Integrated structural system and construction method for crossing giant karst cave
By adopting an integrated structural system in the giant karst cave, including top reinforcement, base reinforcement, protection and bridge structure, combined with light steel shed tunnel and vertical grouting channel, the high cost and difficulty of crossing the giant karst cave in the traditional construction plan are solved. Safety issues, achieving cost control and improvement of operational safety.
Patent Information
- Application Number
- CN202010319635.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-21
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-04-21
AI Technical Summary
When passing through giant karst caves, traditional construction solutions are expensive, difficult to control foundation settlement and ensure operational safety, and cannot effectively solve the construction and operational safety issues of tunnels passing through giant karst caves.
Adopt an integrated structural system, including top reinforcement structure, base reinforcement structure, barrier structure and bridge structure, combined with light steel shed tunnel structure and vertical grouting channel, to ensure the stability of the top wall of the cave, carry the train load, and prevent settlement from affecting operational safety , and provide a construction working platform through waste slag backfilling.
It reduces construction costs, controls foundation settlement, ensures tunnel operation safety, avoids post-construction uneven settlement and structural damage, and improves the safety and economic benefits of construction and operation.
Smart Images

Figure CN111411992B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel construction, and in particular to an integrated structural system for passing through a giant karst cave and a construction method thereof. Background Art
[0002] In order to meet the sustained and rapid development of the national economy, it is urgent to develop large-scale transportation infrastructure construction. At the same time, my country is one of the countries with the largest karst distribution area in the world. With the large-scale construction of transportation infrastructure, a large number of tunnel projects crossing various types of caves will inevitably appear.
[0003] At present, when roads and railways pass through caves, most of them adopt treatment solutions such as mortar-laid rubble or concrete backfill, pile raft or bridge structure span. The above construction schemes are all proposed based on small and medium-sized caves. However, when crossing giant caves with huge cavities, extremely poor cave wall stability, and extremely large height and span, the traditional backfill scheme, whether mortar-laid rubble or concrete backfill, is adopted. The backfill volume reaches a huge amount and the cost is too high; if only waste slag backfill is adopted, due to the backfill depth of tens of meters or even hundreds of meters, it will inevitably produce a large post-construction settlement, causing uneven stress, cracking and damage of the tunnel structure, and seriously affecting the safety of tunnel engineering operation; if only a bridge structure is adopted to cross, the falling of dangerous rocks on the top of the cave will pose a huge threat to the bridge structure and train operation. Obviously, the traditional scheme cannot effectively solve the construction and operation safety problems of tunnels crossing giant caves. Therefore, in order to reasonably control the project cost, effectively control the foundation settlement, and ensure the safety of construction and operation at the same time, the present invention proposes an integrated structural system and a construction method for crossing giant caves. Summary of the invention
[0004] The purpose of the present invention is to use traditional treatment schemes to deal with tunnel projects that pass through giant karst caves, but the cost is either too high, or the post-construction settlement of the foundation cannot be effectively controlled, or the operation safety cannot be ensured. Therefore, the present invention provides an integrated structural system that passes through a giant karst cave and a construction method thereof.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is:
[0006] An integrated structural system for crossing a giant cave, comprising:
[0007] Top reinforcement structure, used to reinforce the top of the cave hall;
[0008] A base reinforcement structure, used to reinforce the excavated base of the waste slag backfill body of the cave hall;
[0009] A retaining structure is arranged on the waste slag backfill body and connected to the top of the cave hall, and a vertical grouting channel is arranged at intervals along the line direction, and the vertical grouting channel extends into the waste slag backfill body where the base reinforcement structure is located;
[0010] The bridge structure is arranged between the retaining structure and the rock wall at the top of the cave hall, and is a load-bearing structure for trains and trackbeds;
[0011] The light steel shed tunnel structure has its bottom ends supported on the bridge structure.
[0012] The integrated structural system for crossing a giant karst cave described in the present invention is adopted, and the forces on each structure are clear; the top reinforcement structure ensures the overall stability of the top wall of the karst cave; the base reinforcement structure ensures that the bottom of the retaining structure has sufficient bearing capacity; the retaining structure protects the waste slag backfill bodies on both sides and ensures the support of the top wall of the karst cave; the bridge structure bears the load of the train and the track bed during operation, and even if the lower backfill body settles, it will not affect the track structure, thereby ensuring the safety of train operation; the light steel shed cave structure shields and protects the top wall of the karst cave, thereby ensuring the safety of train operation, and once the top wall of the karst cave falls slightly, it will not directly hit the train; at the same time, the vertical grouting channel is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure safety during operation.
[0013] Preferably, the retaining structure includes a U-shaped retaining wall structure and a concrete backfill structure, the bottom of the U-shaped retaining wall structure is arranged on the waste slag backfill body, the two sides of the U-shaped retaining wall structure are arranged on the excavation slope of the waste slag backfill body, the concrete backfill structure is respectively arranged on the top surfaces of both sides of the U-shaped retaining wall structure, one side of the concrete backfill structure is arranged on the excavation slope of the waste slag backfill body, and the top of the concrete backfill structure is connected to the top of the cave hall.
[0014] Further preferably, the U-shaped retaining wall structure is a reinforced concrete structure.
[0015] Further preferably, the concrete backfill structure is a foamed concrete backfill structure.
[0016] Further preferably, the vertical grouting channel is arranged at the bottom of the U-shaped retaining wall structure.
[0017] Further preferably, the vertical grouting channel is a grouting pipe.
[0018] Further preferably, the grouting pipe extending into the waste backfill body is wrapped with geotextile.
[0019] Further preferably, a reinforced concrete slope layer is provided on the side wall of the concrete backfill structure located on the construction open hole side.
[0020] Preferably, the top reinforcement structure includes anchor rods and anchor cables extending into the top of the cave hall, and a top plate anchor net spray layer connected to cover the top surface of the cave hall.
[0021] Preferably, the base reinforcement structure includes a grouting structure, a steel pipe pile grouting structure or a jet jet pile structure.
[0022] Preferably, a maintenance passage is provided on the top of the light steel shed tunnel structure.
[0023] The present invention also provides a construction method of an integrated structural system for passing through a giant cave as described in any one of the above items, comprising the following steps:
[0024] ① Backfill the cave hall to a distance of 6m-10m from the top, and construct the top reinforcement structure on the top of the cave hall;
[0025] ② Excavate the core soil of the abandoned slag backfill body of the cave hall layer by layer from top to bottom, apply temporary slope spraying net protection after each layer is excavated, and simultaneously apply advance grouting reinforcement structure on the excavated slopes on both sides of the abandoned slag backfill body;
[0026] ③ When excavation reaches the bottom elevation of the U-shaped retaining wall structure, the base reinforcement structure is constructed;
[0027] ④ construct the U-shaped retaining wall structure;
[0028] ⑤ Construct a concrete backfill structure on the upper part of the U-shaped retaining wall structure;
[0029] ⑥ Construct the bridge structure inside the U-shaped retaining wall structure;
[0030] ⑦ Construct the light steel shed tunnel structure on the bridge structure.
[0031] The construction method of the integrated structural system for crossing a giant karst cave described in the present invention first uses waste slag to backfill the karst cave hall, which not only provides a working platform for the top reinforcement construction of the karst cave, but also makes full use of the tunnel waste slag, avoiding the relevant environmental protection problems caused by the tunnel waste slag; by constructing the top reinforcement structure, the overall stability of the top wall of the karst cave can be ensured; by constructing the base reinforcement structure, the bottom of the retaining structure can be ensured to have sufficient bearing capacity; the retaining structure is set to protect the waste slag backfill bodies on both sides and ensure the support of the top wall of the karst cave; the bridge structure is used to bear the train and roadbed loads during operation, even if the lower backfill body settles, It will not affect the track structure, thus ensuring the safety of train operation; a light steel shed structure is used to shield and protect the top wall of the cave, thus ensuring the safety of train operation. Once there is a slight drop of block from the top wall of the cave, it will not directly hit the train; at the same time, the vertical grouting channel is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure safety during operation; the construction method of the present invention can smoothly cross the giant cave, thus avoiding problems such as construction delays, economic losses and adverse social impacts caused by line rerouting, which can effectively ensure construction and operation safety for both Beijing and Tianjin, and has good economic and social benefits and broad prospects for promotion and application.
[0032] Preferably, in step ①, the cave hall is backfilled with waste slag.
[0033] Preferably, in step ①, the top reinforcement structure includes anchor rods and anchor cables extending into the top of the cave hall, and a top plate anchor mesh spray layer connected to cover the top surface of the cave hall.
[0034] Further preferably, in the step ①, a block stone backfill structure is provided on both sides of the top plate anchor mesh spray layer.
[0035] Preferably, in step ②, the core soil with a longer excavation length is excavated in sections, and the temporary slope spraying protection is applied after each section is excavated.
[0036] Preferably, in step ②, the application distance of the advance grouting reinforcement structure is 8m-10m outside the excavation slope of the waste backfill body.
[0037] Preferably, in step ③, a grouting sealing layer is first applied to the excavated base, the grouting sealing layer also serves as a leveling layer, and then a base reinforcement structure is applied.
[0038] Preferably, in step ③, the base reinforcement structure includes a grouting structure, a steel pipe pile grouting structure or a rotary jet pile structure.
[0039] Preferably, in step ④, the retaining structure includes a U-shaped retaining wall structure and a concrete backfill structure. The U-shaped retaining wall structure is first constructed, the bottom of the U-shaped retaining wall structure is arranged on the base reinforcement structure, and the two sides of the U-shaped retaining wall structure are arranged on the excavated slope of the waste slag backfill body. Then, the concrete backfill structure is backfilled and poured on the top surfaces of both sides of the U-shaped retaining wall structure and the corresponding excavated slopes of the waste slag backfill body, and the top of the concrete backfill structure is connected to the top of the cave hall.
[0040] Further preferably, at least one vertical grouting channel is provided at the bottom of the U-shaped retaining wall structure, and the vertical grouting channel extends into the waste backfill body. The vertical grouting channel is a grouting pipe, and the vertical grouting channel extending into the waste backfill body is wrapped with geotextile.
[0041] Further preferably, the concrete backfill structure is backfilled and poured in sections and layers.
[0042] Further preferably, the concrete backfill structure is a foamed concrete backfill structure.
[0043] Further preferably, a reinforced concrete slope layer is provided on the surface of the concrete backfill structure.
[0044] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0045] 1. The integrated structural system of the present invention for crossing a giant karst cave has clear forces on each structure; the top reinforcement structure ensures the overall stability of the top wall of the karst cave; the base reinforcement structure ensures that the bottom of the retaining structure has sufficient bearing capacity; the retaining structure protects the slag backfill bodies on both sides and ensures the support of the top wall of the karst cave; the bridge structure bears the load of trains and roadbeds during operation, and even if the lower backfill body settles, it will not affect the track structure, ensuring the safety of train operation; the light steel shed cave structure shields and protects the top wall of the karst cave, ensuring the safety of train operation, and once the top wall of the karst cave falls slightly, it will not directly hit the train; at the same time, the vertical grouting channel is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure safety during operation;
[0046] 2. The integrated structural system for crossing a giant cave described in the present invention uses tunnel waste to backfill the giant cave, which not only provides working space for the reinforcement construction of the cave top, but also makes full use of the tunnel waste, thus avoiding the relevant environmental problems caused by the tunnel waste;
[0047] 3. In the integrated structural system for crossing a giant karst cave described in the present invention, the vertical grouting channel is provided between the bottom of the retaining structure and the base reinforcement structure, which is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure operational safety;
[0048] 4. The integrated structural system for passing through a giant karst cave described in the present invention has an inspection passage on the top of the light steel shed cave structure, providing a vertical maintenance passage with maintainability.
[0049] 4. The integrated structural system and construction method for crossing a giant karst cave described in the present invention first backfills the cave hall with waste slag, which not only provides a working platform for the top reinforcement construction of the karst cave, but also makes full use of the tunnel waste slag, avoiding the relevant environmental problems caused by the tunnel waste slag; by constructing the top reinforcement structure, the overall stability of the top wall of the karst cave can be ensured; the construction of the base reinforcement structure can ensure that the bottom of the retaining structure has sufficient bearing capacity; the retaining structure is set to protect the waste slag backfill bodies on both sides and ensure the support of the top wall of the karst cave; the bridge structure is used to bear the train and roadbed loads during operation, even if the lower backfill body settles, It will not affect the track structure, thus ensuring the safety of train operation; a light steel shed structure is used to shield and protect the top wall of the cave, thus ensuring the safety of train operation. Once there is a slight drop of block from the top wall of the cave, it will not directly hit the train; at the same time, the vertical grouting channel is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure safety during operation; the construction method of the present invention can smoothly cross the giant cave, thus avoiding problems such as construction delays, economic losses and adverse social impacts caused by line rerouting, which can effectively ensure construction and operation safety for both Beijing and Tianjin, and has good economic and social benefits and broad prospects for promotion and application. BRIEF DESCRIPTION OF THE DRAWINGS
[0050] Figure 1 It is a schematic diagram of the structure of the integrated structural system for crossing a giant karst cave according to the present invention;
[0051] Figure 2 is a schematic diagram of step ① in Example 2;
[0052] Figure 3 It is a schematic diagram of step ② in Example 2;
[0053] Figure 4 It is a schematic diagram of step ③ in Example 2;
[0054] Figure 5 It is a schematic diagram of step ④ in Example 2;
[0055] Figure 6 It is a schematic diagram of step ⑤ in Example 2;
[0056] Figure 7 It is a schematic diagram of step ⑥ in Example 2;
[0057] Figure 8 It is a schematic diagram of step ⑦ in Example 2;
[0058] Fig. 9 is a schematic diagram of step ⑧ in Example 2;
[0059] Fig.10 is a schematic diagram of step ⑨ in Example 2;
[0060] Fig.11 is a schematic diagram of step ⑩ in Example 2;
[0061] Fig.12 It is the step in Example 2 Schematic diagram of .
[0062] Icons: 1-upper left core soil, 2-upper middle core soil, 3-upper right core soil, 4-middle core soil, 5-lower core soil, 6-grouting plugging layer, 7-geotextile, 8-U-type retaining wall structure, 9-concrete backfill structure, 10-bridge structure, 11-light steel shed tunnel structure, 12-vertical grouting channel, 13-maintenance channel, 14-reinforced concrete slope layer, 100-waste backfill body, 201-anchor rod, 202-anchor cable, 203-top Plate anchor mesh spray layer, 204-block stone backfill structure, 205-first temporary slope spray mesh protection, 206-second temporary slope spray mesh protection, 207-third temporary slope spray mesh protection, 208-fourth temporary slope spray mesh protection, 209-advance grouting reinforcement structure, 210-fifth temporary slope spray mesh protection, 211-sixth temporary slope spray mesh protection, 212-seventh temporary slope spray mesh protection, 213-eighth temporary slope spray mesh protection, 214-base reinforcement structure. DETAILED DESCRIPTION
[0063] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0064] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0065] Example 1
[0066] like Figure 1-12 As shown, the integrated structural system for crossing a giant karst cave described in the present invention includes a top reinforcement structure, a base reinforcement structure 214, a retaining structure, a bridge structure 10 and a light steel shed cave structure 11.
[0067] The top reinforcement structure is used to reinforce the top of the cave hall; specifically, the top reinforcement structure includes anchor rods 201 and anchor cables 202 extending into the top of the cave hall, and a top plate anchor net spray layer 203 connected to cover the top surface of the cave hall, and block stone backfill structures 204 are arranged on both sides of the top plate anchor net spray layer 203.
[0068] The base reinforcement structure 214 is used to reinforce the excavated base of the waste slag backfill body 100 of the cave hall; specifically, the base reinforcement structure 214 includes a grouting structure, a steel pipe pile grouting structure or a rotary jet pile structure.
[0069] The retaining structure is arranged on the waste slag backfill body 100 and connected to the top of the cave hall; the retaining structure includes a U-shaped retaining wall structure 8 and a concrete backfill structure 9, the bottom of the U-shaped retaining wall structure 8 is arranged on the waste slag backfill body 100, the two sides of the U-shaped retaining wall structure 8 are arranged on the excavation slope of the waste slag backfill body 100, the top surfaces of the two sides of the U-shaped retaining wall structure 8 are respectively provided with the concrete backfill structure 9, one side of the concrete backfill structure 9 is arranged on the excavation slope of the waste slag backfill body 100, and the top of the concrete backfill structure 9 is connected to the cave hall. Hall top; specifically, the U-shaped retaining wall structure 8 is a reinforced concrete structure, the concrete backfill structure 9 is a foam concrete backfill structure, a plurality of vertical grouting channels 12 are arranged at the bottom of the U-shaped retaining wall structure 8, the vertical grouting channels 12 are arranged at intervals along the line direction, the vertical grouting channels 12 extend into the waste slag backfill body 100, the vertical grouting channels 12 are PVC grouting pipes, the grouting pipes extending into the waste slag backfill body 100 are wrapped with geotextile 7, and the side wall of the concrete backfill structure 9 on the side of the construction open hole is provided with a reinforced concrete slope layer 14.
[0070] The bridge structure 10 is arranged between the retaining structure and the rock wall at the top of the cave hall, and is a load-bearing structure for trains and roadbeds. The bottom ends of the light steel shed tunnel structure 11 are supported on the bridge structure 10, and a maintenance passage 13 is provided on the top of the light steel shed tunnel structure 11.
[0071] By using the integrated structural system for crossing a giant karst cave described in the present invention, the giant karst cave is backfilled with tunnel slag, which not only provides a working space for the top reinforcement construction of the karst cave, but also makes full use of the tunnel slag, avoiding the relevant environmental protection problems caused by the tunnel slag; the forces on each structure are clear; the top reinforcement structure ensures the overall stability of the top wall of the karst cave; the base reinforcement structure 214 ensures that the bottom of the retaining structure has sufficient bearing capacity; the retaining structure protects the slag backfill bodies 100 on both sides and ensures the support of the top wall of the karst cave; the bridge structure 10 carries the transportation During operation, the train and roadbed loads will not affect the track structure even if the lower backfill body settles, thereby ensuring the safety of train operation; the light steel shed tunnel structure 11 shields the top wall of the cave to ensure the safety of train operation. Once there is a slight drop of the top wall of the cave, it will not directly hit the train; at the same time, the vertical grouting channel 12 is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure safety during operation; an inspection channel 13 is provided on the top of the light steel shed tunnel structure 11 to provide a vertical maintenance channel for maintainability.
[0072] Example 2
[0073] like Figure 1-12 As shown, the construction method of the integrated structural system for passing through a giant cave as described in Example 1 of the present invention comprises the following steps:
[0074] ① Such as Figure 2 As shown, the cave hall is backfilled with waste slag to a distance of 6m-10m from the top, and the top reinforcement structure is applied on the top of the cave hall; specifically, the top reinforcement structure includes an anchor rod 201 and an anchor cable 202 extending into the top of the cave hall, and a top plate anchor net spraying layer 203 connected to cover the top surface of the cave hall, and a block stone backfill structure 204 is arranged on both sides of the top plate anchor net spraying layer 203;
[0075] ② If Figure 3 As shown, the upper left core soil 1 is excavated, and after excavation, the first temporary slope spraying net protection 205 and the second temporary slope spraying net protection 206 are constructed on both sides of the upper left core soil 1, and the advanced grouting reinforcement structure 209 is constructed 8m outside the left excavation slope of the cave hall waste backfill body 100 simultaneously;
[0076] ③ Such as Figure 4 As shown, the upper middle core soil 2 is excavated, and the upper middle core soil 2 is adjacent to the upper left core soil 1. After the excavation, the third temporary slope spraying net protection 207 is applied;
[0077] ④ Such as Figure 5As shown, the upper right core soil 3 is excavated, and the upper right core soil 3 is adjacent to the upper middle core soil 2. After excavation, the fourth temporary slope spraying net protection 208 is constructed, and the advanced grouting reinforcement structure 209 is constructed 8m outside the right excavation slope of the cave hall waste backfill body 100 simultaneously;
[0078] ⑤ Such as Figure 6 As shown, the middle core soil 4 is excavated, and the middle core soil 4 is located below the upper left core soil 1, the upper middle core soil 2 and the upper right core soil 3. After excavation, the fifth temporary slope spraying net protection 210 and the sixth temporary slope spraying net protection 211 are constructed on both sides of the middle core soil 4, and the advanced grouting reinforcement structure 209 is constructed 8m outside the excavation slope on both sides of the cave hall waste backfill body 100 simultaneously.
[0079] ⑥ Such as Figure 7 As shown, the lower core soil 5 is excavated, and the lower core soil 5 is located below the middle core soil 4. After excavation, the seventh temporary slope spraying net protection 212 and the eighth temporary slope spraying net protection 213 are applied on both sides of the lower core soil 5, and the advanced grouting reinforcement structure 209 is applied 8m outside the excavation slope on both sides of the cave hall waste slag backfill body 100 simultaneously;
[0080] ⑦ Such as Figure 8 As shown, when excavation reaches the bottom elevation of the U-shaped retaining wall structure 8, a grouting plugging layer 6 is applied to the excavation base, and the grouting plugging layer 6 also serves as a leveling layer;
[0081] ⑧ Such as Fig. 9 As shown, the base reinforcement structure 214 is applied, and the base reinforcement structure 214 is located below the grouting plugging layer 6; specifically, the base reinforcement structure 214 includes a grouting structure, a steel pipe pile grouting structure or a rotary jet pile structure;
[0082] ⑨ Such as Fig.10 As shown, a U-shaped retaining wall structure 8 is constructed, the bottom of the U-shaped retaining wall structure 8 is arranged on the grouting plugging layer 6, and the two sides of the U-shaped retaining wall structure 8 are arranged on the excavation slope of the waste backfill body 100, and the two sides of the bottom of the U-shaped retaining wall structure 8 are respectively provided with vertical grouting channels 12, and the vertical grouting channels 12 extend into the waste backfill body 100, and the vertical grouting channels 12 are PVC grouting pipes, and the vertical grouting channels 12 extending into the waste backfill body 100 are wrapped with geotextile 7;
[0083] ⑩ Such as Fig.11As shown, foam concrete backfill structures 9 are backfilled and cast in sections and layers on the top surfaces of both sides of the U-shaped retaining wall structure 8 and the corresponding excavated slopes of the waste slag backfill body 100, the top of the concrete backfill structure 9 is connected to the top of the cave hall, and a C35 reinforced concrete slope layer 14 is provided on the slope surface of the concrete backfill structure 9, and the U-shaped retaining wall structure 8 and the concrete backfill structure 9 form a construction open hole;
[0084] like Fig.12 As shown, the bridge structure 10 is constructed inside the U-shaped retaining wall structure 8;
[0085] After the bridge structure 10 is set up, the light steel shed tunnel structure 11 is constructed thereon, and a maintenance passage 13 is constructed on the top of the light steel shed tunnel structure 11 to form a bridge structure 10. Figure 1 The integrated structural system shown crossing the giant cave.
[0086] Repeat steps ① to Until the entire length of the designed section of the line passing through the giant cave hall is completed.
[0087] By using the integrated structural system and construction method for crossing a giant karst cave described in the present invention, firstly, waste slag is used to backfill the cave hall, which not only provides a working platform for the top reinforcement construction of the karst cave, but also makes full use of the tunnel waste slag, avoiding the relevant environmental protection problems caused by the tunnel waste slag; by constructing the top reinforcement structure, the overall stability of the top wall of the karst cave can be ensured; by constructing the base reinforcement structure 214, it can be ensured that the bottom of the retaining structure has sufficient bearing capacity; the retaining structure is set to protect the waste slag backfill bodies 100 on both sides and ensure the support of the top wall of the karst cave; the bridge structure 10 is used to bear the load of the train and the roadbed during operation, even if the lower backfill body sinks The train will not drop or fall without affecting the track structure, thus ensuring the safety of train operation; the light steel shed structure 11 is used to shield and protect the top wall of the cave, thus ensuring the safety of train operation. Once there is a slight drop of the top wall of the cave, it will not directly hit the train; at the same time, the vertical grouting channel 12 is used for compensatory grouting during operation to avoid uneven settlement of the structure and ensure safety during operation; the construction method of the present invention can smoothly cross the giant cave, avoiding problems such as construction delays, economic losses and adverse social impacts caused by line rerouting, which can not only connect Beijing and Tianjin, but also effectively ensure construction and operation safety, and has good economic and social benefits and broad prospects for promotion and application.
[0088] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An integrated structural system for crossing a giant cave, characterized in that: include: Top reinforcement structure, used to reinforce the top of the cave hall; A base reinforcement structure (214) for reinforcing the excavated base of the waste slag backfill body (100) of the cave hall; A retaining structure is arranged on the waste slag backfill body (100) and connected to the top of the cave hall, and a vertical grouting channel (12) is arranged at a distance along the line direction. The vertical grouting channel (12) extends into the waste slag backfill body (100) where the base reinforcement structure (214) is located; The bridge structure (10) is arranged between the retaining structure and the rock wall at the top of the cave hall and is a load-bearing structure for trains and trackbeds; A light steel shed-hole structure (11), the bottom ends of which are supported on the bridge structure (10); The retaining structure comprises a U-shaped retaining wall structure (8) and a concrete backfill structure (9); the bottom of the U-shaped retaining wall structure (8) is arranged on the waste slag backfill body (100); both sides of the U-shaped retaining wall structure (8) are arranged on the excavated slope of the waste slag backfill body (100); the concrete backfill structure (9) is respectively arranged on the top surfaces of both sides of the U-shaped retaining wall structure (8); one side of the concrete backfill structure (9) is arranged on the excavated slope of the waste slag backfill body (100); and the top of the concrete backfill structure (9) is connected to the top of the cave hall.
2. The integrated structural system for passing through a giant cave according to claim 1, characterized in that: The vertical grouting channel (12) is arranged at the bottom of the U-shaped retaining wall structure (8).
3. The integrated structural system for passing through a giant cave according to claim 1, characterized in that: The side wall of the concrete backfill structure (9) located on the construction open hole side is provided with a reinforced concrete slope layer (14).
4. The integrated structural system for passing through a giant cave according to claim 1, characterized in that: The top reinforcement structure comprises an anchor rod (201) and an anchor cable (202) extending into the top of the cave hall, and a top plate anchor net spray layer (203) connected to cover the top surface of the cave hall.
5. The integrated structural system for passing through a giant cave according to claim 1, characterized in that: The base reinforcement structure (214) comprises a grouting structure.
6. The integrated structural system for passing through a giant cave according to claim 1, characterized in that: The base reinforcement structure (214) comprises a steel pipe pile grouting structure or a jet grouting pile structure.
7. The integrated structural system for passing through a giant cave according to any one of claims 1 to 6, characterized in that: A maintenance passage (13) is provided on the top of the light steel shed tunnel structure (11).
8. A construction method of an integrated structural system for passing through a giant cave as claimed in any one of claims 1 to 7, characterized in that: The following steps are involved: ① Backfill the cave hall to a distance of 6m-10m from the top, and construct the top reinforcement structure on the top of the cave hall; ② Excavating the core soil of the slag backfill body (100) of the cave hall layer by layer from top to bottom, applying temporary slope spraying net protection after each layer is excavated, and simultaneously applying the advance grouting reinforcement structure (209) of the excavated slopes on both sides of the slag backfill body (100); ③ When excavating to the bottom elevation of the U-shaped retaining wall structure (8), the base reinforcement structure (214) is constructed; ④ constructing the U-shaped retaining wall structure (8); ⑤ constructing a concrete backfill structure (9) on the upper part of the U-shaped retaining wall structure (8); ⑥ constructing the bridge structure (10) on the inner side of the U-shaped retaining wall structure (8); ⑦ Construct the light steel shed tunnel structure (11) on the bridge structure (10).
9. The construction method according to claim 8, characterized in that: In the step ②, the core soil with a longer excavation length is excavated in sections, and the temporary slope spraying protection is applied after each section is excavated.
10. The construction method according to claim 8, characterized in that: In the step ③, the excavated base grouting sealing layer (6) is first applied, and then the base reinforcement structure (214) is applied.
Citation Information
Patent Citations
Reinforcing structure of high-speed rail tunnel bottom water passing karst cave and construction method of reinforcing structure
CN107905799A
Open cut tunnel and tunnel bottom pile raft structure passing through half-filled karst cave
CN109488330A
Backfilling treatment construction method for tunnel high crossing giant salt cavern
CN109630137A
Integrated structure system penetrating through huge karst cave
CN212154795U