Extreme Challenge Hourglass Tower
By designing the ultimate challenge hourglass tower, the problems of insufficient exploration and challenge of existing outdoor expansion training equipment have been solved, and the fun and interactivity have been achieved, attracting more users.
Patent Information
- Application Number
- CN202010064009.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-01-20
- Publication Date
- 2025-03-04
- Estimated Expiration
- 2040-01-20
AI Technical Summary
The existing outdoor expansion training equipment formats are relatively simple, with monotonous sports postures, insufficient exploration and challenge, and lack of fun and interaction.
An extreme challenge hourglass tower was designed, including the main tower body, central staircase, zipline terminal frame, zipline ladder and wire zipline. The main tower body is equipped with six different expansion projects, each floor of the project includes four challenge projects, forming a continuous hovering shape, which increases adventure and challenge.
Through the design of the Extreme Challenge Hourglass Tower, the fun, adventure and challenge of outdoor expansion sports are enhanced, and more operational projects and interactive experiences are provided, attracting a wider user base.
Smart Images

Figure CN111013159B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of outdoor development equipment, and in particular to an extreme challenge hourglass tower. Background Art
[0002] As people's living standards continue to improve, people's pace of life is getting faster and faster, life and work pressures are getting greater and greater, and people are paying more and more attention to physical exercise. People are not only satisfied with various indoor fitness exercises, but are more willing to participate in outdoor sports. Outdoor sports can not only strengthen the body, but also get close to nature, relax the mind, hone people's will, and have a more positive attitude towards life. Therefore, various outdoor expansion training equipment has also emerged.
[0003] At the same time, outdoor development is also called experiential training. For corporate teams, it can effectively stimulate the potential of corporate personnel and strengthen the team's spirit of cooperation. Outdoor development sports have a history of fifty or sixty years in foreign countries, but it was not until the 1980s that outdoor development sports began to be introduced into my country from Europe and the United States. In recent years, outdoor development sports have been booming among young people in some developed regions and large and medium-sized cities in my country. Outdoor development sports have the characteristics of comprehensive activity, adventure, and challenge. They can effectively combine fitness, adventure, entertainment, and interpersonal communication. The current status of outdoor development training in China is not very mature, but the response is very good and the prospects are bright. The current outdoor development training equipment is relatively simple in form, the movement posture is monotonous, the adventure and challenge are insufficient, and it lacks fun and interactivity. Summary of the invention
[0004] In order to solve the above problems, the present invention proposes an extreme challenge hourglass tower.
[0005] The specific contents are as follows: Extreme Challenge Hourglass Tower, including the main tower, central staircase, zipline terminal frame, zipline platform and steel wire zipline;
[0006] The main tower body comprises two identical regular tetrahedral prism-shaped frames, the two frames are symmetrically arranged in an hourglass-shaped main tower body, the lower end of the main tower body is fixed on the ground, at least six layers of different expansion projects are arranged on the main tower body, and the first layer expansion projects, the second layer expansion projects, the third layer expansion projects, the fourth layer expansion projects, the fifth layer expansion projects, and the sixth layer expansion projects are sequentially distributed on the main tower body from bottom to top, each layer of expansion projects includes four different challenge projects, and the four challenge projects on the same layer are respectively distributed on the four sides of the main tower body, and the expansion projects of two adjacent layers are connected end to end through an inclined challenge project, so that all the selected projects in the six layers of expansion projects form a continuous spiral shape, and spiral on the side of the main tower body from bottom to top, and each layer of expansion projects from the second layer to the fifth layer expansion projects are provided with a rest cage, and the rest cages are all located on the same side of the main tower body, and a transfer platform is provided at the connection between two adjacent challenge projects, and the transfer platform is fixed on the main tower body;
[0007] A rooftop is provided on the top of the main tower body, a central staircase is provided in the center of the main tower body, which is fixed on the ground and connected to the rooftop upwards. The central staircase spirals upwards and is fixed inside the stair support. The lower end of the stair support is vertically fixed on the ground, and the upper end is fixed on the rooftop. A horizontal skybridge A is provided on one side of the upper end of the main tower body. Skybridge A is located between the rooftop and the expansion project on the sixth floor. The last challenge project in the expansion project on the sixth floor is connected to skybridge A. Skybridge B is connected between skybridge A and the central staircase.
[0008] A high-altitude suspended jumping platform and a vertical limit jumping platform are respectively provided on the edges of both sides of the roof of the main tower body. The high-altitude suspended jumping platform and the vertical limit jumping platform are respectively located on both sides of the roof symmetrically and extend outward. A bumper A located above it is fixed on the high-altitude suspended jumping platform, and a descent rope is fixed on the bumper A. A bumper B located above it is fixed on the vertical limit jumping platform. A horizontal zipline fixing frame is also fixed on the roof. At least two pairs of steel wire ziplines are connected between the zipline fixing frame and the zipline terminal frame. The zipline terminal frame is fixed on the ground. Both ends of the steel wire zipline are respectively fixed on the zipline fixing frame and the zipline terminal frame, and the middle part of the steel wire zipline naturally droops in an arc shape. A freely movable zipline ladder is also placed on the ground. The zipline ladder is located on the side of the lowest point of the steel wire zipline.
[0009] Preferably, the first-layer expansion projects include four challenge projects, namely, Angel's Hands, Aerial Dependence, Big Foot and High-Altitude Road, which are connected end to end, wherein the High-Altitude Road is inclined upward to connect with the second-layer expansion projects.
[0010] Preferably, the second-layer expansion projects include four challenge projects, namely, a first rest cage, hot wheels, tire bridge and jungle crossing, which are connected end to end, wherein the jungle crossing is connected to the third-layer expansion projects at an angle upward.
[0011] Preferably, the third-layer expansion project includes four challenge projects, namely, a second rest cage, a belief plum blossom, a lizard wall and a rope net climbing, which are connected end to end, wherein the rope net climbing is connected to the fourth-layer expansion project at an angle upward.
[0012] Preferably, the fourth-layer expansion project includes four challenge projects, namely, a third rest cage, a jungle inclined wood, a left-right solution and a stream-crossing bridge, which are connected end to end in sequence, wherein the stream-crossing bridge is inclined upward and connected to the fifth-layer expansion project.
[0013] Preferably, the fifth-layer expansion project includes four challenge projects, namely, the fourth rest cage, aerial flying, fate sky and aerial hanging piles, which are connected end to end, wherein the aerial hanging piles are inclined upward to connect with the sixth-layer expansion project.
[0014] Preferably, the sixth-floor expansion project includes four challenge projects, namely, a glass bridge connected end to end, a broken bridge in the air, a cross-forward and a life-threatening situation, wherein the life-threatening situation is connected to the sky bridge A by an angled upward.
[0015] Preferably, fastening cables embedded in the ground are fixed around the upper end and the middle part of the main tower body, a horizontal safety rope is provided above each challenge project, and the third-floor expansion project and the fifth-floor expansion project are both provided with rescue passages connected to the central staircase.
[0016] Preferably, a vertically upward lightning rod is fixed on the rooftop of the main tower body, a protective fence A is fixed around the rooftop, a safety door A corresponding to the steel wire rope is provided on the protective fence A and on the side where the steel wire rope is located, a protective fence B is fixed around the high-altitude suspension jumping platform and the vertical limit jumping platform, and safety doors B are hinged on both sides of the outermost ends of the high-altitude suspension jumping platform and the vertical limit jumping platform, a protective fence C is fixed at the connection between the rooftop and the upper end of the central elevator, and protective fences D are fixed on the sides of the overpass A and the overpass B.
[0017] Preferably, the cable terminal frame comprises a horizontal beam, a vertical beam, an oblique support rod and a steel strand cable, the horizontal beam is horizontally fixed on two vertical beams perpendicular to the ground, and inclined oblique support rods and steel strand cable are respectively fixed on both sides of each vertical beam, and the free ends of the oblique support rods and the steel strand cable are fixed on the ground, and the steel wire rope is fixed on the horizontal beam and is located on the same side of the horizontal beam as the oblique support rod; the cable ladder comprises a supporting steel frame and a ladder, a standing platform is provided on the upper end surface of the supporting steel frame, a protective fence is provided around the standing platform, universal wheels are provided at the bottom of the supporting steel frame, and inclined ladders are fixed on two symmetrical sides of the supporting steel frame.
[0018] Beneficial technical effects of the present invention:
[0019] The present invention is an extreme challenge hourglass tower, comprising a main tower body, a central staircase, a zipline terminal frame, a zipline platform and a steel wire zipline. The entire main tower body can carry 27 operation projects, including 24 jungle crossing projects and 3 extreme challenge projects; project distribution: 24 crossing projects are evenly distributed on the four sides of the tower body, each side is provided with six layers of expansion projects, four challenge projects on four sides of each layer are connected end to end, and each adjacent layer is also connected end to end, and the overall 24 projects are connected in series and hover around the main tower body; 3 challenge projects are distributed on the rooftop at the top of the main tower body, high-altitude hanging projects and vertical extreme projects are set on the suspended diving platforms on both sides, the steel wire zipline starts from the rooftop at the top of the main tower body and is connected to the zipline terminal frame. The steel wire zipline will naturally sag in an arc shape in the middle, and the zipline platform is placed near this position, which is convenient for receiving people who have completed the zipline project. The present invention closely combines fitness, exploration, entertainment, and interpersonal communication, and has many challenge projects, and is more interesting, adventurous, and challenging, and more attractive. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 This is the overall structural diagram of the Extreme Challenge Hourglass Tower;
[0021] Figure 2 The main view of the main tower;
[0022] Figure 3 for Figure 2 A top view of
[0023] Figure 4 This is the main view of the center staircase;
[0024] Figure 5 for Figure 3 The main view of all challenge items on the middle A side;
[0025] Figure 6 for Figure 3 The main view of all challenge items on the middle B side;
[0026] Figure 7 for Figure 3 The main view of all challenge items on the middle C side;
[0027] Figure 8 for Figure 3 The main view of all challenge items on the middle D side;
[0028] Fig. 9 This is a bird's-eye view of the first-floor expansion project on the main tower;
[0029] Fig.10 This is a bird's-eye view of the second-floor expansion project on the main tower;
[0030] Fig.11 This is a bird's-eye view of the third-floor expansion project on the main tower;
[0031] Fig.12 This is a bird's-eye view of the fourth-floor expansion project on the main tower;
[0032] Fig.13 This is a bird's-eye view of the fifth-floor expansion project on the main tower;
[0033] Fig.14 This is a bird's-eye view of the sixth-floor expansion project on the main tower;
[0034] Fig.15 This is the top view of Skybridge A and Skybridge B on the main tower:
[0035] Fig.16 for Fig.15 Rear view of
[0036] Fig.17 for Fig.15 Right view of;
[0037] Fig.18 This is the top view of the rooftop:
[0038] Fig.19 for Fig.18 Cross-sectional view in the EE direction;
[0039] Fig. 20 for Fig.18 Cross-sectional view in the FF direction;
[0040] Fig.21 for Fig.18 Cross-sectional view in the middle GG direction;
[0041] Fig. 22 for Fig.18 Cross-sectional view in the middle HH direction;
[0042] Fig.23 This is the main view of the zipline ladder;
[0043] Fig.24 for Fig.23 Left view of
[0044] Fig.25 for Fig.23 A top view of
[0045] Fig.26 This is the front view of the zipline terminal frame;
[0046] Fig. 27 for Fig.26 A top view of
[0047] In the figure: 11. Main tower, 111. Transfer platform, 112. Rescue channel, 113. Fastening wire, 12. Central staircase, 121. Stair support, 13. Roof, 131. Protective fence C, 132. Protective fence A, 14. Cable fixing frame, 141. Safety door A, 15. Steel cable, 16. Bumper, 17. Lightning rod, 18. High-altitude suspended jumping platform, 182. Protective fence B on the high-altitude suspended jumping platform, 183. High-altitude Safety gate B on the suspended diving platform, 184. Suspension rope, 19. Vertical limit diving platform, 192. Protection fence B on the vertical limit diving platform, 193. Safety gate B on the vertical limit diving platform, 30. Zipline platform ladder, 40. Zipline terminal frame, 60. Safety rope, 31. Support steel frame, 32. Standing platform, 33. Ladder, 34. Protection fence E, 35. Universal wheel, 41. Vertical beam, 42. Diagonal support rod, 43. Steel stranded wire, 44. Horizontal beam;
[0048] A1. Angel's Hand, B1. Dependence in the Air, C1. Big Foot, D1. High-altitude Road,
[0049] A2. First rest cage, B2. Hot wheels, C2. Tire bridge, D2. Jungle crossing,
[0050] A3. Second rest cage, B3. Faith plum blossom, C3. Lizard wall, D3. Rope climbing,
[0051] A4. The third rest cage, B4 the forest wood, C4. Both sides, D4. The bridge across the stream,
[0052] A5. The fourth rest cage, B5. Flying in the air, C. Fate sky, D5. Hanging stake in the air,
[0053] A6. Glass bridge, B6. Broken bridge in the air, C6. Crossing forward, D6. Life hanging by a thread,
[0054] A71. Overpass A, A72. Protective fence D on overpass A, A73. Overpass B, A74. Protective fence D on overpass B. DETAILED DESCRIPTION
[0055] Example 1, see Figure 1-27 , the extreme challenge hourglass tower, including the main tower, central stairs, zipline terminal frame, zipline platform and steel wire zipline;
[0056] The main tower body comprises two identical regular tetrahedral frames, the two frames are symmetrically arranged in an hourglass-shaped main tower body, the lower end of the main tower body is fixed on the ground, at least six layers of different expansion projects are arranged on the main tower body, and the first layer expansion projects, the second layer expansion projects, the third layer expansion projects, the fourth layer expansion projects, the fifth layer expansion projects, and the sixth layer expansion projects are sequentially distributed on the main tower body from bottom to top, each layer of expansion projects includes four different challenge projects, and the four challenge projects on the same layer are respectively distributed on the four sides of the main tower body, and the expansion projects of two adjacent layers are connected end to end through an inclined challenge project, so that all the selected projects in the six layers of expansion projects form a continuous spiral shape, and spiral on the side of the main tower body from bottom to top, and each layer of expansion projects from the second layer to the fifth layer expansion projects are provided with a rest cage, and the rest cages are all located on the same side of the main tower body, and a transfer platform is provided at the connection between two adjacent challenge projects, and the transfer platform is fixed on the main tower body, and the transfer platform is used for transition between two adjacent challenge projects;
[0057] A rooftop is provided on the top of the main tower body, a central staircase is provided in the center of the main tower body, which is fixed on the ground and connected to the rooftop upwards. The central staircase spirals upwards and is fixed inside the stair support. The lower end of the stair support is vertically fixed on the ground, and the upper end is fixed on the rooftop. A horizontal skybridge A is provided on one side of the upper end of the main tower body. Skybridge A is located between the rooftop and the expansion project on the sixth floor. The last challenge project in the expansion project on the sixth floor is connected to skybridge A. Skybridge B is connected between skybridge A and the central staircase.
[0058] A high-altitude suspended jumping platform and a vertical limit jumping platform are respectively provided on the edges of both sides of the roof of the main tower body. The high-altitude suspended jumping platform and the vertical limit jumping platform are respectively located on both sides of the roof symmetrically and extend outward. A bumper A located above it is fixed on the high-altitude suspended jumping platform, and a descent rope is fixed on the bumper A. A bumper B located above it is fixed on the vertical limit jumping platform. A horizontal zipline fixing frame is also fixed on the roof. At least two pairs of steel wire ziplines are connected between the zipline fixing frame and the zipline terminal frame. The zipline terminal frame is fixed on the ground. Both ends of the steel wire zipline are respectively fixed on the zipline fixing frame and the zipline terminal frame, and the middle part of the steel wire zipline naturally droops in an arc shape. A freely movable zipline ladder is also placed on the ground. The zipline ladder is located on the side of the lowest point of the steel wire zipline.
[0059] The first-level expansion project includes four challenge projects, namely Angel's Hand, Air Dependence, Big Foot and High-Altitude Road, which are connected end to end. The High-Altitude Road is tilted upward to connect with the second-level expansion project.
[0060] The second-layer expansion projects include four challenge projects, namely, a first rest cage, a hot wheel, a tire bridge, and a jungle crossing, which are connected end to end. The jungle crossing is connected to the third-layer expansion projects at an angle upward.
[0061] The third-layer expansion project includes four challenge projects, namely, the second rest cage, the plum blossom of faith, the lizard wall and the rope net climbing, which are connected end to end. The rope net climbing is connected with the fourth-layer expansion project by slanting upward.
[0062] The fourth-layer expansion project includes four challenge projects, which are connected end to end, namely, the third rest cage, the jungle inclined wood, the left and right way and the stream crossing bridge. The stream crossing bridge is inclined upward and connected to the fifth-layer expansion project.
[0063] The fifth-floor expansion project includes four challenge projects, namely, the fourth rest cage, aerial flying, fate sky and aerial hanging piles, which are connected end to end. Among them, the aerial hanging piles are tilted upward to connect with the sixth-floor expansion project.
[0064] The sixth-floor expansion project includes four challenge projects: a glass bridge connected end to end, a broken bridge in the air, a cross-forward and a life-threatening project. Among them, the life-threatening project is tilted upward and connected to the sky bridge A.
[0065] The upper end and the middle part of the main tower body are fixed with fastening cables embedded in the ground. A horizontal safety rope is provided above each challenge project. The third-floor expansion project and the fifth-floor expansion project are both provided with rescue passages connected to the central staircase, which facilitates rescue when challenges encounter accidents.
[0066] A vertically upward lightning rod is fixed on the rooftop of the main tower body, a protective fence A is fixed around the rooftop, a safety door A corresponding to the steel wire rope is provided on the protective fence A and on the side where the steel wire rope is located, a protective fence B is fixed around the high-altitude suspended jumping platform and the vertical limit jumping platform, and safety doors B are hinged on both sides of the outermost ends of the high-altitude suspended jumping platform and the vertical limit jumping platform, a protective fence C is fixed at the connection between the rooftop and the upper end of the central elevator, and protective fences D are fixed on the sides of the overpass A and overpass B.
[0067] The terminal frame of the zipline includes a horizontal beam, a vertical beam, an oblique support rod and a steel strand pull wire. The horizontal beam is horizontally fixed on two vertical beams perpendicular to the ground. An inclined oblique support rod and a steel strand pull wire are fixed on both sides of each vertical beam. The free ends of the oblique support rod and the steel strand pull wire are fixed on the ground. The steel wire zipline is fixed on the horizontal beam and is located on the same side of the horizontal beam as the oblique support rod. The zipline ladder includes a supporting steel frame and a ladder. A standing platform is provided on the upper end surface of the supporting steel frame, and a protective fence is provided around the standing platform. Universal wheels are provided at the bottom of the supporting steel frame, and inclined ladders are fixed on two symmetrical sides of the supporting steel frame.
[0068] Method of use of the present invention:
[0069] ①Jungle Crossing Project
[0070] Team operation project, 3-6 people form a group, 24 projects around the main tower are operated continuously, the personnel protection method is the hanging protection method, and the protection carrier is the safety rope protection;
[0071] After the coach training, with the assistance of the staff, the operator puts on the safety belt and helmet neatly, hangs the safety belt on the safety rope at the corresponding position, starts from the first challenge project of the first-floor expansion project, completes four challenge projects in the first-floor expansion project in succession, and then enters the second-floor expansion project along the last inclined challenge project, and so on to complete all the challenge projects in succession, and finally reaches the sixth floor, which is the position below the large platform on the top of the tower. In the middle, you can rest and adjust in the rest cage, and then enter the central staircase through Sky Bridge A and Sky Bridge B, return to the ground through the stairs, or go to the rooftop of the main tower to rest and sightsee, or continue to complete the extreme challenge projects on the rooftop.
[0072] ②High-altitude suspension project
[0073] The extreme challenge project goes up the central stairs to the rooftop of the main tower. After training by the coach and with the assistance of the staff, the operator puts on the safety belt and helmet, hangs the safety rope on the bumper, opens the safety door of the high-altitude suspension platform, and slowly descends along the suspension rope according to the correct operating method. Finally, he reaches the ground, removes the safety equipment, and the operation is completed.
[0074] ③Vertical limit project
[0075] The extreme challenge project goes up the central stairs to the rooftop on the top of the main tower. After coach training and with the assistance of the staff, the operator puts on the safety belt and helmet, hangs the safety belt on the ring of the quick jump machine, opens the safety door of the vertical extreme jump platform, takes a step forward and jumps off the platform. Under the protection of the quick jump machine, the operator first speeds up and then slows down, descending rapidly in a free fall style. After halfway, the speed gradually slows down, and finally reaches the ground gently, removes the safety equipment, and the operation is completed.
[0076] ③Zipline project
[0077] The extreme challenge project goes up the central stairs to the rooftop on the top of the main tower. After the coach training, with the assistance of the staff, the operator puts on the safety belt and helmet, hangs the zipline pulley on the steel wire, opens the safety door of the guardrail, squats slightly at the front of the platform, and slides down the pulley with the body leaning forward after a rapid sprint. After crossing the lowest point of the steel wire zipline, it tends to move upward. Before reaching the terminal frame of the zipline, it slows down, stops, and slides in a spiral, finally sliding to the lowest point of the steel wire and stopping. Then the staff pushes the zipline platform ladder to the bottom of the operator, assists the operator to release the pulley lock, and the operator climbs back to the ground along the ladder, and the operation is completed.
Claims
1. The extreme challenge hourglass tower includes the main tower, central stairs, zipline terminal frame, zipline platform and steel wire zipline, and its characteristics are: The main tower body comprises two identical regular tetrahedral prism-shaped frames, the two frames are symmetrically arranged in an hourglass-shaped main tower body, the lower end of the main tower body is fixed on the ground, at least six layers of different expansion projects are arranged on the main tower body, and the first layer expansion projects, the second layer expansion projects, the third layer expansion projects, the fourth layer expansion projects, the fifth layer expansion projects, and the sixth layer expansion projects are sequentially distributed on the main tower body from bottom to top, each layer of expansion projects includes four different challenge projects, and the four challenge projects on the same layer are respectively distributed on the four sides of the main tower body, and the expansion projects of two adjacent layers are connected end to end through an inclined challenge project, so that all the selected projects in the six layers of expansion projects form a continuous spiral shape, and spiral on the side of the main tower body from bottom to top, and each layer of expansion projects from the second layer to the fifth layer expansion projects are provided with a rest cage, and the rest cages are all located on the same side of the main tower body, and a transfer platform is provided at the connection between two adjacent challenge projects, and the transfer platform is fixed on the main tower body; A rooftop is provided on the top of the main tower body, a central staircase is provided in the center of the main tower body, which is fixed on the ground and connected to the rooftop upwards. The central staircase spirals upwards and is fixed inside the stair support. The lower end of the stair support is vertically fixed on the ground, and the upper end is fixed on the rooftop. A horizontal skybridge A is provided on one side of the upper end of the main tower body. Skybridge A is located between the rooftop and the expansion project on the sixth floor. The last challenge project in the expansion project on the sixth floor is connected to skybridge A. Skybridge B is connected between skybridge A and the central staircase. A high-altitude suspended jumping platform and a vertical limit jumping platform are respectively provided on the edges of both sides of the roof of the main tower body. The high-altitude suspended jumping platform and the vertical limit jumping platform are respectively located on both sides of the roof symmetrically and extend outward. A bumper A located above it is fixed on the high-altitude suspended jumping platform, and a descent rope is fixed on the bumper A. A bumper B located above it is fixed on the vertical limit jumping platform. A horizontal zipline fixing frame is also fixed on the roof. At least two pairs of steel wire ziplines are connected between the zipline fixing frame and the zipline terminal frame. The zipline terminal frame is fixed on the ground. Both ends of the steel wire zipline are respectively fixed on the zipline fixing frame and the zipline terminal frame, and the middle part of the steel wire zipline naturally droops in an arc shape. A freely movable zipline ladder is also placed on the ground. The zipline ladder is located on the side of the lowest point of the steel wire zipline.
2. The extreme challenge hourglass tower according to claim 1 is characterized in that: The first-level expansion project includes four challenge projects, namely Angel's Hand, Air Dependence, Big Foot and High-Altitude Road, which are connected end to end. The High-Altitude Road is tilted upward to connect with the second-level expansion project.
3. The extreme challenge hourglass tower according to claim 2 is characterized in that: The second-layer expansion projects include four challenge projects, namely, a first rest cage, hot wheels, tire bridge and jungle crossing, which are connected end to end. The jungle crossing is connected to the third-layer expansion projects by tilting upward.
4. The extreme challenge hourglass tower according to claim 3 is characterized in that: The third-layer expansion project includes four challenge projects, namely, the second rest cage, the plum blossom of faith, the lizard wall and the rope net climbing, which are connected end to end. The rope net climbing is connected with the fourth-layer expansion project by slanting upward.
5. The extreme challenge hourglass tower according to claim 4 is characterized in that: The fourth-layer expansion project includes four challenge projects, which are connected end to end, namely, the third rest cage, the jungle inclined wood, the left and right way and the stream crossing bridge. The stream crossing bridge is inclined upward and connected to the fifth-layer expansion project.
6. The extreme challenge hourglass tower according to claim 5 is characterized by: The fifth-floor expansion project includes four challenge projects, namely, the fourth rest cage, aerial flying, fate sky and aerial hanging piles, which are connected end to end. Among them, the aerial hanging piles are tilted upward to connect with the sixth-floor expansion project.
7. The extreme challenge hourglass tower according to claim 6 is characterized by: The sixth-floor expansion project includes four challenge projects: a glass bridge connected end to end, a broken bridge in the air, a cross-forward and a life-threatening project. Among them, the life-threatening project is tilted upward and connected to the sky bridge A.
8. The extreme challenge hourglass tower according to claim 1 is characterized by: The upper end and the middle part of the main tower body are fixed with fastening cables pre-buried in the ground. A horizontal safety rope is provided above each challenge project. The third-floor expansion project and the fifth-floor expansion project are both provided with rescue passages connected to the central staircase.
9. The extreme challenge hourglass tower according to claim 1 is characterized by: A vertically upward lightning rod is fixed on the rooftop of the main tower body, a protective fence A is fixed around the rooftop, a safety door A corresponding to the steel wire rope is provided on the protective fence A and on the side where the steel wire rope is located, a protective fence B is fixed around the high-altitude suspended jumping platform and the vertical limit jumping platform, and safety doors B are hinged on both sides of the outermost ends of the high-altitude suspended jumping platform and the vertical limit jumping platform, a protective fence C is fixed at the connection between the rooftop and the upper end of the central elevator, and protective fences D are fixed on the sides of the overpass A and overpass B.
10. The extreme challenge hourglass tower according to claim 1 is characterized by: The terminal frame of the zipline includes a horizontal beam, a vertical beam, an oblique support rod and a steel strand pull wire. The horizontal beam is horizontally fixed on two vertical beams perpendicular to the ground. An inclined oblique support rod and a steel strand pull wire are fixed on both sides of each vertical beam. The free ends of the oblique support rod and the steel strand pull wire are fixed on the ground. The steel wire zipline is fixed on the horizontal beam and is located on the same side of the horizontal beam as the oblique support rod. The zipline ladder includes a supporting steel frame and a ladder. A standing platform is provided on the upper end surface of the supporting steel frame, and a protective fence is provided around the standing platform. Universal wheels are provided at the bottom of the supporting steel frame, and inclined ladders are fixed on two symmetrical sides of the supporting steel frame.
Citation Information
Patent Citations
Extreme challenge hourglass tower
CN211863836U