A ternary precursor intelligent lean system and method
Through the synergistic effect of ERP, MES, DCS and OA modules, the problems of ternary precursor production line automation and real-time control are solved, efficient production management and cost reduction are achieved, and pollution of unqualified products and unvalued processing are avoided.
Patent Information
- Application Number
- CN201911054832.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-31
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2039-10-31
AI Technical Summary
The existing ternary precursor production lines lack automation, resulting in high labor intensity and unqualified products being mixed into the next stage, increasing production costs and unable to achieve lean production.
The synergistic effect of ERP management module, MES management module, DCS control module and OA module is adopted to realize the automation and real-time management of ternary precursor production, including raw material procurement, production planning, production process monitoring, equipment control and production capacity calculation.
Effectively reduce management costs, avoid unqualified products entering the next process, realize automated and intelligent management of the production line, and improve the control capabilities of the product process.
Smart Images

Figure CN111008812B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of process production automation, and more specifically, to a ternary precursor intelligent lean system and method. Background Art
[0002] At present, the mainstream high-nickel ternary precursor production lines mainly use manual operation of the equipment, and then carry out processes such as high-nickel ternary precursor reaction, aging, filtration and drying. In addition, most of the materials in the production process are also manually sampled and manually tested, and then analyzed by process or quality assurance personnel to determine whether the precursor semi-finished products enter the next stage or whether the precursor finished products are sold and to which customers they are sold.
[0003] The above process has the following disadvantages: the precursor production process is not automated enough, resulting in excessive labor intensity for operators, testers and process personnel, and manual sampling and testing cannot timely and effectively confirm the status of the product production process, and it is easy for unqualified products to enter the next work section for operation, resulting in the mixing of unqualified and qualified products, further causing an increase in unqualified products, or unqualified products enter the next work section for non-value-added production operations, thereby resulting in a waste of production costs, and is not conducive to product process control, and cannot achieve lean production; the overall product production process is not intelligent enough, from raw material procurement, production plan formulation, raw material procurement, material production, data testing, data aggregation and product warehousing and sales are all done manually, and a large number of people are involved in the above process. On the one hand, it increases production costs, and on the other hand, it is easy to cause process delays and increased error rates, and it is impossible to quickly and efficiently solve production line problems, and cannot achieve lean management. Summary of the invention
[0004] In order to overcome the defect that the product production process of the ternary precursor in the above-mentioned prior art cannot timely control the product production status, the present invention provides a ternary precursor intelligent lean system and a ternary precursor intelligent lean method, which realizes the automated operation and real-time control of the product production process of the ternary precursor by combining the ERP management module, the MES management module, the DCS control module and the OA module.
[0005] In order to solve the above technical problems, the technical solution of the present invention is as follows:
[0006] A ternary precursor intelligent lean system includes an ERP management module, an MES management module, a DCS control module, an OA module, and a database. The ERP management module is connected to the MES management module, the OA module, and the database. The MES management module is connected to the ERP management module, the DCS control module, and the OA module. The DCS control module is connected to the MES management module, the OA module, and the database.
[0007] The ERP management module is used to formulate a purchase plan based on the input customer demand information, send it to the management terminal through the OA module for purchase, and retrieve production data, equipment operation data, and production plan data from the database and transmit them to the MES management module;
[0008] The MES management module is used to calculate the production scheduling data according to the received data and send the production data and production scheduling data to the DCS control module, and to feed back the actual production data of the equipment to the ERP management module;
[0009] The DCS control module is used to control the operation of the ternary precursor production workshop equipment according to the received production data and production scheduling data, monitor whether the process detection data is normal during the production process, and feedback the equipment operation and energy consumption data, process detection data, and finished product detection data to the MES management module.
[0010] In this technical solution, through the synergy of ERP management module, MES management module, DCS control module, OA module and database, the automation and intelligence of raw material procurement, production planning and process management, production process monitoring and feedback, workshop equipment control, production capacity calculation, energy consumption accounting, finished product sales plan and other processes of high-nickel ternary precursor production are realized.
[0011] Preferably, the customer demand information includes but is not limited to the ternary precursor product model, product quantity, and delivery time;
[0012] Production data includes but is not limited to product finished product indicators, product finished product quantity, product process workshop equipment parameters, PFMEA and control plan;
[0013] Equipment operation data includes but is not limited to MFMEA, workshop equipment operation data, workshop equipment limit capacity and standard capacity;
[0014] Production planning data includes but is not limited to daily production capacity planning and production schedule of products;
[0015] Production scheduling data includes but is not limited to daily product batches and quantities of production line equipment in each section of the workshop;
[0016] The actual production data of the equipment includes but is not limited to the actual production capacity of the workshop equipment, unit energy consumption data, batch product indicators, batch output data and finished product qualification rate.
[0017] Preferably, the ERP management module includes a sales management unit, a production management unit, and a procurement management unit, wherein the sales management unit is respectively connected to the database, the MES management module, and the OA module; the production management unit is respectively connected to the database, the procurement management unit, the MES management module, and the OA module; and the procurement management unit is respectively connected to the production management unit and the OA module. During use, the sales management unit retrieves the product finished product indicators and quantity data from the database, and performs matching calculations based on the input customer demand information to determine the product shipment quantity, target manufacturer, and shipment time, and then sends it to the management terminal through the OA module; the production management unit retrieves the production data and equipment operation data of the relevant product model from the database based on the input customer demand information, and calculates the production plan data, and then sends it to the procurement management unit to make a procurement plan; the procurement management unit calculates the quantity and price of raw materials required for production as a procurement plan based on the production plan data, and then sends it to the management terminal through the OA module.
[0018] Preferably, the MES management module includes an equipment data management unit, a production scheduling management unit, and a finished product quality management unit, wherein the equipment data management unit is respectively connected to the database, the production scheduling management unit, the DCS control module, and the OA module; the production scheduling management unit is respectively connected to the DCS control module and the OA module; the finished product quality management unit is respectively connected to the database, the DCS control module, the OA module, and the sales management unit in the ERP management module. During use, the equipment data management unit calculates the equipment real-time production capacity and unit energy consumption data according to the equipment operation data received from the DCS control module, and then sends it to the production scheduling management unit; the production scheduling management unit calculates the production scheduling data according to the received production data, equipment operation data, and production plan data, and then transmits it to the DCS control module; the finished product quality management unit determines whether the finished product is qualified according to the equipment operation and energy consumption data and finished product inspection data fed back by the DCS control module, and if not, sends a finished product warning signal to the management personnel terminal through the OA module.
[0019] The present invention also proposes a ternary precursor intelligent lean method, which uses the above-mentioned ternary precursor intelligent lean system and includes the following steps:
[0020] S1: The manager inputs the customer demand information into the ERP management module. The ERP management module retrieves the production data and equipment operation data from the database, calculates the production plan data, and then formulates a procurement plan based on the customer demand information and sends it to the manager terminal through the OA module for procurement. At the same time, the retrieved production data, equipment operation data and production plan data are transmitted to the MES management module.
[0021] S2: The production scheduling management unit in the MES management module calculates the production scheduling data of each production line equipment according to the received production data, equipment operation data and production plan data, and then sends the production data and production scheduling data to the DCS control module;
[0022] S3: The DCS control module controls the workshop equipment to produce according to the received production data and production scheduling data, and during the production process, the DCS control module determines whether the process detection data meets the preset qualified threshold. If not, the DCS control module sends a process warning message to the management terminal through the OA module, and controls the equipment to transfer the material to the remelting area; if yes, the DCS control module feeds back the equipment operation and energy consumption data, process detection data, and finished product detection data information to the MES management module;
[0023] S4: The MES management module calculates the actual production data of the equipment according to the received equipment operation and energy consumption data, process detection data, and finished product detection data information, and then determines whether the actual production data of the equipment meets the preset equipment qualification threshold and finished product qualification threshold. If so, the actual production data of the equipment is sent to the ERP management module. The ERP management module determines the product delivery quantity, target manufacturer and delivery time according to the actual production data of the equipment and customer demand information, and then sends it to the management terminal through the OA module; if not, the MES management module sends equipment warning information and finished product warning information to the management terminal through the OA module.
[0024] Preferably, in step S1, the specific steps include:
[0025] S1.1: The manager inputs the customer demand information into the ERP management module. The production management unit in the ERP management module retrieves the production data of the corresponding product model from the database according to the product model, product quantity and delivery time in the customer demand information, calculates the daily production capacity plan and production schedule of the order product as the production plan data, and then determines whether the production plan data meets the preset production permission threshold: if not, the production alarm information is sent to the manager through the OA module; if so, the production data and production plan data are sent to the production scheduling management unit of the MES module for production scheduling processing;
[0026] S1.2: The purchasing management unit in the ERP management module calculates the types, quantities and prices of raw materials required for production based on the customer demand information, and then combines text and charts as a purchasing plan and sends it to the management terminal through the OA module for purchasing; when the purchasing plan cannot be carried out or an error occurs, the purchasing management unit sends a purchasing warning message to the management terminal through the OA module.
[0027] Preferably, in step S3, the specific steps of the DCS control module controlling the workshop equipment to perform production according to the received production data and production scheduling data are as follows: the DCS control module sets the reaction section parameters, the filter press section parameters and the drying section parameters according to the production data and the production scheduling data, wherein the reaction section parameters include the flow rates of the reactor salt solution, alkali solution and complexing agent, the reaction pH value, the reaction speed, the reaction temperature and the particle size and diameter distance of the reaction slurry, the filter press section parameters include the conductivity of the washing liquid of the filter press, the filter press time and the moisture content of the filter cake, and the drying section parameters include the drying temperature and the moisture content of the powder; during the production process, when the DCS control module determines that the process detection data does not meet the preset threshold, it sends a process warning message to the management personnel through the OA module, and transfers the material to the re-dissolution area.
[0028] Preferably, in step S4, the specific steps include:
[0029] S4.1: The equipment data management unit in the MES management module calculates the equipment real-time production capacity, unit energy consumption data, batch product data and product qualification rate as the actual production data of the equipment according to the equipment operation and energy consumption data, process detection data and finished product detection data information fed back by the DCS control module;
[0030] S4.2: The equipment data management unit determines whether the actual production data of the equipment meets the preset equipment qualification threshold. If so, execute S4.3; if not, send equipment warning information to the management terminal through the OA module, and the management personnel perform maintenance on the equipment and update the equipment operation data in the database;
[0031] S4.3: The finished product quality management unit in the MES management module determines whether the finished product meets the preset finished product qualification threshold based on the equipment operation and energy consumption data, process detection data, and finished product detection data information fed back by the DCS control module. If so, the actual production data of the equipment is sent to the sales management unit in the ERP management module. The sales management unit determines the product delivery quantity, target manufacturer and delivery time based on the actual production data of the equipment and customer demand information, and then sends it to the management terminal through the OA module; if not, the finished product quality management unit sends finished product warning information to the management personnel through the OA module, and the management personnel checks the production process and updates the production data in the database.
[0032] Compared with the prior art, the beneficial effects of the technical solution of the present invention are: through the coordinated action of the ERP management module, the MES management module, the DCS control module, the OA module and the database, the automated management, control and detection of the ternary precursor production are realized, the management cost is effectively reduced, and the positive feedback of the production line production data can be realized, avoiding the contamination of qualified materials and non-value-added processing caused by unqualified products entering the next process. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 This is a structural schematic diagram of a ternary precursor intelligent lean system of Example 1.
[0034] Figure 2 This is a flow chart of a ternary precursor intelligent lean method of Example 2. DETAILED DESCRIPTION
[0035] The drawings are for illustrative purposes only and should not be construed as limiting the present patent;
[0036] In order to better illustrate the present embodiment, some parts in the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product;
[0037] It is understandable to those skilled in the art that some well-known structures and their descriptions may be omitted in the drawings.
[0038] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0039] Example 1
[0040] This embodiment proposes a ternary precursor intelligent lean system, such as Figure 1 The figure shows a schematic diagram of the structure of a ternary precursor intelligent lean system of this embodiment.
[0041] A ternary precursor intelligent lean system of the present embodiment includes an ERP management module 1, an MES management module 2, a DCS control module 3, an OA module 4, and a database 5, wherein the ERP management module 1 is connected to the MES management module 2, the OA module 4, and the database 5, the MES management module 2 is connected to the ERP management module 1, the DCS control module 3, the OA module 4, and the database 5, and the DCS control module 3 is connected to the MES management module 2 and the OA module 4.
[0042] In this embodiment, the ERP management module 1 includes a purchasing management unit 11 , a production management unit 12 , and a sales management unit 13 , and the MES management module 2 includes an equipment data management unit 21 , a production scheduling management unit 22 , and a finished product quality management unit 23 .
[0043] In the ERP management module 1, the sales management unit 13 is connected to the database 5 and the OA module 4, and the input end of the sales management unit 13 is connected to the output end of the finished product quality management unit 23; the production management unit 12 is connected to the database 5 and the OA module 4, and the output end of the production management unit 12 is respectively connected to the input end of the procurement management unit 11 and the input end of the production scheduling management unit 22; the procurement management unit 11 is connected to the OA module 4.
[0044] In the MES management module 2, the equipment data management unit 21 is connected to the database 5 and the OA module 4, and the input end of the equipment data management unit 21 is connected to the output end of the DCS control module 3, and the output end of the equipment data management unit 21 is connected to the input end of the production scheduling management unit 22; the production scheduling management unit 22 is connected to the OA module 4, and the input end of the production scheduling management unit 22 is connected to the output end of the production management unit 12, and the output end of the production scheduling management unit 22 is connected to the input end of the DCS control module 3; the finished product quality management unit 23 is connected to the OA module 4 and the database 5, and the input end of the finished product quality management unit 23 is connected to the output end of the DCS control module 3.
[0045] In this embodiment, customer demand information includes but is not limited to the ternary precursor product model, product quantity, and delivery time; production data includes but is not limited to product finished product indicators, product finished product quantity, product process workshop equipment parameters, PFMEA and control plan; equipment operation data includes but is not limited to MFMEA, workshop equipment operation data, workshop equipment limit production capacity and standard production capacity; production plan data includes but is not limited to the product's daily production capacity plan and production schedule; production scheduling data includes but is not limited to daily product batches and quantities of production line equipment in each section of the workshop; actual production data of equipment includes but is not limited to actual production capacity of workshop equipment, unit energy consumption data, batch product indicators, batch output data, and finished product qualification rate.
[0046] In the specific implementation process, the production management unit 12 in the ERP management module 1 retrieves the production data and equipment operation data of different product models from the database 5 according to the customer demand information input by the system, including the product model and quantity information of the high-nickel ternary precursor required by the customer, wherein the production data includes product finished product indicators, product finished product quantity, product process workshop equipment parameters, PFMEA and control plan, and the equipment operation data includes MFMEA, workshop equipment operation data, workshop equipment limit capacity and standard capacity and other data, which are used to calculate the daily capacity plan and production schedule and other production plan data of the customer order product, and then send the above data to the procurement management unit 11, which calculates the quantity and price of raw materials required for production as the procurement plan according to the production plan data, and then sends it to the management terminal through the OA module 4 for procurement;
[0047] At the same time, the production management unit 12 sends the above data to the production scheduling management unit 22 in the MES management module. The production scheduling management unit 22 calculates the production scheduling data of each production line in each section, that is, it plans the daily production batches and quantities of the equipment of each production line in each section, and then sends the production scheduling data calculated by the production scheduling management unit 22 and the received production data to the DCS control module 3. The DCS control module 3 controls the production line equipment to produce the target product high nickel ternary precursor according to the received production scheduling data, as well as the control plan, workshop equipment operation data, product process workshop equipment parameters, PFMEA and other data.
[0048] Specifically, after the DCS control module 3 sets the equipment parameters and process parameters of each section according to the control plan, product process parameters, production schedule, control plan and product process parameters, it controls each feed flow valve to flow into the reactor with a reaction speed of 400 rpm at a flow rate determined by the above data, and adjusts the flow rate through the steam and cooling water solenoid valves to stabilize the reaction temperature at 55.0°C. At the same time, the reaction pH value is controlled at 12.5 by adjusting the alkali solution flow rate. When the online particle size analyzer tests that the particle size of the reaction slurry grows to D50 = 10.3 μm and the diameter distance = 1.1, the DCS control module 3 controls the equipment to open the overflow pipe solenoid valve to overflow the slurry into the transfer tank, and then closes the solenoid valve passing through the return dissolution zone pipeline, opens the two-in-one The solenoid valve of the filter press equipment pipeline is used to pump the high-nickel ternary precursor slurry into the two-in-one filter press equipment for filtration and washing, and then compressed air is introduced for filter pressing to the online moisture meter to test the moisture content of the filter cake to be 10%, and then the material is closed and discharged to the discharge port of the return dissolution area, and then discharged to the disc drying equipment through the qualified material discharge port. After drying at a drying temperature of 150°C, it is dried until the online moisture meter tests that the moisture content of the high-nickel ternary precursor powder is 0.5%, and then the solenoid valve of the pipeline passing through the return dissolution area silo and the return drying equipment silo is closed, and the solenoid valve of the pipeline leading to the qualified material silo is opened. The dried high-nickel ternary precursor powder is transported to the qualified material silo through the negative pressure conveying equipment, and the high-nickel ternary precursor product is tested by the desktop testing equipment to obtain the finished product test data.
[0049] In the process of the DCS control module 3 controlling the production line equipment to produce the target product, the DCS control module 3 monitors whether the process detection data meets the preset threshold. If not, the DCS control module 3 sends a process warning message to the management terminal through the OA module 4, and feeds back the equipment operation and energy consumption data to the equipment data management unit 21 in the MES management module 2, and sends the equipment operation and energy consumption data, process detection data, and finished product detection data to the finished product quality management unit 23, wherein the equipment data management unit 21 obtains the equipment operation and energy consumption data from the database 5, and calculates the equipment real-time production capacity, unit energy consumption data and other equipment actual production data according to the feedback equipment operation and energy consumption data. When it is determined that the equipment real-time production capacity and unit energy consumption data do not meet the preset equipment qualification threshold, the equipment data management unit 21 sends the equipment warning message to the management terminal through the OA module 4;
[0050] The finished product quality management unit 23 judges the finished product quality based on the finished product inspection data obtained through feedback. When it is judged that the finished product quality does not meet the preset finished product qualification threshold, the finished product quality management unit 23 sends a finished product warning message to the management personnel through the OA module 4; when the finished product quality management unit 23 judges that the current finished product quality meets the preset finished product qualification threshold, the finished product quality management unit 23 sends the actual production data of the equipment to the sales management unit 13 in the ERP management module 1, wherein the actual production data of the equipment includes the actual production capacity of the workshop equipment, unit energy consumption data, batch product indicators, batch output data and other data. The sales management unit 13 calculates the batch product indicators and product quantities based on the feedback of the actual production data of the equipment and draws them into a chart, and determines the product delivery quantity, target manufacturer and delivery time and other data based on the customer demand information, and then sends it to the management personnel for processing through the OA module 4, and when the existing product quantity cannot meet the customer demand information, the sales warning message is sent to the management personnel for processing through the OA module 4.
[0051] The intelligent lean system for ternary precursors in this embodiment realizes the automation and intelligence of processes such as raw material procurement, production planning and process management, production process monitoring and feedback, workshop equipment control, production capacity calculation, cost accounting, and finished product sales planning for the production of high-nickel ternary precursors through the synergistic effect of ERP management module, MES management module, DCS control module, OA module and database.
[0052] Example 2
[0053] This embodiment applies a ternary precursor intelligent lean system of embodiment 1 and proposes a ternary precursor intelligent lean method, such as Figure 2 Shown is a flow chart of a ternary precursor intelligent lean method of this embodiment.
[0054] A ternary precursor intelligent lean method of this embodiment includes the following steps:
[0055] S1: The manager inputs the customer demand information into the ERP management module 1. The ERP management module 1 retrieves the production data and equipment operation data from the database 5, calculates the production plan data, and then formulates a procurement plan based on the customer demand information and sends it to the manager terminal through the OA module 4 for procurement. At the same time, the retrieved production data, equipment operation data and production plan data are transmitted to the MES management module 2.
[0056] The specific steps are as follows:
[0057] S1.1: The manager inputs the customer demand information into the ERP management module 1. The production management unit 12 in the ERP management module 1 retrieves the production data of the corresponding product model from the database 5 according to the product model, product quantity and delivery time in the customer demand information, calculates the daily production capacity plan and production schedule of the order product as the production plan data, and then the production management unit 12 determines whether the production plan data meets the preset production permission threshold: if not, the production management unit 12 sends the production alarm information to the manager terminal through the OA module 4; if so, the production management unit 12 sends the production data, equipment operation data and production plan data to the production scheduling management unit 22 of the MES module 2 for production scheduling processing;
[0058] S1.2: The purchasing management unit 11 in the ERP management module 1 calculates the types, quantities and prices of raw materials required for production based on the customer demand information, and then combines text and charts as a purchasing plan and sends it to the management terminal through the OA module 4 for purchasing; when the purchasing plan cannot be carried out or an error occurs, the purchasing management unit 11 sends a purchasing warning message to the management terminal through the OA module 4.
[0059] S2: The production scheduling management unit 22 in the MES management module 2 calculates the production scheduling data of each production line equipment according to the received production data, equipment operation data and production plan data, and then sends the production data and production scheduling data to the DCS control module 3.
[0060] S3: The DCS control module 3 controls the workshop equipment to carry out production according to the received production data and production scheduling data, and during the production process, the DCS control module 3 determines whether the process detection data meets the preset qualified threshold value. If not, the DCS control module 3 sends a process warning message to the management terminal through the OA module 4, and controls the equipment to transfer the material to the re-dissolution area; if so, the equipment operation and energy consumption data, process detection data, and finished product detection data information are fed back to the MES management module 2.
[0061] In this step, the DCS control module 3 sets the reaction section parameters, the filter press section parameters and the drying section parameters according to the production data and the production scheduling data, wherein the reaction section parameters include the flow of the reactor salt solution, alkali solution and complexing agent, the reaction pH value, the reaction speed, the reaction temperature and the particle size and diameter of the reaction slurry; the filter press section parameters include the conductivity of the washing liquid of the filter press, the filter press time and the moisture content of the filter cake; the drying section parameters include the drying temperature and the moisture content of the powder; during the production process, when the DCS control module 3 determines that the process detection data does not meet the preset threshold, it sends a process warning message to the management terminal through the OA module 4 and transfers the material to the re-dissolution area.
[0062] S4: The MES management module 2 calculates the actual production data of the equipment according to the received equipment operation and energy consumption data, process detection data, and finished product detection data information, and then determines whether the actual production data of the equipment meets the preset equipment qualification threshold and finished product qualification threshold. If so, the actual production data of the equipment is sent to the ERP management module 1. The ERP management module 1 determines the product delivery quantity, target manufacturer and delivery time according to the customer demand information, and then sends it to the management terminal through the OA module 4; if not, the MES management module 2 sends the equipment warning information and the finished product warning information to the management terminal through the OA module 4; the specific steps are as follows:
[0063] S4.1: The equipment data management unit 21 in the MES management module 2 calculates the equipment real-time production capacity, unit energy consumption data, batch product data and product qualification rate as the actual production data of the equipment according to the equipment operation and energy consumption data, process detection data and finished product detection data information fed back by the DCS control module 3;
[0064] S4.2: The equipment data management unit 21 determines whether the actual production data of the equipment meets the preset equipment qualification threshold. If so, step S4.3 is executed; if not, the OA module 4 sends equipment warning information to the management terminal, and the management personnel inspects and repairs the equipment and updates the equipment operation data in the database 5;
[0065] S4.3: The finished product quality management unit 23 in the MES management module 2 determines whether the finished product meets the preset finished product qualification threshold based on the equipment operation and energy consumption data, process detection data, and finished product detection data information fed back by the DCS control module 3. If so, the actual production data of the equipment is sent to the sales management unit 13 in the ERP management module 1. The sales management unit 13 determines the product delivery quantity, target manufacturer and delivery time based on the actual production data of the equipment and customer demand information, and then sends it to the management terminal through the OA module 4; if not, the finished product quality management unit 23 sends finished product warning information to the management personnel through the OA module 4, and the management personnel checks the production process and updates the production data in the database 5.
[0066] In this embodiment, customer demand information includes but is not limited to the ternary precursor product model, product quantity, and delivery time; production data includes but is not limited to product finished product indicators, product finished product quantity, product process workshop equipment parameters, PFMEA and control plan; equipment operation data includes but is not limited to MFMEA, workshop equipment operation data, workshop equipment limit production capacity and standard production capacity; production plan data includes but is not limited to the product's daily production capacity plan and production schedule; production scheduling data includes but is not limited to daily product batches and quantities of production line equipment in each section of the workshop; actual production data of equipment includes but is not limited to actual production capacity of workshop equipment, unit energy consumption data, batch product indicators, batch output data and finished product qualification rate.
[0067] The same or similar reference numerals correspond to the same or similar components;
[0068] The terms used in the drawings to describe positional relationships are only used for illustrative purposes and should not be construed as limiting this patent;
[0069] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A ternary precursor intelligent lean system, characterized in that: It includes an ERP management module, an MES management module, a DCS control module, an OA module, and a database. The ERP management module is connected to the MES management module, the OA module, and the database. The MES management module is connected to the ERP management module, the DCS control module, the OA module, and the database. The DCS control module is connected to the MES management module and the OA module, wherein: The ERP management module is used to formulate a procurement plan based on the input customer demand information, send it to the management terminal through the OA module for procurement, and retrieve production data, equipment operation data, and production plan data from the database and transmit them to the MES management module; The MES management module is used to calculate the production schedule data of each production line equipment according to the received production data, equipment operation data and production plan data, and send the production data and production schedule data to the DCS control module, and feed back the actual production data of the equipment to the ERP management module; The DCS control module is used to control the operation of the ternary precursor production workshop equipment according to the received production scheduling data. The DCS control module sets the reaction section parameters, filter press section parameters and drying section parameters according to the production data and production scheduling data, wherein the reaction section parameters include the flow of the reactor salt solution, alkali solution and complexing agent, the reaction pH value, the reaction speed, the reaction temperature and the particle size and diameter of the reaction slurry, the filter press section parameters include the conductivity of the washing liquid of the filter press, the filter press time and the moisture content of the filter cake, and the drying section parameters include the drying temperature and the moisture content of the powder; it is also used to monitor the process detection data during the production process, and determine whether the process detection data meets the preset qualified threshold value. If not, the process warning information is sent to the management personnel terminal through the OA module, and the equipment is controlled to transfer the material to the re-dissolution area; if so, the equipment operation and energy consumption data, process detection data, and finished product detection data are fed back to the MES management module; The MES management module is also used to calculate the actual production data of the equipment based on the received equipment operation and energy consumption data, process detection data, and finished product detection data information, and then determine whether the actual production data of the equipment meets the preset equipment qualification threshold and finished product qualification threshold. If so, the actual production data of the equipment is sent to the ERP management module. The ERP management module determines the product delivery quantity, target manufacturer and delivery time based on the actual production data of the equipment and customer demand information, and then sends it to the management terminal through the OA module; if not, the MES management module sends equipment warning information and finished product warning information to the management terminal through the OA module.
2. The ternary precursor intelligent lean system according to claim 1, characterized in that: The customer demand information includes but is not limited to the ternary precursor product model, product quantity, and delivery time; The production data include but are not limited to product finished product indicators, product finished product quantity, product process workshop equipment parameters, PFMEA and control plan; The equipment operation data includes but is not limited to MFMEA, workshop equipment operation data, workshop equipment limit capacity and standard capacity; The production plan data includes but is not limited to the daily production capacity plan and production schedule of the product; The production scheduling data includes but is not limited to daily product batches and quantities of production line equipment in each section of the workshop; The actual production data of the equipment includes but is not limited to the actual production capacity of the workshop equipment, unit energy consumption data, batch product indicators, batch output data, and finished product qualification rate.
3. The ternary precursor intelligent lean system according to claim 2, characterized in that: The ERP management module includes a sales management unit, a production management unit, and a procurement management unit, wherein: the sales management unit is respectively connected to the database, the MES management module, and the OA module; the production management unit is respectively connected to the database, the procurement management unit, the MES management module, and the OA module; the procurement management unit is respectively connected to the production management unit and the OA module.
4. The ternary precursor intelligent lean system according to claim 3, characterized in that: The MES management module includes an equipment data management unit, a production scheduling management unit, and a finished product quality management unit, wherein: the equipment data management unit is respectively connected to the database, the production scheduling management unit, the DCS control module, and the OA module; the production scheduling management unit is respectively connected to the production management unit, the DCS control module, and the OA module in the ERP management module; the finished product quality management unit is respectively connected to the database, the DCS control module, the OA module, and the sales management unit in the ERP management module.
5. A ternary precursor intelligent lean method, applied to the ternary precursor intelligent lean system according to any one of claims 1 to 4, characterized in that: The following steps are involved: S1: The manager inputs the customer demand information into the ERP management module. The ERP management module retrieves the production data and equipment operation data from the database, calculates the production plan data, and then formulates a procurement plan based on the customer demand information and sends it to the manager terminal through the OA module for procurement. At the same time, the retrieved production data, equipment operation data and production plan data are transmitted to the MES management module. S2: The production scheduling management unit in the MES management module calculates the production scheduling data of each production line equipment according to the received production data, equipment operation data and production plan data, and then sends the production data and production scheduling data to the DCS control module; S3: The DCS control module controls the workshop equipment to produce according to the received production data and production scheduling data. During the production process, the DCS control module determines whether the process detection data meets the preset qualified threshold. If not, the DCS control module sends a process warning message to the management terminal through the OA module, and controls the equipment to transfer the material to the re-dissolution area; if yes, the DCS control module feeds back the equipment operation and energy consumption data, process detection data, and finished product detection data information to the MES management module; S4: The MES management module calculates the actual production data of the equipment according to the received equipment operation and energy consumption data, process detection data, and finished product detection data information, and then determines whether the actual production data of the equipment meets the preset equipment qualification threshold and finished product qualification threshold. If so, the actual production data of the equipment is sent to the ERP management module. The ERP management module determines the product delivery quantity, target manufacturer and delivery time according to the actual production data of the equipment and customer demand information, and then sends it to the management terminal through the OA module; if not, the MES management module sends equipment warning information and finished product warning information to the management terminal through the OA module.
6. The intelligent lean method for ternary precursors according to claim 5, characterized in that: In the step S1, the specific steps include: S1.1: The manager inputs the customer demand information into the ERP management module. The production management unit in the ERP management module retrieves the production data of the corresponding product model from the database according to the product model, product quantity and delivery time in the customer demand information, calculates the daily production capacity plan and production schedule of the order product as the production plan data, and then determines whether the production plan data meets the preset production permission threshold: if not, the production alarm information is sent to the manager through the OA module; if so, the production data and production plan data are sent to the production scheduling management unit of the MES module for production scheduling processing; S1.2: The purchasing management unit in the ERP management module calculates the types, quantities and prices of raw materials required for production based on the customer demand information, and then combines text and charts as a purchasing plan and sends it to the management terminal through the OA module for purchasing; when the purchasing plan cannot be carried out or an error occurs, the purchasing management unit sends a purchasing warning message to the management terminal through the OA module.
7. The ternary precursor intelligent lean method according to claim 5, characterized in that: In the step S3, the specific steps of the DCS control module controlling the workshop equipment to perform production according to the received production data and production scheduling data are as follows: the DCS control module sets the reaction section parameters, the filter pressing section parameters and the drying section parameters according to the production data and the production scheduling data, wherein the reaction section parameters include the flow rates of the reactor salt solution, alkali solution and complexing agent, the reaction pH value, the reaction speed, the reaction temperature and the particle size and diameter of the reaction slurry; the filter pressing section parameters include the conductivity of the washing liquid of the filter press, the filter pressing time and the moisture content of the filter cake; and the drying section parameters include the drying temperature and the moisture content of the powder.
8. The intelligent lean method for ternary precursors according to claim 5, characterized in that: In the step S4, the specific steps include: S4.1: The equipment data management unit in the MES management module calculates the equipment real-time production capacity, unit energy consumption data, batch product data and product qualification rate as the actual production data of the equipment according to the equipment operation and energy consumption data, process detection data and finished product detection data information fed back by the DCS control module; S4.2: The equipment data management unit determines whether the actual production data of the equipment meets the preset equipment qualification threshold. If so, execute S4.3; if not, send equipment warning information to the management terminal through the OA module, and the management personnel perform maintenance on the equipment and update the equipment operation data in the database; S4.3: The finished product quality management unit in the MES management module determines whether the finished product meets the preset finished product qualification threshold based on the equipment operation and energy consumption data, process detection data, and finished product detection data information fed back by the DCS control module. If so, the actual production data of the equipment is sent to the sales management unit in the ERP management module. The sales management unit determines the product delivery quantity, target manufacturer and delivery time based on the actual production data of the equipment and customer demand information, and then sends it to the management terminal through the OA module; if not, the finished product quality management unit sends finished product warning information to the management personnel through the OA module and updates the production data in the database.