2 It is an inert gas that can reduce the oxidation decomposition reaction of SF6 under the action of electric field. The power frequency breakdown characteristics of the mixed gas were analyzed from two aspects: theoretical analysis and experiment. The results show that when SF 6 When the gas content is 20%, the power frequency breakdown voltage of the mixed gas can reach 75% of the power frequency breakdown voltage of pure SF6 gas. 6 When the gas content is 30%, the power frequency breakdown voltage rises to 80%, and then 6 As the gas content increases, the power frequency breakdown voltage increases slowly, but the SF 6Gas costs and pollution levels will increase significantly. The specific process is:
[0068] a. Calculate SF 6 and N 2 Theoretical value of the power frequency breakdown voltage of the mixed gas,
[0069] Since pure SF 6 The empirical formula for the power frequency breakdown voltage of a gap with gas as the insulating medium is:
[0070] SF 6 and N 2 The formula for the power frequency breakdown voltage of the gap with mixed gas as the insulating medium is:
[0071] E af is the power frequency breakdown voltage, f is the non-uniformity coefficient, p is the absolute pressure of the gas, d is the electrode spacing (cm), x is SF 6 The proportion of mixed gas, when d = 2CM,
[0072] a.1. Calculation of 10% SF 6 Theoretical value of mixed gas at different pressures,
[0073] a.2. Calculation of 20% SF 6 Theoretical value of mixed gas at different pressures,
[0074] a.3. Calculation of 30% SF 6 Theoretical value of mixed gas at different pressures,
[0075] a.4. Calculation of 50% SF 6 Theoretical value of mixed gas at different pressures,
[0076] a.5. Calculation of 80% SF 6 Theoretical value of mixed gas at different pressures,
[0077] a.6. Calculation of 100% SF 6 Theoretical value of mixed gas at different pressures;
[0078] The theoretical values are shown in Table 1.
[0079]
[0080] Table 1
[0081] b. Determine SF 6 and N 2 Test value of power frequency breakdown voltage of mixed gas,
[0082] b.1. Make Figure 3The test device A shown in the figure comprises a closed tank A1, a gas charging valve A2, a pressure gauge, an insulating porcelain sleeve A3, a discharge electrode A4 and a conductive rod A5. The gas charging valve and the pressure gauge are respectively connected to the closed tank. A pair of conductive rods are symmetrically arranged at both ends of the closed tank. The discharge electrode is connected to the inner end of the conductive rod. The insulating porcelain sleeve is sleeved on the outer end of the conductive rod. The inner end of the conductive rod extends into the closed tank. The conductive rod is threadedly connected to the closed tank and can move relative to the closed tank along the length direction of the closed tank.
[0083] b.2. Inject 10% SF 6 Mixed gas, apply power frequency voltage from 0kV, when the voltage increases to 75% of the expected breakdown voltage, start to slowly increase the voltage until the discharge electrode breaks down, then the test value of the breakdown voltage of the mixed gas at the current gas pressure can be determined.
[0084] b.3. Continue to inject 10% SF 6 Mix the gas until the pressure changes, repeat b.2 to obtain the 10% SF 6 Test value of breakdown voltage of mixed gas,
[0085] b.4. Repeat b.2 and b.3, inject 20% SF 6 Mixed gas, 30% SF 6 Mixed gas, 50% SF 6 Mixed gas, 80% SF 6 Mixed gas, 100% SF 6 The test value of breakdown voltage of mixed gas with different proportions at corresponding pressure can be obtained.
[0086] When d = 2CM, the test values obtained are shown in Table 2.
[0087]
[0088] Table 2
[0089] c. From the theoretical and experimental values, it can be seen that when SF 6 When the gas content ratio is 20% to 30%, the power frequency breakdown voltage of the mixed gas can reach that of pure SF 6 75% to 80% of the power frequency breakdown voltage of gas;
[0090] d. Adjust the distance between a pair of discharge electrodes to d = 1.5CM, repeat step b, and obtain the test values as shown in Table 3.
[0091]
[0092]
[0093] Table 3
[0094] This proves the conclusion in c. Determine SF 6 The optimal ratio in the mixed gas is 20%-30%.
[0095] 3. Control the solenoid valve on the leakage pipe to open, and simulate the mixed gas overflowing from the leakage hole.
[0096] The device structure of the present invention is consistent with the GIS electrical equipment, and the leakage position can be controlled artificially. 6 and N 2 The mixed gas of gas is economical and practical, and can ensure the safety of the participants. It can accurately simulate the leakage of common key parts of GIS electrical equipment, and can artificially control the leakage location and leakage rate. 2 and SF 6 The mixed gas of the gas is economical and practical, and can ensure the safety of the participants. 6 Gas leakage fault simulation device can accurately simulate GIS electrical equipment SF 6 Leakage, providing safe, accurate, efficient and professional training in line with on-site production for trainees. The program can manually control the leakage location, adjust the leakage rate and monitor the mixed gas tank pressure. The color LED touch screen is used for operation and monitoring data display, and the operation is intuitive and the human-machine interface is friendly.
Claims
1. A GIS electrical equipment SF 6 Simulation device for gas leakage failure, Features: It includes a base, GIS simulation pipeline, gas storage tank, mixed gas tank and electrical control system; Multiple porcelain sleeves are welded on the GIS simulation pipeline, and leakage holes are set on the GIS simulation pipeline and the porcelain sleeves; Each gas storage tank is respectively arranged on a base; The mixed gas tank is provided with a pressure sensor, a leak hole and an air inlet hole. A leak pipe is provided outside the leak hole, and an air inlet pipe is provided outside the air inlet hole. The other end of the air inlet pipe is connected to the corresponding gas storage tank. The leak pipe and the air inlet pipe are both provided with solenoid valves for controlling the opening and closing of the pipeline. The mixed gas tank is placed in the GIS simulation pipeline. The electrical control system includes a power supply, a voltage stabilizing component, a main control processor, a control panel and relays. The relays are set one by one with the solenoid valves. The electrical control system controls the opening and closing of each solenoid valve individually through each relay. The GIS simulation pipeline is a cylindrical pipeline, three porcelain sleeve fixing seats are welded on the upper part, and leakage holes are arranged at the welds. Both ends of the pipeline are locked by cover plates, and a movable door is arranged on one end cover plate. The control panel is arranged outside the movable door, and the main control processor is arranged inside the movable door. There are two types of gas storage tanks, one is SF 6 Gas tank, another type is N 2 gas tank.
2. GIS electrical equipment SF according to claim 1 6 Simulation device for gas leakage failure, Features: The bottom of the base is provided with a pulley for movement.
3. The GIS electrical equipment SF according to claim 1 6 Simulation device for gas leakage failure, Features: A sealing ring is arranged between the cover plate and the GIS simulation pipeline, and a small hole is arranged on the sealing ring to form an air leakage hole at the threaded connection.
4. A GIS electrical equipment SF 6 Simulation method of gas leakage failure, It is characterized in that The method uses the simulation device described in claim 1 as a tool, and comprises the following steps: Step 1: Control all solenoid valves to be in the closed state and inject SF into a gas storage tank. 6 , another type of gas tank is filled with N 2 ; Step 2: Open the solenoid valve on the air intake pipe and inject SF into the mixed gas tank at the same time. 6 and N 2 ; Control the gas pressure in the mixed gas tank to 0.35-0.7 MPa; Step 3: Control the solenoid valve on the leaking pipe to open, and simulate the mixed gas overflowing from the leaking hole.
5. GIS electrical equipment SF according to claim 4 6 Simulation method of gas leakage failure, It is characterized in that In step 2, SF 6 The proportion is 20%-30%.
6. GIS electrical equipment SF according to claim 5 6 Simulation method of gas leakage failure, It is characterized in that In step 2, confirm that SF 6 The method of content is: a. Calculate SF 6 and N 2 Theoretical value of the power frequency breakdown voltage of the mixed gas, a.
1. Calculation of 10% SF 6 Theoretical value of mixed gas at different pressures, a.
2. Calculation of 20% SF 6 Theoretical value of mixed gas at different pressures, a.
3. Calculation of 30% SF 6 Theoretical value of mixed gas at different pressures, a.
4. Calculation of 50% SF 6 Theoretical value of mixed gas at different pressures, a.
5. Calculation of 80% SF 6 Theoretical value of mixed gas at different pressures, a.
6. Calculation of 100% SF 6 Theoretical value of mixed gas at different pressures; b. Determine SF 6 and N 2 Test value of power frequency breakdown voltage of mixed gas, b.
1. Make a test device, which includes a sealed tank, an air-charging valve, a pressure gauge, an insulating porcelain sleeve, a discharge electrode and a conductive rod. The air-charging valve and the pressure gauge are respectively connected to the sealed tank. A pair of conductive rods are symmetrically arranged at both ends of the sealed tank. The discharge electrode is connected to the inner end of the conductive rod. The insulating porcelain sleeve is sleeved on the outer end of the conductive rod. The inner end of the conductive rod extends into the sealed tank. b.
2. Inject 10% SF 6 Mixed gas, apply power frequency voltage from 0kV, when the voltage increases to 75% of the expected breakdown voltage, start to slowly increase the voltage until the discharge electrode breaks down, then the test value of the breakdown voltage of the mixed gas at the current gas pressure can be determined. b.
3. Continue to inject 10% SF 6 Mix the gas until the pressure changes, repeat b.2 to obtain the 10% SF 6 Test value of breakdown voltage of mixed gas, b.
4. Repeat b.2 and b.3, injecting 20% SF 6 Mixed gas, 30% SF 6 Mixed gas, 50% SF 6 Mixed gas, 80% SF 6 Mixed gas, 100% SF 6 The test value of breakdown voltage of mixed gas with different proportions at corresponding pressure can be obtained. c. From the theoretical and experimental values, it can be seen that when SF 6 When the gas content ratio is 20%~30%, the power frequency breakdown voltage of the mixed gas can reach that of pure SF 6 75%~80% of the power frequency breakdown voltage of gas; d. Adjust the distance between a pair of discharge electrodes, repeat steps a and b, and verify the conclusion in c.
7. GIS electrical equipment SF according to claim 6 6 Simulation method of gas leakage failure, It is characterized in that In the above a, pure SF 6 The empirical formula for the power frequency breakdown voltage of a gap with gas as the insulating medium is: , SF 6 and N 2 The formula for the power frequency breakdown voltage of the gap with mixed gas as the insulating medium is: ; is the power frequency breakdown voltage, is the non-uniformity coefficient, is the absolute pressure of the gas, is the electrode spacing, the unit of electrode spacing is cm, For SF 6 The proportion of mixed gas.