Base station and measurement capability determination method

By using the measurement capability adjustment unit in LTE-NR DC, the measurement capability candidates of the user device are notified and the decision is made based on the response of the secondary node. This solves the problem that the total upper limit condition cannot be guaranteed due to the independent determination of the measurement capability of the user device, and realizes the The measurement capabilities of the access method are appropriately distributed and independently operated, which improves system stability and efficiency.

CN111149381BActive Publication Date: 2024-10-18NTT DOCOMO INC
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN201880062573.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-09-12
Publication Date
2024-10-18
Estimated Expiration
2038-09-12

Smart Images

  • Figure CN111149381B_ABST
    Figure CN111149381B_ABST
Patent Text Reader

Abstract

A base station of a first wireless access method provides dual connection to a user device together with a sub-node of a second wireless access method, and comprises: a measurement capability adjustment unit, which notifies the sub-node of candidates for measurement capability of the user device in the first wireless access method or candidates for measurement capability of the user device in the second wireless access method, and determines the measurement capability of the user device in the first wireless access method based on a response from the sub-node; and a measurement control unit, which controls the measurement operation of the user device in the first wireless access method based on the determined measurement capability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a base station and a method for determining measurement capability. Background Art

[0002] Currently, in 3GPP (Third Generation Partnership Project), the specification formulation of a new wireless communication system called NR (New Radio Access Technology) as a successor to LTE (Long Term Evolution) and LTE-Advanced is being promoted. NR is sometimes also expressed as 5G.

[0003] In NR, as in LTE, the introduction of dual connectivity (DC) is being studied. Dual connectivity is an operation mode of a user device that can connect to both a primary node and a secondary node base station. As one form of dual connectivity in NR, there is LTE-NR dual connectivity (LTE-NR DC), which divides data between LTE base stations (eNB) and NR base stations (gNB) and simultaneously sends and receives data through these base stations.

[0004] like Figure 1 As shown, in LTE-NR DC, it is being studied that eNB and gNB each have an RRC (Radio Resource Control) entity. Figure 1 The left figure shows LTE-NRDC with eNB as the primary node and gNB as the secondary node. Figure 1 The right figure shows an LTE-NR DC with gNB as the master node and eNB as the slave node. The RRC state of the user device is managed by the master node, but RRC messages can be sent and received directly between the user device and the slave node (refer to non-patent document 1). For example, the setting of the frequency layer measured by the user device (also called the measurement object), the setting of the event for the user device to report the measurement result (radio quality, etc.) (also called the reporting setting (Reporting Configuration)), etc. can be sent directly from the slave node to the user device. In addition, the report of the measurement result from the user device to the slave node (also called the measurement report (Measurement Report)) can also be sent directly from the user device to the slave node.

[0005] Prior art literature

[0006] Non-patent literature

[0007] Non-patent document 1: 3GPP TR38.804 V1.0.0 (2017-03) Summary of the invention

[0008] Problems to be solved by the invention

[0009] In LTE-NR DC, the setting of the measurement operation in the user equipment (measurement configuration) is performed independently in LTE and NR. Since the measurement configuration includes the measurement object and the report configuration, the measurement object and the report configuration are also independently set in LTE and NR. That is, the measurement capability of the user equipment, such as the number of frequency layers measured by the user equipment and the number of events for which the user equipment reports the measurement results, is determined independently in LTE and NR. The eNB and gNB each set the measurement object for the user equipment within the range of the determined measurement capability and set the report configuration.

[0010] On the other hand, it is assumed that the measurement capability of the user device in LTE and the measurement capability of the user device in NR each have an upper limit value, and the total value of the measurement capabilities of the user devices in both LTE and NR is also specified to have an upper limit value. For example, it is assumed that (1) a condition that a maximum of 8 frequency layers can be measured in LTE, (2) a condition that a maximum of 8 frequency layers can be measured in NR, and (3) a condition that a maximum of 12 frequency layers can be measured in LTE and NR combined. In this example, if the eNB and gNB each independently determine the measurement capability of the user device, the condition (3) cannot be guaranteed.

[0011] In addition, the above problem is not limited to LTE-NR DC, but occurs in Multi-RAT Dual Connection (MR DC) using different radio access methods (Radio Access Technology (RAT)).

[0012] An object of the present invention is to appropriately determine the measurement capability of a user equipment in each radio access method in a dual connection using different radio access methods.

[0013] Means for solving problems

[0014] One embodiment of the present invention is a base station of a first radio access method, which provides dual connectivity to a user device together with a slave node of a second radio access method, and has:

[0015] a measurement capability adjustment unit that notifies the secondary node of a candidate for the measurement capability of the user apparatus in the first radio access method or a candidate for the measurement capability of the user apparatus in the second radio access method, and determines the measurement capability of the user apparatus in the first radio access method based on a response from the secondary node; and

[0016] The measurement control unit controls a measurement operation of the user equipment in the first radio access method based on the determined measurement capability.

[0017] Effects of the Invention

[0018] According to the present invention, in dual connectivity using different radio access methods, the measurement capability of a user equipment in each radio access method can be appropriately determined, and the setting of the measurement operation of the user equipment can be independently performed for each radio access method. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram showing the architecture of LTE-NR DC.

[0020] Figure 2 This is a schematic diagram showing a wireless communication system according to an embodiment of the present invention.

[0021] Figure 3 This is an example of defining the same measurement capability for all user devices.

[0022] Figure 4 This is an example of defining different measurement capabilities for each UE category.

[0023] Figure 5 It is a sequence diagram showing the measurement capability adjustment process between base stations (specific example 1).

[0024] Figure 6 It is a sequence diagram showing the measurement capability adjustment process between base stations (specific example 2).

[0025] Figure 7 It is a sequence diagram showing the measurement capability adjustment process between base stations (specific example 3).

[0026] Figure 8 It is a sequence diagram showing the measurement capability adjustment process between base stations (specific example 4).

[0027] Fig. 9 It is a sequence diagram showing the measurement capability adjustment process between base stations (specific example 5).

[0028] Fig.10 This is a structural diagram of a base station.

[0029] Fig.11This is the hardware structure diagram of the base station. DETAILED DESCRIPTION

[0030] Hereinafter, embodiments of the present invention will be described based on the drawings.

[0031] In the following embodiments, a distributed communication between base stations such as LTE-NR DC is disclosed, that is, a base station that provides dual connectivity to user devices.

[0032] <Overview of Wireless System>

[0033] First, refer to Figure 2 A wireless communication system according to an embodiment of the present invention is described. Figure 2 1 is a schematic diagram showing a wireless communication system according to an embodiment of the present invention. The wireless communication system 10 is composed of a plurality of base stations 101 and 102 and a user device 200. The base stations 101 and 102 may be referred to as eNBs in LTE and gNBs in NR. The user device 200 may be referred to as UE.

[0034] like Figure 2 As shown, the user device 200 is connected to the base stations 101 and 102 (hereinafter, sometimes collectively referred to as the base station 100) of LTE and / or NR in communication, and supports dual connection with the base stations 101 and 102. That is, the user device 200 can simultaneously use multiple component carriers provided by the base stations 101 and 102 to simultaneously send or receive data with the base stations 101 and 102. For example, in LTE-NRDC, downlink data addressed to the user device 200 from the core network (not shown) is allocated between the base stations 101 and 102 via the X2 interface or the Xn interface, and is sent from the base stations 101 and 102 to the user device 200, respectively. In the following embodiments, LTE-NR DC is used as an example for description, but the embodiments of the present invention are not limited to LTE-NR DC, and can also be applied to multi-RAT dual connection (MR DC) using different RATs.

[0035] In the illustrated embodiment, although the wireless communication system 10 has only two base stations 101 and 102, in this specification, the term dual connectivity also includes distributed communication or multiple connectivity using three or more base stations 100. Furthermore, generally, a plurality of base stations 100 are deployed to cover the service area of ​​the wireless communication system 10.

[0036] In dual connection, one of the base stations 101 and 102 becomes the master node that manages the RRC state with the user device 200, and the other becomes the slave node that sets the component carrier for the user device 200 according to the instruction from the master node. For convenience, it is assumed that the base station 101 is the master node and the base station 102 is the slave node for explanation. In LTE-NR DC, sometimes the LTE base station (eNB) becomes the master node, and sometimes the NR base station (gNB) becomes the master node. The group of service cells associated with the master node is called the master cell group (MCG: Master Cell Group), and the group of service cells associated with the slave node is called the secondary cell group (SCG: Secondary Cell Group).

[0037] Similar to the cell selection in a general wireless communication system, in dual connection, the user device 200 also performs wireless quality measurement (Measurement) to determine whether there is an adjacent cell with a better reception environment than the reception environment of the own cell. The user device 200 sets the operation for measuring wireless quality via RRC signaling from the master node 101 and the slave node 102, respectively, and reports the measurement result. Specifically, the master node 101 and the slave node 102 respectively set a measurement object (Measuremet Object) for specifying the frequency layer of the measurement object for the user device 200, and set a reporting configuration (Reporting Configuration) for specifying the event for reporting the measurement result. The measurement object and the reporting configuration are associated by an identifier (Measurement ID). The user device 200 measures the wireless quality of the frequency layer specified by the measurement object, and sends the measurement result (measurement report) if the event specified by the reporting configuration (for example, a condition exceeding a certain threshold) is met.

[0038] In LTE-NR DC, the measurement object is independently set in LTE and NR, respectively, and the report setting is also independently set in LTE and NR, respectively. That is, the master node 101 and the slave node 102 can specify the frequency layer measured by the user device 200 through the measurement object, and can specify the event for which the user device 200 reports the measurement result through the report setting. On the other hand, it is not desirable for the master node 101 and the slave node 102 to specify the frequency layer and the event to the user device 200 indefinitely, and to set an upper limit value for the number of frequency layers and an upper limit value for the number of events. In the following embodiments, examples of setting an upper limit value for the number of frequency layers and an upper limit value for the number of events are described, but other upper limits for limiting the measurement capability of the user device 200 may also be set.

[0039] Figure 3: is a diagram showing an example of specifying the same measurement capability for all user devices. For example, the upper limit of the number of frequency layers that can be set for the user device 200 is specified for each RAT, and is also specified as a total value between RATs. For example, the upper limit of the number of frequency layers in LTE is X1, the upper limit of the number of frequency layers in NR is X2, and the upper limit of the total number of frequency layers in LTE and NR is Y, where Y is less than X1+X2. Similarly, for example, the upper limit of the number of events that can be set for the user device 200 is specified for each RAT, and is also specified as a total value between RATs. For example, the upper limit of the number of events in LTE is N1, the upper limit of the number of events in NR is N2, and the upper limit of the total number of events in LTE and NR is Z, where Z is less than N1+N2. The master node 101 and the slave node 102 need to consider these upper limits to determine the measurement capability of the user device 200 and control the measurement operation of the user device 200.

[0040] Figure 4 : is a diagram showing an example of specifying different measurement capabilities for each UE category. For example, UE category #A and UE category #B can be specified according to the capabilities of the user device 200. The number of specified UE categories can be set arbitrarily. The upper limit value of the number of frequency layers and the upper limit value of the number of events can be different according to the UE category. For example, for a user device of UE category #A, the upper limit value of the number of frequency layers in LTE is Fn1, the upper limit value of the number of frequency layers in NR is Fn2, and the upper limit value of the total number of frequency layers in LTE and NR is YA, and YA is less than Fn1+Fn2. In addition, for a user device of UE category #B, the upper limit value of the number of frequency layers in LTE is Fn3, the upper limit value of the number of frequency layers in NR is Fn4, and the upper limit value of the total number of frequency layers in LTE and NR is YB, and YB is less than Fn3+Fn4. Similarly, for example, for a user device of category #A, the upper limit value of the number of events in LTE is Me1, the upper limit value of the number of events in NR is Me2, and the upper limit value of the total number of events in LTE and NR is ZA, and ZA is less than Me1+Me2. In addition, for user devices of category #B, the upper limit of the number of events in LTE is Me3, the upper limit of the number of events in NR is Me4, and the upper limit of the total number of events of both LTE and NR is ZB, which is less than Me3+Me4.

[0041] In the embodiment of the present invention, the primary node 101 and the secondary node 102 cooperate, considering Figure 3 and Figure 4 The process of determining the measurement capability of the user equipment 200 based on the upper limit value shown will be described below.

[0042] <Concrete example 1>

[0043] In the specific example 1, an example is described in which the master node 101 notifies the slave node 102 of the measurement capability candidates of the user equipment 200 and the slave node 102 accepts the notified measurement capability candidates.

[0044] In the specific example 1, it is assumed that the master node 101 is a base station of LTE and the slave node 102 is a base station of NR. Figure 3 or Figure 4 The upper limit value of each RAT and the upper limit value of the total value between RATs shown in FIG. 1 determine the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) that are candidates for the measurement capability of the user apparatus 200 in LTE, and determine the number of frequency layers (SCG-NumFreqLayer: n) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user apparatus 200 in NR. For example, in the case of Figure 3 As shown in FIG. 1 , when UE category is not considered, n is X1, N is less than X2, m is less than N1, and M is less than N2. In addition, n+N is less than Y, and m+M is less than Z. Figure 4 As shown in the figure, when considering the UE category, for the user equipment 200 of UE category #A, n is less than Fn1, N is less than Fn2, m is less than Me1, and M is less than Me2. In addition, n+N is less than YA, and m+M is less than ZA.

[0045] The master node 101 notifies the slave node 102 of the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user device 200 in the NR (S101). The number of frequency layers N and the number of events M may be included in the message sent by the master node 101 to the slave node 102 when requesting the addition or modification of the SCG.

[0046] The slave node 102 determines whether it can accept the number of frequency layers N and the number of events M as candidates for the notified measurement capability, and if it can accept the number of frequency layers N and the number of events M, it sends a response (Accept and / or affirmative answer (ACK, etc., the same below) to that effect to the master node 101 (S102). In addition, if it cannot accept the number of frequency layers N and the number of events M, the slave node 102 sends a response (Reject and / or negative answer (NACK, etc., the same below) to that effect to the master node 101.

[0047] When the master node 101 receives a response (Accept) indicating that the slave node 102 accepts the number of frequency layers N and the number of events M, it determines that the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) that can be used as candidates for the measurement capability of the user device 200 in LTE can be used. In addition, when the master node 101 receives a response (Reject) from the slave node 102 indicating that the number of frequency layers N and the number of events M cannot be accepted, the master node 101 can return to step S101 and notify other numbers of frequency layers (for example, a value obtained by adding a fixed value to N) and numbers of events (for example, a value obtained by adding a fixed value to M) that are candidates for the measurement capability.

[0048] The master node 101 configures the measurement object and report configuration in LTE via RRC signaling to control the measurement operation of the user equipment 200 based on the number of frequency layers n and the number of events m determined in LTE ( S103 ).

[0049] The slave node 102 configures the measurement object and report configuration in LTE via RRC signaling to control the measurement operation of the user equipment 200 based on the number of frequency layers N and the number of events M determined in NR ( S104 ).

[0050] In the above step S101, the master node 101 notifies the slave node 102 of the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user device 200 in NR, but may also notify the slave node 102 of the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) that are candidates for the measurement capability of the user device 200 in LTE. For example, the master node 101 does not determine the number of frequency layers N and the number of events M in NR, but determines the number of frequency layers n and the number of events m in LTE and notifies the slave node 102. In step S102, the slave node 102 determines whether the notified frequency layer n and the number of events m can be accepted. Specifically, the slave node 102 refers to the following. Figure 3 or Figure 4The upper limit value of each RAT and the upper limit value of the total value between RATs shown in the figure determine whether the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user device 200 in NR can be determined. If the number of frequency layers n and the number of events m can be accepted, a response (Accept) indicating this is sent to the master node 101. If the number of frequency layers n and the number of events m cannot be accepted, a response (Reject) indicating this is sent to the master node 101. If the master node 101 receives a response (Reject) indicating that the number of frequency layers n and the number of events m cannot be accepted from the slave node 102, the master node 101 can return to step S101 and notify other numbers of frequency layers (for example, values ​​obtained by subtracting a fixed value from n) and numbers of events (for example, values ​​obtained by subtracting a fixed value from m) that are candidates for the measurement capability.

[0051] Alternatively, the following operation may be performed. The master node 101 does not determine the number of frequency layers N and the number of events M in NR, but determines the number of frequency layers n and the number of events m in LTE and notifies the slave node 102. In step S102, the slave node 102 refers to the upper limit value of each RAT and the upper limit value of the total value between RATs, and determines whether the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) as candidates for the measurement capability of the user device 200 in NR can be determined so as not to exceed the upper limit value of the total value between RATs, and sends a response (Accept) indicating this to the master node 101. Since the value can be set independently in each RAT, the value determined in each RAT is applied as long as the upper limit value of the total value of the RAT is not exceeded. According to this operation, the value can be determined without exceeding the total value between RATs, and the operation (such as signaling) will not be unnecessarily large, which is preferable. In the case of exceeding the total value between RATs, it can be dealt with by taking an operation such as specific example 4.

[0052] <Concrete example 2>

[0053] In the specific example 2, an example is described in which the master node 101 notifies the slave node 102 of the measurement capability candidates of the user equipment 200 and the slave node 102 requests a measurement capability different from the notified measurement capability candidates.

[0054] In the specific example 2, it is assumed that the master node 101 is an LTE base station and the slave node 102 is an NR base station. Figure 3 or Figure 4The upper limit value of each RAT and the upper limit value of the total value between RATs shown determine the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) that are candidates for the measurement capability of the user device 200 in LTE, and determine the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user device 200 in NR.

[0055] The master node 101 notifies the slave node 102 of the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user apparatus 200 in NR ( S201 ).

[0056] When the secondary node 102 cannot accept the notified number of frequency layers N and number of events M as candidates for measurement capability, it requests the primary node 101 for a number of frequency layers (SCG-NumFreqLayer: N') and a number of events (SCG-NumMeasEvent: M') different from the number of frequency layers N and the number of events M (S202). For example, N' is a value greater than N, and M' is a value greater than M.

[0057] The master node 101 determines whether it can accommodate the requested number of frequency layers N' and number of events M', and if it can accommodate the number of frequency layers N' and number of events M', it sends a response (Accept) to the slave node 102 to indicate this (S203). For example, even if the number of frequency layers N' and number of events M' are received, the master node 101 can accommodate the number of frequency layers N' and number of events M' as long as the upper limit of the total value of the number of frequency layers in both LTE and NR and the upper limit of the total value of the number of events are not exceeded. In addition, the master node 101 can accommodate the number of frequency layers N' and number of events M' if it can reduce the number of frequency layers n and number of events m in LTE without exceeding the upper limit of the total value of the number of frequency layers in both LTE and NR and the upper limit of the total value of the number of events. In addition, if the master node 101 cannot accommodate the number of frequency layers N' and number of events M', it sends a response (Reject) to the slave node 102 to indicate this.

[0058] If the master node 101 can accommodate the requested number of frequency layers N' and number of events M', the master node 101 determines the number of frequency layers n' and number of events m' of the user device 200 in LTE within the range of the upper limit of the total number of frequency layers and the upper limit of the total number of events of both LTE and NR minus the requested number of frequency layers N' and number of events M'. For example, in the case Figure 3 As shown in FIG. 1 , without considering the UE category, the master node 101 determines the number of frequency layers n' of less than X1 within the range of Y-N', and the number of events m' of less than N1 within the range of Z-M' in LTE. Figure 4 As shown, considering the UE category, the master node 101 determines the number of frequency layers n' to be less than Fn1 within the range of YA-N' and the number of events m' to be less than Me1 within the range of ZA-M' for the user equipment 200 of UE category #A in LTE.

[0059] The master node 101 configures the measurement object and report configuration in LTE via RRC signaling to control the measurement operation of the user equipment 200 based on the number of frequency layers n′ and the number of events m′ determined in LTE ( S204 ).

[0060] When the slave node 102 receives a response (Accept) indicating that the master node 101 has accepted the number of frequency layers N' and the number of events M', it sets the measurement object and report setting in LTE via RRC signaling to control the measurement operation of the user device 200 based on the number of frequency layers N' and the number of events M' in NR (S205). In addition, when the slave node 102 receives a response (Reject) from the master node 101 indicating that the number of frequency layers N' and the number of events M' cannot be accepted, the slave node 102 may also return to step S202 to request other numbers of frequency layers (e.g., a value obtained by subtracting a fixed value from N') and numbers of events (e.g., a value obtained by subtracting a fixed value from M').

[0061] In the above step S201, the master node 101 notifies the slave node 102 of the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) as candidates for the measurement capability of the user device 200 in NR, but may also notify the slave node 102 of the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) as candidates for the measurement capability of the user device 200 in LTE. For example, the master node 101 does not determine the number of frequency layers N and the number of events M in NR, but determines the number of frequency layers n and the number of events m in LTE and notifies the slave node 102. In step S202, the slave node 102 determines whether the notified number of frequency layers n and the number of events m can be accepted. Specifically, the slave node 102 refers to the following. Figure 3 or Figure 4The upper limit value of each RAT and the upper limit value of the total value between RATs shown in the figure are used to determine whether the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user device 200 in NR can be determined. If the number of frequency layers n and the number of events m cannot be accepted, the master node 101 is requested to have a number of frequency layers (MCG-NumFreqLayer: n') and a number of events (MCG-NumMeasEvent: m') that are different from the number of frequency layers n and the number of events m. For example, n' is a value smaller than n, and m' is a value smaller than m. In step S203, the master node 101 determines whether the requested number of frequency layers n' and the number of events m' can be accepted. If the number of frequency layers n' and the number of events m' can be accepted, the master node 101 sends a response (Accept) indicating this to the slave node 102. If the number of frequency layers n' and the number of events m' cannot be accepted, the master node 101 sends a response (Reject) indicating this to the slave node 102. When the slave node 102 receives a response (Reject) from the master node 101 indicating that the number of frequency layers n' and the number of events m' cannot be accommodated, the slave node 102 can return to step S202 to request other numbers of frequency layers (for example, a value obtained by adding a fixed value to n') and numbers of events (for example, a value obtained by adding a fixed value to m').

[0062] <Concrete example 3>

[0063] In the specific example 3, an example is described in which the master node 101 and the slave node 102 request each other to measure the capability until the measurement capability of the user equipment 200 can be mutually accepted.

[0064] In the specific example 3, it is assumed that the master node 101 is an LTE base station and the slave node 102 is an NR base station. Figure 3 or Figure 4 The upper limit value of each RAT and the upper limit value of the total value between RATs shown determine the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) that are candidates for the measurement capability of the user device 200 in LTE, and determine the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user device 200 in NR.

[0065] The master node 101 notifies the slave node 102 of the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) that are candidates for the measurement capability of the user apparatus 200 in NR ( S301 ).

[0066] Similar to step S202 in specific example 2, when the slave node 102 cannot accept the notified number of frequency layers N and number of events M as candidates for measurement capability, it requests the master node 101 for a number of frequency layers (SCG-NumFreqLayer: N') and a number of events (SCG-NumMeasEvent: M') that are different from the number of frequency layers N and the number of events M (S302).

[0067] The master node 101 determines whether it can accommodate the requested number of frequency layers N' and number of events M'. If it cannot accommodate the number of frequency layers N' and number of events M', it requests the slave node 102 for a number of frequency layers (SCG-NumFreqLayer: N") and a number of events (SCG-NumMeasEvent: M") that are different from the number of frequency layers N' and number of events M' (S303). For example, N" is a value smaller than N', and M" is a value smaller than M'.

[0068] Steps S302 and S303 are repeated until the master node 101 and the slave node 102 can mutually accommodate the number of frequency layers and the number of events.

[0069] The master node 101 and the slave node 102 are able to accept the number of frequency layers and the number of events requested by the other party (in Figure 7 In the example of FIG. 1 , when the slave node 102 can accept the number of frequency layers N” and the number of events M” requested from the master node 101 , a response (Accept) indicating this is sent ( S304 ).

[0070] The master node 101 determines the number of frequency layers n" and the number of events m" in LTE based on the number of frequency layers N" and the number of events M". Thereafter, the master node 101 sets the measurement object and report setting in LTE via RRC signaling to control the measurement operation of the user device 200 based on the number of frequency layers m" and the number of events n" determined in LTE (S305).

[0071] The slave node 102 configures the measurement object and report configuration in LTE via RRC signaling to control the measurement operation of the user equipment 200 based on the number of frequency layers N" and the number of events M" (S306).

[0072] In the specific example 3, the master node 101 also notifies the slave node 102 of the number of frequency layers (SCG-NumFreqLayer: N) and the number of events (SCG-NumMeasEvent: M) as candidates for the measurement capability of the user device 200 in NR, but the master node 101 may also notify the slave node 102 of the number of frequency layers (MCG-NumFreqLayer: n) and the number of events (MCG-NumMeasEvent: m) as candidates for the measurement capability of the user device 200 in LTE. The same process as above is continued until the number of frequency layers and the number of events in LTE requested from the other party can be accepted.

[0073] <Concrete example 4>

[0074] In Specific Example 4, an example is described in which the measurement capability of the user apparatus 200 determined using any one of Specific Examples 1 to 3 is changed in response to a request from the slave node 102. This specific example is mainly applied when the measurement capability used by the slave node 102 needs to be increased.

[0075] In specific example 4, it is assumed that the master node 101 is a base station of LTE and the slave node 102 is a base station of NR. For example, when the measurement capability of the user device 200 in NR needs to be increased due to the allocation of a new frequency band, the installation of a new base station in the vicinity, etc., the slave node 102 sends a request for changing the number of frequency layers and the number of events in NR to the master node 101 (S401). The request for changing the number of frequency layers and the number of events in NR can be included in the message sent by the slave node 102 to the master node 101 when requesting a change in the SCG.

[0076] Master node 101 refers to Figure 3 or Figure 4 The upper limit value in the NR shown in FIG. 4 is notified to the slave node 102 (S402) of the number of frequency layers (SCG-NumFreqLayer: P) and the number of events (SCG-NumMeasEvent: Q) that are candidates for the measurement capability of the user device 200 in the NR. For example, P is a value greater than N, and Q is a value greater than M. Figure 3 As shown in FIG. 1 , without considering the UE category, P is less than X2 and Q is less than N2. Figure 4 As shown in the figure, when considering the UE category, for the user equipment 200 of UE category #A, P is less than or equal to Fn2, and Q is less than or equal to Me2.

[0077] The slave node 102 determines whether it can accept the notified number of frequency layers N and number of events M as candidates for measurement capability, and if it can accept the number of frequency layers N and number of events M, it sends a response (Accept) to that effect to the master node 101 (S403). In addition, if the number of frequency layers P and number of events Q cannot be accepted, the slave node 102 sends a response (Reject) to that effect to the master node 101. In this case, the master node 101 can return to step S402 and notify other numbers of frequency layers (e.g., a value obtained by adding a fixed value to P) and numbers of events (e.g., a value obtained by adding a fixed value to Q) as candidates for measurement capability.

[0078] Thereafter, similarly to steps S103 and S104 in the specific example 1, the master node 101 and the slave node control the measurement operation of the user equipment 200 (not shown).

[0079] <Concrete example 5>

[0080] In concrete example 5, an example is described in which the measurement capability of the user apparatus 200 determined using any one of concrete examples 1 to 3 is changed in response to a request from the master node 101. This concrete example is mainly applied when the measurement capability applied by the slave node 102 needs to be reduced.

[0081] In specific example 5, it is assumed that the master node 101 is a base station of LTE and the slave node 102 is a base station of NR. For example, when it is necessary to reduce the measurement capability of the user device 200 in NR, the master node 101 sends a request for changing the number of frequency layers and the number of events in NR to the slave node 102 (S501). The request for changing the number of frequency layers and the number of events in NR can be included in the message sent by the master node 101 to the slave node 102 when requesting a change of SCG.

[0082] When the frequency layer and the number of events can be changed from M and N to P and Q respectively, the slave node 102 notifies the master node 101 of the changed number of frequency layers (SCG-NumFreqLayer: P) and the number of events (SCG-NumMeasEvent: Q) (S502). For example, P is a value smaller than N, and Q is a value smaller than M.

[0083] The master node 101 determines whether it can accept the number of frequency layers P and the number of events Q, and if it can accept the number of frequency layers P and the number of events Q, it sends a response (Accept) indicating this to the slave node 102 (S503). In addition, if the master node 101 cannot accept the number of frequency layers P and the number of events Q, it sends a response (Reject) indicating this to the slave node 102. In this case, the slave node 102 can return to step S502 and notify other numbers of frequency layers (for example, the value obtained by subtracting a fixed value from P) and numbers of events (for example, the value obtained by subtracting a fixed value from Q) as measurement capabilities.

[0084] Thereafter, similarly to steps S103 and S104 in the specific example 1, the master node 101 and the slave node control the measurement operation of the user equipment 200 (not shown).

[0085] Furthermore, when the measurement capability of the user equipment 200 is changed in response to a request from the master node 101 , the measurement capability of the user equipment 200 can also be changed according to the procedures of Specific Examples 1 to 3.

[0086] <Structure of base station>

[0087] Next, refer to Fig.10 , an example of the functional structure of the base station 100 that performs the processing operations described so far is described. The base station 100 may have the functions of one of the master node 101 or the slave node 102 in any one of the specific examples 1 to 5, or may have the functions of both the master node 101 and the slave node 102 in any one of the specific examples 1 to 5. Fig.10 As shown, the base station 100 includes a signal transmitting unit 110 , a signal receiving unit 120 , a measurement capability adjusting unit 130 , an inter-base station communication unit 140 , and a measurement control unit 150 . Fig.10 The functional structure shown is only an example, and the functional division and the names of the functional units can be arbitrarily set as long as the operation of the embodiment of the present invention can be performed.

[0088] The signal transmission unit 110 generates a transmission signal to be transmitted to the user equipment 200, and transmits the transmission signal wirelessly. The signal reception unit 120 wirelessly receives various signals from the user equipment 200, and obtains a higher layer signal from the received physical layer signal. In order to control the measurement operation of the user equipment 200, the signal transmission unit 110 transmits an RRC message for setting a measurement object and a report setting to the user equipment 200. In addition, the signal reception unit 120 receives a measurement result from the user equipment 200.

[0089] The measurement capability adjustment unit 130 cooperates with the dual-connected counterpart node to determine the measurement capability of the user device 200. The measurement capability adjustment unit 130 performs the information exchange between the master node 101 and the slave node 102 described in specific examples 1 to 5 via the inter-base station communication unit 140 to determine the number of frequency layers and the number of events as the measurement capability of the user device 200. For example, when the base station 100 is the master node 101, the measurement capability adjustment unit 130 notifies the slave node 102 of the candidate of the measurement capability that the master node 101 should apply or the candidate of the measurement capability that the slave node 102 should apply, and based on the response from the slave node 102, further exchanges information with the slave node 102 as needed to determine the measurement capability that the master node 101 should apply. Alternatively, for example, in the case where the base station 100 is the master node 101, the measurement capability adjustment unit 130 receives from the slave node 102 a request for the measurement capability that the slave node 102 should apply or the measurement capability that the master node 101 should apply, determines whether the measurement capability requested from the slave node 102 can be accepted, further exchanges information with the slave node 102 as needed, and determines the measurement capability that the master node 101 should apply. In addition, for example, in the case where the base station 100 is the slave node 102, the measurement capability adjustment unit 130 receives from the master node 101 a candidate for the measurement capability that the master node 101 should apply or the candidate for the measurement capability that the slave node 102 should apply, determines whether the measurement capability notified from the master node 101 can be accepted, further exchanges information with the master node 101 as needed, and determines the measurement capability that the slave node 102 should apply. Alternatively, for example, in the case where the base station 100 is the secondary node 102, the measurement capability adjustment unit 130 requests the primary node 101 for the measurement capability that the secondary node 102 should apply or the measurement capability that the primary node 101 should apply, and based on the response from the primary node 101, further information is exchanged with the primary node 101 as needed to determine the measurement capability that the secondary node 102 should apply.

[0090] The measurement control unit 150 sets a measurement target and a report setting for the user equipment 200 to control the measurement operation of the user equipment 200 based on the measurement capability determined in the measurement capability adjustment unit 130 .

[0091] <Hardware Structure>

[0092] The block diagram used in the description of the above-mentioned embodiment represents a block of a functional unit. These functional blocks (structural parts) are implemented by any combination of hardware and / or software. In addition, the implementation method of each functional block is not particularly limited. That is, each functional block can be implemented by a device that is physically and / or logically combined, or two or more devices that are physically and / or logically separated can be directly and / or indirectly (for example, wired and / or wireless) connected and implemented by these devices.

[0093] For example, the base station 100 according to one embodiment of the present invention may function as a computer that performs processing of the wireless communication method of the present invention. Fig.11 1 is a block diagram showing the hardware structure of the base station 100 according to one embodiment of the present invention. The base station 100 may also be physically configured as a computer device including a processor 1001, a memory 1002, a storage 1003, a communication device 1004, an input device 1005, an output device 1006, a bus 1007, and the like.

[0094] In the following description, the term "device" can be replaced with circuit, equipment, unit, etc. The hardware configuration of base station 100 may include one or more of the devices shown in the figure, or may exclude some of the devices.

[0095] Each function in the base station 100 is implemented by reading the specified software (program) into hardware such as the processor 1001 and the memory 1002, and performing calculations by the processor 1001, and controlling the communication of the communication device 1004 and / or the reading and / or writing of data in the memory 1002 and the storage 1003.

[0096] The processor 1001 controls the entire computer by, for example, operating an operating system. The processor 1001 may be composed of a central processing unit (CPU) including an interface with peripheral devices, a control device, a calculation device, a register, etc. For example, each of the above components may be implemented by the processor 1001.

[0097] In addition, the processor 1001 reads the program (program code), software module and / or data from the storage 1003 and / or the communication device 1004 to the memory 1002, and performs various processes based on these. As a program, a program that causes a computer to perform at least a part of the operations described in the above embodiment is used. For example, the processing performed by each component of the base station 100 can be implemented by a control program stored in the memory 1002 and operated in the processor 1001, and the same can be implemented for other functional blocks. Although the above-mentioned various processes are described as being performed by one processor 1001, they can also be performed simultaneously or sequentially by more than two processors 1001. The processor 1001 can be installed in more than one chip. In addition, the program can also be sent from the network via an electrical communication line.

[0098] The memory 1002 is a computer-readable recording medium, and may be composed of at least one of a ROM (Read Only Memory), an EPROM (Erasable Programmable ROM), an EEPROM (Electrically Erasable Programmable ROM), a RAM (Random Access Memory), etc. The memory 1002 may be referred to as a register, a cache, a main memory (main storage device), etc. The memory 1002 may store executable programs (program codes), software modules, etc., for implementing the wireless communication method of one embodiment of the present invention.

[0099] The storage 1003 is a computer-readable recording medium, and may be composed of at least one of an optical disk such as a CD-ROM (Compact Disc ROM), a hard disk drive, a flexible disk, an optical magnetic disk (e.g., a compact disk, a digital versatile disk, a Blu-ray (registered trademark) disk), a smart card, a flash memory (e.g., a card, a stick, a key drive), a floopy (registered trademark) disk, a magnetic strip, etc. The storage 1003 may be referred to as an auxiliary storage device. The above-mentioned storage medium may also be, for example, a database, a server, and other appropriate media including the memory 1002 and / or the storage 1003.

[0100] The communication device 1004 is hardware (transmitting and receiving device) for communicating between computers via a wired and / or wireless network, and is also called a network device, a network controller, a network card, a communication module, etc. For example, the above-mentioned signal sending unit 110, the signal receiving unit 120 and the inter-base station communication unit 140 can be implemented by the communication device 1004.

[0101] The input device 1005 is an input device that receives input from the outside (e.g., a keyboard, a mouse, a microphone, a switch, a button, a sensor, etc.). The output device 1006 is an output device that implements output to the outside (e.g., a display, a speaker, an LED light, etc.). In addition, the input device 1005 and the output device 1006 may also be an integrated structure (e.g., a touch panel).

[0102] In addition, the processor 1001, the memory 1002 and other devices are connected via a bus 1007 for communicating information. The bus 1007 may be composed of a single bus or different buses between devices.

[0103] In addition, the base station 100 may also include hardware such as a microprocessor, a digital signal processor (DSP), an ASIC (Application Specific Integrated Circuit), a PLD (Programmable Logic Device), and an FPGA (Field Programmable Gate Array), and may also implement a part or all of each functional block through the hardware. For example, the processor 1001 may be implemented by at least one of these hardware.

[0104] <Summary of Embodiments>

[0105] As described above, according to an embodiment of the present invention, there is provided a base station of a first wireless access method, wherein the base station of the first wireless access method provides dual connection to a user device together with a sub-node of a second wireless access method, and comprises: a measurement capability adjustment unit, which notifies the sub-node of a candidate for the measurement capability of the user device in the first wireless access method or a candidate for the measurement capability of the user device in the second wireless access method, and determines the measurement capability of the user device in the first wireless access method based on a response from the sub-node; and a measurement control unit, which controls the measurement operation of the user device in the first wireless access method based on the determined measurement capability.

[0106] In dual connections using different wireless access methods, the base station can appropriately determine the measurement capabilities of the user equipment in each wireless access method, and can independently set the measurement operation of the user equipment for each wireless access method. In addition, the operator can also consider Figure 3 and Figure 4 The upper limit value shown is set by the OAM (Operation, Administration, and Maintenance) system to measure the capability of the user device. However, by cooperating between the master node and the slave node to determine the measurement capability of the user device, it is possible to appropriately control each user device individually.

[0107] In addition, the measurement capability adjustment unit may also determine a candidate for the measurement capability of the user device in the first wireless access method or a candidate for the measurement capability of the user device in the second wireless access method based on the upper limit value of the total value of the measurement capabilities in both the first wireless access method and the second wireless access method, and notify the secondary node. Upon receiving a response indicating that the secondary node has accepted the notified candidate for the measurement capability, the measurement capability of the user device in the first wireless access method is determined within the range of the measurement capability obtained by subtracting the notified candidate for the measurement capability from the upper limit value of the total value of the measurement capabilities in both the first wireless access method and the second wireless access method.

[0108] According to the above configuration, since the slave node accepts the measurement capability determined in the master node, it is possible to reduce information exchange required for adjusting the measurement capability between the master node and the slave node.

[0109] Furthermore, when receiving a response requesting a measurement capability different from the notified measurement capability candidate from the secondary node, the measurement capability adjustment unit determines whether the requested measurement capability can be accepted and notifies the secondary node of the determination result.

[0110] According to the above configuration, since the slave node can request the master node for the required measurement capability, it is possible to determine the measurement capability appropriate for the slave node.

[0111] Furthermore, when receiving a request to change the measurement capability of the user equipment in the second radio access method from the secondary node, the measurement capability adjustment unit notifies the secondary node of candidates for the measurement capability of the user equipment in the second radio access method.

[0112] According to the above configuration, it is possible to appropriately change the already determined measurement capability according to environmental changes in the slave node and the like.

[0113] <Supplement>

[0114] The notification of information is not limited to the method / implementation method described in this specification, and may be performed by other methods. For example, the notification of information may be implemented through physical layer signaling (e.g., DCI (Downlink Control Information), UCI (Uplink Control Information)), high-layer signaling (e.g., RRC (Radio Resource Control) signaling, MAC (Medium Access Control) signaling, broadcast information (MIB (Master Information Block), SIB (System Information Block)), other signals or a combination thereof. In addition, RRC signaling may be referred to as an RRC message, for example, an RRC Connection Setup message, an RRC Connection Reconfiguration message, or the like.

[0115] The various methods / embodiments described in this specification can be applied to LTE (Long Term Evolution), LTE-A (LTE-Advanced), SUPER 3G, IMT-Advanced, 4G, 5G, FRA (Future Radio Access), W-CDMA (registered trademark), GSM (registered trademark), CDMA2000, UMB (Ultra Mobile Broadband), IEEE 802.11 (Wi-Fi), IEEE 802.16 (WiMAX), IEEE 802.20, UWB (Ultra-WideBand), Bluetooth (registered trademark), systems utilizing other appropriate systems, and / or next-generation systems expanded upon them.

[0116] The processing procedures, timings, flow charts, etc. of each mode / embodiment described in this specification may be changed in order as long as there is no contradiction. For example, regarding the method described in this specification, the elements of various steps are presented in the order of illustration and are not limited to the specific order presented.

[0117] In the present specification, as for the specific operation performed by the base station 100, it is sometimes performed by its upper node according to the situation. Obviously, in a network including one or more network nodes having a base station, various operations performed for communicating with a terminal can be performed by the base station and / or other network nodes other than the base station (for example, consider MME or S-GW, etc., but not limited to this). In the above, the case where there is one other network node other than the base station is illustrated, but it can also be a combination of multiple other network nodes (for example, MME and S-GW).

[0118] Information etc. may be output from a higher layer (or a lower layer) to a lower layer (or a higher layer), or may be input and output via a plurality of network nodes.

[0119] The input and output information can be stored in a specific location (e.g., a memory) or managed by a management table. The input and output information can be overwritten, updated, or additionally recorded. The output information can be deleted. The input information can be sent to other devices.

[0120] The determination may be made based on a value represented by 1 bit (0 or 1), based on a true or false value (Boolean: true or false), or by comparison of numerical values ​​(for example, comparison with a predetermined value).

[0121] Each method / embodiment described in this specification may be used alone or in combination, or may be switched during execution. In addition, notification of specified information (e.g., notification of "is X") is not limited to explicit notification, but may also be performed through implicit notification (e.g., notification of the specified information is not performed).

[0122] Software, whether referred to as software, firmware, middleware, microcode, hardware description language, or otherwise, shall be construed broadly to mean instructions, instruction sets, codes, code segments, program code, programs, subroutines, software modules, applications, software applications, software packages, routines, subroutines, objects, executables, execution threads, procedures, functions, or the like.

[0123] In addition, software, instructions, etc. may be sent and received via transmission media. For example, where the software is sent from a website, server, or other remote source using wired technologies such as coaxial cable, fiber optic cable, twisted pair, and digital subscriber line (DSL), and / or wireless technologies such as infrared, wireless, and microwave, these wired technologies and / or wireless technologies are included in the definition of transmission media.

[0124] Information, signals, etc. described in this specification may be represented using any of a variety of different technologies. For example, data, instructions, commands, information, signals, bits, symbols, chips, etc. mentioned throughout the above description may be represented by voltage, current, electromagnetic waves, magnetic fields or magnetic particles, light fields or photons, or any combination thereof.

[0125] In addition, the terms described in this specification and / or the terms required for understanding of this specification can be replaced with terms having the same or similar meanings. For example, a channel and / or a code element can be a signal. In addition, a signal can be a message. In addition, a component carrier (CC) can also be referred to as a carrier frequency, a cell, etc.

[0126] The terms "system" and "network" used in this specification are used interchangeably.

[0127] In addition, the information, parameters, etc. described in this specification may be represented by absolute values, relative values ​​relative to a specified value, or other corresponding information. For example, wireless resources may also be indicated by indexes.

[0128] The names of the parameters used above should not be interpreted restrictively in any way. Furthermore, the formulas using these parameters may differ from the formulas explicitly disclosed in this specification. Since various channels (e.g., PUCCH, PDCCH, etc.) and information elements (e.g., TPC, etc.) can be identified by any suitable name, the various names assigned to these various channels and information elements should not be interpreted restrictively in any way.

[0129] A base station can accommodate one or more (for example, three) cells (also referred to as sectors). When a base station accommodates multiple cells, the overall coverage area of ​​the base station can be divided into multiple smaller areas, and each smaller area can also provide communication services through a base station subsystem (for example, a small base station for indoor use (Remote Radio Head (RRH))). Terms such as "cell" or "sector" refer to a part or the entirety of the coverage area of ​​a base station and / or a base station subsystem that provides communication services within the coverage area. Furthermore, terms such as "base station", "eNB (or gNB)", "cell" and "sector" can be used interchangeably in this specification. Base stations are sometimes also referred to as fixed stations, NodeB, eNodeB (eNB), gNodeB (gNB), access points, micro-micro cells, small cells, and other terms.

[0130] User equipment is also sometimes referred to by those skilled in the art as a mobile station, a subscriber station, a mobile unit, a subscriber unit, a wireless unit, a remote unit, a mobile device, a wireless device, a wireless communication device, a remote device, a mobile subscriber station, an access terminal, a mobile terminal, a wireless terminal, a remote terminal, a handset, a user agent, a mobile client, a client or some other appropriate terminology.

[0131] The terms "determining" and "determining" used in this specification sometimes include a variety of operations. "Determining" and "determining" may include situations where, for example, calculating, computing, processing, deriving, investigating, looking up (e.g., searching in a table, database or other data structure), and ascertaining are considered to be "determining" and "determining". In addition, "determining" and "determining" may include situations where receiving (e.g., receiving information), transmitting (e.g., transmitting information), input, output, accessing (e.g., accessing data in a memory) are considered to be "determining" and "determining". In addition, "determining" and "determining" may include situations where resolving, selecting, choosing, establishing, comparing, etc. are considered to be "determining" and "determining". That is, "determining" and "determining" may include situations where any operation is considered to be "determining" and "determining".

[0132] The terms "connected", "coupled", or all variations thereof, mean all connections or couplings, direct or indirect, between two or more elements, and can include situations where there are one or more intermediate elements between the two elements that are "connected" or "coupled" to each other. The coupling or connection between elements can be physical, logical, or a combination thereof. As used in this specification, it is possible to consider two elements being "connected" or "coupled" to each other by using one or more wires, cables, and / or printed electrical connections, and as several non-limiting and non-exhaustive examples, by using electromagnetic energy such as electromagnetic energy with wavelengths in the wireless frequency domain, microwave region, and / or optical (visible and invisible) region.

[0133] The phrase “based on” used in this specification does not mean “based only on” unless otherwise explicitly stated. In other words, the phrase “based on” means both “based only on” and “based at least on”.

[0134] All references to elements using the designations "first", "second", etc. used in this specification do not limit the quantity or order of these elements in an all-round manner. These designations may be used in this specification as a convenient method of distinguishing two or more elements. Therefore, reference to the first and second elements does not mean that only two elements can be used or that the first element must precede the second element in some form.

[0135] The “unit” in the configuration of each of the above-mentioned devices may be replaced with a “section”, “circuit”, “device” or the like.

[0136] As long as the terms "include", "including" and their variations are used in this specification or claims, these terms are intended to be inclusive, just like the term "comprising". Furthermore, the term "or" used in this specification or claims is not intended to be a logical exclusive or.

[0137] As mentioned above, although the embodiment of the present invention has been described in detail, the present invention is not limited to the above-mentioned specific embodiment, and various modifications and changes can be made within the scope of the gist of the present invention described in the claims.

[0138] This international application claims the priority based on Japanese Patent Application No. 2017-187255 filed on September 27, 2017, and the entire contents of No. 2017-187255 are cited in this international application.

[0139] Description of symbols

[0140] 100 Base Stations

[0141] 110 signal sending unit

[0142] 120 signal receiving unit

[0143] 130 Measurement capability adjustment unit

[0144] 140 Inter-base station communication unit

[0145] 150 Measurement control unit

Claims

1. A master node having: A control unit, determining the number of frequency layers of the terminal in the second radio access method and the number of events in which the terminal reports a measurement result when the terminal communicates with a primary node of the first radio access method and a secondary node of the second radio access method; A sending unit, configured to send the number of frequency layers and the number of events in the second wireless access mode to the secondary node; as well as a receiving unit, receiving a response from the secondary node indicating that the secondary node has accepted the number of frequency layers and the number of events, The control unit controls the measurement operation of the terminal based on the response, The control unit determines the number of frequency layers and the number of events in the second radio access method based on an upper limit value of a total value of a measurement capability of the terminal in the first radio access method and a measurement capability of the terminal in the second radio access method.

2. A measurement operation control method, comprising: The master node of the first wireless access method determines the number of frequency layers of the terminal in the second wireless access method and the number of events in which the terminal reports measurement results when the terminal communicates with the master node and the slave node of the second wireless access method, wherein: Determining the number of frequency layers and the number of events in the second radio access method based on an upper limit of a total value of a measurement capability of the terminal in the first radio access method and a measurement capability of the terminal in the second radio access method; The master node sends the number of frequency layers and the number of events in the second wireless access mode to the slave node; The master node receives a response from the slave node indicating that the slave node has accepted the number of frequency layers and the number of events; as well as The master node controls a measurement operation of the terminal based on the response.

3. A secondary node, comprising: A receiving unit, receiving, from a master node of a first wireless access mode, the number of frequency layers of the terminal in the second wireless access mode when the terminal communicates with the master node and a slave node of the second wireless access mode and the number of events in which the terminal reports a measurement result; A sending unit, sending a response indicating that the number of frequency layers and the number of events are accepted; as well as a control unit, controlling a measurement operation of the terminal based on the number of frequency layers and the number of events accepted, The number of frequency layers and the number of events in the second radio access method are determined based on an upper limit of a total value of a measurement capability of the terminal in the first radio access method and a measurement capability of the terminal in the second radio access method.

4. A wireless communication system, comprising a terminal, a master node, and a slave node, wherein: The master node has: a control unit, determining the number of frequency layers of the terminal in the second radio access method and the number of events in which the terminal reports a measurement result when the terminal communicates with the primary node of the first radio access method and the secondary node of the second radio access method; A sending unit, configured to send the number of frequency layers and the number of events in the second wireless access mode to the secondary node; as well as a receiving unit, receiving a response from the secondary node indicating that the secondary node has accepted the number of frequency layers and the number of events, The control unit controls the measurement operation of the terminal based on the response, The control unit determines the number of frequency layers and the number of events in the second radio access method based on an upper limit of a sum of a measurement capability of the terminal in the first radio access method and a measurement capability of the terminal in the second radio access method, The secondary node has: A receiving unit, receiving the number of frequency layers and the number of events in the second wireless access mode from the master node of the first wireless access mode; A sending unit, sending a response indicating that the number of frequency layers and the number of events are accepted; as well as The control unit controls the measurement operation of the terminal based on the number of frequency layers and the number of events accepted.

Citation Information

Patent Citations

  • Integrated valve device

    JP2017187255A