Device, system and method for obtaining primary current wiring switching under single-phase grounding fault

By adding a switch to the single-phase ground fault simulation system, the wiring transformation without unwinding the lines is realized, which solves the problem of cumbersome wiring transformation in the existing technology and improves the test efficiency.

CN111077412BActive Publication Date: 2024-10-15STATE GRID SICHUAN ELECTRIC POWER CORP ELECTRIC POWER RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010042922.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-15
Publication Date
2024-10-15
Estimated Expiration
2040-01-15

AI Technical Summary

Technical Problem

In the single-phase ground fault simulation test, the existing technology requires frequent replacement of lines, resulting in a cumbersome and time-consuming wiring conversion process, which seriously affects the test efficiency.

Method used

Add a switch to each phase, and realize wiring transformation by operating high-voltage switches K1 and K2 to avoid unwinding primary side wires and simplify the wiring process.

Benefits of technology

It improves the efficiency of single-phase ground fault simulation tests, simplifies the wiring conversion process, and reduces operating time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111077412B_ABST
    Figure CN111077412B_ABST
Patent Text Reader

Abstract

The present invention discloses a wiring switching device, system and method for obtaining a primary current under a single-phase grounding fault, including at least one of an A-phase structure, a B-phase structure and a C-phase structure, wherein the A-phase structure, the B-phase structure and the C-phase structure are the same, wherein the structure includes a simulated grounding resistor R, a single-pole double-throw high-voltage switch K1 and a single-pole double-throw high-voltage switch K2; the moving end of K2 is connected to the corresponding phase power line, and the fixed end of K2 is switched between its left connection end and its right connection end; the moving end of K1 is connected to the relevant equipment on the power supply side, and the fixed end of K1 is switched between its left connection end and its right connection end; the left connection end corresponding to the fixed end of K1 is grounded in a first grounding mode, and the right connection end corresponding to the fixed end of K1 is grounded in a second grounding mode. The present invention can achieve the simulation of a single-phase grounding fault in one phase and then switch to another phase to have a single-phase grounding fault, without having to untie the wires on the primary side of each phase, and the wiring change can be achieved by operating the switching switch, thereby improving the test efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power supply testing, and in particular to a wiring switching device, a system and a method for obtaining a primary current under a single-phase grounding fault. Background Art

[0002] Most of my country's medium-voltage distribution network systems are neutral-point insulated systems. Single-phase grounding faults are one of the types of faults that often occur in distribution network systems. According to the relevant regulations of the power industry, when a single-phase grounding fault occurs, the distribution network system using neutral-point insulation can still operate with power for 2 hours. The patent "System and method for obtaining the metering performance of electric energy metering devices under single-phase grounding faults" (application number: 201910281485.9) proposes to build a single-phase grounding fault experimental platform under laboratory conditions to simulate the impact of electric energy metering devices installed in different locations on users' electric energy metering. Figure 1 As shown, when a single-phase grounding occurs (taking a single-phase grounding fault on phase C as an example), a fault current on phase C flows from the earth to the line, while a capacitive current on phases A and B flows from the line to the earth. Therefore, when a single-phase grounding fault occurs on different phases, the current between the line and the earth is different.

[0003] The patent "System and method for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault" (application number: 201910281485.9) proposes Figure 2 The wiring circuit for simulating the current of each phase when a single-phase grounding fault occurs is shown in the figure. In the laboratory, in order to simulate the single-phase grounding fault occurring in different phases, Figure 2 It is cumbersome to replace the wiring. When simulating a single-phase grounding fault in one phase and then switching to a single-phase grounding fault in another phase, the wires on the primary side of each phase need to be untied first and then rewired. Since the primary wire is usually a high-voltage insulated wire with a large current, the primary wire is usually heavy and inconvenient to move. At the same time, the wiring conversion process takes a lot of time, which seriously affects the test efficiency. Summary of the invention

[0004] Therefore, in order to solve the above-mentioned technical problems, the present invention is Figure 2 On this basis, a switching switch is added to each phase to simulate a single-phase grounding fault in one phase and then switch to another phase. There is no need to untie the wires on the primary side of each phase. The wiring change can be achieved by operating the switching switch, which improves the test efficiency.

[0005] To achieve the above-mentioned purpose of the invention, the present application provides a wiring switching device for obtaining primary current under a single-phase grounding fault, wherein the device includes at least one of an A-phase structure, a B-phase structure and a C-phase structure, and the A-phase structure, the B-phase structure and the C-phase structure are the same, wherein the structure includes an analog grounding resistor R, a single-pole double-throw high-voltage switch K1 and a single-pole double-throw high-voltage switch K2; the moving end of K2 is connected to the corresponding phase power line, and the fixed end of K2 is switched between its left connection end and right connection end; the moving end of K1 is connected to relevant equipment on the power supply side, and the fixed end of K1 is switched between its left connection end and right connection end; the left connection end corresponding to the fixed end of K1 is grounded using a first grounding method, and the right connection end corresponding to the fixed end of K1 is grounded using a second grounding method.

[0006] Among them, the structure of phase A includes a simulated grounding resistor R, a single-pole double-throw high-voltage switch K1 and a single-pole double-throw high-voltage switch K2; the moving end of K2 is connected to the A-phase power line, and is connected to its corresponding phase power supply in other phase structures, and the fixed end of K2 is switched between its left connection end and right connection end; the moving end of K1 is connected to the power supply side current transformer T1, and the fixed end of K1 is switched between its left connection end and right connection end; one end of the simulated grounding resistor R is grounded, and the other end of the simulated grounding resistor R is connected to the left connection end corresponding to the fixed end of K1, the high-voltage end of the capacitor to ground is connected to the right connection end corresponding to the fixed end of K1, and the low-voltage end of the capacitor to ground is grounded after being connected through phase adjustment.

[0007] Preferably, for a single-phase grounding fault phase, the fixed end of K1 is connected to its left connecting end, so that the high-voltage end of the simulated grounding resistor R is connected to T1; the fixed end of K2 is connected to its right connecting end, so that the high-voltage end of the ground capacitor C is connected to the line through K1; for a non-single-phase grounding fault phase, the fixed end of K1 is connected to its right connecting end, so that the simulated grounding resistor R is in a suspended state and not connected to the line; the fixed end of K2 is connected to its left connecting end, so that the high-voltage end of the ground capacitor C is connected to the transformer T1.

[0008] The present invention also provides a system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault, wherein a switching device is provided in the system, wherein the switching device includes at least one of an A-phase structure, a B-phase structure and a C-phase structure, wherein the A-phase structure, the B-phase structure and the C-phase structure are the same, wherein the structure includes an analog grounding resistor R, a single-pole double-throw high-voltage switch K1 and a single-pole double-throw high-voltage switch K2; the moving end of K2 is connected to the corresponding phase power line, and the fixed end of K2 includes a left connection end and a right connection end; the moving end of K1 is connected to relevant equipment on the power supply side, the fixed end of K1 includes a left connection end and a right connection end, and the right connection end of K2 is connected to the right connection end of K1; the left connection end corresponding to the fixed end of K1 is grounded using a first grounding method, and the right connection end corresponding to the fixed end of K1 is grounded using a second grounding method.

[0009] Preferably, the system is provided with a non-fault phase detection device and a fault phase detection device, the non-fault phase detection device and the fault phase detection device have the same structure, and the non-fault phase detection device includes a power supply side current transformer T1, a current booster T2 and a load side current transformer T3; the power supply side current transformer T1, the current booster T2 and the load side current transformer T3 are connected in sequence and closed into a loop.

[0010] Preferably, one end of the current booster T2 in the non-fault phase detection device is connected to the A phase line; one end of the power supply side current transformer T1 is connected to the grounding capacitor C A The high voltage end.

[0011] Preferably, one end of the current booster T2 in the fault phase detection device is connected to the C phase line; one end of the power supply side current transformer T1 is connected to an end of the switch K away from the resistor R.

[0012] Preferably, the primary side of the current booster T2 is arranged on the line of the fault phase or the non-fault detection phase, and the secondary side of the current booster T2 is connected to the power supply side current transformer T1 and the load side current transformer T3.

[0013] Preferably, the core of the current booster T2 adopts an annular structure, and the input line passes through the inner ring of the annular structure.

[0014] The present invention also provides a method for obtaining a wiring switch for obtaining a primary current under a single-phase grounding fault, characterized in that the method is based on the wiring switching device for obtaining a primary current under a single-phase grounding fault or based on the system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault, and the switching method of the method is: switching is performed by switching the fixed end positions of the single-pole double-throw high-voltage switch K1 and the single-pole double-throw high-voltage switch K2 in the structure.

[0015] One or more technical solutions provided by this application have at least the following technical effects or advantages:

[0016] The present invention adds a switching switch to each phase to simulate a single-phase grounding fault in one phase and then switch to another phase. When the single-phase grounding fault occurs, it is not necessary to untie the wires on the primary side of each phase. The wiring change can be achieved only by operating the switching switch, thereby improving the test efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation on the embodiments of the present invention;

[0018] Figure 1 This is a schematic diagram of a single-phase ground fault experimental platform;

[0019] Figure 2It is a schematic diagram of the composition of a system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault;

[0020] Figure 3 It is a schematic diagram of the composition of the device in the present invention. DETAILED DESCRIPTION

[0021] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present application and the features in the embodiments can be combined with each other without conflict.

[0022] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those within the scope of this description. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0023] Through the research of the inventor, it can be seen that for the ungrounded phase (with Figure 2 For example, the low-voltage end of the capacitor to ground is grounded, and the high-voltage end is connected to one end of the A-phase current transformer T1. The other end of the A-phase current transformer T1 is connected to the A-phase line. It can be seen that for the grounded phase (with Figure 2 Taking phase C as an example), the low-voltage end of the ground capacitor is grounded, and the high-voltage end is connected to the C-phase line. The low-voltage end of the resistor R simulating a fault is grounded, and the high-voltage end is connected to one end of the C-phase current transformer T1, and the other end of the C-phase current transformer T1 is connected to the C-phase line. It can be seen that the main difference between the grounded phase and the ungrounded phase is the wiring of the capacitor and the wiring of the resistor (only the grounded phase has a grounding resistor).

[0024] Through the analysis of each phase current and wiring under single-phase grounding fault, the design scheme of the present invention is as follows Figure 3 As shown. The design of each phase is the same, and phase A is used as an example for explanation. Each phase is set with a ground fault resistance and a ground capacitance branch, and two single-pole double-throw high-voltage switches K1 and K2 are added. The connection is as follows Figure 3 As shown. For a single-phase grounding fault phase, K1 is placed at the left end, so that the high-voltage end of the simulated grounding resistor R is connected to T1; K2 is placed at the right end, so that the high-voltage end of the capacitor C to the ground is connected to the line through K1; for a non-single-phase grounding fault phase, K1 is placed at the right end, so that the simulated grounding resistor R is in a suspended state and is not connected to the line; K2 is placed at the left end, so that the high-voltage end of the capacitor C to the ground is connected to the line. Through the above design, it is possible to simulate single-phase grounding conditions of different phases by simply switching switches.

[0025] The application of the present invention is an improvement on the application of the patent "System and method for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault" (application number: 201910281485.9). For an introduction to the contents related to the patent, please refer to the published patent, and the present invention will not make corresponding elaborations.

[0026] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0027] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A device for obtaining a primary current connection switch under a single-phase grounding fault, characterized in that: The switching device includes at least one of an A-phase structure, a B-phase structure and a C-phase structure, and the A-phase structure, the B-phase structure and the C-phase structure are the same, wherein the structure includes an analog grounding resistor R, a single-pole double-throw high-voltage switch K1 and a single-pole double-throw high-voltage switch K2; the moving end of K2 is connected to the corresponding phase power line, and the fixed end of K2 includes a left connection end and a right connection end; the moving end of K1 is connected to the relevant equipment on the power supply side, the fixed end of K1 includes a left connection end and a right connection end, and the right connection end of K2 is connected to the right connection end of K1; the left connection end corresponding to the fixed end of K1 is grounded using a first grounding method, and the right connection end corresponding to the fixed end of K1 is grounded using a second grounding method; Among them, the moving end of K1 is connected to the current transformer T1 on the power supply side, one end of the simulated grounding resistor R is grounded, the other end of the simulated grounding resistor R is connected to the left connection end corresponding to the fixed end of K1, the high voltage end of the capacitor to ground is connected to the right connection end corresponding to the fixed end of K1, and the low voltage end of the capacitor to ground is connected and grounded after phase adjustment; For a single-phase grounding fault phase, the moving end of K1 is connected to its left connection end, so that the high-voltage end of the simulated grounding resistor R is connected to T1; the moving end of K2 is connected to its right connection end, so that the high-voltage end of the ground capacitor C is connected to the line through K1; for a non-single-phase grounding fault phase, the moving end of K1 is connected to its right connection end, so that the simulated grounding resistor R is in a suspended state and not connected to the line; the moving end of K1 is connected to its right connection end, so that the high-voltage end of the ground capacitor C is connected to the transformer T1.

2. A system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault, characterized in that: The system is provided with a switching device, which includes at least one of an A-phase structure, a B-phase structure and a C-phase structure, and the A-phase structure, the B-phase structure and the C-phase structure are the same, wherein the structure includes an analog grounding resistor R, a single-pole double-throw high-voltage switch K1 and a single-pole double-throw high-voltage switch K2; the moving end of K2 is connected to the corresponding phase power line, and the fixed end of K2 includes a left connection end and a right connection end; the moving end of K1 is connected to the relevant equipment on the power supply side, the fixed end of K1 includes a left connection end and a right connection end, and the right connection end of K2 is connected to the right connection end of K1; the left connection end corresponding to the fixed end of K1 is grounded using a first grounding method, and the right connection end corresponding to the fixed end of K1 is grounded using a second grounding method; Among them, the moving end of K1 is connected to the current transformer T1 on the power supply side, one end of the simulated grounding resistor R is grounded, the other end of the simulated grounding resistor R is connected to the left connection end corresponding to the fixed end of K1, the high voltage end of the capacitor to ground is connected to the right connection end corresponding to the fixed end of K1, and the low voltage end of the capacitor to ground is connected and grounded after phase adjustment; For a single-phase grounding fault phase, the fixed end of K1 is connected to its left connection end, so that the high-voltage end of the simulated grounding resistor R is connected to T1; the fixed end of K2 is connected to its right connection end, so that the high-voltage end of the ground capacitor C is connected to the line through K1; for a non-single-phase grounding fault phase, the fixed end of K1 is connected to its right connection end, so that the simulated grounding resistor R is in a suspended state and not connected to the line; the moving end of K1 is connected to its right connection end, so that the high-voltage end of the ground capacitor C is connected to the transformer T1.

3. The system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault according to claim 2 is characterized in that: The system is provided with a non-fault phase detection device and a fault phase detection device, the non-fault phase detection device and the fault phase detection device have the same structure, and the non-fault phase detection device includes a power supply side current transformer T1, a current booster T2 and a load side current transformer T3; the power supply side current transformer T1, the current booster T2 and the load side current transformer T3 are connected in sequence and closed into a loop.

4. The system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault according to claim 3 is characterized in that: One end of the current booster T2 in the non-fault phase detection device is connected to the A-phase line; one end of the power supply side current transformer T1 is connected to the high voltage end of the grounding capacitor CA.

5. The system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault according to claim 3, characterized in that: One end of the current booster T2 in the fault phase detection device is connected to the C phase line; one end of the power supply side current transformer T1 is connected to an end of the switch K away from the resistor R.

6. The system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault according to claim 3, characterized in that: The primary side of the current booster T2 is arranged on the line of the fault phase or the non-fault detection phase, and the secondary side of the current booster T2 is connected to the power supply side current transformer T1 and the load side current transformer T3.

7. The system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault according to claim 3, characterized in that: The core of the current booster T2 adopts an annular structure, and the input line passes through the inner ring of the annular structure.

8. A method for obtaining primary current wiring switching under a single-phase grounding fault, characterized in that: The method is based on the wiring switching device for obtaining primary current under a single-phase grounding fault as described in claim 1 or the system for obtaining the metering performance of an electric energy metering device under a single-phase grounding fault as described in any one of claims 2 to 7. The switching method of the method is: switching is performed by switching the fixed end positions of the single-pole double-throw high-voltage switch K1 and the single-pole double-throw high-voltage switch K2 in the structure.