A construction method for the upper module of a prefabricated offshore booster station
Through modular prefabricated design and offshore assembly methods, problems such as tight construction schedules and multiple cross-operations in the construction of offshore booster stations are solved, achieving high construction efficiency, low cost and safe construction.
Patent Information
- Application Number
- CN202010325646.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-23
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-04-23
AI Technical Summary
The construction of offshore booster stations has problems such as tight construction schedule, many cross-cutting operations, long construction period, large area, high cost and unsafety.
It adopts a modular prefabricated design and is divided into a jacket, the first deck and the second deck. Each electrical equipment room is connected through T-shaped hooks and the main lifting load-bearing column. The cable connection is modular. The modules are pre-assembled at the dock and assembled at sea. , Reduce cross-work and construction period.
It achieves short construction period, low management cost, less redundant design, safe construction, improves construction efficiency and sealing, and reduces material usage and platform area.
Smart Images

Figure CN111490485B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an offshore booster station, and in particular to a construction method for an upper assembly block of a prefabricated offshore booster station. Background Art
[0002] Wind power generation is the mainstream industry of clean energy in the international community. It has significant social and environmental benefits and is of great significance to promoting the development of renewable energy in my country. In recent years, the development of wind power has expanded from land to sea. The construction of an offshore wind farm generally includes five major sections: wind farm, cable loop between wind farms, offshore substation, transmission cable, and on-shore control center. The offshore substation is a transit station and key hub for centralized boosting and transmission of wind farm electricity. The offshore substation gathers the most core electrical equipment of the entire wind farm and is also the core of daily manual maintenance and operation.
[0003] The offshore booster station is generally divided into an upper block and an offshore platform steel structure, and is the boost, distribution and control center of the offshore wind farm. The upper block is generally equipped with various electrical equipment such as the main transformer, high and low voltage distribution cabinets, GIS, communication relay equipment, etc., which are used to collect the electricity generated by all offshore wind turbines, boost the voltage through the main transformer, and then send it to the land through a high-voltage submarine cable. The offshore platform steel structure is a facility that fixes the entire upper structure of the offshore booster station on the seabed. In addition to bearing the entire weight of the upper structure, it also needs to withstand external forces such as wind, waves, and currents.
[0004] At present, the construction of offshore substations involves cross-construction of reinforced concrete and electrical modules at sea, with the platform being built while the electrical modules are installed. This has the disadvantages of tight construction period, many cross-operations, long construction period, large construction area, many redundant designs, serious cost waste, and unsafe construction. Summary of the invention
[0005] In order to solve the above technical problems, the present invention provides a prefabricated offshore substation upper assembly and a construction method thereof, which adopts a modular prefabricated substation and has the advantages of short construction period, less cross-operation, low management cost, less redundant design and safe construction.
[0006] To achieve the above object, the technical solution of the present invention is as follows:
[0007] A prefabricated offshore substation upper assembly comprises a first deck and a second deck arranged on a conductor frame, a 35KV distribution room and a screen room are arranged on the left side of the second deck, a main transformer room is arranged in the middle, and a GIS distribution room and an auxiliary equipment room are arranged on the right side, the screen room is located above the 35KV distribution room, and the two are connected by a T-hook, the auxiliary equipment room is located above the GIS distribution room, and the two are connected by a T-hook; the main transformer room and the 35KV distribution room are connected by a 35KV cable, the main transformer room and the GIS distribution room are connected by a 220KV cable, and the 35KV cable and the 220KV cable are both located between the first deck and the second deck.
[0008] In the above scheme, the screen room is composed of the secondary equipment room, emergency power distribution room, secondary battery room, diesel tank room and diesel engine room from left to right.
[0009] In the above scheme, the 35KV distribution room also includes a low-voltage distribution room located between two 35KV distribution rooms.
[0010] In the above scheme, the GIS power distribution room also includes a fire-fighting equipment room and a communication battery room located on the right side of the GIS power distribution room.
[0011] In the above solution, two adjacent cabins are connected by a buckle plate.
[0012] In the above scheme, a HVAC room is set up inside the auxiliary equipment room.
[0013] In the above scheme, a transformer oil collection tank, a domestic waste collection device and a cable fixing device are arranged on the first deck.
[0014] In the above scheme, the tops of the screen room, main transformer room and auxiliary equipment room are at the same height, forming a top deck, and a platform boom, a communication antenna and a lightning rod are installed on the top of the top deck.
[0015] A construction method for a prefabricated offshore booster station upper assembly comprises the following steps:
[0016] (1) First, build the offshore platform steel structure at sea and install the jacket on the offshore platform steel structure;
[0017] (2) Assembling the upper modules of the offshore substation at the dock, including building the first deck, installing the transformer oil collection tank, domestic waste collection device and cable fixing device on the first deck, and building the second deck above the first deck through supporting columns;
[0018] (3) Install the prefabricated screen room above the 35KV distribution room, install the prefabricated auxiliary equipment room above the GIS distribution room, connect the above modules together through T-hooks and main load-bearing columns, and then hoist the above modules and the main transformer room to the second deck, with the main transformer room located in the middle;
[0019] (4) The tops of the screen room, main transformer room and auxiliary equipment room are at the same height, forming the top deck, and then the platform boom, communication antenna and lightning rod are installed on the top deck;
[0020] (5) After installation, use 35kV cable to connect the 35kV distribution room and the main transformer room together, use 220kV cable to connect the GIS distribution room and the main transformer room together, and at the same time connect the primary and secondary lines that need to be connected between each module together.
[0021] Through the above technical solution, the prefabricated offshore booster station upper assembly and the construction method thereof provided by the present invention have the following beneficial effects:
[0022] 1. The present invention divides the offshore boost substation into various functional modules according to the functions, so that the upper structure of the offshore boost substation has clearer functional division, more reasonable layout and more compact structure. This design not only saves construction materials, but also makes the upper structure of the offshore boost substation platform smaller, which is convenient for the transportation and installation of the upper structure of the offshore boost substation platform;
[0023] 2. In the present invention, the electrical modules are prefabricated in a modular factory, and the platform steel structure modules are constructed at sea. The two construction processes do not interfere with each other. When each is completed, they are integrated and assembled. This construction method effectively reduces cross-operation, shortens the construction period, improves construction efficiency, and reduces the difficulty of on-site construction management;
[0024] 3. The present invention adopts a modular design, each module is formed separately, and the painting operation is carried out in the factory. This method can not only play the role of environmental protection, but also has a good anti-corrosion effect in places with high anti-corrosion requirements such as marine environments;
[0025] 4. In the present invention, corresponding mechanical and electrical interfaces are reserved between each module, so that the installation of the module is highly flexible and the installation and adjustment of the module are extremely convenient;
[0026] 5. In the present invention, single system debugging and troubleshooting of electrical modules before delivery can be realized, thus minimizing the workload of on-site debugging;
[0027] 6. In the present invention, the factory prefabrication of the booster station module optimizes the deck structure of the offshore platform, reduces the construction area of the deck, reduces redundant design of the offshore platform, and saves the cost of offshore platform construction;
[0028] 7. In the present invention, the joints between the modules are formed with gusset plates to form a maze structure, which can achieve a good sealing effect;
[0029] 8. In the present invention, each cabin can be hoisted from the top, and the upper and lower cabins are connected and fixed by T-hooks and the main load-bearing columns of the hoisting, so that the upper and lower modules can be firmly connected into a whole, thereby realizing the overall hoisting of the offshore substation and the overall hoisting of multi-layer cabins, thereby saving hoisting man-hours. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art are briefly introduced below.
[0031] Figure 1 This is a schematic diagram of the overall structure of an upper assembly of a prefabricated offshore booster station disclosed in an embodiment of the present invention;
[0032] Figure 2 This is a schematic diagram of the screen room structure disclosed in an embodiment of the present invention;
[0033] Figure 3 This is a schematic diagram of the structure of a 35KV power distribution room disclosed in an embodiment of the present invention;
[0034] Figure 4 This is a schematic diagram of the structure of a GIS power distribution room disclosed in an embodiment of the present invention;
[0035] Figure 5 A schematic diagram of the structure of the auxiliary equipment room disclosed in an embodiment of the present invention;
[0036] Figure 6 for Figure 1 Schematic diagram of the cross section of the AA part;
[0037] Figure 7 for Figure 2 The enlarged schematic diagram of part A in the middle;
[0038] Figure 8 This is a schematic diagram of the overall lifting;
[0039] Fig. 9 for Figure 8 Enlarged view of part B Figure 1 ;
[0040] Fig.10 for Figure 8Enlarged view of part B Figure 2 .
[0041] In the figure, 1. conductor rack; 2. first deck; 3. second deck; 4. top deck; 5. 35KV power distribution room; 6. screen room; 7. main transformer room; 8. GIS power distribution room; 9. auxiliary equipment room; 10. T-hook; 11. 35KV cable; 12. 220KV cable; 13. secondary equipment room; 14. emergency power distribution room; 15. secondary battery room; 16. diesel tank room; 17. diesel engine room; 18. low voltage distribution room Electric room; 19. Fire-fighting equipment room; 20. Communication battery room; 21. HVAC room; 22. Transformer oil collection tank; 23. Domestic waste collection device; 24. Cable fixing device; 25. Platform boom; 26. Communication antenna; 27. Lightning rod; 28. Main load-bearing column for lifting; 29. Main load-bearing column for upper prefabricated cabin; 30. Female head; 31. Main load-bearing column for lower prefabricated cabin; 32. Male head; 33. Steel pin; 34. Clamp plate; 35. Lifting equipment. DETAILED DESCRIPTION
[0042] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0043] The present invention provides a prefabricated offshore booster station upper assembly, such as Figure 1 As shown, it includes a first deck 2 and a second deck 3 arranged on a conductor frame 1, a 35KV distribution room 5 and a screen room 6 are arranged on the left side of the second deck 3, a main transformer room 7 is arranged in the middle, and a GIS distribution room 8 and an auxiliary equipment room 9 are arranged on the right side. The screen room 6 is located above the 35KV distribution room 5, as shown in FIG. Figure 6 As shown, the two are connected by a T-hook 10, the auxiliary equipment room 9 is located above the GIS distribution room 8, and the two are connected by a T-hook 10; the main transformer room 7 and the 35KV distribution room 5 are connected by a 35KV cable 11, and the main transformer room 7 and the GIS distribution room 8 are connected by a 220KV cable 12, and the 35KV cable 11 and the 220KV cable 12 are both located between the first deck 2 and the second deck 3. The tops of the screen room 6, the main transformer room 7 and the auxiliary equipment room 9 are at the same height, forming the top deck 4, and the top of the top deck 4 is equipped with a platform boom 25, a communication antenna 26 and a lightning rod 27.
[0044] In this embodiment, Figure 2 As shown, the screen room 6 includes the secondary equipment room 13, the emergency power distribution room 14, the secondary battery room 15, the diesel tank room 16 and the diesel engine room 17 from left to right. Figure 3 As shown, the 35KV distribution room 5 also includes a low voltage distribution room 18 located between the two 35KV distribution rooms 5. Figure 4As shown, the GIS power distribution room 8 also includes a fire equipment room 19 and a communication battery room 20 located on the right side of the GIS power distribution room 8. Figure 7 As shown, two adjacent compartments are connected by a buckle plate 34 to form a circular maze structure, thereby increasing the sealing performance of the connection.
[0045] like Figure 5 As shown, a HVAC room 21 is arranged inside the auxiliary equipment room 9 .
[0046] A transformer oil collection tank 22 , a domestic waste collection device 23 and a cable fixing device 24 are arranged on the first deck 2 .
[0047] A construction method for a prefabricated offshore booster station upper assembly comprises the following steps:
[0048] (1) First, an offshore platform steel structure is constructed offshore, and a jacket 1 is installed on the offshore platform steel structure;
[0049] (2) Assembling the upper modules of the offshore substation at the dock, including constructing the first deck 2, installing a transformer oil collection tank 22, a domestic waste collection device 23 and a cable fixing device 24 on the first deck 2, and constructing a second deck 3 above the first deck 2 through support columns 25;
[0050] (3) Install the prefabricated screen room 6 above the 35KV distribution room 5 using the hanger 35, and install the prefabricated auxiliary equipment room 9 above the GIS distribution room 8 using the hanger 35, as shown in the figure. Figure 8 and Fig. 9 and Fig.10 As shown, the modules are connected together by T-hook 10 and main load-bearing column 28, and then the modules and main transformer room 7 are hoisted to the second deck 3, with the main transformer room 7 located in the middle;
[0051] (4) The tops of the screen room 6, the main transformer room 7 and the auxiliary equipment room 9 are at the same height, forming the top deck 4, and then the platform boom 25, the communication antenna 26 and the lightning rod 27 are installed on the top deck 4;
[0052] (5) After installation, use 35kV cable 11 to connect the 35kV distribution room 5 and the main transformer room 7 together, use 220kV cable 12 to connect the GIS distribution room 8 and the main transformer room 7 together, and at the same time connect the primary and secondary lines that need to be connected between the modules together.
[0053] The structure of the main load-bearing column 28 at the middle connection is as follows: Fig. 9As shown, a female head 30 is integrated inside the main load-bearing column 29 of the upper prefabricated cabin, and a male head 32 is integrated inside the main load-bearing column 31 of the lower prefabricated cabin. The male head 32 has a guiding function in position, and the male head 32 can be used as a hanging point for a single-layer prefabricated cabin. The male head 32 and the female head 30 are connected through a steel pin 33, and are welded to the main load-bearing column for hoisting after assembly.
[0054] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A construction method for the upper module of a prefabricated offshore booster station, characterized in that: The upper module of the prefabricated offshore substation includes the first deck and the second deck arranged on the conductor frame. The left side of the second deck is provided with a 35KV distribution room and a screen room, the middle is provided with a main transformer room, and the right side is provided with a GIS distribution room and an auxiliary equipment room. The screen room is located above the 35KV distribution room, and the two are connected by a T-hook. The auxiliary equipment room is located above the GIS distribution room, and the two are connected by a T-hook. The main transformer room and the 35KV distribution room are connected by a 35KV cable, and the main transformer room and the GIS distribution room are connected by a 220KV cable. The 35KV cable and the 220KV cable are both located between the first deck and the second deck. The screen room is composed of secondary equipment room, emergency power distribution room, secondary battery room, diesel tank room and diesel engine room from left to right; the 35KV power distribution room also includes a low-voltage power distribution room located between two 35KV power distribution rooms; the GIS power distribution room also includes a fire equipment room and a communication battery room located on the right side of the GIS power distribution room; two adjacent compartments are connected by buckle plates; The construction method includes the following steps: (1) First, build the offshore platform steel structure at sea and install the jacket on the offshore platform steel structure; (2) Assembling the upper modules of the offshore substation at the dock, including building the first deck, installing the transformer oil collection tank, domestic waste collection device and cable fixing device on the first deck, and building the second deck above the first deck through supporting columns; (3) Install the prefabricated screen room above the 35KV distribution room, install the prefabricated auxiliary equipment room above the GIS distribution room, connect the above modules together through T-hooks and main load-bearing columns, and then hoist the above modules and the main transformer room to the second deck, with the main transformer room located in the middle; (4) The tops of the screen room, main transformer room and auxiliary equipment room are at the same height, forming the top deck, and then the platform boom, communication antenna and lightning rod are installed on the top deck; (5) After installation, use 35kV cable to connect the 35kV distribution room and the main transformer room together, use 220kV cable to connect the GIS distribution room and the main transformer room together, and at the same time connect the primary and secondary lines that need to be connected between each module together.
2. The construction method of the upper module of a prefabricated offshore booster station according to claim 1 is characterized in that: A heating and ventilation room is arranged inside the auxiliary equipment room.
3. The construction method of the upper module of a prefabricated offshore booster station according to claim 1 is characterized in that: The first deck is provided with a transformer oil collection tank, a domestic waste collection device and a cable fixing device.
4. The construction method of the upper module of a prefabricated offshore booster station according to claim 1 is characterized in that: The tops of the screen room, main transformer room and auxiliary equipment room are at the same height, forming a top deck, and a platform boom, a communication antenna and a lightning rod are installed on the top of the top deck.