A hoisting method for a desilication tank tube row lifting support and a heating tube bundle

By setting up a group pairing device on the upper annular channel steel in the inner wall of the silicone desolation groove and setting up a transport bracket on the upper side of the stirring shaft, using the agitating shaft as the inverted carrier, the lifting, back-up, and installation in the range of 360 degrees is achieved, and the problems of long pipe dismantling and reinstallation time, large labor consumption, and lagging construction periods in the prior art are solved, and construction efficiency and safe production are improved.

CN110790175BActive Publication Date: 2025-07-01SHANXI ALUMINIUM FACTORY
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN201911200497.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-11-29
Publication Date
2025-07-01
Estimated Expiration
2039-11-29

AI Technical Summary

Technical Problem

The existing silicone descending trough pipe disassembly and reinstallation time is long, and it consumes a lot of labor, resulting in waste of labor and crane machinery shift costs, and the overhaul period is lagging. The existing lifting methods have a long construction period and a large amount of labor and equipment investment.

Method used

A desiccant tube drainage and transportation bracket is designed, including a set pairing device mounted on the annular channel steel on the upper part of the inner wall of the desiccant groove and a transport bracket arranged on the upper side of the stirring shaft. The stirring shaft is used as the inverted carrier to achieve lifting, inverted transportation, and installation in a range of 360 degrees.

Benefits of technology

The time required for pipe dismantling and reinstallation has been greatly reduced, manpower and equipment investment has been saved, overhauling the overhaul period ahead of schedule, and improving construction efficiency and safety production coefficient.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110790175B_ABST
    Figure CN110790175B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of construction technology, and particularly relates to a lifting method for a desilication tank pipe row transfer support and a heating tube bundle. The purpose of the present invention is to solve the technical problems that the existing pipe row removal and reinstallation require a long time, consume a large amount of manpower, cause waste of labor costs and crane mechanical shift fees, and delay the overhaul period, and that the existing lifting method has a long construction period and a large investment in labor and equipment. The present invention includes a pairing device clamped on the upper annular channel steel on the inner wall of the desilication tank and a transfer support arranged on the upper side of the stirring shaft of the desilication tank. An inspection manhole is opened at the top of the desilication tank. By arranging a pairing device on the upper annular channel steel on the inner wall of the desilication tank and a transfer support on the upper side of the stirring shaft of the desilication tank, and using the stirring shaft of the desilication tank as a transfer carrier, the pipe row can be transferred to the construction site at one time. With the pipe row transfer support, only one person needs to rotate the stirring shaft to achieve 360° lifting transfer, pairing, and installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of construction, and in particular relates to a desiliconization trough pipe row transportation bracket and a method for hoisting a heating pipe bundle. Background Art

[0002] The desiliconization tank is the main equipment for high-pressure dissolution of alumina. Due to long-term use, the heating tube bundle in the desiliconization tank has broken, the weld of the header tube has cracked, and serious material accumulation has occurred, affecting the normal operation of the desiliconization tank. In order to ensure the normal operation of the equipment, the heating tube bundle must be replaced.

[0003] The removal and reinstallation of the existing old pipe banks and upper and lower ring pipes takes a long time and consumes a lot of manpower, which not only wastes labor costs and crane machine shift fees, but also delays the overhaul period. The existing lifting method is to transport the pipe bundle from the outside of the desiliconization tank through the manhole door to the inside of the desiliconization tank, and then lift it multiple times with a hand winch and transport it to the construction site. The construction period is long and the labor and equipment investment is large. Summary of the invention

[0004] The purpose of the present invention is to solve the technical problems that the existing pipe bank removal and reinstallation takes a long time, consumes a lot of manpower, wastes labor costs and crane machinery shift fees, and delays the overhaul period, as well as the existing lifting method has a long construction period and a large amount of labor and equipment investment, and provide a desiliconization slot pipe bank transportation bracket and a heating tube bundle lifting method. In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0005] A desiliconization tank pipe row transportation bracket, characterized in that it includes a pairing device clamped on the annular channel steel on the upper inner wall of the desiliconization tank and a transportation bracket arranged on the upper side of the desiliconization tank stirring shaft, and an inspection manhole is opened on the top of the desiliconization tank. The desiliconization tank stirring shaft is used as a transportation carrier to transport the pipe row to the construction site at one time, and the pipe bundle can be hoisted, transported, paired and installed within a range of 360 degrees, which greatly reduces the time required for dismantling and reinstalling the pipe row, saves manpower, labor costs and crane machine shift fees, and advances the overhaul period. In addition, such an arrangement is more convenient, quick and efficient, reduces the labor intensity of on-site construction personnel, improves the safety production factor, and has good test results.

[0006] Furthermore, the pairing device includes a pairing bracket and a manual hoist, wherein the manual hoist is arranged at the end of the bracket arm of the pairing bracket, and the heating tube bundle is lifted by the manual hoist and paired and installed with the upper heating ring tube and the lower heating ring tube.

[0007] Furthermore, the pairing bracket includes a bracket base and a bracket arm. The bracket base and the bracket arm are integrally designed. The bracket base is used for clamping onto the annular channel steel. The bracket base adopts a mobile operation and can move on the annular channel steel. After the pipe row is hoisted to the installation position, it can be quickly paired and welded, enabling hoisting, transferring, pairing, and installation within a 360-degree range, greatly reducing the time for hoisting, transferring, pairing, and installing the pipe row.

[0008] Moreover, the lifting bracket includes a connecting rod and a hook. The hook is arranged at one end of the connecting rod, and the other end of the connecting rod is used for connecting to the upper side of the stirring shaft of the desilication tank. The setting of the hook further ensures that when the heating pipe is hung on the connecting rod, it will not be thrown out due to the rotation of the stirring shaft.

[0009] Moreover, a tension bar is provided between the lifting bracket and the stirring shaft of the desilication tank to stabilize the lifting bracket.

[0010] A hoisting method for the heating tube bundle of a desilication tank includes the following steps:

[0011] Step 1, open a maintenance manhole at the top of the desilication tank;

[0012] Step 2, weld the pre-made lifting bracket to the upper side of the stirring shaft;

[0013] Step 3, use a crane to put the heating tube bundle into the desilication tank through the maintenance manhole at the top of the desilication tank, and hang the heating tube bundle on the lifting bracket with a steel wire rope;

[0014] Step 4, move the heating tube bundle to the intended installation position by rotating the stirring shaft;

[0015] Step 5, clamp the pairing bracket onto the annular channel steel on the upper part of the inner wall of the desilication tank, and the pairing bracket can move on the annular channel steel according to the pairing position;

[0016] Step 6, lift the heating tube bundle with a manual hoist and pair and install it with the upper heating ring pipe and the lower heating ring pipe;

[0017] Step 7, pair all the heating tube bundles one by one according to Steps 3 - 6 to achieve 360° dead-angle-free installation in place, that is, complete the installation of the heating tube bundle;

[0018] Step 8, after the installation is completed, remove the pairing bracket, cut off the lifting bracket, and close the maintenance manhole.

[0019] This method uses the stirring shaft of the desilication tank as a transfer carrier to transfer the pipe row to the construction site at one time. The tube bundle can be hoisted, transferred, paired, and installed within a 360-degree range, greatly reducing the construction period and also saving a large amount of labor and equipment investment.

[0020] Compared with the prior art, the beneficial effects of the present invention are as follows:

[0021] 1. In the present invention, a pairing device is arranged on the upper annular channel steel on the inner wall of the desilication tank, and a lifting support is arranged on the upper side of the stirring rotating shaft of the desilication tank. Using the stirring rotating shaft of the desilication tank as a transfer carrier, the pipe row can be transferred to the construction site at one time. The pipe row lifting support can realize 360° dead-angle-free lifting, transfer, pairing and installation by only one person rotating the stirring rotating shaft, and accurately lift and transfer the pipe row to any installation position, greatly reducing the time required for pipe row demolition and reinstallation, saving labor, as well as labor costs and crane mechanical shift fees, and advancing the overhaul period. In addition, such an arrangement is more convenient, fast and efficient, reducing the labor intensity of on-site construction personnel and increasing the safety production coefficient, and the test effect is good.

[0022] 2. The pairing support of the present invention includes a support clamping seat and a support arm. The support clamping seat and the support arm are integrally designed. The support clamping seat is used for clamping on the annular channel steel, and the support clamping seat adopts a mobile operation and can move on the annular channel steel. After the pipe row is lifted and transferred to the installation position, it can be quickly paired and welded, realizing lifting, transfer, pairing and installation within a 360-degree range, greatly reducing the time for pipe row lifting, transfer, pairing and installation.

[0023] 3. The lifting support of the present invention includes a connecting rod and a hook. The hook is arranged at one end of the connecting rod, and the other end of the connecting rod is used for connecting with the upper side of the stirring rotating shaft of the desilication tank. The setting of the hook further ensures that when the heating pipe is suspended on the connecting rod, it will not be thrown out due to the rotation of the stirring rotating shaft.

[0024] 4. A stay bar is arranged between the lifting support and the stirring rotating shaft of the desilication tank of the present invention for stabilizing the lifting support.

[0025] 5. The method of the present invention uses the stirring rotating shaft of the desilication tank as a transfer carrier to transfer the pipe row to the construction site at one time, and can lift, transfer, pair and install the pipe bundle within a 360-degree range, greatly reducing the construction period and also greatly saving the input of labor and equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 is the overall structural schematic diagram of the present invention;

[0027] Figure 2 is the structural schematic diagram of the pairing device of the present invention;

[0028] Figure 3 is the structural schematic diagram of the connection between the lifting support and the stirring rotating shaft of the present invention;

[0029] In the figure: 1-assembly device, 101-assembly bracket, 102-manual hoist, 103-bracket holder, 104-bracket arm, 2-transportation bracket, 201-connecting rod, 202-hook, 3-manhole for inspection, 4-tensioning rod. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] Example

[0032] like Figures 1-3 As shown, a desiliconization trough pipe row transport bracket includes an assembly device 1 clamped on the upper annular channel steel on the inner wall of the desiliconization trough and a transport bracket 2 arranged on the upper side of the desiliconization trough stirring shaft, the transport bracket 2 includes a connecting rod 201 and a hook 202, the hook is arranged at one end of the connecting rod 201, and the other end of the connecting rod 201 is used to connect with the upper side of the stirring shaft of the desiliconization trough, a tie rod 4 is provided between the transport bracket 2 and the stirring shaft of the desiliconization trough for stabilizing the transport bracket 2, and a maintenance manhole 3 is opened at the top of the desiliconization trough, the assembly device 1 includes an assembly bracket 101 and a manual hoist 102, the assembly bracket 101 includes a bracket holder 103 and a bracket arm 104, the bracket holder 103 and the bracket arm 104 are designed as one body, the bracket holder 103 is used to be clamped on the annular channel steel, and the manual hoist 102 is arranged at the end of the bracket arm 104 of the assembly bracket 101.

[0033] A method for hoisting a desiliconization tank heating tube bundle comprises the following steps:

[0034] Step 1, opening a maintenance manhole 3 at the top of the desiliconization tank;

[0035] Step 2, welding the pre-made lifting bracket 2 to the upper side of the stirring shaft;

[0036] Step 3: Use a crane to place the heating tube bundle into the desiliconization tank from the inspection manhole 3 at the top of the desiliconization tank, and hang the heating tube bundle on the transportation bracket 2 with a steel wire rope;

[0037] Step 4, moving the heating tube bundle to a location to be installed by rotating the stirring shaft;

[0038] Step 5, clamping the assembly bracket 101 on the annular channel steel on the upper part of the inner wall of the desiliconization tank, and the assembly bracket 101 can move on the annular channel steel according to the assembly position;

[0039] Step 6, lifting the heating tube bundle by the manual hoist 102, and assembling and installing it with the upper heating ring tube and the lower heating ring tube;

[0040] Step 7: All the heating tube bundles are assembled one by one according to steps 3-6 to achieve 360° installation without dead angles, thus completing the installation of the heating tube bundle;

[0041] Step 8, after the installation is completed, remove the assembly bracket 101, cut off the transportation bracket 2 and close the inspection manhole 3.

[0042] The assembling device 1, assembling bracket 101, manual hoist 102, bracket holder 103, bracket arm 104, transport bracket 2, connecting rod 201, hook 202, inspection manhole 3, and tie rod 4 of the present invention are all universal standard parts or parts known to those skilled in the art, and their structures and principles can be known to those skilled in the art through technical manuals or conventional experimental methods.

[0043] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. It is obvious to those skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any figure mark in the claims should not be regarded as limiting the claims involved.

[0044] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A hoisting method for the heating tube bundle of a desilication tank, characterized in that: Apply a desilication tank pipe row lifting support, including an assembly device (1) clamped on the upper annular channel steel of the inner wall of the desilication tank and a lifting support (2) arranged on the upper side of the stirring shaft of the desilication tank. An inspection manhole (3) is provided at the top of the desilication tank; The assembly device (1) includes an assembly support (101) and a manual hoist (102). The assembly support (101) includes a support clamp (103) and a support arm (104). The support clamp (103) and the support arm (104) are integrally designed. The support clamp (103) is used to clamp on the annular channel steel, and the manual hoist (102) is arranged at the end of the support arm (104); The lifting support (2) includes a connecting rod (201) and a hook (202). The hook is arranged at one end of the connecting rod (201). The other end of the connecting rod (201) is used to connect with the upper side of the stirring shaft of the desilication tank. A stay bar (4) is provided between the lifting support (2) and the stirring shaft of the desilication tank to stabilize the lifting support (2); It includes the following steps: Step 1, open an inspection manhole (3) at the top of the desilication tank; Step 2, weld the pre-made lifting support (2) on the upper side of the stirring shaft; Step 3, use a crane to put the heating tube bundle into the desilication tank from the inspection manhole (3) at the top of the desilication tank, and hang the heating tube bundle on the lifting support (2) with a steel wire rope; Step 4, move the heating tube bundle to the intended installation position by rotating the stirring shaft; Step 5, clamp the assembly support (101) on the upper annular channel steel of the inner wall of the desilication tank, and the assembly support (101) can move on the annular channel steel according to the assembly position; Step 6, lift the heating tube bundle by the manual hoist (102) and carry out assembly and installation with the upper heating ring tube and the lower heating ring tube; Step 7, group all the heating tube bundles one by one according to Steps 3-6 to achieve 360° dead-angle-free installation in place, that is, complete the installation of the heating tube bundle; Step 8, after the installation is completed, remove the assembly support (101), cut off the lifting support (2) and close the inspection manhole (3).

Citation Information

Patent Citations

  • Portable detachable hoisting equipment

    CN201952153U

  • Pressure steel pipe stiffening ring assembling tool

    CN204281113U

  • Desilicication groove pipe row allocating and transporting support

    CN211110802U