A prefabricated retaining structure connection device and connection method thereof

By adopting the design of steel composite waist beams and retaining member connectors in the anchor-pull retaining structure, the problems of excessive stress on the waist beams and long construction period in the traditional connection method are solved, and stable retaining structure connections and efficient pre-construction are achieved. Stress transfer improves construction convenience and resource utilization efficiency.

CN111456027BActive Publication Date: 2024-10-25CHINA JK INST OF ENG INVESTIGATION & DESIGN
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010294951.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-15
Publication Date
2024-10-25
Estimated Expiration
2040-04-15

AI Technical Summary

Technical Problem

In the anchor-type retaining structure, the connection between the traditional steel waist beam and the reinforced concrete waist beam has local excessive stress, leading to instability such as torsion and overturning. The construction period is long, the formwork processing is difficult, and the prestress transfer is not direct. And recycling is difficult, affecting the environment and resource utilization.

Method used

Multiple vertical supporting piles and horizontally placed steel composite waist beams are used. The steel strands are fixed through retaining component connectors and anchor cables, and anchors and steel angle pads are used for prestressed locking to form a stable support. Block structure connecting device.

Benefits of technology

It achieves a firm connection between the anchor cable and the retaining structure, avoids the torsion and overturning of the waist beam, simplifies the construction, improves the prestress transfer efficiency, and has the advantages of low weight, convenient assembly, adjustable stiffness, and recyclability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111456027B_ABST
    Figure CN111456027B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled retaining structure connection device, including a plurality of vertically arranged support piles, wherein at least one horizontally placed steel composite waist beam is arranged in the plurality of support piles away from the rock and soil body along the length direction of the support piles, and a plurality of retaining component connectors are evenly penetrated in the gaps of the steel composite waist beams, wherein the retaining component connectors are arranged one-to-one correspondingly to the support piles, and the other end of the retaining component connectors is clamped on the corresponding support piles, and an anchor cable is arranged between two adjacent support piles, wherein a plurality of steel strands are fixed in the anchor cable, and the other ends of the plurality of steel strands are connected to anchors through the gaps of the steel composite waist beams. The assembled retaining structure connection device of the present invention solves the problems in the prior art that the steel waist beams are prone to local instability due to excessive local force, such as twisting and overturning, and the reinforced concrete waist beam templates are difficult to process and the construction period is long. The present invention also discloses an assembled retaining structure connection method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of geotechnical engineering prevention and control, and relates to an assembled retaining structure connection device. The present invention also relates to an assembled retaining structure connection method. Background Art

[0002] Anchor-type retaining structures are widely used in geotechnical engineering applications such as foundation pit support and slope protection. These structures utilize anchor rods (cables) embedded deep within the stabilizing rock and soil to provide a fulcrum reaction force, balancing the geotechnical pressure transmitted by retaining elements embedded in the bottom and sidewalls of the target, thereby ensuring the safety and stability of the target. The reliability of the connection between the anchor rods (cables) and retaining elements is crucial to the effectiveness of the retaining structure and the safety of the target.

[0003] The traditional connection method between anchor rods (cables) and retaining elements is steel waist beams and reinforced concrete waist beams. In recent years, a new method of connecting without waist beams has emerged. The most widely used is the steel composite waist beam. This connection device often causes deviations in the construction of the retaining structure. The free surface of the retaining structure is not in the same plane, the waist beam does not effectively contact the retaining element, and the retaining element cannot effectively transmit the force to the nearest anchor rod (cable), resulting in excessive stress on the waist beam, causing local instability such as torsion and overturning, which may endanger the safety of the object being controlled. The reinforced concrete waist beam has high stiffness and It can be tightly connected to the retaining members, but has disadvantages such as difficult formwork processing, long construction period, slow concrete hardening, and heavy weight; anchor rods (cables) often apply prestress to the waist beam through anchors, and then transfer it to the retaining members through the waist beam to reduce soil deformation and ensure the safety of the protected buildings (structures) on the top of the slope; but due to indirect force transmission, it often causes large prestress loss, affecting the effect of prestressing; traditional waist beams are difficult to recycle, which is inconsistent with the requirements of protecting the environment and saving resources; the newly emerging waist-beam-free construction method has the advantages of direct force transmission and simple operation, but lacks integrity. Summary of the Invention

[0004] The purpose of the present invention is to provide an assembled retaining structure connection device, which solves the problems in the prior art that the steel waist beam is prone to local instability such as twisting and overturning due to excessive local force, and the reinforced concrete waist beam formwork is difficult to process and has a long construction period.

[0005] Another object of the present invention is to provide a method for connecting an assembled retaining structure.

[0006] The technical solution adopted by the present invention is an assembled retaining structure connection device, including multiple support piles vertically arranged in the rock and soil body, and at least one horizontally placed steel composite waist beam is arranged on the side of the multiple support piles away from the rock and soil body along the length direction of the support piles, and multiple retaining component connectors are evenly penetrated in the gaps of the steel composite waist beams. The retaining component connectors are arranged in a one-to-one correspondence with the support piles, and the other end of the retaining component connector is clamped on the corresponding support pile, and an anchor cable is arranged between two adjacent support piles, and multiple steel strands are fixed in the anchor cable. The other ends of the multiple steel strands are passed through the gaps of the steel composite waist beams and are connected with anchors.

[0007] The present invention is also characterized in that

[0008] The steel composite waist beam includes two I-shaped steels arranged in parallel with a certain gap, and a plurality of steel gusset plates are welded to the two I-shaped steels along the length direction.

[0009] The upper and lower surfaces of the two I-shaped steels are welded through steel gusset plates.

[0010] A steel angle pad is also provided between the anchor and the steel composite waist beam. Holes are opened on the steel angle pad at the corresponding gaps in the steel composite waist beam. The end of the steel strand away from the rock and soil body passes through the gaps and holes in the steel composite waist beam and is fixed to the anchor.

[0011] The steel angle pad is arranged in a right-angle trapezoidal shape, and the inclined surface of the steel angle pad is away from the steel composite waist beam and is arranged perpendicular to the steel strand.

[0012] A hook is provided on one side of the steel angle pad close to the steel composite waist beam, and the hook is hooked on the steel composite waist beam.

[0013] The retaining component connector includes an arc-shaped steel plate, the lower surface of which is connected to two parallel legs. The curvature of the arc-shaped steel plate is adapted to the supporting piles, and the two legs extend into the gap of the steel composite waist beam.

[0014] A rectangular gap is formed between the two legs and the steel composite waist beam, and a wedge-shaped steel plate is embedded in the rectangular gap. The wedge-shaped steel plate is provided with a reserved hole. Multiple wedge-shaped steel plates embedded in each retaining component connector are connected in sequence into a whole by steel wire passing through the reserved holes.

[0015] A steel bracket is also provided on the lower surface of the steel composite waist beam corresponding to the support pile position, and the steel bracket is fixed to the support pile by expansion bolts.

[0016] Another technical solution of the present invention is a method for connecting an assembled retaining structure, which uses the above-mentioned assembled retaining structure connection device and is specifically implemented according to the following steps:

[0017] Step 1: After the support piles and anchor cables are constructed and meet the design strength requirements, place the steel composite waist beam horizontally at the designed position, insert the two legs of the retaining element connector into the gap between the two steel sections in the steel composite waist beam, and hang the steel angle pads on the steel composite waist beam through the hooks;

[0018] Step 2: Adjust the positions of the retaining element connectors and steel angle pads so that they are aligned with the support piles and anchor cables respectively;

[0019] Step 3: Place the wedge-shaped steel plate into and fill the rectangular gap between the two legs of the retaining member connector and the steel composite waist beam, and connect the wedge-shaped steel plate into a whole with steel wire through the reserved holes;

[0020] Step 4: After fixing the steel strands with the anchors through the steel angle pads, prestress the anchor cables with the jacks and lock the anchor heads to complete the tensioning and locking of the anchor cables.

[0021] Step 5: Unload the jack and complete the support structure connection.

[0022] The beneficial effects of the present invention are:

[0023] 1. The anchor cable (rod) and the retaining structure are firmly connected through this connection device, which can fully play the supporting role of the waist beam and avoid local instability such as waist beam twisting and overturning, and can effectively avoid overall damage caused by local instability.

[0024] 2. This connection device has the advantages of light weight, convenient construction, ready for installation and full utilization of rigidity.

[0025] 3. The prestressing and locking method of this device has the advantages of direct prestressing force transmission and small prestressing loss.

[0026] 4. This device uses assembled components, and the position of the device accessories can be flexibly adjusted according to the spacing and position of the anchor cables (rods) and supporting components. It is simple and easy to assemble and disassemble, and can be easily recycled and reused.

[0027] 5. The anchor cable (rod) is connected to the retaining member through this device, and the retaining structure composed of multiple retaining members is subjected to force in a coordinated manner as a whole, and has good integrity. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a structural schematic diagram of an assembled retaining structure connection device of the present invention;

[0029] Figure 2 yes Figure 1 A top view of

[0030] Figure 3 This is a cross-sectional view of the anchor cable position in an assembled retaining structure connection device of the present invention;

[0031] Figure 4 This is a structural schematic diagram of a medium-section steel composite waist beam of an assembled retaining structure connection device of the present invention;

[0032] Figure 5 This is a structural diagram of a medium-shaped steel angle pad in an assembled retaining structure connection device of the present invention;

[0033] Figure 6 yes Figure 5 Left view of;

[0034] Figure 7 It is a structural schematic diagram of a retaining member connector in an assembled retaining structure connection device of the present invention;

[0035] Figure 8 This is a cross-sectional view of the position of support piles in an assembled retaining structure connection device of the present invention;

[0036] Figure 9 This is a diagram showing an embodiment of a wedge-shaped steel plate in an assembled retaining structure connection device of the present invention;

[0037] Figure 10 This is a diagram showing a second embodiment of a wedge-shaped steel plate in an assembled retaining structure connection device of the present invention;

[0038] Figure 11 This is a third embodiment diagram of a wedge-shaped steel plate in an assembled retaining structure connection device of the present invention.

[0039] In the figure, 1. Support piles, 2. Retaining element connectors, 3. Steel composite waist beam, 4. Steel strands, 5. Anchors, 6. Steel angle pads, 7. Steel tie plates, 8. Wedge-shaped steel plates, 9. Steel brackets, 10. Steel sections, 11. Anchor cables, 12. Reserved holes;

[0040] 2-1.Curved steel plate, 2-2.Limbs;

[0041] 6-1. Hole, 6-2. Hook. DETAILED DESCRIPTION

[0042] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0043] The present invention provides an assembled retaining structure connection device, the structure of which is as follows Figure 1-2As shown, it includes multiple supporting piles 1 vertically arranged in the rock and soil body, and at least one horizontally placed steel composite waist beam 3 is arranged along the length direction of the supporting piles 1 on the side of the multiple supporting piles 1 away from the rock and soil body. A plurality of retaining member connectors 2 are evenly penetrated in the gaps of the steel composite waist beams 3. The retaining member connectors 2 are arranged in a one-to-one correspondence with the supporting piles 1, and the other end of the retaining member connector 2 is clamped on the corresponding supporting pile 1. An anchor cable 11 is arranged between two adjacent supporting piles 1, and multiple steel strands 4 are fixed in the anchor cable 11. The other ends of the multiple steel strands 4 pass through the gaps of the steel composite waist beams 3 and are connected with anchors 5.

[0044] like Figure 3-4 As shown, the steel composite waist beam 3 includes two I-shaped steels 10 arranged in parallel with a certain gap, and a plurality of steel gusset plates 7 are welded to the two I-shaped steels 10 along the length direction.

[0045] The upper and lower surfaces of the two I-shaped steels 10 are welded by steel gusset plates 7 .

[0046] like Figure 5-6 As shown, a steel angle pad 6 is also provided between the anchor 5 and the steel composite waist beam 3. A hole 6-1 is opened on the steel angle pad 6 at the gap corresponding to the steel composite waist beam 3. The end of the steel strand 4 away from the rock and soil body passes through the gap of the steel composite waist beam 3 and the hole 6-1 in sequence and is fixed to the anchor 5.

[0047] The steel angle pad 6 is set to a right-angled trapezoidal shape, and the inclined surface of the steel angle pad 6 is away from the steel composite waist beam 3 and is set perpendicular to the steel strand 4.

[0048] A hook 6 - 2 is provided on one side of the steel angle pad 6 close to the section steel composite waist beam 3 , and the hook 6 - 2 is hooked on the section steel composite waist beam 3 .

[0049] like Figure 7 As shown, the retaining member connector 2 includes a curved steel plate 2-2, the lower surface of which is connected to two parallel legs 2-1. The curvature of the curved steel plate 2-2 is adapted to the supporting pile 1, and the two legs 2-1 extend into the gap of the steel composite waist beam 3.

[0050] like Figure 8-11 As shown, a rectangular gap is formed between the two legs 2-1 and the steel composite waist beam 3, and a wedge-shaped steel plate 8 is embedded in the rectangular gap. A reserved hole 12 is provided on the wedge-shaped steel plate 8. The multiple wedge-shaped steel plates 8 embedded in the retaining member connector 2 are connected in sequence into a whole by passing steel wire through the reserved holes 12.

[0051] A steel bracket 9 is further provided on the lower surface of the steel composite waist beam 3 corresponding to the position of the supporting pile 1, and the steel bracket 9 is fixed to the supporting pile 1 by expansion bolts.

[0052] Another technical solution of the present invention is a method for connecting an assembled retaining structure, which uses the above-mentioned assembled retaining structure connection device and is specifically implemented according to the following steps:

[0053] Step 1: After the support piles 1 and anchor cables 11 are constructed and meet the design strength requirements, the steel composite waist beam 3 is placed horizontally at the designed position, the two legs 2-1 of the retaining member connector 2 are inserted into the gap between the two steel sections 10 in the steel composite waist beam 3, and the steel angle pad 6 is hung on the steel composite waist beam 3 through the hook 6-2;

[0054] Step 2: Adjust the positions of the retaining member connector 2 and the steel angle pad 6 so that they are aligned with the support pile 1 and the anchor cable 11 respectively;

[0055] Step 3: Place the wedge-shaped steel plate 8 into and fill the rectangular gap between the two legs 2-1 of the retaining member connector 2 and the steel composite waist beam 3, and connect the wedge-shaped steel plate 8 into a whole with steel wire through the reserved hole 12;

[0056] Step 4: After fixing the steel strand 4 with the anchor 5 through the steel angle pad 6, prestressing the anchor cable 11 is applied by the jack, and the anchor head is locked to complete the tensioning and locking of the anchor cable 11;

[0057] Step 5: Unload the jack and complete the support structure connection.

Claims

1. An assembled retaining structure connection device, characterized in that: The invention comprises a plurality of support piles (1) vertically arranged in a rock and soil body, at least one horizontally placed steel composite waist beam (3) is arranged on one side of the plurality of support piles (1) away from the rock and soil body along the length direction of the support piles (1), a plurality of retaining component connecting pieces (2) are evenly penetrated in the gap of the steel composite waist beam (3), the retaining component connecting pieces (2) are arranged one-to-one with the support piles (1), the other end of the retaining component connecting piece (2) is clamped on the corresponding support pile (1), an anchor cable (11) is arranged between two adjacent support piles (1), a plurality of steel strands (4) are fixed in the anchor cable (11), the other ends of the plurality of steel strands (4) pass through the gap of the steel composite waist beam (3) and are connected to an anchor (5); the steel composite waist beam (3) comprises two I-shaped steels (10) arranged in parallel with a certain gap, and the two I-shaped steels (10) are welded and connected to a plurality of steel tie plates (7) along the length direction; The upper and lower surfaces of the two I-shaped steels (10) are welded via steel tie plates (7); A steel angle pad (6) is also provided between the anchor (5) and the steel composite waist beam (3); a hole (6-1) is provided on the steel angle pad (6) at a position corresponding to the gap of the steel composite waist beam (3); the end of the steel strand (4) away from the rock and soil body passes through the gap of the steel composite waist beam (3) and the hole (6-1) in sequence to connect to the anchor (5); A hook (6-2) is provided on one side of the steel angle pad (6) close to the steel composite waist beam (3), and the hook (6-2) is hooked on the steel composite waist beam (3); The retaining element connector (2) comprises an arc-shaped steel plate (2-2), the lower surface of the arc-shaped steel plate (2-2) being connected to two parallel legs (2-1), the curvature of the arc-shaped steel plate (2-2) being adapted to the support pile (1), and the two legs (2-1) extending into the gap of the steel composite waist beam (3); A rectangular gap is formed between the two limbs (2-1) and the steel composite waist beam (3), and a wedge-shaped steel plate (8) is embedded in the rectangular gap. A reserved hole (12) is provided on the wedge-shaped steel plate (8). The plurality of wedge-shaped steel plates (8) embedded in the earth retaining component connector (2) are sequentially connected into a whole by passing steel wires through the reserved holes (12); The connection method is implemented according to the following steps: Step 1: After the support piles (1) and anchor cables (11) are constructed and meet the design strength requirements, the steel composite waist beam (3) is placed horizontally at the design position, the two legs (2-1) of the retaining component connector (2) are inserted into the gap between the two steel sections (10) in the steel composite waist beam (3), and the steel angle pad (6) is hung on the steel composite waist beam (3) through the hook (6-2); Step 2, adjusting the positions of the retaining member connector (2) and the steel angle pad (6) so that they are aligned with the support pile (1) and the anchor cable (11) respectively; Step 3, placing a wedge-shaped steel plate (8) into and filling the rectangular gap between the two legs (2-1) of the retaining member connector (2) and the steel composite waist beam (3), and connecting the wedge-shaped steel plate (8) into a whole by using a steel wire through the reserved hole (12); Step 4, after fixing the steel strand (4) with the anchor (5) through the steel angle pad (6), applying prestress to the anchor cable (11) with the jack, and locking the anchor head, thereby completing the tensioning and locking of the anchor cable (11); Step 5, unload the jack and complete the support structure connection.

2. The assembled retaining structure connection device according to claim 1, characterized in that: The steel angle pad (6) is arranged in a right-angled trapezoidal shape, and the inclined surface of the steel angle pad (6) is away from the steel composite waist beam (3) and is arranged perpendicular to the steel strand (4).

3. The assembled retaining structure connection device according to claim 1, characterized in that: A steel bracket (9) is also provided on the lower surface of the steel composite waist beam (3) at a position corresponding to the support pile (1), and the steel bracket (9) is fixed to the support pile (1) by means of expansion bolts.